81_FR_18674 81 FR 18612 - Golden Pass Products, LLC and Golden Pass Pipeline, LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Golden Pass LNG Export Project

81 FR 18612 - Golden Pass Products, LLC and Golden Pass Pipeline, LLC; Notice of Availability of the Draft Environmental Impact Statement for the Proposed Golden Pass LNG Export Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 62 (March 31, 2016)

Page Range18612-18614
FR Document2016-07260

Federal Register, Volume 81 Issue 62 (Thursday, March 31, 2016)
[Federal Register Volume 81, Number 62 (Thursday, March 31, 2016)]
[Notices]
[Pages 18612-18614]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-07260]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP14-517-000; CP14-518-000]


Golden Pass Products, LLC and Golden Pass Pipeline, LLC; Notice 
of Availability of the Draft Environmental Impact Statement for the 
Proposed Golden Pass LNG Export Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared a draft environmental impact statement (EIS) 
for the Golden Pass Liquefied Natural Gas (LNG) Export Project, 
proposed by Golden Pass Products, LLC and Golden Pass Pipeline, LLC 
(collectively referred to as Golden Pass) in the above-referenced 
docket. Golden Pass requests authorization to expand and modify the 
existing Golden Pass LNG Import Terminal to allow the export of LNG, 
which would require construction and operation of various liquefaction, 
LNG distribution, and appurtenant facilities. The Project would also 
include construction of approximately 2.6 miles of 24-inch pipeline, 
three new compressor stations, and interconnections for bi-directional 
transport of natural gas to and from the Golden Pass LNG Export 
terminal.
    The draft EIS assesses the potential environmental effects of the 
construction and operation of the Golden Pass LNG Export Project in 
accordance with the requirements of the National Environmental Policy 
Act (NEPA). The FERC staff concludes that approval of the proposed 
project, with the mitigation measures recommended in the EIS, would 
result in some adverse environmental impact; however, those impacts 
would not be significant with

[[Page 18613]]

implementation of Golden Pass' proposed mitigation and the additional 
measures recommended in the draft EIS.
    The U.S. Army Corps of Engineers, U.S. Coast Guard (Coast Guard), 
U.S. Department of Energy, U.S. Department of Transportation, and U.S. 
Environmental Protection Agency participated as cooperating agencies in 
the preparation of the EIS. Cooperating agencies have jurisdiction by 
law or special expertise with respect to resources potentially affected 
by the proposal and participate in the NEPA analysis. Although the 
cooperating agencies provided input to the conclusions and 
recommendations presented in the draft EIS, the agencies will present 
their own conclusions and recommendations in their respective Records 
of Decision for the project.
    The draft EIS addresses the potential environmental effects of the 
construction and operation of the following project facilities:
     Liquefaction facilities at the existing Golden Pass Export 
Terminal including three liquefaction trains, a truck unloading 
facility, refrigerant and condensate storage, safety and control 
systems, and associated infrastructure;
     a supply dock and alternate marine delivery facilities at 
the Terminal;
     three miles of a new 24-inch-diameter pipeline loop \1\ 
adjacent to the existing Golden Pass pipeline;
---------------------------------------------------------------------------

    \1\ A loop is a segment of pipe that is installed adjacent to an 
existing pipeline and connected to it at both ends. A loop generally 
allows more gas to move through the system.
---------------------------------------------------------------------------

     three new compressor stations;
     five new pipeline interconnections and modifications at 
existing pipeline interconnections; and
     miscellaneous appurtenant facilities.
    The FERC staff mailed copies of the draft EIS to federal, state, 
and local government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners and other interested individuals and 
groups; newspapers and libraries in the project area; and parties to 
this proceeding. Paper copy versions of this EIS were mailed to those 
specifically requesting them; all others received a CD version. In 
addition, the draft EIS is available for public viewing on the FERC's 
Web site (www.ferc.gov) using the eLibrary link. A limited number of 
copies are available for distribution and public inspection at: Federal 
Energy Regulatory Commission, Public Reference Room, 888 First Street 
NE., Room 2A, Washington, DC 20426, (202) 502-8371.
    Any person wishing to comment on the draft EIS may do so. To ensure 
consideration of your comments on the proposal in the final EIS, it is 
important that the Commission receive your comments on or before May 
16, 2016.
    For your convenience, there are four methods you can use to submit 
your comments to the Commission. The Commission will provide equal 
consideration to all comments received, whether filed in written form 
or provided verbally. The Commission encourages electronic filing of 
comments and has expert staff available to assist you at (202) 502-8258 
or [email protected]. Please carefully follow these instructions so that 
your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP14-517-000 or CP14-518-000) with your submission: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Room 1A, Washington, DC 20426.
    (4) In lieu of sending written or electronic comments, the 
Commission invites you to attend one of the public comment meetings its 
staff will conduct in the project area to receive comments on the draft 
EIS, scheduled as follows:

------------------------------------------------------------------------
               Date and time                          Location
------------------------------------------------------------------------
Wednesday, April 19, 2016, 7:00 p.m.......  VFW Post 4759, 4402 Highway
                                             12, Starks, Louisiana
                                             70661, (337) 743-6409
Thursday, April 20, 2016, 7:00 p.m........  Sabine Pass ISD, 5641 South
                                             Gulfway Drive, Sabine Pass,
                                             Texas 77655, (409) 971-2321
------------------------------------------------------------------------

    We will begin our sign up of speakers at 6:30 p.m. The scoping 
meetings will begin at 7:00 p.m. with a description of our 
environmental review process by Commission staff, after which speakers 
will be called. The meetings will end once all speakers have provided 
their comments or at 9:00 p.m., whichever comes first. Please note that 
there may be a time limit of three minutes to present comments, and 
speakers should structure their comments accordingly. If time limits 
are implemented, they will be strictly enforced to ensure that as many 
individuals as possible are given an opportunity to comment. The 
meetings will be recorded by a stenographer to ensure comments are 
accurately recorded. Transcripts will be entered into the formal record 
of the Commission proceeding.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR part 385.214).\2\ Only intervenors have 
the right to seek rehearing of the Commission's decision. The 
Commission grants affected landowners and others with environmental 
concerns intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which no other 
party can adequately represent. Simply filing environmental comments 
will not give you intervenor status, but you do not need intervenor 
status to have your comments considered.
---------------------------------------------------------------------------

    \2\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

Questions?

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP14-
517 or CP14-518). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676; for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription that allows you to keep track of all formal issuances and 
submittals in specific dockets. This can reduce the amount of time you 
spend researching proceedings

[[Page 18614]]

by automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: March 25, 2016.
Nathaniel J. Davis, Sr.,
 Deputy Secretary.
[FR Doc. 2016-07260 Filed 3-30-16; 8:45 am]
BILLING CODE 6717-01-P



                                                  18612                        Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices

                                                  please contact FERC Online Support at                      Comments Due: 5 p.m. ET 4/15/16.                   385.214) on or before 5:00 p.m. Eastern
                                                  FERCOnlineSupport@ferc.gov, (866)                          Docket Numbers: ER16–1270–000.                     time on the specified comment date.
                                                  208–3676 (toll free), or (202) 502–8659                    Applicants: PJM Interconnection,                   Protests may be considered, but
                                                  (TTY). In lieu of electronic filing, please             L.L.C.                                                intervention is necessary to become a
                                                  send a paper copy to: Secretary, Federal                   Description: § 205(d) Rate Filing:                 party to the proceeding.
                                                  Energy Regulatory Commission, 888                       Original Service Agreement No. 4430;                     eFiling is encouraged. More detailed
                                                  First Street NE., Washington, DC 20426.                 Queue Position #AB1–099 to be                         information relating to filing
                                                  The first page of any filing should                     effective 2/24/2016.                                  requirements, interventions, protests,
                                                  include docket number P–14765–000.                         Filed Date: 3/24/16.                               service, and qualifying facilities filings
                                                     More information about this project,                    Accession Number: 20160324–5190.                   can be found at: http://www.ferc.gov/
                                                  including a copy of the application, can                   Comments Due: 5 p.m. ET 4/14/16.                   docs-filing/efiling/filing-req.pdf. For
                                                  be viewed or printed on the ‘‘eLibrary’’                   Docket Numbers: ER16–1271–000.                     other information, call (866) 208–3676
                                                  link of Commission’s Web site at                           Applicants: Midcontinent                           (toll free). For TTY, call (202) 502–8659.
                                                  http://www.ferc.gov/docs-filing/                        Independent System Operator, Inc.                       Dated: March 25, 2016.
                                                  elibrary.asp. Enter the docket number                      Description: § 205(d) Rate Filing:                 Nathaniel J. Davis, Sr.,
                                                  (P–14765) in the docket number field to                 2016–03–25_SA 2907 ATC–ROCKGEN                        Deputy Secretary.
                                                  access the document. For assistance,                    GIA (J382) to be effective 3/26/2016.                 [FR Doc. 2016–07259 Filed 3–30–16; 8:45 am]
                                                  contact FERC Online Support.                               Filed Date: 3/25/16.                               BILLING CODE 6717–01–P
                                                    Dated: March 22, 2016.                                   Accession Number: 20160325–5051.
                                                  Nathaniel J. Davis, Sr.,                                   Comments Due: 5 p.m. ET 4/15/16.
                                                  Deputy Secretary.                                          Docket Numbers: ER16–1272–000.                     DEPARTMENT OF ENERGY
                                                  [FR Doc. 2016–07233 Filed 3–30–16; 8:45 am]                Applicants: Southern California
                                                  BILLING CODE 6717–01–P                                  Edison Company.                                       Federal Energy Regulatory
                                                                                                             Description: § 205(d) Rate Filing: 2016            Commission
                                                                                                          TACBAA Update to be effective
                                                                                                                                                                [Docket Nos. CP14–517–000; CP14–518–
                                                  DEPARTMENT OF ENERGY                                    6/1/2016.                                             000]
                                                                                                             Filed Date: 3/25/16.
                                                  Federal Energy Regulatory                                  Accession Number: 20160325–5082.                   Golden Pass Products, LLC and
                                                  Commission                                                 Comments Due: 5 p.m. ET 4/15/16.                   Golden Pass Pipeline, LLC; Notice of
                                                                                                             Docket Numbers: ER16–1273–000.                     Availability of the Draft Environmental
                                                  Combined Notice of Filings #1
                                                                                                             Applicants: American Electric Power                Impact Statement for the Proposed
                                                     Take notice that the Commission                      Service Corporation, Michigan Electric                Golden Pass LNG Export Project
                                                  received the following electric corporate               Transmission Company, PJM
                                                                                                          Interconnection, L.L.C.                                  The staff of the Federal Energy
                                                  filings:
                                                                                                             Description: § 205(d) Rate Filing: AEP             Regulatory Commission (FERC or
                                                     Docket Numbers: EC16–93–000.                                                                               Commission) has prepared a draft
                                                     Applicants: Atlas Power Finance,                     submits Original Interconnection
                                                                                                          Agreement No. 4251 with METC to be                    environmental impact statement (EIS)
                                                  LLC, Dynegy Inc., Energy Capital                                                                              for the Golden Pass Liquefied Natural
                                                  Partners III, LLC, GDF Suez Energy                      effective 3/25/2016.
                                                                                                             Filed Date: 3/25/16.                               Gas (LNG) Export Project, proposed by
                                                  North America, Inc.                                                                                           Golden Pass Products, LLC and Golden
                                                     Description: Joint Application for                      Accession Number: 20160325–5088.
                                                                                                             Comments Due: 5 p.m. ET 4/15/16.                   Pass Pipeline, LLC (collectively referred
                                                  Authorization under FPA Section 203 of                                                                        to as Golden Pass) in the above-
                                                  Atlas Power Finance, LLC, Dynegy Inc.,                     Docket Numbers: ER16–1274–000.                     referenced docket. Golden Pass requests
                                                  Energy Capital Partners III, LLC, and                      Applicants: Verso Androscoggin                     authorization to expand and modify the
                                                  GDF SUEZ Energy North America, Inc.                     Power LLC.                                            existing Golden Pass LNG Import
                                                     Filed Date: 5/24/16.                                    Description: Notice of Cancellation of             Terminal to allow the export of LNG,
                                                     Accession Number: 20160325–5113.                     Market-Based Rate Tariff of Verso                     which would require construction and
                                                     Comments Due: 5 p.m. ET 4/15/16.                     Androscoggin Power LLC.                               operation of various liquefaction, LNG
                                                     Docket Numbers: EC16–94–000.                            Filed Date: 3/25/16.                               distribution, and appurtenant facilities.
                                                     Applicants: Dynegy Inc., Energy                         Accession Number: 20160325–5145.                   The Project would also include
                                                  Capital Partners III, LLC.                                 Comments Due: 5 p.m. ET 4/15/16.                   construction of approximately 2.6 miles
                                                     Description: Joint Application under                    Docket Numbers: ER16–1275–000.                     of 24-inch pipeline, three new
                                                  FPA Section 203 of Dynegy Inc. and                         Applicants: Innovative Solar 46, LLC.              compressor stations, and
                                                  Energy Capital Partners III, LLC.                          Description: Baseline eTariff Filing:              interconnections for bi-directional
                                                     Filed Date: 5/24/16.                                 Baseline Tariff to be effective                       transport of natural gas to and from the
                                                     Accession Number: 20160325–5131.                     12/31/9998.                                           Golden Pass LNG Export terminal.
                                                     Comments Due: 5 p.m. ET 4/15/16.                        Filed Date: 3/25/16.                                  The draft EIS assesses the potential
                                                     Take notice that the Commission                         Accession Number: 20160325–5192.                   environmental effects of the
                                                  received the following electric rate                       Comments Due: 5 p.m. ET 4/15/16.                   construction and operation of the
                                                  filings:                                                   The filings are accessible in the                  Golden Pass LNG Export Project in
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                     Docket Numbers: ER16–770–001.                        Commission’s eLibrary system by                       accordance with the requirements of the
                                                     Applicants: Midcontinent                             clicking on the links or querying the                 National Environmental Policy Act
                                                  Independent System Operator, Inc.                       docket number.                                        (NEPA). The FERC staff concludes that
                                                     Description: Tariff Amendment:                          Any person desiring to intervene or                approval of the proposed project, with
                                                  2016–03–25 ZDB Deficiency Response                      protest in any of the above proceedings               the mitigation measures recommended
                                                  Filing to be effective 3/25/2016.                       must file in accordance with Rules 211                in the EIS, would result in some adverse
                                                     Filed Date: 3/25/16.                                 and 214 of the Commission’s                           environmental impact; however, those
                                                     Accession Number: 20160325–5130.                     Regulations (18 CFR 385.211 and                       impacts would not be significant with


                                             VerDate Sep<11>2014   19:30 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1


                                                                                Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices                                                   18613

                                                  implementation of Golden Pass’                             Any person wishing to comment on                      We will begin our sign up of speakers
                                                  proposed mitigation and the additional                  the draft EIS may do so. To ensure                    at 6:30 p.m. The scoping meetings will
                                                  measures recommended in the draft EIS.                  consideration of your comments on the                 begin at 7:00 p.m. with a description of
                                                     The U.S. Army Corps of Engineers,                    proposal in the final EIS, it is important            our environmental review process by
                                                  U.S. Coast Guard (Coast Guard), U.S.                    that the Commission receive your                      Commission staff, after which speakers
                                                  Department of Energy, U.S. Department                   comments on or before May 16, 2016.                   will be called. The meetings will end
                                                  of Transportation, and U.S.                                For your convenience, there are four               once all speakers have provided their
                                                  Environmental Protection Agency                         methods you can use to submit your                    comments or at 9:00 p.m., whichever
                                                  participated as cooperating agencies in                 comments to the Commission. The                       comes first. Please note that there may
                                                  the preparation of the EIS. Cooperating                 Commission will provide equal                         be a time limit of three minutes to
                                                  agencies have jurisdiction by law or                    consideration to all comments received,               present comments, and speakers should
                                                  special expertise with respect to                       whether filed in written form or                      structure their comments accordingly. If
                                                  resources potentially affected by the                   provided verbally. The Commission                     time limits are implemented, they will
                                                  proposal and participate in the NEPA                    encourages electronic filing of                       be strictly enforced to ensure that as
                                                  analysis. Although the cooperating                      comments and has expert staff available               many individuals as possible are given
                                                  agencies provided input to the                          to assist you at (202) 502–8258 or                    an opportunity to comment. The
                                                  conclusions and recommendations                         efiling@ferc.gov. Please carefully follow             meetings will be recorded by a
                                                  presented in the draft EIS, the agencies                these instructions so that your                       stenographer to ensure comments are
                                                  will present their own conclusions and                  comments are properly recorded.                       accurately recorded. Transcripts will be
                                                  recommendations in their respective                                                                           entered into the formal record of the
                                                                                                             (1) You can file your comments                     Commission proceeding.
                                                  Records of Decision for the project.                    electronically using the eComment
                                                     The draft EIS addresses the potential                                                                         Any person seeking to become a party
                                                                                                          feature on the Commission’s Web site                  to the proceeding must file a motion to
                                                  environmental effects of the                            (www.ferc.gov) under the link to
                                                  construction and operation of the                                                                             intervene pursuant to Rule 214 of the
                                                                                                          Documents and Filings. This is an easy                Commission’s Rules of Practice and
                                                  following project facilities:                           method for submitting brief, text-only
                                                     • Liquefaction facilities at the                                                                           Procedures (18 CFR part 385.214).2 Only
                                                                                                          comments on a project;                                intervenors have the right to seek
                                                  existing Golden Pass Export Terminal
                                                  including three liquefaction trains, a                     (2) You can file your comments                     rehearing of the Commission’s decision.
                                                  truck unloading facility, refrigerant and               electronically by using the eFiling                   The Commission grants affected
                                                  condensate storage, safety and control                  feature on the Commission’s Web site                  landowners and others with
                                                  systems, and associated infrastructure;                 (www.ferc.gov) under the link to                      environmental concerns intervenor
                                                     • a supply dock and alternate marine                 Documents and Filings. With eFiling,                  status upon showing good cause by
                                                  delivery facilities at the Terminal;                    you can provide comments in a variety                 stating that they have a clear and direct
                                                     • three miles of a new 24-inch-                      of formats by attaching them as a file                interest in this proceeding which no
                                                  diameter pipeline loop 1 adjacent to the                with your submission. New eFiling                     other party can adequately represent.
                                                  existing Golden Pass pipeline;                          users must first create an account by                 Simply filing environmental comments
                                                     • three new compressor stations;                     clicking on ‘‘eRegister.’’ If you are filing          will not give you intervenor status, but
                                                     • five new pipeline interconnections                 a comment on a particular project,                    you do not need intervenor status to
                                                  and modifications at existing pipeline                  please select ‘‘Comment on a Filing’’ as              have your comments considered.
                                                  interconnections; and                                   the filing type; or
                                                                                                                                                                Questions?
                                                     • miscellaneous appurtenant                             (3) You can file a paper copy of your
                                                  facilities.                                             comments by mailing them to the                          Additional information about the
                                                     The FERC staff mailed copies of the                  following address. Be sure to reference               project is available from the
                                                  draft EIS to federal, state, and local                  the project docket number (CP14–517–                  Commission’s Office of External Affairs,
                                                  government representatives and                          000 or CP14–518–000) with your                        at (866) 208–FERC, or on the FERC Web
                                                  agencies; elected officials;                            submission: Kimberly D. Bose,                         site (www.ferc.gov) using the eLibrary
                                                  environmental and public interest                       Secretary, Federal Energy Regulatory                  link. Click on the eLibrary link, click on
                                                  groups; Native American tribes;                         Commission, 888 First Street NE., Room                ‘‘General Search,’’ and enter the docket
                                                  potentially affected landowners and                     1A, Washington, DC 20426.                             number excluding the last three digits in
                                                  other interested individuals and groups;                   (4) In lieu of sending written or                  the Docket Number field (i.e., CP14–517
                                                  newspapers and libraries in the project                 electronic comments, the Commission                   or CP14–518). Be sure you have selected
                                                  area; and parties to this proceeding.                   invites you to attend one of the public               an appropriate date range. For
                                                  Paper copy versions of this EIS were                    comment meetings its staff will conduct               assistance, please contact FERC Online
                                                  mailed to those specifically requesting                 in the project area to receive comments               Support at FercOnlineSupport@ferc.gov
                                                  them; all others received a CD version.                 on the draft EIS, scheduled as follows:               or toll free at (866) 208–3676; for TTY,
                                                  In addition, the draft EIS is available for                                                                   contact (202) 502–8659. The eLibrary
                                                  public viewing on the FERC’s Web site                         Date and time                 Location          link also provides access to the texts of
                                                  (www.ferc.gov) using the eLibrary link.                                                                       formal documents issued by the
                                                  A limited number of copies are available                Wednesday, April 19,         VFW Post 4759,           Commission, such as orders, notices,
                                                  for distribution and public inspection                   2016, 7:00 p.m.               4402 Highway 12,       and rulemakings.
                                                  at: Federal Energy Regulatory                                                          Starks, Louisiana         In addition, the Commission offers a
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                                                         70661, (337) 743–      free service called eSubscription that
                                                  Commission, Public Reference Room,                                                     6409
                                                  888 First Street NE., Room 2A,                                                                                allows you to keep track of all formal
                                                                                                          Thursday, April 20,          Sabine Pass ISD,         issuances and submittals in specific
                                                  Washington, DC 20426, (202) 502–8371.                     2016, 7:00 p.m.              5641 South
                                                                                                                                                                dockets. This can reduce the amount of
                                                                                                                                         Gulfway Drive,
                                                     1 A loop is a segment of pipe that is installed                                     Sabine Pass,           time you spend researching proceedings
                                                  adjacent to an existing pipeline and connected to                                      Texas 77655, (409)
                                                  it at both ends. A loop generally allows more gas                                      971–2321                  2 See the previous discussion on the methods for

                                                  to move through the system.                                                                                   filing comments.



                                             VerDate Sep<11>2014   19:09 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1


                                                  18614                        Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices

                                                  by automatically providing you with                     ecomment.asp. You must include your                   protests, or motions to intervene must
                                                  notification of these filings, document                 name and contact information at the end               be received on or before the specified
                                                  summaries, and direct links to the                      of your comments. Please include the                  comment date for the particular
                                                  documents. Go to www.ferc.gov/docs-                     project number (P–2077–104 on any                     application.
                                                  filing/esubscription.asp.                               comments, motions, or                                    o. Filing and Service of Responsive
                                                    Dated: March 25, 2016.                                recommendations filed.                                Documents: Any filing must (1) bear in
                                                                                                             k. Description of Request: The                     all capital letters the title
                                                  Nathaniel J. Davis, Sr.,
                                                                                                          applicant requests that the Commission                ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                                  Deputy Secretary.                                       suspend the requirement or                            ‘‘MOTION TO INTERVENE’’ as
                                                  [FR Doc. 2016–07260 Filed 3–30–16; 8:45 am]             permanently amend the license to                      applicable; (2) set forth in the heading
                                                  BILLING CODE 6717–01–P                                  eliminate or suspend the requirement to               the name of the applicant and the
                                                                                                          provide downstream fish passage under                 project number of the application to
                                                                                                          Articles 409 and 413 at the Fifteen Mile              which the filing responds; (3) furnish
                                                  DEPARTMENT OF ENERGY                                    Falls Project. Due to suspension of the               the name, address, and telephone
                                                                                                          Atlantic salmon restoration program in                number of the person protesting or
                                                  Federal Energy Regulatory                               the Connecticut River basin by the U.S.
                                                  Commission                                                                                                    intervening; and (4) otherwise comply
                                                                                                          Fish and Wildlife Service in 2012, the                with the requirements of 18 CFR
                                                  [Project No. 2077–104]                                  applicant believes that continued                     385.2001 through 385.2005. All
                                                                                                          operation of the skimmer gate for                     comments, motions to intervene, or
                                                  TransCanada Hydro Northeast, Inc.;                      downstream smolt passage at the                       protests must set forth their evidentiary
                                                  Notice of Application Accepted for                      McIndoes Falls development should be                  basis and otherwise comply with the
                                                  Filing, Soliciting Comments, Motions                    discontinued. In addition, the                        requirements of 18 CFR 4.34(b). All
                                                  To Intervene, and Protests                              requirement to conduct studies to                     comments, motions to intervene, or
                                                                                                          monitor the effectiveness of the                      protests should relate to project works
                                                     Take notice that the following
                                                                                                          downstream fish passage facilities and                which are the subject of the application.
                                                  hydroelectric application has been filed
                                                                                                          associated operational flows to pass                  Agencies may obtain copies of the
                                                  with the Commission and is available
                                                                                                          Atlantic salmon smolts downstream at                  application directly from the applicant.
                                                  for public inspection:
                                                                                                          the Moore and McIndoes developments,                  A copy of any protest or motion to
                                                     a. Type of Application: Amendment                    should also be discontinued.
                                                  of fish passage plan.                                                                                         intervene must be served upon each
                                                                                                             l. Locations of the Application: A                 representative of the applicant specified
                                                     b. Project No.: 2077–104.                            copy of the application is available for
                                                     c. Date Filed: March 8, 2016.                                                                              in the particular application. If an
                                                                                                          inspection and reproduction at the                    intervener files comments or documents
                                                     d. Applicant: TransCanada Hydro                      Commission’s Public Reference Room,
                                                  Northeast, Inc.                                                                                               with the Commission relating to the
                                                                                                          located at 888 First Street NE., Room
                                                     e. Name of Project: Fifteen Mile Falls                                                                     merits of an issue that may affect the
                                                                                                          2A, Washington, DC 20426, or by calling
                                                  Project.                                                                                                      responsibilities of a particular resource
                                                                                                          (202) 502–8371. This filing may also be
                                                     f. Location: Connecticut River, near                                                                       agency, they must also serve a copy of
                                                                                                          viewed on the Commission’s Web site at
                                                  the town of Littleton in Grafton County,                                                                      the document on that resource agency.
                                                                                                          http://www.ferc.gov/docs-filing/
                                                  New Hampshire, and Caledonia County,                                                                          A copy of all other filings in reference
                                                                                                          elibrary.asp. Enter the docket number
                                                  Vermont.                                                                                                      to this application must be accompanied
                                                                                                          excluding the last three digits in the
                                                     g. Filed Pursuant to: Federal Power                                                                        by proof of service on all persons listed
                                                                                                          docket number field (P–2077) to access
                                                  Act, 16 U.S.C. 791a–825r.                                                                                     in the service list prepared by the
                                                                                                          the document. You may also register
                                                     h. Applicant Contact: Mr. John L.                    online at http://www.ferc.gov/docs-                   Commission in this proceeding, in
                                                  Ragonese, License Manager,                              filing/esubscription.asp to be notified               accordance with 18 CFR 4.34(b) and
                                                  TransCanada, U.S. Northeast Hydro                       via email of new filings and issuances                385.2010.
                                                  Region, 4 Park Street, Suite 402                        related to this or other pending projects.              Dated: March 23, 2016.
                                                  Concord, NH 04347 (603) 225–5528.                       For assistance, call 1–866–208–3676 or                Nathaniel J. Davis, Sr.,
                                                     i. FERC Contact: Mr. Joseph Enrico,                  email FERCOnlineSupport@ferc.gov, for                 Deputy Secretary.
                                                  (212) 273–5917, joseph.enrico@ferc.gov.                 TTY, call (202) 502–8659. A copy is also              [FR Doc. 2016–07245 Filed 3–30–16; 8:45 am]
                                                     j. Deadline for filing comments,                     available for inspection and                          BILLING CODE 6717–01–P
                                                  motions to intervene, and protests, is 30               reproduction at the address in item (h)
                                                  days from the issuance date of this                     above.
                                                  notice by the Commission. All                              m. Individuals desiring to be included             DEPARTMENT OF ENERGY
                                                  documents may be filed electronically                   on the Commission’s mailing list should
                                                  via the Internet. See, 18 CFR                           so indicate by writing to the Secretary               Federal Energy Regulatory
                                                  385.2001(a)(1)(iii) and the instructions                of the Commission.                                    Commission
                                                  on the Commission’s Web site at                            n. Comments, Protests, or Motions to
                                                  http://www.ferc.gov/docs-filing/                        Intervene: Anyone may submit                          [Docket No. ER16–1129–000]
                                                  efiling.asp. If unable to be filed                      comments, a protest, or a motion to                   VPI Enterprises, Inc.; Supplemental
                                                  electronically, documents may be paper-                 intervene in accordance with the                      Notice That Initial Market-Based Rate
                                                  filed. To paper-file, an original and                   requirements of Rules of Practice and                 Filing Includes Request for Blanket
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  seven copies should be mailed to:                       Procedure, 18 CFR 385.210, .211, .214.                Section 204 Authorization
                                                  Secretary, Federal Energy Regulatory                    In determining the appropriate action to
                                                  Commission, 888 First Street NE.,                       take, the Commission will consider all                  This is a supplemental notice in the
                                                  Washington, DC 20426. Commenters                        protests or other comments filed, but                 above-referenced proceeding of VPI
                                                  can submit brief comments up to 6,000                   only those who file a motion to                       Enterprises, Inc.’s application for
                                                  characters, without prior registration,                 intervene in accordance with the                      market-based rate authority, with an
                                                  using the eComment system at http://                    Commission’s Rules may become a                       accompanying rate tariff, noting that
                                                  www.ferc.gov/docs-filing/                               party to the proceeding. Any comments,                such application includes a request for


                                             VerDate Sep<11>2014   19:09 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00051   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1



Document Created: 2016-03-31 00:55:31
Document Modified: 2016-03-31 00:55:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 18612 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR