81_FR_18685 81 FR 18623 - Atlantic Coast Pipeline, LLC; Notice of Amendment to Application

81 FR 18623 - Atlantic Coast Pipeline, LLC; Notice of Amendment to Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 62 (March 31, 2016)

Page Range18623-18624
FR Document2016-07239

Federal Register, Volume 81 Issue 62 (Thursday, March 31, 2016)
[Federal Register Volume 81, Number 62 (Thursday, March 31, 2016)]
[Notices]
[Pages 18623-18624]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-07239]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP15-554-001; PF15-6-000]


Atlantic Coast Pipeline, LLC; Notice of Amendment to Application

    Take notice that on March 14, 2016, Atlantic Coast Pipeline, LLC 
(ACP), 120 Tredgar Street, Richmond, Virginia 23219, filed an amendment 
to its application under section 7(c) of the Natural Gas Act and Part 
157 of the Commission's regulations requesting authorization to 
install, construct, own, operate and maintain certain natural gas 
pipeline facilities for its Atlantic Coast Pipeline project.
    ACP's pending application seeks authorization of: (i) Approximately 
564.1 miles of various diameter pipeline; (ii) three greenfield 
compressor stations totaling 117,545 horsepower (HP) of compression; 
and (iii) various appurtenant and auxiliary facilities designed to 
transport up to approximately 1.5 million dekatherms per day (MMDth/d) 
of natural gas. In the amendment, ACP proposes a major route change 
near the Monongahela and George Washington National Forests that would 
affect landowners in Randolph and Pocahontas Counties, West Virginia, 
and Highland, Bath and Augustana Counties, Virginia. Other, smaller 
route changes proposed in the amendment would affect landowners in 
Randolph and Pocahontas Counties, West Virginia, Bath, Nelson and 
Dinwiddie Counties, Virginia, and Cumberland and Johnston Counties, 
North Carolina. The amended facilities would increase the total length 
of the pipeline to 599.7 miles and compressor station HP from 40,715 HP 
to 53,515 HP at the proposed Buckingham County, Virginia compressor 
station, all as more fully described in the application.
    The filings may also be viewed on the Web at http://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC at [email protected] or toll 
free at (866) 208-3676, or TTY, (202) 502-8659.
    Any questions regarding ACP's or DTI's projects should be directed 
to Angela Woolard, Gas Transmission Certificates, Dominion 
Transmission, Inc., 701 East Cary Street, Richmond, Virginia 23219; 
telephone: 866-319-3382.
    Within 90 days after the Commission issues a Notice of Amendment to 
Application for the ACP, the

[[Page 18624]]

Commission staff will issue a Notice of Schedule for Environmental 
Review that will indicate the anticipated date for the Commission's 
staff issuance of the final EIS analyzing ACP's amended proposal, as 
well as Dominion Transmission, Inc.'s and Atlantic Coast Pipeline, LLC 
and Piedmont Natural Gas Company, Inc.'s associated proposals pending 
in Docket Nos. CP15-555-000 and CP15-556-000, respectively. The 
issuance of a Notice of Schedule for Environmental Review will also 
serve to notify federal and state agencies of the timing for the 
completion of all necessary reviews, and the subsequent need to 
complete all federal authorizations within 90 days of the date of 
issuance of the Commission staff's final EIS.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order. At a future date, the 
Commission will issue a Supplemental Notice of Intent to Prepare an 
Environmental Impact Statement that opens a supplemental scoping period 
and announces procedures to solicit environmental comments on the 
amended application. This Notice will be mailed to all parties on the 
Commission's environmental mailing list for this docket.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on April 12, 2016.

    Dated: March 22, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-07239 Filed 3-30-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices                                            18623

                                                     Description: Compliance filing:                         Description: § 205(d) Rate Filing: 3186            DEPARTMENT OF ENERGY
                                                  Compliance2 to 134 to be effective 4/1/                 KCP&L and KEPCO Interconnection
                                                  2015.                                                   Agreement to be effective 3/22/2016.                  Federal Energy Regulatory
                                                     Filed Date: 3/23/16.                                    Filed Date: 3/23/16.                               Commission
                                                     Accession Number: 20160323–5183.                        Accession Number: 20160323–5045.                   [Docket Nos. CP15–554–001; PF15–6–000]
                                                     Comments Due: 5 p.m. ET 4/13/16.                        Comments Due: 5 p.m. ET 4/13/16.
                                                     Docket Numbers: ER16–456–002.                           Docket Numbers: ER16–1262–000.                     Atlantic Coast Pipeline, LLC; Notice of
                                                     Applicants: Baltimore Gas and                                                                              Amendment to Application
                                                                                                             Applicants: Midcontinent
                                                  Electric Company, Potomac Electric                      Independent System Operator, Inc.,                       Take notice that on March 14, 2016,
                                                  Power Company, Delmarva Power &                         Montana-Dakota Utilities Co., Division                Atlantic Coast Pipeline, LLC (ACP), 120
                                                  Light Company, Atlantic City Electric                   of MDU Resources Inc.                                 Tredgar Street, Richmond, Virginia
                                                  Company, PJM Interconnection, L.L.C.                                                                          23219, filed an amendment to its
                                                                                                             Description: § 205(d) Rate Filing:
                                                     Description: Compliance filing: BGE,                                                                       application under section 7(c) of the
                                                                                                          2016–03–23_SA 2908 MDU-Basin
                                                  Delmarva, et al. submit compliance                                                                            Natural Gas Act and Part 157 of the
                                                                                                          Electric Facility Sharing Agreement to
                                                  filing per 2/23/2016 order to be effective                                                                    Commission’s regulations requesting
                                                                                                          be effective 1/1/2016.
                                                  3/8/2016.                                                                                                     authorization to install, construct, own,
                                                     Filed Date: 3/23/16.                                    Filed Date: 3/23/16.
                                                                                                             Accession Number: 20160323–5062.                   operate and maintain certain natural gas
                                                     Accession Number: 20160323–5143.                                                                           pipeline facilities for its Atlantic Coast
                                                     Comments Due: 5 p.m. ET 4/13/16.                        Comments Due: 5 p.m. ET 4/13/16.
                                                                                                                                                                Pipeline project.
                                                     Docket Numbers: ER16–792–001.                           Docket Numbers: ER16–1263–000.                        ACP’s pending application seeks
                                                     Applicants: New Harquahala                              Applicants: Southern California                    authorization of: (i) Approximately
                                                  Generating Company, LLC.                                Edison Company.                                       564.1 miles of various diameter
                                                     Description: Tariff Amendment:                          Description: § 205(d) Rate Filing:                 pipeline; (ii) three greenfield
                                                  Amendment to New Harquahala                             Amendment to Exhibit A of Distribution                compressor stations totaling 117,545
                                                  Revised MBR Tariff to be effective 3/28/                Service Agreement with SCE–RAP for                    horsepower (HP) of compression; and
                                                  2016.                                                   CREST to be effective 5/23/2016.                      (iii) various appurtenant and auxiliary
                                                     Filed Date: 3/23/16.                                    Filed Date: 3/23/16.                               facilities designed to transport up to
                                                     Accession Number: 20160323–5114.                        Accession Number: 20160323–5117.                   approximately 1.5 million dekatherms
                                                     Comments Due: 5 p.m. ET 4/13/16.                        Comments Due: 5 p.m. ET 4/13/16.                   per day (MMDth/d) of natural gas. In the
                                                     Docket Numbers: ER16–793–001.                           Docket Numbers: ER16–1264–000.                     amendment, ACP proposes a major
                                                     Applicants: Talen Montana, LLC.                         Applicants: Southern California                    route change near the Monongahela and
                                                     Description: Tariff Amendment:                       Edison Company.                                       George Washington National Forests
                                                  Amendment to Talen Montana Revised                                                                            that would affect landowners in
                                                                                                             Description: § 205(d) Rate Filing:
                                                  MBR Tariff to be effective 3/28/2016.                                                                         Randolph and Pocahontas Counties,
                                                                                                          Amended SGIA and Distribution
                                                     Filed Date: 3/23/16.                                                                                       West Virginia, and Highland, Bath and
                                                                                                          Service Agmt SEPV Mojave West, LLC
                                                     Accession Number: 20160323–5116.                                                                           Augustana Counties, Virginia. Other,
                                                                                                          to be effective 3/24/2016.
                                                     Comments Due: 5 p.m. ET 4/13/16.                                                                           smaller route changes proposed in the
                                                                                                             Filed Date: 3/23/16.
                                                     Docket Numbers: ER16–795–001.                                                                              amendment would affect landowners in
                                                                                                             Accession Number: 20160323–5118.                   Randolph and Pocahontas Counties,
                                                     Applicants: Talen Energy Marketing,
                                                                                                             Comments Due: 5 p.m. ET 4/13/16.                   West Virginia, Bath, Nelson and
                                                  LLC.
                                                     Description: Tariff Amendment:                          The filings are accessible in the                  Dinwiddie Counties, Virginia, and
                                                  Amendment to Talen Energy Marketing                     Commission’s eLibrary system by                       Cumberland and Johnston Counties,
                                                  MBR Tariff to be effective 3/28/2016.                   clicking on the links or querying the                 North Carolina. The amended facilities
                                                     Filed Date: 3/23/16.                                 docket number.                                        would increase the total length of the
                                                     Accession Number: 20160323–5115.                        Any person desiring to intervene or                pipeline to 599.7 miles and compressor
                                                     Comments Due: 5 p.m. ET 4/13/16.                     protest in any of the above proceedings               station HP from 40,715 HP to 53,515 HP
                                                     Docket Numbers: ER16–1259–000.                       must file in accordance with Rules 211                at the proposed Buckingham County,
                                                     Applicants: Southwest Power Pool,                    and 214 of the Commission’s                           Virginia compressor station, all as more
                                                  Inc.                                                    Regulations (18 CFR 385.211 and                       fully described in the application.
                                                     Description: Notice of Cancellation of               385.214) on or before 5:00 p.m. Eastern                  The filings may also be viewed on the
                                                  Letter Agreement (SA 1121) of                           time on the specified comment date.                   Web at http://www.ferc.gov using the
                                                  Southwest Power Pool, Inc.                              Protests may be considered, but                       ‘‘eLibrary’’ link. Enter the docket
                                                     Filed Date: 3/23/16.                                 intervention is necessary to become a                 number excluding the last three digits in
                                                     Accession Number: 20160323–5015.                     party to the proceeding.                              the docket number field to access the
                                                     Comments Due: 5 p.m. ET 4/13/16.                        eFiling is encouraged. More detailed               document. For assistance, please contact
                                                                                                          information relating to filing                        FERC at FERCOnlineSupport@ferc.gov
                                                     Docket Numbers: ER16–1260–000.                                                                             or toll free at (866) 208–3676, or TTY,
                                                                                                          requirements, interventions, protests,
                                                     Applicants: Southwest Power Pool,                                                                          (202) 502–8659.
                                                                                                          service, and qualifying facilities filings
                                                  Inc.                                                                                                             Any questions regarding ACP’s or
                                                                                                          can be found at: http://www.ferc.gov/
                                                     Description: Notice of Cancellation of                                                                     DTI’s projects should be directed to
                                                                                                          docs-filing/efiling/filing-req.pdf. For
                                                  Letter Agreement (SA 1287) of
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                                                                          other information, call (866) 208–3676                Angela Woolard, Gas Transmission
                                                  Southwest Power Pool, Inc.                                                                                    Certificates, Dominion Transmission,
                                                                                                          (toll free). For TTY, call (202) 502–8659.
                                                     Filed Date: 3/23/16.                                                                                       Inc., 701 East Cary Street, Richmond,
                                                     Accession Number: 20160323–5016.                       Dated: March 23, 2016.
                                                                                                                                                                Virginia 23219; telephone: 866–319–
                                                     Comments Due: 5 p.m. ET 4/13/16.                     Nathaniel J. Davis, Sr.,                              3382.
                                                     Docket Numbers: ER16–1261–000.                       Deputy Secretary.                                        Within 90 days after the Commission
                                                     Applicants: Southwest Power Pool,                    [FR Doc. 2016–07237 Filed 3–30–16; 8:45 am]           issues a Notice of Amendment to
                                                  Inc.                                                    BILLING CODE 6717–01–P                                Application for the ACP, the


                                             VerDate Sep<11>2014   19:09 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00060   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1


                                                  18624                        Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices

                                                  Commission staff will issue a Notice of                 placed on the Commission’s                            F, applicable to Duke Energy Florida to
                                                  Schedule for Environmental Review that                  environmental mailing list, will receive              September 30, 2021.
                                                  will indicate the anticipated date for the              copies of the environmental documents,                DATES: Written comments are due on or
                                                  Commission’s staff issuance of the final                and will be notified of meetings                      before June 29, 2016. A public
                                                  EIS analyzing ACP’s amended proposal,                   associated with the Commission’s                      information and public comment forum
                                                  as well as Dominion Transmission,                       environmental review process.                         will be held at 12:00 Noon, Thursday,
                                                  Inc.’s and Atlantic Coast Pipeline, LLC                 Environmental commenters will not be                  May 5, 2016. Persons desiring to speak
                                                  and Piedmont Natural Gas Company,                       required to serve copies of filed                     at the forum are requested to notify
                                                  Inc.’s associated proposals pending in                  documents on all other parties.                       Southeastern at least seven (7) days
                                                  Docket Nos. CP15–555–000 and CP15–                      However, the non-party commenters                     before the forum is scheduled so that a
                                                  556–000, respectively. The issuance of a                will not receive copies of all documents              list of forum participants can be
                                                  Notice of Schedule for Environmental                    filed by other parties or issued by the               prepared. Others present may speak if
                                                  Review will also serve to notify federal                Commission (except for the mailing of                 time permits. Persons desiring to attend
                                                  and state agencies of the timing for the                environmental documents issued by the                 the forum should also notify
                                                  completion of all necessary reviews, and                Commission) and will not have the right               Southeastern at least seven (7) days
                                                  the subsequent need to complete all                     to seek court review of the                           before the forum is scheduled. If
                                                  federal authorizations within 90 days of                Commission’s final order. At a future                 Southeastern has not been notified by
                                                  the date of issuance of the Commission                  date, the Commission will issue a                     close of business on April 28, 2016, that
                                                  staff’s final EIS.                                      Supplemental Notice of Intent to                      at least one person intends to be present
                                                     There are two ways to become                         Prepare an Environmental Impact                       at the forum, the forum may be canceled
                                                  involved in the Commission’s review of                  Statement that opens a supplemental                   with no further notice.
                                                  this project. First, any person wishing to              scoping period and announces                          ADDRESSES: Written comments should
                                                  obtain legal status by becoming a party                 procedures to solicit environmental                   be submitted to: Kenneth E. Legg,
                                                  to the proceedings for this project                     comments on the amended application.                  Administrator, Southeastern Power
                                                  should, on or before the comment date                   This Notice will be mailed to all parties             Administration, Department of Energy,
                                                  stated below, file with the Federal                     on the Commission’s environmental                     1166 Athens Tech Road, Elberton,
                                                  Energy Regulatory Commission, 888                       mailing list for this docket.                         Georgia 30635–6711. The public
                                                  First Street NE., Washington, DC 20426,                    The Commission strongly encourages                 comment forum will meet at the Jim
                                                  a motion to intervene in accordance                     electronic filings of comments, protests              Woodruff Project Site Managers Office
                                                  with the requirements of the                            and interventions in lieu of paper using              Conference Room, 2382 Boosterclub
                                                  Commission’s Rules of Practice and                      the ‘‘eFiling’’ link at http://                       Road, Chattahoochee, FL 32324, Phone
                                                  Procedure (18 CFR 385.214 or 385.211)                   www.ferc.gov. Persons unable to file                  (229) 662–2001.
                                                  and the Regulations under the NGA (18                   electronically should submit an original
                                                  CFR 157.10). A person obtaining party                                                                         FOR FURTHER INFORMATION CONTACT:
                                                                                                          and 5 copies of the protest or                        Virgil G. Hobbs III, Southeastern Power
                                                  status will be placed on the service list               intervention to the Federal Energy
                                                  maintained by the Secretary of the                                                                            Administration, Department of Energy,
                                                                                                          Regulatory Commission, 888 First Street               1166 Athens Tech Road, Elberton,
                                                  Commission and will receive copies of                   NE., Washington, DC 20426.
                                                  all documents filed by the applicant and                                                                      Georgia 30635–6711, Phone (706) 213–
                                                                                                             Comment Date: 5:00 p.m. Eastern                    3800.
                                                  by all other parties. A party must submit               Time on April 12, 2016.
                                                  7 copies of filings made with the                                                                             SUPPLEMENTARY INFORMATION: Existing
                                                  Commission and must mail a copy to                        Dated: March 22, 2016.                              rate schedules are supported by a June
                                                  the applicant and to every other party in               Nathaniel J. Davis, Sr.,                              2011 Repayment Study and other
                                                  the proceeding. Only parties to the                     Deputy Secretary.                                     supporting data contained in FERC
                                                  proceeding can ask for court review of                  [FR Doc. 2016–07239 Filed 3–30–16; 8:45 am]           Docket No. EF11–12–000. A repayment
                                                  Commission orders in the proceeding.                    BILLING CODE 6717–01–P                                study prepared in January 2016 shows
                                                     However, a person does not have to                                                                         that the existing rates are adequate to
                                                  intervene in order to have comments                                                                           meet repayment criteria and generate a
                                                  considered. The second way to                           DEPARTMENT OF ENERGY                                  surplus. Southeastern is proposing a
                                                  participate is by filing with the                                                                             rate reduction to eliminate this surplus.
                                                  Secretary of the Commission, as soon as                 Southeastern Power Administration                     A revised study with a revenue
                                                  possible, an original and two copies of                                                                       reduction of $2,316,000 per year
                                                  comments in support of or in opposition                 Jim Woodruff Project                                  demonstrates the rates are adequate to
                                                  to this project. The Commission will                    AGENCY: Southeastern Power                            meet repayment criteria. The rate
                                                  consider these comments in                              Administration, DOE.                                  adjustment is a reduction of about 24
                                                  determining the appropriate action to be                ACTION: Notice of proposed rate                       percent.
                                                  taken, but the filing of a comment alone                adjustment.                                              In the proposed rate schedule JW–1–
                                                  will not serve to make the filer a party                                                                      K, which is available to preference
                                                  to the proceeding. The Commission’s                     SUMMARY:    Southeastern proposes a new               customers, the capacity charge would be
                                                  rules require that persons filing                       rate schedule JW–1–K to replace                       reduced from $10.29 per kilowatt per
                                                  comments in opposition to the project                   Wholesale Power Rate Schedules JW–1–                  month to $7.74 per kilowatt per month.
                                                  provide copies of their protests only to                J for a five-year period from October 1,              The energy charge would be reduced
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  the party or parties directly involved in               2016, to September 30, 2021. Rate                     from 26.51 mills per kilowatt-hour to
                                                  the protest.                                            schedule JW–1–K would be applicable                   20.44 mills per kilowatt-hour. Rate
                                                     Persons who wish to comment only                     to Southeastern power sold to existing                schedule JW–2–F, available to Duke
                                                  on the environmental review of this                     preference customers in the Duke                      Energy Florida (DEF), would continue
                                                  project should submit an original and                   Energy Florida (formerly Florida Power                the current rate of 100 percent of DEF’s
                                                  two copies of their comments to the                     Corporation) service area. In addition,               fuel cost.
                                                  Secretary of the Commission.                            Southeastern proposes to extend                          In addition to the capacity and energy
                                                  Environmental commenters will be                        Wholesale Power Rate Schedules JW–2–                  charges, each preference customer will


                                             VerDate Sep<11>2014   19:09 Mar 30, 2016   Jkt 238001   PO 00000   Frm 00061   Fmt 4703   Sfmt 4703   E:\FR\FM\31MRN1.SGM   31MRN1



Document Created: 2016-03-31 00:56:01
Document Modified: 2016-03-31 00:56:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on April 12, 2016.
FR Citation81 FR 18623 