81_FR_18662 81 FR 18600 - Notice of Intent To Prepare a Draft Integrated Feasibility Report Including Environmental Impact Statement/Environmental Impact Report (Integrated Feasibility Report) for the East San Pedro Bay Ecosystem Restoration Feasibility Study, Los Angeles County, CA

81 FR 18600 - Notice of Intent To Prepare a Draft Integrated Feasibility Report Including Environmental Impact Statement/Environmental Impact Report (Integrated Feasibility Report) for the East San Pedro Bay Ecosystem Restoration Feasibility Study, Los Angeles County, CA

DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers

Federal Register Volume 81, Issue 62 (March 31, 2016)

Page Range18600-18601
FR Document2016-07284

The Los Angeles District of the U.S. Army Corps of Engineers (Corps) and the City of Long Beach intend to prepare a draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the East San Pedro Bay Ecosystem Restoration Feasibility Study, Los Angeles County, California. The components of the EIS/EIR will be contained in an Integrated Feasibility Report (IFR) that also includes a Feasibility Report.

Federal Register, Volume 81 Issue 62 (Thursday, March 31, 2016)
[Federal Register Volume 81, Number 62 (Thursday, March 31, 2016)]
[Notices]
[Pages 18600-18601]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-07284]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army, Corps of Engineers


Notice of Intent To Prepare a Draft Integrated Feasibility Report 
Including Environmental Impact Statement/Environmental Impact Report 
(Integrated Feasibility Report) for the East San Pedro Bay Ecosystem 
Restoration Feasibility Study, Los Angeles County, CA

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

[[Page 18601]]


ACTION: Notice of Intent.

-----------------------------------------------------------------------

SUMMARY: The Los Angeles District of the U.S. Army Corps of Engineers 
(Corps) and the City of Long Beach intend to prepare a draft 
Environmental Impact Statement/Environmental Impact Report (EIS/EIR) 
for the East San Pedro Bay Ecosystem Restoration Feasibility Study, Los 
Angeles County, California. The components of the EIS/EIR will be 
contained in an Integrated Feasibility Report (IFR) that also includes 
a Feasibility Report.

DATES: Two public scoping meetings will be held on April 7, 2016, at 
2:00 p.m. and at 6:00 p.m. Submit written comments concerning this 
notice no later than May 7, 2016.

ADDRESSES: The location for the scoping meetings is: Bixby Park 
Community Center, 130 Cherry Avenue, Long Beach, CA 90802.
    Mail written comments, suggestions, and/or request to be placed on 
the mailing list for announcements to: Naeem A. Siddiqui, U.S. Army 
Corps of Engineers, Los Angeles District, CESPL-PDR-N, 915 Wilshire 
Blvd., Los Angeles, CA 90017-3401 or by email to: 
[email protected].

FOR FURTHER INFORMATION CONTACT: Naeem A. Siddiqui, Project 
Environmental Coordinator, 213-452-3852, 
[email protected].

SUPPLEMENTARY INFORMATION: The Feasibility Study is being conducted as 
a partial response to Senate Resolution, dated June 25, 1969, reading 
in part:

    Resolved by the Committee on Public Works of the United States 
Senate, that the Board of Engineers for Rivers and Harbors, created 
under Section 3 of the River and Harbor Act, approved June 13, 1902, 
be, and is hereby requested to review the report of the Chief of 
Engineers on the Los Angeles and San Gabriel Rivers and Ballona 
Creek, California, published as House Document Numbered 838, 
Seventy-sixth Congress, and other pertinent reports, with a view to 
determining whether any modifications contained herein are advisable 
at the present time, in the resources in the Los Angeles County 
Drainage Area. . . .

    The study area is located offshore of the City of Long Beach, 
California, in the easternmost part of San Pedro Bay. It includes the 
area between the Long Beach shoreline, the Long Beach Breakwater and 
the Los Angeles River estuary.
    The Corps is the lead agency in preparing the EIS in accordance 
with the National Environmental Policy Act (NEPA). The City of Long 
Beach is the non-Federal sponsor of the Feasibility Study and the lead 
agency in preparing the EIR in accordance with the California 
Environmental Quality Act. The Corps and City of Long Beach have agreed 
to jointly prepare an IFR including EIS/EIR to optimize efficiency and 
avoid duplication.
    1. Description. The study will evaluate opportunities to restore 
aquatic habitat such as kelp, rocky reef, coastal wetlands and other 
types of sufficient quality and quantity to support diverse resident 
and migratory species, and to improve water circulation sufficient to 
support and sustain aquatic habitat, within East San Pedro Bay, 
California. Recreational opportunities will also be explored, although 
the primary objective will be ecosystem restoration.
    The Corps completed a Reconnaissance Report in August 2010 which 
identified a federal interest in addressing issues such as loss of 
historic coastal wetlands, lack of rocky reef/hard bottom habitat, loss 
of kelp habitat, poor water circulation and tidal action, and other 
degraded ecosystem conditions. The study is now entering the 
feasibility phase in which alternatives will be developed, a 
tentatively selected plan and ultimately a proposed project will be 
identified, and environmental documentation will be completed.
    2. Alternatives. Potential measures that would meet the objectives 
of the study are currently being developed and may include the addition 
of rocks out side of navigational channels to create underwater rocky 
reef and form a base for kelp beds; creation of sandy islands to 
provide suitable habitat for eelgrass; and various modifications to the 
Long Beach Breakwater such as removal and/or notching to improve water 
circulation. Measures will be grouped into discrete alternatives and 
analyzed in the IFR. In addition, the study will also evaluate the No 
Action alternative pursuant to NEPA.
    3. Scoping and Analysis. a. The Corps intends to hold a public 
scoping meeting for the Draft IFR to aid in the determination of 
significant environmental issues associated with the proposed project, 
and to assist with alternative development. Affected federal, state and 
local resource agencies, Native American groups and concerned interest 
groups/individuals are invited to participate in the scoping process. 
Public participation is critical in defining the scope of analysis in 
the Draft IFR, identifying significant environmental issues in the 
Draft IFR, providing useful information such as published and 
unpublished data, sharing knowledge about relevant issues, and 
recommending potential measures or alternatives that may be considered 
for the purpose of meeting study objectives.
    b. Potential impacts associated with the proposed project will be 
fully evaluated during the feasibility study. Identified planning 
constraints and considerations such as navigational operations, 
existing major utilities and infrastructure, minimizing flood risks 
will be considered. Resource categories that will be analyzed include: 
Physical environment, geology, biological resources, navigation/land 
use, air quality, water quality, recreational usage, aesthetics, 
cultural resources, transportation, noise, hazardous waste, 
socioeconomics and safety.
    c. Throughout the feasibility study, the Corps and the City of Long 
Beach will coordinate and, or consult with other State and Federal 
regulatory and permitting agencies to ensure compliance with 
environmental laws and regulations including but not limited to the 
Coastal Zone Management Act, Clean Water Act, Endangered Species Act, 
U.S. Fish and Wildlife Coordination Act, Magnuson-Stevens Fishery 
Management and Conservation Act, as amended, National Historic 
Preservation Act, and the Clean Air Act.
    4. Public Scoping Meetings: The Corps and City of Long Beach will 
jointly conduct two public scoping meetings at the date and address 
indicated above. The purpose of the scoping meeting is to gather 
information from the general public or interested organizations about 
issues and concerns that they would like to see addressed in the Draft 
IFR. Comments may be delivered in writing or verbally at the meeting. 
All comments will be entered into the public record.
    5. Availability of the Draft IFR: The Draft IFR including Draft 
EIS/EIR is anticipated to be available for public review and comment in 
the spring or summer of 2017.

    Dated: March 23, 2016.
Kirk E. Gibbs,
Colonel, U.S. Army, Commander and District Engineer.
[FR Doc. 2016-07284 Filed 3-30-16; 8:45 am]
BILLING CODE 3720-58-P



                                                  18600                        Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices

                                                    Non-Major Defense Equipment (Non-                     ViaSat, Carlsbad, CA                                     (e) ALQ–240 Electronic Support
                                                  MDE):                                                   GC Micro, Petaluma, CA                                Measures (ESM). This system provides
                                                  Associated training, training devices,                  Rockwell Collins, Cedar Rapids, IA                    real time capability for the automatic
                                                    and support                                           Spirit Aero, Wichita, KS                              detection, location, measurement, and
                                                                                                          Raytheon, Waltham, MA                                 analysis of Radio-Frequency (RF) signals
                                                    (iv) Military Department: U.S. Navy                   Telephonics, Farmingdale, NY
                                                  (SAN, Basic Aircraft Procurement Case;                                                                        and modes. Real time results are
                                                                                                          Pole Zero, Cincinnati, OH
                                                  LVK, Basic Training Devices Case; TGO,                  Northrop Grumman Corp, Falls Church,                  compared with a library of known
                                                  Basic Training Case)                                      VA                                                  emitters to perform emitter
                                                    (v) Prior Related Cases, if any: UK–P–                Exelis, McLean, VA                                    classification and specific emitter
                                                  FBF, total case value $5.6M,                            Terma, Arlington, VA                                  identification (SEI).
                                                  implemented January 27, 2015.                           Symmetrics, Canada                                       (f) Electronic Warfare Self Protection
                                                    (vi) Sales Commission, Fee. etc., Paid,               Arnprior Aerospace, Canada                            (EWSP). The aircraft EWSP consists of
                                                  Offered, or Agreed to be Paid: None                     General Electric, UK                                  the ALQ–213 Electronic Warfare
                                                    (vii) Sensitivity of Technology                       Martin Baker, UK                                      Management System (EWMS), ALE–47
                                                  Contained in the Defense Article or                       There are no known offset agreements                Countermeasures Dispensing System
                                                  Defense Services Proposed to be Sold:                   proposed in connection with this                      (CMDS), and the AN/AAQ–24
                                                  See attached Annex                                      potential sale.                                       Directional Infrared Countermeasures
                                                    (viii) Date Report Delivered to                         There will be no adverse impact on                  (DIRCM)/AAR–54 Missile Warning
                                                  Congress: 24 March 2016                                 U.S. defense readiness as a result of this            Sensors (MWS). The EWSP includes
                                                    *as defined in Section 47(6) of the                   proposed sale.                                        threat information.
                                                  Arms Export Control Act.                                                                                         3. If a technologically advanced
                                                                                                          Transmittal No. 16–26                                 adversary was to obtain access to the P–
                                                  POLICY JUSTIFICATION
                                                                                                          Notice of Proposed Issuance of Letter of              8A specific hardware and software
                                                  United Kingdom—P–8A Aircraft and                        Offer Pursuant to Section 36(b)(1) of the             elements, systems could be reverse
                                                  Associated Support                                      Arms Export Control Act, as amended                   engineered to discover U.S. Navy
                                                    The Government of the United                          Annex Item No. vii                                    capabilities and tactics. The
                                                  Kingdom (UK) has requested                                                                                    consequences of the loss of this
                                                  notification for the possible                              (vii) Sensitivity of Technology                    technology, to a technologically
                                                  procurement of up to nine (9) P–8A                         1. The P–8A aircraft is a militarized              advanced or competent adversary, could
                                                  Patrol Aircraft, associated major defense               version of the Boeing 737–800 Next                    result in the development of
                                                  equipment, associated training, and                     Generation (NG) commercial aircraft.                  countermeasures or equivalent systems,
                                                  support. The estimated cost is $3.2                     The P–8A is replacing the P–3C as the                 which could reduce system
                                                  billion.                                                Navy’s long-range anti-submarine                      effectiveness or be used in the
                                                    The UK is a close ally and an                         warfare (ASW), anti-surface warfare                   development of a system with similar
                                                  important partner on critical foreign                   (ASuW), intelligence, surveillance, and               advance capabilities.
                                                  policy and defense issues. The proposed                 reconnaissance (ISR) aircraft capable of                 4. A determination has been made
                                                  sale will enhance U.S. foreign policy                   broad-area, maritime and littoral                     that the United Kingdom can provide
                                                  and national security objectives by                     operations.                                           substantially the same degree of
                                                  enhancing the UK’s capabilities to                         2. P–8A mission systems include:                   protection for the technology being
                                                  provide national defense and contribute                    (a) Tactical Open Mission Software
                                                                                                                                                                released as the U.S. Government.
                                                  to NATO and coalition operations.                       (TOMS). TOMS functions include
                                                                                                                                                                Support of the P–8A Patrol Aircraft to
                                                    The proposed sale will allow the UK                   environment planning tactical aids,
                                                                                                                                                                the Government of the United Kingdom
                                                  to reestablish its Maritime Surveillance                weapons planning aids, and data
                                                                                                                                                                is necessary in the furtherance of the
                                                  Aircraft (MSA) capability that it                       correlation. TOMS includes an
                                                                                                                                                                U.S. foreign policy and national security
                                                  divested when it cancelled the Nimrod                   algorithm for track fusion which
                                                                                                                                                                objectives.
                                                  MRA4 Maritime Patrol Aircraft (MPA)                     automatically correlates tracks produced
                                                                                                                                                                   5. All defense articles and services
                                                  program. The United Kingdom has                         by on-board and off-board sensors.
                                                                                                                                                                listed in this transmittal have been
                                                  retained core skills in maritime patrol                    (b) Electro-Optical (EO) and Infrared
                                                                                                                                                                authorized for release and export to the
                                                  and reconnaissance following the                        (IR) MX–20HD. The EO/IR system
                                                                                                                                                                United Kingdom.
                                                  retirement of the Nimrod aircraft                       processes visible EO and IR spectrum to
                                                                                                          detect and image objects.                             [FR Doc. 2016–07267 Filed 3–30–16; 8:45 am]
                                                  through Personnel Exchange Programs
                                                  (PEPs). The MSA has remained the                           (c) AN/AAQ–2(V)1 Acoustic System.                  BILLING CODE 5001–06–P

                                                  United Kingdom’s highest priority                       The Acoustic sensor system is
                                                  unfunded requirement. The P–8A                          integrated within the mission system as
                                                  aircraft would fulfill this requirement.                the primary sensor for the aircraft ASW               DEPARTMENT OF DEFENSE
                                                  The UK will have no difficulty                          missions. The system has multi-static
                                                                                                          active coherent (MAC) 64 sonobuoy                     Department of the Army, Corps of
                                                  absorbing these aircraft into its armed                                                                       Engineers
                                                  forces.                                                 processing capability and acoustic
                                                    The proposed sale of this equipment                   sensor prediction tools.                              Notice of Intent To Prepare a Draft
                                                  and support will not alter the basic                       (d) AN/APY–10 Radar. The aircraft                  Integrated Feasibility Report Including
                                                  military balance in the region.                         radar is a direct derivative of the legacy            Environmental Impact Statement/
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                    The prime contractor involved in this                 AN/APS–137(V) installed in the P–3C.                  Environmental Impact Report
                                                  sale is The Boeing Company, Seattle,                    The radar capabilities include Global                 (Integrated Feasibility Report) for the
                                                  WA. Implementation of the proposed                      Positioning System (GPS), selective                   East San Pedro Bay Ecosystem
                                                  sale will require approximately sixty-                  availability anti-spoofing, Synthetic                 Restoration Feasibility Study, Los
                                                  four (64) personnel hired by Boeing to                  Aperture Radar (SAR), and Inverse                     Angeles County, CA
                                                  support the program in the United                       Synthetic Aperture Radar (ISAR)
                                                  Kingdom. Additional contractors                         imagery resolutions, and periscope                    AGENCY:Department of the Army, U.S.
                                                  include:                                                detection mode.                                       Army Corps of Engineers, DoD.


                                             VerDate Sep<11>2014   19:09 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1


                                                                               Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices                                                  18601

                                                  ACTION:   Notice of Intent.                             California Environmental Quality Act.                    b. Potential impacts associated with
                                                                                                          The Corps and City of Long Beach have                 the proposed project will be fully
                                                  SUMMARY:    The Los Angeles District of                 agreed to jointly prepare an IFR                      evaluated during the feasibility study.
                                                  the U.S. Army Corps of Engineers                        including EIS/EIR to optimize efficiency              Identified planning constraints and
                                                  (Corps) and the City of Long Beach                      and avoid duplication.                                considerations such as navigational
                                                  intend to prepare a draft Environmental                    1. Description. The study will                     operations, existing major utilities and
                                                  Impact Statement/Environmental                          evaluate opportunities to restore aquatic             infrastructure, minimizing flood risks
                                                  Impact Report (EIS/EIR) for the East San                habitat such as kelp, rocky reef, coastal             will be considered. Resource categories
                                                  Pedro Bay Ecosystem Restoration                         wetlands and other types of sufficient                that will be analyzed include: Physical
                                                  Feasibility Study, Los Angeles County,                  quality and quantity to support diverse               environment, geology, biological
                                                  California. The components of the EIS/                  resident and migratory species, and to                resources, navigation/land use, air
                                                  EIR will be contained in an Integrated                  improve water circulation sufficient to               quality, water quality, recreational
                                                  Feasibility Report (IFR) that also                      support and sustain aquatic habitat,                  usage, aesthetics, cultural resources,
                                                  includes a Feasibility Report.                          within East San Pedro Bay, California.                transportation, noise, hazardous waste,
                                                  DATES: Two public scoping meetings                      Recreational opportunities will also be               socioeconomics and safety.
                                                  will be held on April 7, 2016, at 2:00                  explored, although the primary                           c. Throughout the feasibility study,
                                                  p.m. and at 6:00 p.m. Submit written                    objective will be ecosystem restoration.              the Corps and the City of Long Beach
                                                  comments concerning this notice no                         The Corps completed a                              will coordinate and, or consult with
                                                  later than May 7, 2016.                                 Reconnaissance Report in August 2010                  other State and Federal regulatory and
                                                  ADDRESSES: The location for the scoping                 which identified a federal interest in                permitting agencies to ensure
                                                  meetings is: Bixby Park Community                       addressing issues such as loss of historic            compliance with environmental laws
                                                  Center, 130 Cherry Avenue, Long Beach,                  coastal wetlands, lack of rocky reef/hard             and regulations including but not
                                                  CA 90802.                                               bottom habitat, loss of kelp habitat, poor            limited to the Coastal Zone Management
                                                     Mail written comments, suggestions,                  water circulation and tidal action, and               Act, Clean Water Act, Endangered
                                                  and/or request to be placed on the                      other degraded ecosystem conditions.                  Species Act, U.S. Fish and Wildlife
                                                  mailing list for announcements to:                      The study is now entering the feasibility             Coordination Act, Magnuson-Stevens
                                                  Naeem A. Siddiqui, U.S. Army Corps of                   phase in which alternatives will be                   Fishery Management and Conservation
                                                  Engineers, Los Angeles District, CESPL–                 developed, a tentatively selected plan                Act, as amended, National Historic
                                                  PDR–N, 915 Wilshire Blvd., Los                          and ultimately a proposed project will                Preservation Act, and the Clean Air Act.
                                                  Angeles, CA 90017–3401 or by email to:                  be identified, and environmental                         4. Public Scoping Meetings: The
                                                  Naeem.A.Siddiqui@usace.army.mil.                        documentation will be completed.                      Corps and City of Long Beach will
                                                  FOR FURTHER INFORMATION CONTACT:
                                                                                                             2. Alternatives. Potential measures                jointly conduct two public scoping
                                                  Naeem A. Siddiqui, Project                              that would meet the objectives of the
                                                                                                                                                                meetings at the date and address
                                                                                                          study are currently being developed and
                                                  Environmental Coordinator, 213–452–                                                                           indicated above. The purpose of the
                                                                                                          may include the addition of rocks out
                                                  3852, Naeem.A.Siddiqui@                                                                                       scoping meeting is to gather information
                                                                                                          side of navigational channels to create
                                                  usace.army.mil.                                                                                               from the general public or interested
                                                                                                          underwater rocky reef and form a base
                                                  SUPPLEMENTARY INFORMATION: The                                                                                organizations about issues and concerns
                                                                                                          for kelp beds; creation of sandy islands
                                                  Feasibility Study is being conducted as                                                                       that they would like to see addressed in
                                                                                                          to provide suitable habitat for eelgrass;
                                                  a partial response to Senate Resolution,                                                                      the Draft IFR. Comments may be
                                                                                                          and various modifications to the Long
                                                  dated June 25, 1969, reading in part:                                                                         delivered in writing or verbally at the
                                                                                                          Beach Breakwater such as removal and/
                                                                                                                                                                meeting. All comments will be entered
                                                     Resolved by the Committee on Public                  or notching to improve water
                                                                                                          circulation. Measures will be grouped                 into the public record.
                                                  Works of the United States Senate, that the
                                                  Board of Engineers for Rivers and Harbors,                                                                       5. Availability of the Draft IFR: The
                                                                                                          into discrete alternatives and analyzed
                                                  created under Section 3 of the River and                                                                      Draft IFR including Draft EIS/EIR is
                                                                                                          in the IFR. In addition, the study will
                                                  Harbor Act, approved June 13, 1902, be, and             also evaluate the No Action alternative               anticipated to be available for public
                                                  is hereby requested to review the report of the         pursuant to NEPA.                                     review and comment in the spring or
                                                  Chief of Engineers on the Los Angeles and
                                                                                                             3. Scoping and Analysis. a. The Corps              summer of 2017.
                                                  San Gabriel Rivers and Ballona Creek,
                                                  California, published as House Document                 intends to hold a public scoping                        Dated: March 23, 2016.
                                                  Numbered 838, Seventy-sixth Congress, and               meeting for the Draft IFR to aid in the               Kirk E. Gibbs,
                                                  other pertinent reports, with a view to                 determination of significant                          Colonel, U.S. Army, Commander and District
                                                  determining whether any modifications                   environmental issues associated with                  Engineer.
                                                  contained herein are advisable at the present           the proposed project, and to assist with              [FR Doc. 2016–07284 Filed 3–30–16; 8:45 am]
                                                  time, in the resources in the Los Angeles               alternative development. Affected                     BILLING CODE 3720–58–P
                                                  County Drainage Area. . . .                             federal, state and local resource
                                                     The study area is located offshore of                agencies, Native American groups and
                                                  the City of Long Beach, California, in                  concerned interest groups/individuals                 DEPARTMENT OF DEFENSE
                                                  the easternmost part of San Pedro Bay.                  are invited to participate in the scoping
                                                  It includes the area between the Long                   process. Public participation is critical             Department of the Army; Corps of
                                                  Beach shoreline, the Long Beach                         in defining the scope of analysis in the              Engineers
                                                  Breakwater and the Los Angeles River                    Draft IFR, identifying significant
                                                                                                                                                                Intent To Prepare a Draft
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  estuary.                                                environmental issues in the Draft IFR,
                                                     The Corps is the lead agency in                      providing useful information such as                  Environmental Impact Statement for
                                                  preparing the EIS in accordance with                    published and unpublished data,                       The Coastal Texas Protection and
                                                  the National Environmental Policy Act                   sharing knowledge about relevant                      Restoration Feasibility Study
                                                  (NEPA). The City of Long Beach is the                   issues, and recommending potential                    AGENCY: Department of the Army, U.S.
                                                  non-Federal sponsor of the Feasibility                  measures or alternatives that may be                  Army Corps of Engineers, DoD.
                                                  Study and the lead agency in preparing                  considered for the purpose of meeting
                                                                                                                                                                ACTION: Notice of Intent.
                                                  the EIR in accordance with the                          study objectives.


                                             VerDate Sep<11>2014   19:09 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1



Document Created: 2016-03-31 00:56:01
Document Modified: 2016-03-31 00:56:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Intent.
DatesTwo public scoping meetings will be held on April 7, 2016, at 2:00 p.m. and at 6:00 p.m. Submit written comments concerning this notice no later than May 7, 2016.
ContactNaeem A. Siddiqui, Project Environmental Coordinator, 213-452-3852, [email protected]
FR Citation81 FR 18600 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR