81 FR 1412 - Mill and Main Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 7 (January 12, 2016)

Page Range1412-1412
FR Document2016-00401

Federal Register, Volume 81 Issue 7 (Tuesday, January 12, 2016)
[Federal Register Volume 81, Number 7 (Tuesday, January 12, 2016)]
[Notices]
[Page 1412]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-00401]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14722-000]


Mill and Main Hydroelectric Project; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On October 16, 2015, AS Clock Tower Owner, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the Mill 
and Main Hydroelectric Project (Mill and Main Project) to be located on 
the Assabet River, near Maynard, Middlesex County, Massachusetts. The 
sole purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of: (1) The existing 9.5-foot-
high, 170-foot-long granite block Ben Smith dam; (2) the existing 
18.75-acre Ben Smith dam impoundment with a storage capacity of 475 
acre-feet and a normal water surface elevation of 177 feet above mean 
sea level (msl); (3) an existing 1,600-foot-long power canal leading to 
an existing gatehouse at the upstream end of the existing 18.3-acre 
Mill Pond impoundment with a storage capacity of 130 acre-feet and a 
normal water surface elevation of 176 feet msl; (4) the existing 
masonry Mill Pond dam; (5) an existing 7-foot-diameter, 49-foot-long 
penstock; (6) an existing masonry powerhouse containing one turbine-
generator unit with an installed capacity of 290-kilowatts; (7) two 
300-foot-long masonry tailraces; (8) an existing 480-volt transmission 
line and a 13.8 kV step-up transformer to interconnect the project with 
the Clock Tower Place; and (9) appurtenant facilities. The estimated 
annual generation of the Mill and Main Project would be about 1,241 
megawatt-hours. The existing Ben Smith and Mill dams and appurtenant 
works are owned by AS Clock Tower Owner, LLC.
    Applicant Contact: Mr. Kurt W. Saraceno, AS Clock Tower Owner, LLC, 
c/o Saracen Properties. 41 Seyon Street, Suite 200, Waltham, MA 02453; 
phone: (781) 250-8000 x2710.
    FERC Contact: Patrick Crile; phone: (202) 502-8042 or email: 
[email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14722-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14722) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 6, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00401 Filed 1-11-16; 8:45 am]
BILLING CODE 6717-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 1412 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR