81_FR_23553 81 FR 23476 - National Fuel Gas Supply Corporation; Notice of Application

81 FR 23476 - National Fuel Gas Supply Corporation; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 77 (April 21, 2016)

Page Range23476-23477
FR Document2016-09227

Federal Register, Volume 81 Issue 77 (Thursday, April 21, 2016)
[Federal Register Volume 81, Number 77 (Thursday, April 21, 2016)]
[Notices]
[Pages 23476-23477]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-09227]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-125-000]


National Fuel Gas Supply Corporation; Notice of Application

    Take notice that on April 4, 2016, National Fuel Gas Supply 
Corporation (National Fuel), 6363 Main Street, Williamsville, New York 
14221, filed an application pursuant to sections 7(b) and 7(c) of the 
Natural Gas Act (NGA), and Part 157 of the Commission's regulations 
requesting authority to construct, replace, and abandon existing 
pipelines and modify compressor facilities along the T2K, TNY, and KNY 
natural gas pipelines, all as more fully set forth in the application 
which is on file with the Commission and open to public inspection. The 
cost for the proposed project work is $29,382,602.
    Any questions concerning this application should be directed to 
Laura P. Berloth, Attorney, National Fuel Gas Supply Corporation, 6363 
Main Street, Williamsville, New York 14221-5887, by phone at (716) 857-
7001, by fax at (716) 857-7206, or by email at [email protected].
    Specifically, National Fuel seeks to; (i) construct and operate 1.2 
miles of new 20-inch-diameter pipeline, adding 2,600 dekatherms per day 
(Dth/d) of new firm service capacity (Line T2K Install); (ii) replace 
approximately 6.7 miles of 20-inch-diameter bare steel pipeline with 
7.0 miles of new 24-inch-diameter coated pipeline (Line TNY 
Replacement); and (iii) abandon approximately 14.9 miles of 20-inch-
diameter bare steel pipeline (Line KNY Abandonment), all located in 
Erie County, New York.
    The filing is available for review at the Commission in the Public 
Reference Room or may be viewed on the Commission's Web site web at 
http://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Pursuant to section 157.9 of the Commission's rules (18 CFR 157.9), 
within 90 days of this Notice, the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule will serve to 
notify federal and state agencies of the timing for the completion of 
all necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 5 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original

[[Page 23477]]

and 7 copies of the protest or intervention to the Federal Energy 
regulatory Commission, 888 First Street NE., Washington, DC 20426.
    Comment Date: 5:00 p.m. Eastern Time on May 6, 2016.

    Dated: April 15, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-09227 Filed 4-20-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  23476                         Federal Register / Vol. 81, No. 77 / Thursday, April 21, 2016 / Notices

                                                     Filed Date: 4/15/16.                                 pipelines and modify compressor                       to the proceedings for this project
                                                     Accession Number: 20160415–5143.                     facilities along the T2K, TNY, and KNY                should, on or before the comment date
                                                     Comments Due: 5 p.m. ET 5/6/16.                      natural gas pipelines, all as more fully              stated below, file with the Federal
                                                     Docket Numbers: ER16–1425–000.                       set forth in the application which is on              Energy Regulatory Commission, 888
                                                     Applicants: Northern States Power                    file with the Commission and open to                  First Street NE., Washington, DC 20426,
                                                  Company, a Wisconsin corporation.                       public inspection. The cost for the                   a motion to intervene in accordance
                                                     Description: Tariff Cancellation:                    proposed project work is $29,382,602.                 with the requirements of the
                                                  2016–4–15_NSPW Cancel Clarity Tariff                       Any questions concerning this                      Commission’s Rules of Practice and
                                                  ID Filing to be effective 4/15/2016.                    application should be directed to Laura               Procedure (18 CFR 385.214 or 385.211)
                                                     Filed Date: 4/15/16.                                 P. Berloth, Attorney, National Fuel Gas               and the Regulations under the NGA (18
                                                     Accession Number: 20160415–5144.                     Supply Corporation, 6363 Main Street,                 CFR 157.10). A person obtaining party
                                                     Comments Due: 5 p.m. ET 5/6/16.                      Williamsville, New York 14221–5887,                   status will be placed on the service list
                                                     Docket Numbers: ER16–1426–000.                       by phone at (716) 857–7001, by fax at                 maintained by the Secretary of the
                                                     Applicants: Southwestern Public                      (716) 857–7206, or by email at berlothl@              Commission and will receive copies of
                                                  Service Company.                                        natfuel.com.                                          all documents filed by the applicant and
                                                     Description: Tariff Cancellation:                       Specifically, National Fuel seeks to;              by all other parties. A party must submit
                                                  2016–4–15_SPS Cancel Clarity Tariff ID                  (i) construct and operate 1.2 miles of                5 copies of filings made with the
                                                  Filing to be effective 4/15/2016.                       new 20-inch-diameter pipeline, adding                 Commission and must mail a copy to
                                                     Filed Date: 4/15/16.                                 2,600 dekatherms per day (Dth/d) of                   the applicant and to every other party in
                                                     Accession Number: 20160415–5150.                     new firm service capacity (Line T2K                   the proceeding. Only parties to the
                                                     Comments Due: 5 p.m. ET 5/6/16.                      Install); (ii) replace approximately 6.7              proceeding can ask for court review of
                                                                                                          miles of 20-inch-diameter bare steel                  Commission orders in the proceeding.
                                                     The filings are accessible in the
                                                                                                          pipeline with 7.0 miles of new 24-inch-                  However, a person does not have to
                                                  Commission’s eLibrary system by
                                                                                                          diameter coated pipeline (Line TNY                    intervene in order to have comments
                                                  clicking on the links or querying the
                                                                                                          Replacement); and (iii) abandon                       considered. The second way to
                                                  docket number.
                                                                                                          approximately 14.9 miles of 20-inch-                  participate is by filing with the
                                                     Any person desiring to intervene or
                                                                                                          diameter bare steel pipeline (Line KNY                Secretary of the Commission, as soon as
                                                  protest in any of the above proceedings
                                                                                                          Abandonment), all located in Erie                     possible, an original and two copies of
                                                  must file in accordance with Rules 211
                                                                                                          County, New York.                                     comments in support of or in opposition
                                                  and 214 of the Commission’s                                The filing is available for review at              to this project. The Commission will
                                                  Regulations (18 CFR 385.211 and                         the Commission in the Public Reference                consider these comments in
                                                  385.214) on or before 5:00 p.m. Eastern                 Room or may be viewed on the                          determining the appropriate action to be
                                                  time on the specified comment date.                     Commission’s Web site web at http://                  taken, but the filing of a comment alone
                                                  Protests may be considered, but                         www.ferc.gov using the ‘‘eLibrary’’ link.             will not serve to make the filer a party
                                                  intervention is necessary to become a                   Enter the docket number excluding the                 to the proceeding. The Commission’s
                                                  party to the proceeding.                                last three digits in the docket number                rules require that persons filing
                                                     eFiling is encouraged. More detailed                 field to access the document. For                     comments in opposition to the project
                                                  information relating to filing                          assistance, contact FERC at                           provide copies of their protests only to
                                                  requirements, interventions, protests,                  FERCOnlineSupport@ferc.gov or call                    the party or parties directly involved in
                                                  service, and qualifying facilities filings              toll-free, (886) 208–3676 or TYY, (202)               the protest.
                                                  can be found at: http://www.ferc.gov/                   502–8659.                                                Persons who wish to comment only
                                                  docs-filing/efiling/filing-req.pdf. For                    Pursuant to section 157.9 of the                   on the environmental review of this
                                                  other information, call (866) 208–3676                  Commission’s rules (18 CFR 157.9),                    project should submit an original and
                                                  (toll free). For TTY, call (202) 502–8659.              within 90 days of this Notice, the                    two copies of their comments to the
                                                    Dated: April 15, 2016.                                Commission staff will either: Complete                Secretary of the Commission.
                                                  Kimberly D. Bose,                                       its environmental assessment (EA) and                 Environmental commenters will be
                                                  Secretary.                                              place it into the Commission’s public                 placed on the Commission’s
                                                  [FR Doc. 2016–09224 Filed 4–20–16; 8:45 am]
                                                                                                          record (eLibrary) for this proceeding or              environmental mailing list, will receive
                                                                                                          issue a Notice of Schedule for                        copies of the environmental documents,
                                                  BILLING CODE 6717–01–P
                                                                                                          Environmental Review. If a Notice of                  and will be notified of meetings
                                                                                                          Schedule for Environmental Review is                  associated with the Commission’s
                                                  DEPARTMENT OF ENERGY                                    issued, it will indicate, among other                 environmental review process.
                                                                                                          milestones, the anticipated date for the              Environmental commenters will not be
                                                  Federal Energy Regulatory                               Commission staff’s issuance of the final              required to serve copies of filed
                                                  Commission                                              environmental impact statement (FEIS)                 documents on all other parties.
                                                                                                          or EA for this proposal. The filing of the            However, the non-party commenters
                                                  [Docket No. CP16–125–000]
                                                                                                          EA in the Commission’s public record                  will not receive copies of all documents
                                                  National Fuel Gas Supply Corporation;                   for this proceeding or the issuance of a              filed by other parties or issued by the
                                                  Notice of Application                                   Notice of Schedule will serve to notify               Commission (except for the mailing of
                                                                                                          federal and state agencies of the timing              environmental documents issued by the
                                                    Take notice that on April 4, 2016,                    for the completion of all necessary                   Commission) and will not have the right
                                                  National Fuel Gas Supply Corporation
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                                                                          reviews, and the subsequent need to                   to seek court review of the
                                                  (National Fuel), 6363 Main Street,                      complete all federal authorizations                   Commission’s final order.
                                                  Williamsville, New York 14221, filed an                 within 90 days of the date of issuance                   The Commission strongly encourages
                                                  application pursuant to sections 7(b)                   of the Commission staff’s FEIS or EA.                 electronic filings of comments, protests
                                                  and 7(c) of the Natural Gas Act (NGA),                     There are two ways to become                       and interventions in lieu of paper using
                                                  and Part 157 of the Commission’s                        involved in the Commission’s review of                the ‘‘eFiling’’ link at http://
                                                  regulations requesting authority to                     this project. First, any person wishing to            www.ferc.gov. Persons unable to file
                                                  construct, replace, and abandon existing                obtain legal status by becoming a party               electronically should submit an original


                                             VerDate Sep<11>2014   13:27 Apr 20, 2016   Jkt 238001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\21APN1.SGM   21APN1


                                                                                Federal Register / Vol. 81, No. 77 / Thursday, April 21, 2016 / Notices                                                 23477

                                                  and 7 copies of the protest or                          First Street NE., Washington, DC 20426.               consider all protests or other comments
                                                  intervention to the Federal Energy                      The first page of any filing should                   filed, but only those who file a motion
                                                  regulatory Commission, 888 First Street                 include docket number P–7656–012.                     to intervene in accordance with the
                                                  NE., Washington, DC 20426.                                 j. Description of Project Facilities: (1)          Commission’s Rules may become a
                                                    Comment Date: 5:00 p.m. Eastern                       An 18-inch-high, 15-foot-long dam; (2)                party to the proceeding. Any comments,
                                                  Time on May 6, 2016.                                    an 18-inch-diameter, 400-foot-long PVC                protests, or motions to intervene must
                                                    Dated: April 15, 2016.
                                                                                                          penstock; (3) a powerhouse containing                 be received on or before the specified
                                                                                                          two generating units for a total installed            comment date for the particular
                                                  Kimberly D. Bose,
                                                                                                          capacity of 79 kilowatts; (4) a 300-foot-             application.
                                                  Secretary.                                              long, 480-volt transmission line; and (5)                o. Filing and Service of Responsive
                                                  [FR Doc. 2016–09227 Filed 4–20–16; 8:45 am]             appurtenant facilities.                               Documents: Any filing must (1) bear in
                                                  BILLING CODE 6717–01–P                                     k. Description of Proceeding: The                  all capital letters the title
                                                                                                          licensee is in violation of standard                  ‘‘COMMENTS,’’ ‘‘PROTEST,’’ or
                                                                                                          Article 16 of its license issued on June              ‘‘MOTION TO INTERVENE’’ as
                                                  DEPARTMENT OF ENERGY                                    24, 1986 (35 FERC ¶ 62,532). Article 16               applicable; (2) set forth in the heading
                                                                                                          states, in part: If the Licensee shall                the name of the applicant and the
                                                  Federal Energy Regulatory                               abandon or discontinue good faith
                                                  Commission                                                                                                    project number of the application to
                                                                                                          operation of the project or refuse or                 which the filing responds; (3) furnish
                                                  [Project No. 7656–012]                                  neglect to comply with the terms of the               the name, address, and telephone
                                                                                                          license and the lawful orders of the                  number of the person protesting or
                                                  John A. Dodson; Notice of Proposed                      Commission mailed to the record                       intervening; and (4) otherwise comply
                                                  Termination of License by Implied                       address of the Licensee or its agent, the             with the requirements of 18 CFR
                                                  Surrender and Soliciting Comments,                      Commission will deem it to be the                     385.2001 through 385.2005. All
                                                  Protests and Motions To Intervene                       intent of the Licensee to surrender the               comments, motions to intervene, or
                                                                                                          license.                                              protests must set forth their evidentiary
                                                     Take notice that the following                          Commission records indicate that the
                                                  hydroelectric proceeding has been                                                                             basis and otherwise comply with the
                                                                                                          project has not been operated since the
                                                  initiated by the Commission:                                                                                  requirements of 18 CFR 4.34(b). All
                                                                                                          fall of 2012 when heavy storms flooded
                                                     a. Type of Proceeding: Proposed                                                                            comments, protests, or motions to
                                                                                                          the powerhouse. Due to an ongoing
                                                  Termination of License by Implied                                                                             intervene should relate to project works
                                                                                                          property rights dispute involving access
                                                  Surrender.                                                                                                    which are the subject of the implied
                                                                                                          to and the use of lands needed for
                                                     b. Project No.: 7656–012.                                                                                  surrender. A copy of any protest or
                                                                                                          project purposes, the licensee has been
                                                     c. Date Initiated: April 14, 2016.                                                                         motion to intervene must be served
                                                                                                          reluctant to repair the project and return
                                                     d. Licensee: John A. Dodson.                                                                               upon each representative of the
                                                                                                          it to service. In addition, the licensee
                                                     e. Name and Location of Project:                                                                           applicant specified in the particular
                                                                                                          has not responded to several
                                                  Buttermilk Falls Hydroelectric Project                  Commission requests to file a plan and                application. If an intervener files
                                                  located on Buttermilk Falls Brook, in                   schedule to restore project operation in              comments or documents with the
                                                  Orange County, New York.                                a timely manner.                                      Commission relating to the merits of an
                                                     f. Filed Pursuant to: Standard Article                  l. This notice is available for review             issue that may affect the responsibilities
                                                  16.                                                     and reproduction at the Commission in                 of a particular resource agency, they
                                                     g. Licensee Contact Information: Mr.                 the Public Reference Room, Room 2A,                   must also serve a copy of the document
                                                  John A. Dodson, P.O. Box 221, Highland                  888 First Street NE., Washington, DC                  on that resource agency. A copy of all
                                                  Falls, New York 10928, Phone: (914)                     20426. The notice and other project                   other filings in reference to this
                                                  446–7704.                                               records may also be viewed on the                     application must be accompanied by
                                                     h. FERC Contact: Mr. Ashish Desai,                   Commission’s Web site at http://                      proof of service on all persons listed in
                                                  (202) 502–8370, Ashish.Desai@ferc.gov.                  www.ferc.gov/docs-filing/elibrary.asp.                the service list prepared by the
                                                     i. Deadline for filing comments,                     Enter the Docket number (P–7656–012)                  Commission in this proceeding in
                                                  protests, and motions to intervene is 30                excluding the last three digits in the                accordance with 18 CFR 4.34(b) and
                                                  days from the issuance date of this                     docket number field to access the                     385.2010.
                                                  notice by the Commission. The                           notice. You may also register online at                 Dated: April 15, 2016.
                                                  Commission strongly encourages                          http://www.ferc.gov/docs-filing/                      Kimberly D. Bose,
                                                  electronic filing. Please file comments,                esubscription.asp to be notified via                  Secretary.
                                                  protests, and motions to intervene using                email of new filings and issuances                    [FR Doc. 2016–09228 Filed 4–20–16; 8:45 am]
                                                  the Commission’s eFiling system at                      related to this or other pending projects.            BILLING CODE 6717–01–P
                                                  http://www.ferc.gov/docs-filing/                        For assistance, call toll-free (866) 208–
                                                  efiling.asp. Commenters can submit                      3676 or email FERCOnlineSupport@
                                                  brief comments up to 6,000 characters,                  ferc.gov. For TTY, call (202) 502–8659.               DEPARTMENT OF ENERGY
                                                  without prior registration, using the                      m. Individuals desiring to be included
                                                  eComment system at http://                              on the Commission’s mailing list should               Federal Energy Regulatory
                                                  www.ferc.gov/docs-filing/                               so indicate by writing to the Secretary               Commission
                                                  ecomment.asp. You must include your                     of the Commission.
                                                  name and contact information at the end                    n. Comments, Protests, or Motions to               [Docket No. CP16–121–000; PF15–28–000]
jstallworth on DSK7TPTVN1PROD with NOTICES




                                                  of your comments. For assistance,                       Intervene: Anyone may submit                          National Grid LNG LLC; Notice of
                                                  please contact FERC Online Support at                   comments, a protest, or a motion to                   Application
                                                  FERCOnlineSupport@ferc.gov, (866)                       intervene in accordance with the
                                                  208–3676 (toll free), or (202) 502–8659                 requirements of Rules of Practice and                   Take notice that on April 1, 2016,
                                                  (TTY). In lieu of electronic filing, please             Procedure, 18 CFR 385.210, .211, and                  National Grid LNG LLC (NGLNG),
                                                  send a paper copy to: Secretary, Federal                .214. In determining the appropriate                  having its principal place of business at
                                                  Energy Regulatory Commission, 888                       action to take, the Commission will                   40 Sylvan Rd, Waltham, MA 02451,


                                             VerDate Sep<11>2014   13:27 Apr 20, 2016   Jkt 238001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\21APN1.SGM   21APN1



Document Created: 2016-04-21 01:18:28
Document Modified: 2016-04-21 01:18:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern Time on May 6, 2016.
FR Citation81 FR 23476 