DEPARTMENT OF THE INTERIOR
Bureau of Ocean Energy Management

Federal Register Volume 81, Issue 81 (April 27, 2016)

Page Range24869-24880
FR Document2016-09709

To comply with the Paperwork Reduction Act of 1995 (PRA), the Bureau of Ocean Energy Management (BOEM) is notifying the public that we have submitted an information collection request (ICR) to the Office of Management and Budget (OMB) for review and approval. This ICR concerns the paperwork requirements in the regulations under ``Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf.'' This notice provides the public a second opportunity to comment on the paperwork burden of this collection.

Federal Register, Volume 81 Issue 81 (Wednesday, April 27, 2016)
[Federal Register Volume 81, Number 81 (Wednesday, April 27, 2016)]
[Notices]
[Pages 24869-24880]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-09709]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[OMB Control Number 1010-0176; MMAA104000]


Information Collection: Renewable Energy and Alternate Uses of 
Existing Facilities on the Outer Continental Shelf; Submitted for OMB 
Review; Comment Request

ACTION: 30-Day notice.

-----------------------------------------------------------------------

SUMMARY: To comply with the Paperwork Reduction Act of 1995 (PRA), the 
Bureau of Ocean Energy Management (BOEM) is notifying the public that 
we have submitted an information collection request (ICR) to the Office 
of Management and Budget (OMB) for review and approval. This ICR 
concerns the paperwork requirements in the regulations under 
``Renewable Energy and Alternate Uses of Existing Facilities on the 
Outer Continental Shelf.'' This notice provides the public a second 
opportunity to comment on the paperwork burden of this collection.

DATES: Submit written comments by May 27, 2016.

ADDRESSES: Submit comments on this ICR to the Desk Officer for the 
Department of the Interior at OMB-OIRA at (202) 395-5806 (fax) or 
[email protected]. Please provide a copy of your comments to 
BOEM at OPRA Mail Stop: VA-DIR, 45600 Woodland Road, Sterling, VA 
20166. Please reference ICR 1010-0176 in your comment and include your 
name and return address.

FOR FURTHER INFORMATION CONTACT: Office of Policy, Regulations, and 
Analysis at or (202) 208-6352. You may review the ICR online at http://www.reginfo.gov. Follow the instructions to review Department of the 
Interior collections under review by OMB.

SUPPLEMENTARY INFORMATION: 
    OMB Control Number: 1010-0176.
    Title: 30 CFR 585, Renewable Energy and Alternate Uses of Existing 
Facilities on the Outer Continental Shelf.
    Forms: BOEM-0002, BOEM-0003, BOEM-0004, BOEM-0005, BOEM-0006.
    Abstract: The Outer Continental Shelf (OCS) Lands Act, as amended 
(43 U.S.C. 1331 et seq. and 43 U.S.C. 1801 et seq.), authorizes the 
Secretary of the Interior to issue leases, easements, or rights-of-way 
on the OCS for activities that produce or support production, 
transportation, or transmission of energy from sources other than oil 
and gas (renewable energy). Specifically, subsection 8(p) of the OCS 
Lands Act, as amended (43 U.S.C. 1337(p)), directs the Secretary of the 
Interior to issue any necessary regulations to carry out the OCS 
renewable energy program. The Secretary delegated this authority to 
BOEM. BOEM has issued regulations for OCS renewable energy activities 
at 30 CFR part 585; this notice concerns the reporting and 
recordkeeping elements required by these regulations.
    Respondents operate commercial and noncommercial technology 
projects that include installation, construction, operation and 
maintenance, and decommissioning of offshore facilities, as well as 
possible onshore support facilities. BOEM must ensure that these 
activities and operations on the OCS are performed in a safe manner 
which do not cause damage to the environment or endanger life or 
health, do not interfere with the rights of other users on the OCS, and 
balance the protection and development of OCS resources. Therefore, 
BOEM needs information concerning the proposed activities, facilities, 
safety equipment, inspections and tests, and natural and manmade 
hazards near the site, as well as assurance of fiscal responsibility.
    BOEM uses forms to collect some information to ensure proper and 
efficient administration of OCS renewable energy leases and grants and 
to document the financial responsibility of lessees and grantees. Forms 
BOEM-0002, BOEM-0003, BOEM-0004, and BOEM-0006 are used by renewable 
energy entities on the OCS to assign a lease interest, designate an 
operator, and to assign or relinquish a lease or grant. Form BOEM-0005 
was designed to guarantee the performance of sureties with respect to 
bonds issued on behalf of OCS renewable energy lessees, grantees, and 
operators. BOEM maintains the submitted forms as official lease and 
grant records pertaining to operating responsibilities, ownership, and 
financial responsibility.
    We will protect information considered proprietary under the 
Freedom of Information Act (5 U.S.C. 552) and its implementing 
regulations (43 CFR part 2) and under regulations at 30 CFR 585.113, 
addressing disclosure

[[Page 24870]]

of data and information to be made available to the public and others. 
No items of a sensitive nature are collected. Responses are mandatory 
or required to obtain a benefit.
    Frequency: On occasion or annually.
    Description of Respondents: Companies interested in renewable 
energy-related uses on the OCS and holders of leases and grants under 
30 CFR part 585.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this collection is 25,688 hours. The following 
table details the individual components and estimated hour burdens. In 
calculating the burdens, we assumed that respondents perform certain 
requirements in the normal course of their activities. We consider 
these to be usual and customary and took that into account in 
estimating the burden.

                                                                      Burden Table
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                     Non-hour cost burdens
                                       Reporting and recordkeeping                                    --------------------------------------------------
      Section(s) in 30  CFR 585              requirement \1\                    Hour burden                 Average number of annual       Annual burden
                                                                                                                   responses                   hours
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                              Subpart A--General Provisions
--------------------------------------------------------------------------------------------------------------------------------------------------------
102; 105; 110.......................  These sections contain general references to responsibilities, submitting comments, requests,                    0
                                       applications, plans, notices, reports, and/or supplemental information for BOEM approval--burdens
                                       covered under specific requirements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
102(e)..............................  State and local governments    1...............................  2 agreements.....................               2
                                       enter into task force or
                                       joint planning or
                                       coordination agreement with
                                       BOEM.
--------------------------------------------------------------------------------------------------------------------------------------------------------
103; 904............................  Request general departures     2...............................  6 requests.......................              12
                                       not specifically covered
                                       elsewhere in part 585..
--------------------------------------------------------------------------------------------------------------------------------------------------------
105(c)..............................  Make oral requests or          1...............................  5 requests.......................               5
                                       notifications and submit
                                       written follow up within 3
                                       business days not
                                       specifically covered
                                       elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
106; 107; 213(e); 230(f); 302(a);     Submit evidence of             2...............................  20 submissions...................              40
 408(b)(7); 409(c); 1005(d);           qualifications to hold a
 1007(c); 1013(b)(7).                  lease or grant; submit
                                       required supporting
                                       information (electronically
                                       if required).
--------------------------------------------------------------------------------------------------------------------------------------------------------
106(b)(1)...........................  Request exception from         1...............................  1 exception......................               1
                                       exclusion or
                                       disqualification from
                                       participating in
                                       transactions covered by
                                       Federal non-procurement
                                       debarment and suspension
                                       system.
--------------------------------------------------------------------------------------------------------------------------------------------------------
106(b)(2); 118(c); 225(b); 436; 437;  Request reconsideration and/   Requirement not considered IC under 5 CFR 1320.3(h)(9).                           0
 527(c); 705(c)(2); 1016.              or hearing.
--------------------------------------------------------------------------------------------------------------------------------------------------------
108; 530(b).........................  Notify BOEM within 3 business  1...............................  1 notice.........................               1
                                       days after learning of any
                                       action filed alleging
                                       respondent is insolvent or
                                       bankrupt.
--------------------------------------------------------------------------------------------------------------------------------------------------------
109.................................  Notify BOEM in writing of      Requirement not considered IC under 5 CFR 1320.3(h)(1).                           0
                                       merger, name change, or
                                       change of business form no
                                       later than 120 days after
                                       earliest of either the
                                       effective date or filing
                                       date.
--------------------------------------------------------------------------------------------------------------------------------------------------------
111.................................  Within 30 days of receiving    .5..............................  4 submissions....................               2
                                       bill, submit processing fee
                                       payments for BOEM document
                                       or study preparation to
                                       process applications and
                                       other requests.
                                                                    ------------------------------------------------------------------------------------
                                                                                                4 payments x $4,000 = $16,000
--------------------------------------------------------------------------------------------------------------------------------------------------------
111(b)(2), (3)......................  Submit comments on proposed    2...............................  4 requests.......................               8
                                       processing fee or request
                                       approval to perform or
                                       directly pay contractor for
                                       all or part of any document,
                                       study, or other activity, to
                                       reduce BOEM processing costs.
--------------------------------------------------------------------------------------------------------------------------------------------------------
111(b)(3)...........................  Perform, conduct, develop,     19,000..........................  1 submission.....................          19,000
                                       etc., all or part of any
                                       document, study, or other
                                       activity; and provide
                                       results to BOEM to reduce
                                       BOEM processing fee.
--------------------------------------------------------------------------------------------------------------------------------------------------------
111(b)(3)...........................  Pay contractor for all or                         3 contractor payments x $950,000 = $2,850,000
                                       part of any document, study,
                                       or other activity, and
                                       provide results to BOEM to
                                       reduce BOEM processing costs.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24871]]

 
111(b)(7); 118(a); 436(c)...........  Appeal BOEM estimated          Exempt under 5 CFR 1320.4(a)(2), (c).                                             0
                                       processing costs, decisions,
                                       or orders pursuant to 30 CFR
                                       590.
--------------------------------------------------------------------------------------------------------------------------------------------------------
113(b)..............................  Respond to the Freedom of      4...............................  1 agreement......................               4
                                       Information Act release
                                       schedule.
--------------------------------------------------------------------------------------------------------------------------------------------------------
115(c)..............................  Request approval to use later  1...............................  1 request........................               1
                                       edition of a document
                                       incorporated by reference or
                                       alternative compliance.
--------------------------------------------------------------------------------------------------------------------------------------------------------
116.................................  The Director may occasionally  4...............................  25 submissions...................             100
                                       request information to
                                       administer and carry out the
                                       offshore renewable energy
                                       program via Federal Register
                                       Notices.
--------------------------------------------------------------------------------------------------------------------------------------------------------
118(c); 225(b)......................  Within 15 days of bid          Requirement not considered IC under 5 CFR 1320.3(h)(9).                           0
                                       rejection, request
                                       reconsideration of bid
                                       decision or rejection.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  71 responses.....................          19,176
                                                                                                      --------------------------------------------------
                                                                                                                   $2,866,000 non-hour costs
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                   Subpart B--Issuance of OCS Renewable Energy Leases
--------------------------------------------------------------------------------------------------------------------------------------------------------
200; 224; 231; 235; 236; 238........  These sections contain references to information submissions, approvals, requests, applications,                 0
                                       plans, payments, etc., the burdens for which are covered elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
210; 211(a-c); 212 thru 216.........  Submit nominations and         Not considered IC as defined in 5 CFR 1320.3(h)(4).                               0
                                       general comments in response
                                       to Federal Register notices
                                       on Request for Interest in
                                       OCS Leasing, Call for
                                       Information and Nominations
                                       (Call), Area Identification,
                                       and Notices of Sale.
                                       Includes industry, State &
                                       local governments.
--------------------------------------------------------------------------------------------------------------------------------------------------------
210; 211(a-c); 212 thru 216.........  Submit comments and required   4...............................  30 comments......................             120
                                       information in response to
                                       Federal Register notices on
                                       Request for Interest in OCS
                                       Leasing, Call for
                                       Information and Nominations
                                       (Call), Area Identification,
                                       and Notices of Sale.
                                       Includes industry, State &
                                       local governments.
--------------------------------------------------------------------------------------------------------------------------------------------------------
211(d); 216; 220 thru 223; 231(c)(2)  Submit bid, payments, and      5...............................  12 bids..........................              60
                                       required information in
                                       response to Federal Register
                                       Final Sale Notice.
--------------------------------------------------------------------------------------------------------------------------------------------------------
224.................................  Within 10 business days,       1...............................  2 lease executions...............               2
                                       execute 3 copies of lease
                                       form and return to BOEM with
                                       required payments, including
                                       evidence that agent is
                                       authorized to act for
                                       bidder; if applicable,
                                       submit information to
                                       support delay in execution--
                                       competitive leases.
--------------------------------------------------------------------------------------------------------------------------------------------------------
230; 231(a).........................  Submit unsolicited request     5...............................  2 requests.......................              10
                                       and acquisition fee for a
                                       commercial or limited lease.
--------------------------------------------------------------------------------------------------------------------------------------------------------
231(b)..............................  Submit comments in response    4...............................  4 comments.......................              16
                                       to Federal Register notice
                                       re interest of unsolicited
                                       request for a lease.
--------------------------------------------------------------------------------------------------------------------------------------------------------
231(g)..............................  Within 10 business days of     2...............................  2 leases.........................               4
                                       receiving lease documents,
                                       execute lease; file
                                       financial assurance and
                                       supporting documentation--
                                       noncompetitive leases.
--------------------------------------------------------------------------------------------------------------------------------------------------------
231(g)..............................  Within 45 days of receiving    Burdens covered by information collections approved for ONRR 30 CFR               0
                                       lease copies, submit rent      Chapter XII.
                                       and rent information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
235(b); 236(b)......................  Request additional time to     1...............................  3 requests.......................               3
                                       extend preliminary or site
                                       assessment term of
                                       commercial or limited lease,
                                       including revised schedule
                                       for SAP, COP, or GAP
                                       submission.
--------------------------------------------------------------------------------------------------------------------------------------------------------
237(b)..............................  Request lease be dated and     1...............................  1 request........................               1
                                       effective 1st day of month
                                       in which signed.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24872]]

 
238.................................  Submit other renewable energy  Burden covered under SAPs & GAPs Sec.   585.600(a), (c).                          0
                                       research activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  56 responses.....................             216
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                          Subpart C--ROW Grants and RUE Grants for Renewable Energy Activities
--------------------------------------------------------------------------------------------------------------------------------------------------------
306; 309; 315; 316..................  These sections contain references to information submissions, approvals, requests, applications,                 0
                                       plans, payments, etc., the burdens for which are covered elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
302(a); 305; 306....................  Submit copies of a request     5...............................  1 request........................               5
                                       for a new or modified ROW or
                                       RUE and required
                                       information, including
                                       qualifications to hold a
                                       grant, in format specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
307; 308(a)(1)......................  Submit information in          4...............................  2 comments.......................               8
                                       response to Federal Register
                                       notice of proposed ROW or
                                       RUE grant area or comments
                                       on notice of grant auction.
--------------------------------------------------------------------------------------------------------------------------------------------------------
308(a)(2), (b); 315; 316............  Submit bid and payments in     5...............................  1 bid............................               5
                                       response to Federal Register
                                       notice of auction for a ROW
                                       or RUE grant.
--------------------------------------------------------------------------------------------------------------------------------------------------------
309.................................  Submit decision to accept or   2...............................  1 submission.....................               2
                                       reject terms and conditions
                                       of noncompetitive ROW or RUE
                                       grant.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  5 responses......................              20
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Subpart D--Lease and Grant Administration
--------------------------------------------------------------------------------------------------------------------------------------------------------
400; 401; 402; 405; 409; 416, 433...  These sections contain references to information submissions, approvals, requests, applications,                 0
                                       plans, payments, etc., the burdens for which are covered elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
401(b)..............................  Take measures directed by      100.............................  1 report.........................             100
                                       BOEM in cessation order and
                                       submit reports in order to
                                       resume activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
405(d)..............................  Submit written notice of       Requirement not considered IC under 5 CFR 1320.3(h)(1).                           0
                                       change of address.
--------------------------------------------------------------------------------------------------------------------------------------------------------
405(e); Form BOEM-0006..............  If designated operator (DO)    1...............................  1 notice.........................               1
                                       changes, notify BOEM and
                                       identify new DO for BOEM
                                       approval.
--------------------------------------------------------------------------------------------------------------------------------------------------------
408 thru 411; Forms BOEM-0002 and     Within 90 days after last      1 (30 minutes per form x 2 forms  2 requests/submissions...........               2
 BOEM-0003.                            party executes a transfer      = 1 hour).
                                       agreement, submit copies of
                                       a lease or grant assignment
                                       application, including
                                       originals of each instrument
                                       creating or transferring
                                       ownership of record title,
                                       eligibility and other
                                       qualifications; and evidence
                                       that agent is authorized to
                                       execute assignment, in
                                       format specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
415(a)(1); 416; 420(a), (b); 428(b).  Submit request for suspension  10..............................  1 request........................              10
                                       and required information/
                                       payment no later than 90
                                       days prior to lease or grant
                                       expiration.
--------------------------------------------------------------------------------------------------------------------------------------------------------
417(b)..............................  Conduct, and if required pay   100.............................  1 study/submission...............             100
                                       for, site-specific study to
                                       evaluate cause of harm or
                                       damage; and submit copies of
                                       study and results, in format
                                       specified.
                                                                    ------------------------------------------------------------------------------------
                                                                                                1 study x $950,000 = $950,000
--------------------------------------------------------------------------------------------------------------------------------------------------------
425 thru 428; 652(a); 235(a), (b)...  Request lease or grant         6...............................  1 requests.......................               6
                                       renewal no later than 180
                                       days before termination date
                                       of your limited lease or
                                       grant, or no later than 2
                                       years before termination
                                       date of operations term of
                                       commercial lease. Submit
                                       required information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
435; 658(c)(2); Form BOEM-0004......  Submit copies of application   1...............................  1 submission.....................               1
                                       to relinquish lease or
                                       grant, in format specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24873]]

 
436; 437............................  Provide information for        Requirement not considered IC under 5 CFR 1320.3(h)(9).                           0
                                       reconsideration of BOEM
                                       decision to contract or
                                       cancel lease or grant area.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  8 responses......................             220
                                                                                                      --------------------------------------------------
                                                                                                                    $950,000 non-hour costs
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                Subpart E--Payments and Financial Assurance Requirements
--------------------------------------------------------------------------------------------------------------------------------------------------------
An * indicates the primary cites for providing bonds or other financial assurance, and the burdens include any previous or subsequent                  0
 references throughout part 585 to furnish, replace, or provide additional bonds, securities, or financial assurance (including riders,
 cancellations, replacements). This subpart contains references to other information submissions, approvals, requests, applications,
 plans, etc., the burdens for which are covered elsewhere in part 585. In the future BOEM may require electronic filings of certain
 submissions.
--------------------------------------------------------------------------------------------------------------------------------------------------------
500 thru 509; 1011..................  Submit payor information,      Burdens covered by information collections approved for ONRR 30 CFR               0
                                       payments and payment           Chapter XII.
                                       information, and maintain
                                       auditable records according
                                       to ONRR regulations or
                                       guidance.
--------------------------------------------------------------------------------------------------------------------------------------------------------
506(c)(4)...........................  Submit documentation of the    Burden covered under DOE/EIA OMB Control Number 1905-0129.                        0
                                       gross annual generation of
                                       electricity produced by the
                                       generating facility on the
                                       lease--use same form as
                                       authorized by the EIA.
--------------------------------------------------------------------------------------------------------------------------------------------------------
510; 506(c)(3)......................  Submit application and         1...............................  1 submission.....................               1
                                       required information for
                                       waiver or reduction of
                                       rental or other payment.
--------------------------------------------------------------------------------------------------------------------------------------------------------
* 515; 516; 525(a) thru (f).........  Execute and provide $100,000   1...............................  2 bonds..........................               2
                                       minimum lease-specific bond
                                       or other approved security;
                                       or increase bond level if
                                       required.
--------------------------------------------------------------------------------------------------------------------------------------------------------
* 516(a)(2), (3), (b), (c); 517;      Execute and provide            1...............................  2 bonds..........................               2
 525(a) thru (f).                      commercial lease
                                       supplemental bonds in
                                       amounts determined by BOEM.
--------------------------------------------------------------------------------------------------------------------------------------------------------
516(a)(4); 521(c)...................  Execute and provide            1...............................  1 bond...........................               1
                                       decommissioning bond or
                                       other financial assurance;
                                       schedule for providing the
                                       appropriate amount.
--------------------------------------------------------------------------------------------------------------------------------------------------------
517(c)(1)...........................  Submit comments on proposed    1...............................  1 submission.....................               1
                                       adjustment to bond amounts.
--------------------------------------------------------------------------------------------------------------------------------------------------------
517(c)(2)...........................  Request bond reduction and     5...............................  1 request........................               5
                                       submit evidence to justify.
--------------------------------------------------------------------------------------------------------------------------------------------------------
* 520; 521; 525(a) thru (f); Form     Execute and provide $300,000   1...............................  1 bond...........................               1
 BOEM-0005.                            minimum limited lease or
                                       grant-specific bond or
                                       increase financial assurance
                                       and required information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
525(g)..............................  Surety notice to lessee or     1...............................  1 surety notice..................               1
                                       ROW/RUE grant holder and
                                       BOEM within 5 business days
                                       after initiating surety
                                       insolvency or bankruptcy
                                       proceeding, or Treasury
                                       decertifies surety.
--------------------------------------------------------------------------------------------------------------------------------------------------------
* 526 Form BOEM-0005................  In lieu of surety bond,        2...............................  1 pledge.........................               2
                                       pledge other types of
                                       securities, including
                                       authority for BOEM to sell
                                       and use proceeds and submit
                                       required information (1 hour
                                       for form).
--------------------------------------------------------------------------------------------------------------------------------------------------------
526(c)..............................  Provide annual certified       1...............................  1 statement......................               1
                                       statements describing the
                                       nature and market value,
                                       including brokerage firm
                                       statements/reports.
--------------------------------------------------------------------------------------------------------------------------------------------------------
* 527; 531..........................  Demonstrate financial worth/   10..............................  1 demonstration..................              10
                                       ability to carry out present
                                       and future financial
                                       obligations, annual updates,
                                       and related or subsequent
                                       actions/records/reports, etc.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24874]]

 
528.................................  Provide third-party            10..............................  1 submission.....................              10
                                       indemnity; financial
                                       information/statements;
                                       additional bond info;
                                       executed guarantor agreement
                                       and supporting information/
                                       documentation/agreements.
--------------------------------------------------------------------------------------------------------------------------------------------------------
528(c)(6); 532(b)...................  Guarantor/Surety requests      1...............................  1 request........................               1
                                       BOEM terminate period of
                                       liability and notifies
                                       lessee or ROW/RUE grant
                                       holder, etc.
--------------------------------------------------------------------------------------------------------------------------------------------------------
* 529...............................  In lieu of surety bond,        2...............................  1 request........................               2
                                       request authorization to
                                       establish decommissioning
                                       account, including written
                                       authorizations and approvals
                                       associated with account.
--------------------------------------------------------------------------------------------------------------------------------------------------------
530.................................  Notify BOEM promptly of lapse  1...............................  1 notice.........................               1
                                       in bond or other security/
                                       action filed alleging
                                       lessee, surety or guarantor
                                       et al is insolvent or
                                       bankrupt.
--------------------------------------------------------------------------------------------------------------------------------------------------------
533(a)(2)(ii), (iii)................  Provide agreement from surety  3...............................  1 submission.....................               3
                                       issuing new bond to assume
                                       all or portion of
                                       outstanding liabilities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
536(b)..............................  Within 10 business days        16..............................  1 demonstration every 2 years....               8
                                       following BOEM notice,
                                       lessee, grant holder, or
                                       surety agrees to and
                                       demonstrates to BOEM that
                                       lease will be brought into
                                       compliance.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  21 responses.....................              52
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                      Subpart F--Plans and Information Requirements
--------------------------------------------------------------------------------------------------------------------------------------------------------
Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations Plans (COPs), and General Activities                   0
 Plans (GAPs); and the burdens include any previous or subsequent references throughout part 585 to submission and approval. This
 subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are
 covered elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
** 600(a); 601(a), (b); 605 thru      Within time specified after    240.............................  2 SAPs...........................             480
 614; 238; 810.                        issuance of a competitive
                                       lease or grant, or within
                                       time specified after
                                       determination of no
                                       competitive interest, submit
                                       copies of SAP, including
                                       required information to
                                       assist BOEM to comply with
                                       NEPA/CZMA such as hazard
                                       info, air quality, SEMS, and
                                       all required information,
                                       certifications, requests,
                                       etc., in format specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
** 600(b); 601(c), (d)(1); 606(b);    If requesting an operations    1,000...........................  2 COPs...........................           2,000
 618; 620 thru 629; 632; 633; 810.     term for commercial lease,
                                       within time specified before
                                       the end of site assessment
                                       term, submit copies of COP,
                                       or FERC license application,
                                       including required
                                       information to assist BOEM
                                       to comply with NEPA/CZMA
                                       such as hazard info, air
                                       quality, SEMS, and all
                                       required information,
                                       surveys and/or their
                                       results, reports,
                                       certifications, project
                                       easements, supporting data
                                       and information, requests,
                                       etc., in format specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
** 600(c); 601(a), (b); 640 thru      Within time specified after    240.............................  2 GAP............................             480
 648; 651; 238; 810.                   issuance of a competitive
                                       lease or grant, or within
                                       time specified after
                                       determination of no
                                       competitive interest, submit
                                       copies of GAP, including
                                       required information to
                                       assist BOEM to comply with
                                       NEPA/CZMA such as hazard
                                       info, air quality, SEMS, and
                                       all required information,
                                       surveys and reports,
                                       certifications, project
                                       easements, requests, etc.,
                                       in format specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
** 601(d)(2); 622; 628(f); 632; 634;  Submit revised or modified     50..............................  1 revised or modified COP........              50
 658(c)(3); 907.                       COPs, including project
                                       easements, and all required
                                       additional information.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24875]]

 
602 \2\.............................  Until BOEM releases financial  2...............................  9 records/submissions............              18
                                       assurance, respondents must
                                       maintain, and provide to
                                       BOEM if requested, all data
                                       and information related to
                                       compliance with required
                                       terms and conditions of SAP,
                                       COP, or GAP.
--------------------------------------------------------------------------------------------------------------------------------------------------------
** 613(a), (d), (e); 617............  Submit revised or modified     50..............................  1 revised or modified SAP........              50
                                       SAPs and required additional
                                       information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
612; 647............................  Submit copy of SAP or GAP      1...............................  2 leases.........................               2
                                       consistency certification
                                       and supporting
                                       documentation, including
                                       noncompetitive leases.
--------------------------------------------------------------------------------------------------------------------------------------------------------
615(a)..............................  Notify BOEM in writing within  1...............................  2 notices........................               2
                                       30 days of completion of
                                       construction and
                                       installation activities
                                       under SAP.
--------------------------------------------------------------------------------------------------------------------------------------------------------
615(b)..............................  Submit annual report           30..............................  4 reports........................             120
                                       summarizing findings from
                                       site assessment activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
615(c)..............................  Submit annual, or at other     40..............................  4 certifications.................             160
                                       time periods as BOEM
                                       determines, SAP compliance
                                       certification, effectiveness
                                       statement, recommendations,
                                       reports, supporting
                                       documentation, etc.
--------------------------------------------------------------------------------------------------------------------------------------------------------
617(a)..............................  Notify BOEM in writing before  10..............................  1 notice.........................              10
                                       conducting any activities
                                       not approved, or provided
                                       for, in SAP; provide
                                       additional information if
                                       requested.
--------------------------------------------------------------------------------------------------------------------------------------------------------
627(c)..............................  Submit oil spill response      Burden covered under BSEE 1014-0007.                                              0
                                       plan as required by BSEE 30
                                       CFR part 254.
--------------------------------------------------------------------------------------------------------------------------------------------------------
631.................................  Request deviation from         2...............................  1 request........................               2
                                       approved COP schedule.
--------------------------------------------------------------------------------------------------------------------------------------------------------
633(b)..............................  Submit annual, or at other     50..............................  9 certifications.................             450
                                       time periods as BOEM
                                       determines, COP compliance
                                       certification, effectiveness
                                       statement, recommendations,
                                       reports, supporting
                                       documentation, etc.
--------------------------------------------------------------------------------------------------------------------------------------------------------
634(a)..............................  Notify BOEM in writing before  10..............................  1 notice.........................              10
                                       conducting any activities
                                       not approved or provided for
                                       in COP, and provide
                                       additional information if
                                       requested.
--------------------------------------------------------------------------------------------------------------------------------------------------------
635.................................  Notify BOEM any time           1...............................  1 notice.........................               1
                                       commercial operations cease
                                       without an approved
                                       suspension.
--------------------------------------------------------------------------------------------------------------------------------------------------------
636(a)..............................  Notify BOEM in writing no      1...............................  2 notices........................               2
                                       later than 30 days after
                                       commencing activities
                                       associated with placement of
                                       facilities on lease area.
--------------------------------------------------------------------------------------------------------------------------------------------------------
636(b)..............................  Notify BOEM in writing no      1...............................  2 notices........................               2
                                       later than 30 days after
                                       completion of construction
                                       and installation activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
636(c)..............................  Notify BOEM in writing at      1...............................  1 notices........................               1
                                       least 7 days before
                                       commencing commercial
                                       operations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
** 642(b); 648; 655; 658(c)(3)......  Submit revised or modified     50..............................  1 revised or modified GAP........              50
                                       GAPs and required additional
                                       information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
651.................................  Before beginning construction  30..............................  2 surveys/reports................              60
                                       of OCS facility described in
                                       GAP, complete survey
                                       activities identified in GAP
                                       and submit initial findings.
                                       [This only includes the time
                                       involved in submitting the
                                       findings; it does not
                                       include the survey time as
                                       these surveys would be
                                       conducted as good business
                                       practice.].
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24876]]

 
653(a)..............................  Notify BOEM in writing within  1...............................  2 notices........................               2
                                       30 days of completing
                                       installation activities
                                       under the GAP.
--------------------------------------------------------------------------------------------------------------------------------------------------------
653(b)..............................  Submit annual report           30..............................  4 reports........................             120
                                       summarizing findings from
                                       activities conducted under
                                       approved GAP.
--------------------------------------------------------------------------------------------------------------------------------------------------------
653(c)..............................  Submit annual, or at other     40..............................  4 certifications.................             160
                                       time periods as BOEM
                                       determines, GAP compliance
                                       certification,
                                       recommendations, reports,
                                       etc.
--------------------------------------------------------------------------------------------------------------------------------------------------------
655(a)..............................  Notify BOEM in writing before  10..............................  1 notice.........................              10
                                       conducting any activities
                                       not approved or provided for
                                       in GAP, and provide
                                       additional information if
                                       requested.
--------------------------------------------------------------------------------------------------------------------------------------------------------
656.................................  Notify BOEM any time approved  1...............................  1 notice.........................               1
                                       GAP activities cease without
                                       an approved suspension.
--------------------------------------------------------------------------------------------------------------------------------------------------------
658(c)(1)...........................  If after construction, cable   3...............................  1 notice/evidence................               3
                                       or pipeline deviate from
                                       approved COP or GAP, notify
                                       affected lease operators and
                                       ROW/RUE grant holders of
                                       deviation and provide BOEM
                                       evidence of such notices.
--------------------------------------------------------------------------------------------------------------------------------------------------------
659.................................  Determine appropriate air      70..............................  5 reports/information............             350
                                       quality modeling protocol,
                                       conduct air quality
                                       modeling, and submit 3
                                       copies of air quality
                                       modeling report and 3 sets
                                       of digital files as
                                       supporting information to
                                       plans.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  68 responses.....................           4,596
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                Subpart G--Facility Design, Fabrication, and Installation
--------------------------------------------------------------------------------------------------------------------------------------------------------
Three *** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent                     0
 references throughout part 585 to submitting and obtaining approval. This subpart contains references to other information submissions,
 approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
*** 700(a)(1), (b), (c); 701........  Submit Facility Design         200.............................  1 report.........................             200
                                       Report, including copies of
                                       the cover letter,
                                       certification statement, and
                                       all required information (1-
                                       3 paper or electronic copies
                                       as specified).
--------------------------------------------------------------------------------------------------------------------------------------------------------
*** 700(a)(2), (b), (c); 702........  Submit copies of a             160.............................  1 report.........................             160
                                       Fabrication and Installation
                                       Report, certification
                                       statement and all required
                                       information, in format
                                       specified.
--------------------------------------------------------------------------------------------------------------------------------------------------------
705(a)(3); 707; 712.................  Certified Verification Agent   100.............................  1 interim report.................             100
                                       (CVA) conducts independent
                                       assessment of the facility
                                       design and submits copies of
                                       all reports/certifications
                                       to lessee or grant holder
                                       and BOEM--interim reports if
                                       required, in format
                                       specified.
                                                                    ------------------------------------------------------------------------------------
                                                                     100.............................  1 final report...................             100
--------------------------------------------------------------------------------------------------------------------------------------------------------
705(a)(3); 708; 709; 710; 712.......  CVA conducts independent       100.............................  1 interim report.................             100
                                       assessments/inspections on
                                       the fabrication and
                                       installation activities,
                                       informs lessee or grant
                                       holder if procedures are
                                       changed or design
                                       specifications are modified;
                                       and submits copies of all
                                       reports/certifications to
                                       lessee or grant holder and
                                       BOEM--interim reports if
                                       required, in format
                                       specified.
                                                                    ------------------------------------------------------------------------------------
                                                                     100.............................  1 final report...................             100
--------------------------------------------------------------------------------------------------------------------------------------------------------
*** 703; 705(a)(3); 712; 815........  CVA/project engineer monitors  20..............................  1 interim report.................              20
                                       major project modifications
                                       and repairs and submits
                                       copies of all reports/
                                       certifications to lessee or
                                       grant holder and BOEM--
                                       interim reports if required,
                                       in format specified.
                                                                    ------------------------------------------------------------------------------------
                                                                     15                                1 final report...................              15
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24877]]

 
705(c)..............................  Request waiver of CVA          40..............................  1 waiver.........................              40
                                       requirement in writing;
                                       lessee must demonstrate
                                       standard design and best
                                       practices.
--------------------------------------------------------------------------------------------------------------------------------------------------------
706.................................  Submit for approval with SAP,  16..............................  2 nominations....................              32
                                       COP, or GAP, initial
                                       nominations for a CVA or new
                                       replacement CVA nomination,
                                       and required information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
708(b)(2)...........................  Lessee or grant holder notify  1...............................  1 notice.........................               1
                                       BOEM if modifications
                                       identified by CVA/project
                                       engineer are accepted.
--------------------------------------------------------------------------------------------------------------------------------------------------------
709(a)(14); 710(a)(2), (e) \2\......  Make fabrication quality       1...............................  3 records retention..............               3
                                       control, installation
                                       towing, and other records
                                       available to CVA/project
                                       engineer for review
                                       (retention required by Sec.
                                        585.714).
--------------------------------------------------------------------------------------------------------------------------------------------------------
713.................................  Notify BOEM within 10          1...............................  1 notice.........................               1
                                       business days after
                                       commencing commercial
                                       operations.
--------------------------------------------------------------------------------------------------------------------------------------------------------
714 \2\.............................  Until BOEM releases financial  100.............................  1 lessee.........................             100
                                       assurance, compile, retain,
                                       and make available to BOEM
                                       and/or CVA the as-built
                                       drawings, design assumptions/
                                       analyses, summary of
                                       fabrication and installation
                                       examination records,
                                       inspection results, and
                                       records of repairs not
                                       covered in inspection
                                       report. Record original and
                                       relevant material test
                                       results of all primary
                                       structural materials; retain
                                       records during all stages of
                                       construction.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  17 responses.....................             972
--------------------------------------------------------------------------------------------------------------------------------------------------------
        Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs, and GAPs
--------------------------------------------------------------------------------------------------------------------------------------------------------
801(c), (d).........................  Notify BOEM if endangered or   1...............................  2 notices........................               2
                                       threatened species, or their
                                       designated critical habitat,
                                       may be in the vicinity of
                                       the lease or grant or may be
                                       affected by lease or grant
                                       activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
801(e), (f).........................  Submit information to ensure   6...............................  2 submissions....................              12
                                       proposed activities will be
                                       conducted in compliance with
                                       the Endangered Species Act
                                       (ESA) and Marine Mammal
                                       Protection Act (MMPA);
                                       including agreements and
                                       mitigating measures designed
                                       to avoid or minimize adverse
                                       effects and incidental take
                                       of endangered species or
                                       critical habitat.
--------------------------------------------------------------------------------------------------------------------------------------------------------
802; 902(e).........................  Notify BOEM of archaeological  3...............................  1 notice.........................               3
                                       resource within 72 hours of
                                       discovery.
--------------------------------------------------------------------------------------------------------------------------------------------------------
802(b), (c).........................  If requested, conduct further  10..............................  1 report.........................              10
                                       archaeological
                                       investigations and submit
                                       report/information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
802(d)..............................  If applicable, submit payment  .5..............................  1 payment........................               1
                                       for BOEM costs in carrying
                                       out National Historic
                                       Preservation Act
                                       responsibilities.
--------------------------------------------------------------------------------------------------------------------------------------------------------
803.................................  If required, conduct           15..............................  2 survey/report..................              30
                                       additional surveys to define
                                       boundaries and avoidance
                                       distances and submit report.
--------------------------------------------------------------------------------------------------------------------------------------------------------
*** 810; 614; 627; 632(b); 651......  Submit safety management       35..............................  2 submissions....................              70
                                       system description with the
                                       SAP, COP, or GAP.
--------------------------------------------------------------------------------------------------------------------------------------------------------
813(b)(1)...........................  Report within 24 hours when    .5..............................  2 reports........................               1
                                       any required equipment taken
                                       out of service for more than
                                       12 hours; provide written
                                       confirmation if reported
                                       orally.
                                                                    ------------------------------------------------------------------------------------
                                                                     1...............................  1 written confirmation...........               1
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24878]]

 
813(b)(3)...........................  Notify BOEM when equipment     .5..............................  2 notices........................               1
                                       returned to service; provide
                                       written confirmation if
                                       reported orally.
--------------------------------------------------------------------------------------------------------------------------------------------------------
815(c)..............................  When required, analyze cable,  1.5.............................  1 report.........................               2
                                       P/L, or facility damage or
                                       failures to determine cause
                                       and as soon as available
                                       submit comprehensive written
                                       report.
--------------------------------------------------------------------------------------------------------------------------------------------------------
816.................................  Submit plan of corrective      2...............................  1 plan/report....................               2
                                       action report on observed
                                       detrimental effects on
                                       cable, P/L, or facility
                                       within 30 days of discovery;
                                       take remedial action and
                                       submit report of remedial
                                       action within 30 days after
                                       completion.
--------------------------------------------------------------------------------------------------------------------------------------------------------
822(a)(2)(iii), (b).................  Maintain records of design,    1...............................  4 records retention..............               4
                                       construction, operation,
                                       maintenance, repairs, and
                                       investigation on or related
                                       to lease or ROW/RUE area;
                                       make available to BOEM for
                                       inspection.
--------------------------------------------------------------------------------------------------------------------------------------------------------
823.................................  Request reimbursement within   2...............................  1 request........................               2
                                       90 days for food, quarters,
                                       and transportation provided
                                       to BOEM reps during
                                       inspection.
--------------------------------------------------------------------------------------------------------------------------------------------------------
824(a) \2\..........................  Develop annual self-           24..............................  2 plans..........................              48
                                       inspection plan covering all
                                       facilities; retain with
                                       records, and make available
                                       to BOEM upon request.
--------------------------------------------------------------------------------------------------------------------------------------------------------
824(b)..............................  Conduct annual self-           36..............................  2 reports........................              72
                                       inspection and submit report
                                       by November 1.
--------------------------------------------------------------------------------------------------------------------------------------------------------
825.................................  Based on API RP 2A-WSD,        60..............................  2 assessments/actions............             120
                                       perform assessment of
                                       structures, initiate
                                       mitigation actions for
                                       structures that do not pass
                                       assessment process, retain
                                       information, and make
                                       available to BOEM upon
                                       request.
--------------------------------------------------------------------------------------------------------------------------------------------------------
830(a), (c); 831 thru 833...........  Immediately report incidents   Oral .5.........................  2 incidents......................               1
                                       to BOEM via oral
                                       communications, submit
                                       written follow-up report
                                       within 15 business days
                                       after the incident, and
                                       submit any required
                                       additional information.
                                                                    ------------------------------------------------------------------------------------
                                                                     Written 4.......................  1 incident.......................               4
--------------------------------------------------------------------------------------------------------------------------------------------------------
830(d)..............................  Report oil spills as required  Burden covered under BSEE 1014-0007                                               0
                                       by BSEE 30 CFR 254.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  32 responses.....................             386
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                               Subpart I--Decommissioning
--------------------------------------------------------------------------------------------------------------------------------------------------------
Four **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout
 part 585 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications,
 plans, etc., the burdens for which are covered elsewhere in part 585.
--------------------------------------------------------------------------------------------------------------------------------------------------------
**** 902; 905, 906; 907; 908(c); 909  Submit for approval, in        20..............................  1 application....................              20
                                       format specified, copies of
                                       the SAP, COP, or GAP
                                       decommissioning application
                                       and site clearance plan at
                                       least 2 years before
                                       decommissioning activities
                                       begin, 90 days after
                                       completion of activities, or
                                       90 days after cancellation,
                                       relinquishment, or other
                                       termination of lease or
                                       grant. Include documentation
                                       of coordination efforts w/
                                       States/CZMA agencies, local
                                       or tribal governments,
                                       requests that certain
                                       facilities remain in place
                                       for other activities, be
                                       converted to an artificial
                                       reef, or be toppled in
                                       place. Submit additional
                                       information/evidence
                                       requested or modify and
                                       resubmit application.
--------------------------------------------------------------------------------------------------------------------------------------------------------
902(d); 908.........................  Notify BOEM at least 60 days   1...............................  1 notice.........................               1
                                       before commencing
                                       decommissioning activities.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 24879]]

 
910.................................  Within 60 days after removing  1...............................  1 verification...................               1
                                       a facility, verify to BOEM
                                       that site is cleared.
--------------------------------------------------------------------------------------------------------------------------------------------------------
912.................................  Within 60 days after removing  8...............................  1 report.........................               8
                                       a facility, cable, or
                                       pipeline, submit a written
                                       report.
--------------------------------------------------------------------------------------------------------------------------------------------------------
BOEM does not anticipate decommissioning activities for at least 5 years so the requirements have been given a minimal burden.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  4 responses......................              30
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                 Subpart J--RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities
--------------------------------------------------------------------------------------------------------------------------------------------------------
1004, 1005, 1006....................  Contact owner of existing      1...............................  1 request........................               1
                                       facility and/or lessee of
                                       the area to reach
                                       preliminary agreement to use
                                       facility and obtain
                                       concurring signatures;
                                       submit request to BOEM for
                                       an alternative use RUE,
                                       including all required
                                       information/modifications.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1007(a), (b), (c)...................  Submit indication of           4...............................  1 submission.....................               4
                                       competitive interest in
                                       response to Federal Register
                                       notice.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1007(c).............................  Submit description of          5...............................  1 submission.....................               5
                                       proposed activities and
                                       required information in
                                       response to Federal Register
                                       notice of competitive
                                       offering.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1007(f).............................  Lessee or owner of facility    1...............................  1 submission.....................               1
                                       submits decision to accept
                                       or reject proposals deemed
                                       acceptable by BOEM.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1010(c).............................  Request renewal of Alternate   6...............................  1 request........................               6
                                       Use RUE.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1012; 1016(b).......................  Provide financial assurance    1...............................  1 submission.....................               1
                                       as BOEM determines in
                                       approving RUE for an
                                       existing facility, including
                                       additional security if
                                       required.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1013................................  Submit request for assignment  1...............................  1 request........................               1
                                       of an alternative use RUE
                                       for an existing facility,
                                       including all required
                                       information.
--------------------------------------------------------------------------------------------------------------------------------------------------------
1015................................  Request relinquishment of RUE  1...............................  1 request........................               1
                                       for an existing facility.
--------------------------------------------------------------------------------------------------------------------------------------------------------
    Subtotal........................  .............................  ................................  8 responses......................              20
--------------------------------------------------------------------------------------------------------------------------------------------------------
        Total Burden................  .............................  ................................  290 responses....................          25,688
                                                                                                      --------------------------------------------------
                                                                                                                $3,816,000 Non-Hour Cost Burdens
--------------------------------------------------------------------------------------------------------------------------------------------------------
\1\ In the future, BOEM may require electronic filing of certain submissions.
\2\ Retention of these records is usual and customary business practice; the burden is primarily to make them available to BOEM and CVAs.

    Estimated Reporting and Recordkeeping Non-Hour Cost Burden: The 
estimated non-hour cost burdens total $3,816,000. The non-hour cost 
burdens consist of service fees for BOEM document/study preparation, 
costs for paying a contractor instead of BOEM, and costs for a site-
specific study and report to evaluate the cause of harm to natural 
resources.
    Public Disclosure Statement: The PRA (44 U.S.C. 3501, et seq.) 
provides that an agency may not conduct or sponsor a collection of 
information unless it displays a currently valid OMB control number. 
Until OMB approves a collection of information, you are not obligated 
to respond.
    Comments: Section 3506(c)(2)(A) of the PRA (44 U.S.C. 3501, et 
seq.,) requires each agency ``. . . to provide notice . . . and 
otherwise consult with members of the public and affected agencies 
concerning each proposed collection of information . . .'' Agencies 
must specifically solicit comments to: (a) Evaluate whether the 
collection is necessary or useful; (b) evaluate the accuracy of the 
burden of the proposed collection of information; (c) enhance the 
quality, usefulness, and clarity of the information to be collected; 
and (d) minimize the burden on the respondents, including the use of 
technology.
    To comply with the public consultation process, on December 17, 
2015, BOEM published a Federal Register notice (80 FR 78756) announcing 
that we would submit this ICR to OMB for approval. This notice provided 
the required 60-day comment period. BOEM received no comments.
    Public Availability of Comments: Before including your address, 
phone number, email address, or other personal identifying information 
in your comment, you should be aware that

[[Page 24880]]

your entire comment--including your personal identifying information--
may be made publicly available at any time. While you can ask us in 
your comment to withhold your personal identifying information from 
public review, we cannot guarantee that we will be able to do so.

    Dated: March 7, 2016.
Deanna Meyer-Pietruszka,
Chief, Office of Policy, Regulations and Analysis.
[FR Doc. 2016-09709 Filed 4-26-16; 8:45 am]
 BILLING CODE 4310-MR-P



                                                                                            Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                                                             24869

                                                    percent funding of the delegated                                             extend for an additional 3-year period.                                      delegation agreement with ONRR, as
                                                    functions for a 3-year period beginning                                      The States have a current audit                                              shown in the table below:
                                                    October 1, 2016, with the opportunity to

                                                                                                                                                                                                                     Agreement
                                                                                                                              State                                                                                                       Term
                                                                                                                                                                                                                        No.

                                                    Alaska ......................................................................................................................................................    D12AC70003      7/01/2010–6/30/2013
                                                                                                                                                                                                                                    7/01/2013–6/30/2016.
                                                    California ..................................................................................................................................................    D12AC70004      7/01/2010–6/30/2013
                                                                                                                                                                                                                                    7/01/2013–6/30/2016.
                                                    Colorado ..................................................................................................................................................      D12AC70005     10/01/2010–9/30/2013
                                                                                                                                                                                                                                   10/01/2013–9/30/2016.
                                                    North Dakota ............................................................................................................................................        D12AC70007     10/01/2010–9/30/2013
                                                                                                                                                                                                                                   10/01/2013–9/30/2016.
                                                    Texas .......................................................................................................................................................    D12AC70009     10/01/2010–9/30/2013
                                                                                                                                                                                                                                   10/01/2013–9/30/2016.
                                                    Utah .........................................................................................................................................................   D12AC70010      7/01/2010–6/30/2013
                                                                                                                                                                                                                                    7/01/2013–6/30/2016.
                                                    Wyoming ..................................................................................................................................................       D12AC70012     10/01/2010–9/30/2013
                                                                                                                                                                                                                                   10/01/2013–9/30/2016.




                                                      Therefore, ONRR has determined that                                        OIRA at (202) 395–5806 (fax) or OIRA_                                           Respondents operate commercial and
                                                    we will not hold a formal hearing for                                        submission@omb.eop.gov. Please                                               noncommercial technology projects that
                                                    comments under 30 CFR 1227.105.                                              provide a copy of your comments to                                           include installation, construction,
                                                      Dated: April 22, 2016.                                                     BOEM at OPRA Mail Stop: VA–DIR,                                              operation and maintenance, and
                                                    Gregory J. Gould,                                                            45600 Woodland Road, Sterling, VA                                            decommissioning of offshore facilities,
                                                    Director, Office of Natural Resources
                                                                                                                                 20166. Please reference ICR 1010–0176                                        as well as possible onshore support
                                                    Revenue.                                                                     in your comment and include your                                             facilities. BOEM must ensure that these
                                                    [FR Doc. 2016–09852 Filed 4–26–16; 8:45 am]
                                                                                                                                 name and return address.                                                     activities and operations on the OCS are
                                                                                                                                 FOR FURTHER INFORMATION CONTACT:                                             performed in a safe manner which do
                                                    BILLING CODE 4335–30–P
                                                                                                                                 Office of Policy, Regulations, and                                           not cause damage to the environment or
                                                                                                                                 Analysis at or (202) 208–6352. You may                                       endanger life or health, do not interfere
                                                    DEPARTMENT OF THE INTERIOR                                                   review the ICR online at http://                                             with the rights of other users on the
                                                                                                                                 www.reginfo.gov. Follow the                                                  OCS, and balance the protection and
                                                    Bureau of Ocean Energy Management                                            instructions to review Department of the                                     development of OCS resources.
                                                                                                                                 Interior collections under review by                                         Therefore, BOEM needs information
                                                    [OMB Control Number 1010–0176;
                                                                                                                                 OMB.                                                                         concerning the proposed activities,
                                                    MMAA104000]
                                                                                                                                                                                                              facilities, safety equipment, inspections
                                                                                                                                 SUPPLEMENTARY INFORMATION:                                                   and tests, and natural and manmade
                                                    Information Collection: Renewable
                                                                                                                                    OMB Control Number: 1010–0176.                                            hazards near the site, as well as
                                                    Energy and Alternate Uses of Existing
                                                                                                                                    Title: 30 CFR 585, Renewable Energy                                       assurance of fiscal responsibility.
                                                    Facilities on the Outer Continental
                                                                                                                                 and Alternate Uses of Existing Facilities                                       BOEM uses forms to collect some
                                                    Shelf; Submitted for OMB Review;
                                                                                                                                 on the Outer Continental Shelf.                                              information to ensure proper and
                                                    Comment Request
                                                                                                                                    Forms: BOEM–0002, BOEM–0003,                                              efficient administration of OCS
                                                    ACTION:       30-Day notice.                                                 BOEM–0004, BOEM–0005, BOEM–                                                  renewable energy leases and grants and
                                                                                                                                 0006.                                                                        to document the financial responsibility
                                                    SUMMARY:   To comply with the                                                   Abstract: The Outer Continental Shelf                                     of lessees and grantees. Forms BOEM–
                                                    Paperwork Reduction Act of 1995                                              (OCS) Lands Act, as amended (43 U.S.C.                                       0002, BOEM–0003, BOEM–0004, and
                                                    (PRA), the Bureau of Ocean Energy                                            1331 et seq. and 43 U.S.C. 1801 et seq.),                                    BOEM–0006 are used by renewable
                                                    Management (BOEM) is notifying the                                           authorizes the Secretary of the Interior                                     energy entities on the OCS to assign a
                                                    public that we have submitted an                                             to issue leases, easements, or rights-of-                                    lease interest, designate an operator, and
                                                    information collection request (ICR) to                                      way on the OCS for activities that                                           to assign or relinquish a lease or grant.
                                                    the Office of Management and Budget                                          produce or support production,                                               Form BOEM–0005 was designed to
                                                    (OMB) for review and approval. This                                          transportation, or transmission of energy                                    guarantee the performance of sureties
                                                    ICR concerns the paperwork                                                   from sources other than oil and gas                                          with respect to bonds issued on behalf
                                                    requirements in the regulations under                                        (renewable energy). Specifically,                                            of OCS renewable energy lessees,
                                                    ‘‘Renewable Energy and Alternate Uses                                        subsection 8(p) of the OCS Lands Act,                                        grantees, and operators. BOEM
                                                    of Existing Facilities on the Outer                                          as amended (43 U.S.C. 1337(p)), directs                                      maintains the submitted forms as
                                                    Continental Shelf.’’ This notice provides                                    the Secretary of the Interior to issue any                                   official lease and grant records
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    the public a second opportunity to                                           necessary regulations to carry out the                                       pertaining to operating responsibilities,
                                                    comment on the paperwork burden of                                           OCS renewable energy program. The                                            ownership, and financial responsibility.
                                                    this collection.                                                             Secretary delegated this authority to                                           We will protect information
                                                    DATES: Submit written comments by                                            BOEM. BOEM has issued regulations for                                        considered proprietary under the
                                                    May 27, 2016.                                                                OCS renewable energy activities at 30                                        Freedom of Information Act (5 U.S.C.
                                                    ADDRESSES: Submit comments on this                                           CFR part 585; this notice concerns the                                       552) and its implementing regulations
                                                    ICR to the Desk Officer for the                                              reporting and recordkeeping elements                                         (43 CFR part 2) and under regulations at
                                                    Department of the Interior at OMB–                                           required by these regulations.                                               30 CFR 585.113, addressing disclosure


                                               VerDate Sep<11>2014          17:29 Apr 26, 2016         Jkt 238001       PO 00000        Frm 00087       Fmt 4703       Sfmt 4703       E:\FR\FM\27APN1.SGM           27APN1


                                                    24870                                  Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                    of data and information to be made                             energy-related uses on the OCS and                               components and estimated hour
                                                    available to the public and others. No                         holders of leases and grants under 30                            burdens. In calculating the burdens, we
                                                    items of a sensitive nature are collected.                     CFR part 585.                                                    assumed that respondents perform
                                                    Responses are mandatory or required to                           Estimated Reporting and                                        certain requirements in the normal
                                                    obtain a benefit.                                              Recordkeeping Hour Burden: The                                   course of their activities. We consider
                                                       Frequency: On occasion or annually.                         estimated annual hour burden for this                            these to be usual and customary and
                                                       Description of Respondents:                                 collection is 25,688 hours. The                                  took that into account in estimating the
                                                    Companies interested in renewable                              following table details the individual                           burden.

                                                                                                                                     BURDEN TABLE
                                                                                                                                                                                                         Non-hour cost burdens
                                                          Section(s) in 30                      Reporting and recordkeeping requirement 1                         Hour burden
                                                             CFR 585                                                                                                                             Average number of               Annual burden
                                                                                                                                                                                                 annual responses                   hours

                                                                                                                           Subpart A—General Provisions

                                                    102; 105; 110 ................         These sections contain general references to responsibilities, submitting comments, requests, appli-                                              0
                                                                                           cations, plans, notices, reports, and/or supplemental information for BOEM approval—burdens cov-
                                                                                           ered under specific requirements.

                                                    102(e) ............................    State and local governments enter into task force or             1 ..............................   2 agreements ............                     2
                                                                                             joint planning or coordination agreement with
                                                                                             BOEM.

                                                    103; 904 ........................      Request general departures not specifically covered              2 ..............................   6 requests .................                12
                                                                                            elsewhere in part 585..

                                                    105(c) ............................    Make oral requests or notifications and submit writ-             1 ..............................   5 requests .................                  5
                                                                                            ten follow up within 3 business days not specifi-
                                                                                            cally covered elsewhere in part 585.

                                                    106; 107; 213(e); 230(f);              Submit evidence of qualifications to hold a lease or             2 ..............................   20 submissions .........                    40
                                                      302(a); 408(b)(7);                     grant; submit required supporting information
                                                      409(c); 1005(d);                       (electronically if required).
                                                      1007(c); 1013(b)(7).

                                                    106(b)(1) .......................      Request exception from exclusion or disqualification             1 ..............................   1 exception ................                  1
                                                                                            from participating in transactions covered by Fed-
                                                                                            eral non-procurement debarment and suspension
                                                                                            system.

                                                    106(b)(2); 118(c);                     Request reconsideration and/or hearing ....................      Requirement not considered IC under 5 CFR                                        0
                                                      225(b); 436; 437;                                                                                     1320.3(h)(9).
                                                      527(c); 705(c)(2);
                                                      1016.

                                                    108; 530(b) ....................       Notify BOEM within 3 business days after learning of             1 ..............................   1 notice ......................               1
                                                                                            any action filed alleging respondent is insolvent or
                                                                                            bankrupt.

                                                    109 ................................   Notify BOEM in writing of merger, name change, or                Requirement not considered IC under 5 CFR                                        0
                                                                                            change of business form no later than 120 days                  1320.3(h)(1).
                                                                                            after earliest of either the effective date or filing
                                                                                            date.

                                                    111 ................................   Within 30 days of receiving bill, submit processing              .5 .............................   4 submissions ...........                     2
                                                                                            fee payments for BOEM document or study prep-
                                                                                            aration to process applications and other requests.

                                                                                                                                                                                   4 payments × $4,000 = $16,000

                                                    111(b)(2), (3) .................       Submit comments on proposed processing fee or re-                2 ..............................   4 requests .................                  8
                                                                                             quest approval to perform or directly pay con-
                                                                                             tractor for all or part of any document, study, or
                                                                                             other activity, to reduce BOEM processing costs.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    111(b)(3) .......................      Perform, conduct, develop, etc., all or part of any              19,000 .....................       1 submission .............               19,000
                                                                                             document, study, or other activity; and provide re-
                                                                                             sults to BOEM to reduce BOEM processing fee.

                                                    111(b)(3) .......................      Pay contractor for all or part of any document, study,                      3 contractor payments × $950,000 = $2,850,000
                                                                                             or other activity, and provide results to BOEM to
                                                                                             reduce BOEM processing costs.




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016     Jkt 238001   PO 00000   Frm 00088   Fmt 4703   Sfmt 4703     E:\FR\FM\27APN1.SGM              27APN1


                                                                                           Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                                                                           24871

                                                                                                                                         BURDEN TABLE—Continued
                                                                                                                                                                                                                                 Non-hour cost burdens
                                                          Section(s) in 30                        Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                     Average number of               Annual burden
                                                                                                                                                                                                                         annual responses                   hours

                                                    111(b)(7); 118(a); 436(c)              Appeal BOEM estimated processing costs, deci-                                           Exempt under 5 CFR 1320.4(a)(2), (c).                                             0
                                                                                             sions, or orders pursuant to 30 CFR 590.

                                                    113(b) ............................    Respond to the Freedom of Information Act release                                       4 ..............................    1 agreement ..............                    4
                                                                                            schedule.

                                                    115(c) ............................    Request approval to use later edition of a document                                     1 ..............................    1 request ...................                 1
                                                                                            incorporated by reference or alternative compli-
                                                                                            ance.

                                                    116 ................................   The Director may occasionally request information to                                    4 ..............................    25 submissions .........                   100
                                                                                             administer and carry out the offshore renewable
                                                                                             energy program via Federal Register Notices.

                                                    118(c); 225(b) ...............         Within 15 days of bid rejection, request reconsider-                                    Requirement not considered IC under 5 CFR                                         0
                                                                                            ation of bid decision or rejection.                                                    1320.3(h)(9).

                                                          Subtotal ..................      .....................................................................................   .................................   71 responses .............               19,176

                                                                                                                                                                                                                               $2,866,000 non-hour costs

                                                                                                                   Subpart B—Issuance of OCS Renewable Energy Leases

                                                    200; 224; 231; 235; 236;               These sections contain references to information submissions, approvals, requests, applications,                                                                          0
                                                      238.                                 plans, payments, etc., the burdens for which are covered elsewhere in part 585.

                                                    210; 211(a–c); 212 thru                Submit nominations and general comments in re-                                          Not considered IC as defined in 5 CFR                                             0
                                                      216.                                   sponse to Federal Register notices on Request                                         1320.3(h)(4).
                                                                                             for Interest in OCS Leasing, Call for Information
                                                                                             and Nominations (Call), Area Identification, and
                                                                                             Notices of Sale. Includes industry, State & local
                                                                                             governments.

                                                    210; 211(a–c); 212 thru                Submit comments and required information in re-                                         4 ..............................    30 comments .............                  120
                                                      216.                                   sponse to Federal Register notices on Request
                                                                                             for Interest in OCS Leasing, Call for Information
                                                                                             and Nominations (Call), Area Identification, and
                                                                                             Notices of Sale. Includes industry, State & local
                                                                                             governments.

                                                    211(d); 216; 220 thru                  Submit bid, payments, and required information in                                       5 ..............................    12 bids .......................             60
                                                      223; 231(c)(2).                        response to Federal Register Final Sale Notice.

                                                    224 ................................   Within 10 business days, execute 3 copies of lease                                      1 ..............................    2 lease executions ....                       2
                                                                                            form and return to BOEM with required payments,
                                                                                            including evidence that agent is authorized to act
                                                                                            for bidder; if applicable, submit information to sup-
                                                                                            port delay in execution—competitive leases.

                                                    230; 231(a) ....................       Submit unsolicited request and acquisition fee for a                                    5 ..............................    2 requests .................                10
                                                                                             commercial or limited lease.

                                                    231(b) ............................    Submit comments in response to Federal Register 4 ..............................                                            4 comments ...............                  16
                                                                                             notice re interest of unsolicited request for a lease.

                                                    231(g) ............................    Within 10 business days of receiving lease docu- 2 ..............................                                           2 leases .....................                4
                                                                                            ments, execute lease; file financial assurance and
                                                                                            supporting documentation—noncompetitive leases.

                                                    231(g) ............................    Within 45 days of receiving lease copies, submit                                        Burdens covered by information collections                                        0
                                                                                            rent and rent information.                                                             approved for ONRR 30 CFR Chapter XII.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    235(b); 236(b) ...............         Request additional time to extend preliminary or site                                   1 ..............................    3 requests .................                  3
                                                                                             assessment term of commercial or limited lease,
                                                                                             including revised schedule for SAP, COP, or GAP
                                                                                             submission.

                                                    237(b) ............................    Request lease be dated and effective 1st day of                                         1 ..............................    1 request ...................                 1
                                                                                            month in which signed.




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00089        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                    24872                                  Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                                                                                                         BURDEN TABLE—Continued
                                                                                                                                                                                                                                  Non-hour cost burdens
                                                          Section(s) in 30                        Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                     Average number of                Annual burden
                                                                                                                                                                                                                         annual responses                    hours

                                                    238 ................................   Submit other renewable energy research activities ...                                   Burden covered under SAPs & GAPs                                                   0
                                                                                                                                                                                   § 585.600(a), (c).

                                                          Subtotal ..................      .....................................................................................   .................................   56 responses .............                  216

                                                                                                    Subpart C—ROW Grants and RUE Grants for Renewable Energy Activities

                                                    306; 309; 315; 316 ........            These sections contain references to information submissions, approvals, requests, applications,                                                                           0
                                                                                           plans, payments, etc., the burdens for which are covered elsewhere in part 585.

                                                    302(a); 305; 306 ...........           Submit copies of a request for a new or modified                                        5 ..............................    1 request ...................                  5
                                                                                             ROW or RUE and required information, including
                                                                                             qualifications to hold a grant, in format specified.

                                                    307; 308(a)(1) ...............         Submit information in response to Federal Register                                      4 ..............................    2 comments ...............                     8
                                                                                             notice of proposed ROW or RUE grant area or
                                                                                             comments on notice of grant auction.

                                                    308(a)(2), (b); 315; 316               Submit bid and payments in response to Federal                                          5 ..............................    1 bid ..........................               5
                                                                                             Register notice of auction for a ROW or RUE
                                                                                             grant.

                                                    309 ................................   Submit decision to accept or reject terms and condi-                                    2 ..............................    1 submission .............                     2
                                                                                             tions of noncompetitive ROW or RUE grant.

                                                          Subtotal ..................      .....................................................................................   .................................   5 responses ...............                  20

                                                                                                                              Subpart D—Lease and Grant Administration

                                                    400; 401; 402; 405; 409;               These sections contain references to information submissions, approvals, requests, applications,                                                                           0
                                                      416, 433.                            plans, payments, etc., the burdens for which are covered elsewhere in part 585.

                                                    401(b) ............................    Take measures directed by BOEM in cessation                                             100 ..........................      1 report ......................             100
                                                                                             order and submit reports in order to resume activi-
                                                                                             ties.

                                                    405(d) ............................    Submit written notice of change of address ..............                               Requirement not considered IC under 5 CFR                                          0
                                                                                                                                                                                   1320.3(h)(1).

                                                    405(e); Form BOEM–                     If designated operator (DO) changes, notify BOEM                                        1 ..............................    1 notice ......................                1
                                                      0006.                                   and identify new DO for BOEM approval.

                                                    408 thru 411; Forms                    Within 90 days after last party executes a transfer                                     1 (30 minutes per                   2 requests/submis-                             2
                                                      BOEM–0002 and                         agreement, submit copies of a lease or grant as-                                         form × 2 forms = 1                  sions.
                                                      BOEM–0003.                            signment application, including originals of each                                        hour).
                                                                                            instrument creating or transferring ownership of
                                                                                            record title, eligibility and other qualifications; and
                                                                                            evidence that agent is authorized to execute as-
                                                                                            signment, in format specified.

                                                    415(a)(1); 416; 420(a),                Submit request for suspension and required informa-                                     10 ............................     1 request ...................                10
                                                      (b); 428(b).                           tion/payment no later than 90 days prior to lease
                                                                                             or grant expiration.

                                                    417(b) ............................    Conduct, and if required pay for, site-specific study                                   100 ..........................      1 study/submission ....                     100
                                                                                            to evaluate cause of harm or damage; and submit
                                                                                            copies of study and results, in format specified.

                                                                                                                                                                                                           1 study × $950,000 = $950,000
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    425 thru 428; 652(a);                  Request lease or grant renewal no later than 180                                        6 ..............................    1 requests .................                   6
                                                      235(a), (b).                           days before termination date of your limited lease
                                                                                             or grant, or no later than 2 years before termi-
                                                                                             nation date of operations term of commercial
                                                                                             lease. Submit required information.

                                                    435; 658(c)(2); Form                   Submit copies of application to relinquish lease or                                     1 ..............................    1 submission .............                     1
                                                      BOEM–0004.                             grant, in format specified.




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00090        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                                                          Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                                                                          24873

                                                                                                                                        BURDEN TABLE—Continued
                                                                                                                                                                                                                                Non-hour cost burdens
                                                          Section(s) in 30                       Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                    Average number of              Annual burden
                                                                                                                                                                                                                        annual responses                  hours

                                                    436; 437 ........................     Provide information for reconsideration of BOEM de-                                     Requirement not considered IC under 5 CFR                                        0
                                                                                            cision to contract or cancel lease or grant area.                                     1320.3(h)(9).

                                                          Subtotal ..................     .....................................................................................   .................................   8 responses ...............               220

                                                                                                                                                                                                                               $950,000 non-hour costs

                                                                                                             Subpart E—Payments and Financial Assurance Requirements

                                                    An * indicates the primary cites for providing bonds or other financial assurance, and the burdens include any previous or sub-                                                                                0
                                                      sequent references throughout part 585 to furnish, replace, or provide additional bonds, securities, or financial assurance (in-
                                                      cluding riders, cancellations, replacements). This subpart contains references to other information submissions, approvals, re-
                                                      quests, applications, plans, etc., the burdens for which are covered elsewhere in part 585. In the future BOEM may require
                                                      electronic filings of certain submissions.

                                                    500 thru 509; 1011 .......            Submit payor information, payments and payment                                          Burdens covered by information collections                                       0
                                                                                            information, and maintain auditable records ac-                                       approved for ONRR 30 CFR Chapter XII.
                                                                                            cording to ONRR regulations or guidance.

                                                    506(c)(4) ........................    Submit documentation of the gross annual genera-                                        Burden covered under DOE/EIA OMB Con-                                            0
                                                                                            tion of electricity produced by the generating facil-                                 trol Number 1905–0129.
                                                                                            ity on the lease—use same form as authorized by
                                                                                            the EIA.

                                                    510; 506(c)(3) ...............        Submit application and required information for waiv-                                   1 ..............................    1 submission .............                   1
                                                                                            er or reduction of rental or other payment.

                                                    * 515; 516; 525(a) thru               Execute and provide $100,000 minimum lease-spe-                                         1 ..............................    2 bonds .....................                2
                                                       (f).                                 cific bond or other approved security; or increase
                                                                                            bond level if required.

                                                    * 516(a)(2), (3), (b), (c);           Execute and provide commercial lease supplemental                                       1 ..............................    2 bonds .....................                2
                                                       517; 525(a) thru (f).                bonds in amounts determined by BOEM.

                                                    516(a)(4); 521(c) ...........         Execute and provide decommissioning bond or other                                       1 ..............................    1 bond .......................               1
                                                                                            financial assurance; schedule for providing the ap-
                                                                                            propriate amount.

                                                    517(c)(1) ........................    Submit comments on proposed adjustment to bond                                          1 ..............................    1 submission .............                   1
                                                                                            amounts.

                                                    517(c)(2) ........................    Request bond reduction and submit evidence to jus-                                      5 ..............................    1 request ...................                5
                                                                                           tify.

                                                    * 520; 521; 525(a) thru Execute and provide $300,000 minimum limited                                                          1 ..............................    1 bond .......................               1
                                                       (f); Form BOEM–0005.   lease or grant-specific bond or increase financial
                                                                              assurance and required information.

                                                    525(g) ............................   Surety notice to lessee or ROW/RUE grant holder                                         1 ..............................    1 surety notice ...........                  1
                                                                                            and BOEM within 5 business days after initiating
                                                                                            surety insolvency or bankruptcy proceeding, or
                                                                                            Treasury decertifies surety.

                                                    * 526 Form BOEM–0005                  In lieu of surety bond, pledge other types of securi-                                   2 ..............................    1 pledge ....................                2
                                                                                            ties, including authority for BOEM to sell and use
                                                                                            proceeds and submit required information (1 hour
                                                                                            for form).

                                                    526(c) ............................   Provide annual certified statements describing the                                      1 ..............................    1 statement ...............                  1
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                            nature and market value, including brokerage firm
                                                                                            statements/reports.

                                                    * 527; 531 ......................     Demonstrate financial worth/ability to carry out                                        10 ............................     1 demonstration ........                   10
                                                                                           present and future financial obligations, annual
                                                                                           updates, and related or subsequent actions/
                                                                                           records/reports, etc.




                                               VerDate Sep<11>2014       17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00091        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                    24874                                  Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                                                                                                         BURDEN TABLE—Continued
                                                                                                                                                                                                                                 Non-hour cost burdens
                                                          Section(s) in 30                        Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                     Average number of               Annual burden
                                                                                                                                                                                                                         annual responses                   hours

                                                    528 ................................   Provide third-party indemnity; financial information/                                   10 ............................     1 submission .............                  10
                                                                                             statements; additional bond info; executed guar-
                                                                                             antor agreement and supporting information/docu-
                                                                                             mentation/agreements.

                                                    528(c)(6); 532(b) ...........          Guarantor/Surety requests BOEM terminate period                                         1 ..............................    1 request ...................                 1
                                                                                            of liability and notifies lessee or ROW/RUE grant
                                                                                            holder, etc.

                                                    * 529 ..............................   In lieu of surety bond, request authorization to es-                                    2 ..............................    1 request ...................                 2
                                                                                             tablish decommissioning account, including written
                                                                                             authorizations and approvals associated with ac-
                                                                                             count.

                                                    530 ................................   Notify BOEM promptly of lapse in bond or other se-                                      1 ..............................    1 notice ......................               1
                                                                                            curity/action filed alleging lessee, surety or guar-
                                                                                            antor et al is insolvent or bankrupt.

                                                    533(a)(2)(ii), (iii) .............     Provide agreement from surety issuing new bond to                                       3 ..............................    1 submission .............                    3
                                                                                             assume all or portion of outstanding liabilities.

                                                    536(b) ............................    Within 10 business days following BOEM notice, les-                                     16 ............................     1 demonstration every                         8
                                                                                            see, grant holder, or surety agrees to and dem-                                                                              2 years.
                                                                                            onstrates to BOEM that lease will be brought into
                                                                                            compliance.

                                                          Subtotal ..................      .....................................................................................   .................................   21 responses .............                  52

                                                                                                                          Subpart F—Plans and Information Requirements

                                                    Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations Plans (COPs), and General                                                                                        0
                                                      Activities Plans (GAPs); and the burdens include any previous or subsequent references throughout part 585 to submission
                                                      and approval. This subpart contains references to other information submissions, approvals, requests, applications, plans,
                                                      etc., the burdens for which are covered elsewhere in part 585.

                                                    ** 600(a); 601(a), (b);                Within time specified after issuance of a competitive                                   240 ..........................      2 SAPs ......................              480
                                                       605 thru 614; 238;                   lease or grant, or within time specified after deter-
                                                       810.                                 mination of no competitive interest, submit copies
                                                                                            of SAP, including required information to assist
                                                                                            BOEM to comply with NEPA/CZMA such as haz-
                                                                                            ard info, air quality, SEMS, and all required infor-
                                                                                            mation, certifications, requests, etc., in format
                                                                                            specified.

                                                    ** 600(b); 601(c), (d)(1);             If requesting an operations term for commercial                                         1,000 .......................       2 COPs ......................             2,000
                                                       606(b); 618; 620 thru                  lease, within time specified before the end of site
                                                       629; 632; 633; 810.                    assessment term, submit copies of COP, or FERC
                                                                                              license application, including required information
                                                                                              to assist BOEM to comply with NEPA/CZMA such
                                                                                              as hazard info, air quality, SEMS, and all required
                                                                                              information, surveys and/or their results, reports,
                                                                                              certifications, project easements, supporting data
                                                                                              and information, requests, etc., in format specified.

                                                    ** 600(c); 601(a), (b);                Within time specified after issuance of a competitive                                   240 ..........................      2 GAP ........................             480
                                                       640 thru 648; 651;                   lease or grant, or within time specified after deter-
                                                       238; 810.                            mination of no competitive interest, submit copies
                                                                                            of GAP, including required information to assist
                                                                                            BOEM to comply with NEPA/CZMA such as haz-
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                            ard info, air quality, SEMS, and all required infor-
                                                                                            mation, surveys and reports, certifications, project
                                                                                            easements, requests, etc., in format specified.

                                                    ** 601(d)(2); 622; 628(f);             Submit revised or modified COPs, including project                                      50 ............................     1 revised or modified                       50
                                                       632; 634; 658(c)(3);                  easements, and all required additional information.                                                                         COP.
                                                       907.




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00092        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                                                           Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                                                  24875

                                                                                                                          BURDEN TABLE—Continued
                                                                                                                                                                                                        Non-hour cost burdens
                                                          Section(s) in 30                     Reporting and recordkeeping requirement 1                         Hour burden
                                                             CFR 585                                                                                                                            Average number of               Annual burden
                                                                                                                                                                                                annual responses                   hours

                                                    602 2 ..............................   Until BOEM releases financial assurance, respond-               2 ..............................   9 records/submissions                       18
                                                                                            ents must maintain, and provide to BOEM if re-
                                                                                            quested, all data and information related to com-
                                                                                            pliance with required terms and conditions of
                                                                                            SAP, COP, or GAP.

                                                    ** 613(a), (d), (e); 617 ...           Submit revised or modified SAPs and required addi-              50 ............................    1 revised or modified                       50
                                                                                             tional information.                                                                                SAP.

                                                    612; 647 ........................      Submit copy of SAP or GAP consistency certification             1 ..............................   2 leases .....................                2
                                                                                             and supporting documentation, including non-
                                                                                             competitive leases.

                                                    615(a) ............................    Notify BOEM in writing within 30 days of completion             1 ..............................   2 notices ....................                2
                                                                                            of construction and installation activities under
                                                                                            SAP.

                                                    615(b) ............................    Submit annual report summarizing findings from site             30 ............................    4 reports ....................             120
                                                                                             assessment activities.

                                                    615(c) ............................    Submit annual, or at other time periods as BOEM                 40 ............................    4 certifications ...........               160
                                                                                             determines, SAP compliance certification, effec-
                                                                                             tiveness statement, recommendations, reports,
                                                                                             supporting documentation, etc.

                                                    617(a) ............................    Notify BOEM in writing before conducting any activi-            10 ............................    1 notice ......................             10
                                                                                            ties not approved, or provided for, in SAP; provide
                                                                                            additional information if requested.

                                                    627(c) ............................    Submit oil spill response plan as required by BSEE              Burden covered under BSEE 1014–0007.                                             0
                                                                                             30 CFR part 254.

                                                    631 ................................   Request deviation from approved COP schedule .....              2 ..............................   1 request ...................                 2

                                                    633(b) ............................    Submit annual, or at other time periods as BOEM                 50 ............................    9 certifications ...........               450
                                                                                             determines, COP compliance certification, effec-
                                                                                             tiveness statement, recommendations, reports,
                                                                                             supporting documentation, etc.

                                                    634(a) ............................    Notify BOEM in writing before conducting any activi-            10 ............................    1 notice ......................             10
                                                                                            ties not approved or provided for in COP, and pro-
                                                                                            vide additional information if requested.

                                                    635 ................................   Notify BOEM any time commercial operations cease                1 ..............................   1 notice ......................               1
                                                                                            without an approved suspension.

                                                    636(a) ............................    Notify BOEM in writing no later than 30 days after              1 ..............................   2 notices ....................                2
                                                                                            commencing activities associated with placement
                                                                                            of facilities on lease area.

                                                    636(b) ............................    Notify BOEM in writing no later than 30 days after              1 ..............................   2 notices ....................                2
                                                                                            completion of construction and installation activi-
                                                                                            ties.

                                                    636(c) ............................    Notify BOEM in writing at least 7 days before com-              1 ..............................   1 notices ....................                1
                                                                                            mencing commercial operations.

                                                    ** 642(b); 648; 655;                   Submit revised or modified GAPs and required addi-              50 ............................    1 revised or modified                       50
                                                       658(c)(3).                            tional information.                                                                                GAP.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    651 ................................   Before beginning construction of OCS facility de-               30 ............................    2 surveys/reports .......                   60
                                                                                             scribed in GAP, complete survey activities identi-
                                                                                             fied in GAP and submit initial findings. [This only
                                                                                             includes the time involved in submitting the find-
                                                                                             ings; it does not include the survey time as these
                                                                                             surveys would be conducted as good business
                                                                                             practice.].




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016    Jkt 238001   PO 00000   Frm 00093   Fmt 4703   Sfmt 4703     E:\FR\FM\27APN1.SGM              27APN1


                                                    24876                                  Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                                                                                                         BURDEN TABLE—Continued
                                                                                                                                                                                                                                 Non-hour cost burdens
                                                          Section(s) in 30                        Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                     Average number of               Annual burden
                                                                                                                                                                                                                         annual responses                   hours

                                                    653(a) ............................    Notify BOEM in writing within 30 days of completing                                     1 ..............................    2 notices ....................                2
                                                                                            installation activities under the GAP.

                                                    653(b) ............................    Submit annual report summarizing findings from ac-                                      30 ............................     4 reports ....................             120
                                                                                             tivities conducted under approved GAP.

                                                    653(c) ............................    Submit annual, or at other time periods as BOEM                                         40 ............................     4 certifications ...........               160
                                                                                             determines, GAP compliance certification, rec-
                                                                                             ommendations, reports, etc.

                                                    655(a) ............................    Notify BOEM in writing before conducting any activi-                                    10 ............................     1 notice ......................             10
                                                                                            ties not approved or provided for in GAP, and pro-
                                                                                            vide additional information if requested.

                                                    656 ................................   Notify BOEM any time approved GAP activities                                            1 ..............................    1 notice ......................               1
                                                                                            cease without an approved suspension.

                                                    658(c)(1) ........................     If after construction, cable or pipeline deviate from                                   3 ..............................    1 notice/evidence ......                      3
                                                                                              approved COP or GAP, notify affected lease oper-
                                                                                              ators and ROW/RUE grant holders of deviation
                                                                                              and provide BOEM evidence of such notices.

                                                    659 ................................   Determine appropriate air quality modeling protocol,                                    70 ............................     5 reports/information                      350
                                                                                            conduct air quality modeling, and submit 3 copies
                                                                                            of air quality modeling report and 3 sets of digital
                                                                                            files as supporting information to plans.

                                                          Subtotal ..................      .....................................................................................   .................................   68 responses .............                4,596

                                                                                                                   Subpart G—Facility Design, Fabrication, and Installation

                                                    Three *** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subse-                                                                                   0
                                                      quent references throughout part 585 to submitting and obtaining approval. This subpart contains references to other informa-
                                                      tion submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585.

                                                    *** 700(a)(1), (b), (c);               Submit Facility Design Report, including copies of                                      200 ..........................      1 report ......................            200
                                                       701.                                  the cover letter, certification statement, and all re-
                                                                                             quired information (1–3 paper or electronic copies
                                                                                             as specified).

                                                    *** 700(a)(2), (b), (c);               Submit copies of a Fabrication and Installation Re-                                     160 ..........................      1 report ......................            160
                                                       702.                                  port, certification statement and all required infor-
                                                                                             mation, in format specified.

                                                    705(a)(3); 707; 712 .......            Certified Verification Agent (CVA) conducts inde-                                       100 ..........................      1 interim report ..........                100
                                                                                             pendent assessment of the facility design and
                                                                                             submits copies of all reports/certifications to les-
                                                                                             see or grant holder and BOEM—interim reports if
                                                                                             required, in format specified.

                                                                                                                                                                                   100 ..........................      1 final report ..............              100

                                                    705(a)(3); 708; 709;                   CVA conducts independent assessments/inspections                                        100 ..........................      1 interim report ..........                100
                                                      710; 712.                             on the fabrication and installation activities, in-
                                                                                            forms lessee or grant holder if procedures are
                                                                                            changed or design specifications are modified;
                                                                                            and submits copies of all reports/certifications to
                                                                                            lessee or grant holder and BOEM—interim reports
                                                                                            if required, in format specified.

                                                                                                                                                                                   100 ..........................      1 final report ..............              100
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    *** 703; 705(a)(3); 712;               CVA/project engineer monitors major project modi-                                       20 ............................     1 interim report ..........                 20
                                                       815.                                 fications and repairs and submits copies of all re-
                                                                                            ports/certifications to lessee or grant holder and
                                                                                            BOEM—interim reports if required, in format spec-
                                                                                            ified.

                                                                                                                                                                                   15                                  1 final report ..............               15




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00094        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                                                           Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                                                                           24877

                                                                                                                                         BURDEN TABLE—Continued
                                                                                                                                                                                                                                 Non-hour cost burdens
                                                          Section(s) in 30                        Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                     Average number of               Annual burden
                                                                                                                                                                                                                         annual responses                   hours

                                                    705(c) ............................    Request waiver of CVA requirement in writing; les-                                      40 ............................     1 waiver .....................              40
                                                                                            see must demonstrate standard design and best
                                                                                            practices.

                                                    706 ................................   Submit for approval with SAP, COP, or GAP, initial                                      16 ............................     2 nominations ............                  32
                                                                                             nominations for a CVA or new replacement CVA
                                                                                             nomination, and required information.

                                                    708(b)(2) .......................      Lessee or grant holder notify BOEM if modifications                                     1 ..............................    1 notice ......................               1
                                                                                             identified by CVA/project engineer are accepted.

                                                    709(a)(14); 710(a)(2),                 Make fabrication quality control, installation towing,                                  1 ..............................    3 records retention ....                      3
                                                      (e) 2.                                and other records available to CVA/project engi-
                                                                                            neer for review (retention required by § 585.714).

                                                    713 ................................   Notify BOEM within 10 business days after com-                                          1 ..............................    1 notice ......................               1
                                                                                            mencing commercial operations.

                                                    714 2 ..............................   Until BOEM releases financial assurance, compile,                                       100 ..........................      1 lessee .....................             100
                                                                                            retain, and make available to BOEM and/or CVA
                                                                                            the as-built drawings, design assumptions/anal-
                                                                                            yses, summary of fabrication and installation ex-
                                                                                            amination records, inspection results, and records
                                                                                            of repairs not covered in inspection report. Record
                                                                                            original and relevant material test results of all pri-
                                                                                            mary structural materials; retain records during all
                                                                                            stages of construction.

                                                          Subtotal ..................      .....................................................................................   .................................   17 responses .............                 972

                                                        Subpart H—Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs,
                                                                                                           COPs, and GAPs

                                                    801(c), (d) .....................      Notify BOEM if endangered or threatened species,                                        1 ..............................    2 notices ....................                2
                                                                                             or their designated critical habitat, may be in the
                                                                                             vicinity of the lease or grant or may be affected by
                                                                                             lease or grant activities.

                                                    801(e), (f) ......................     Submit information to ensure proposed activities will                                   6 ..............................    2 submissions ...........                   12
                                                                                             be conducted in compliance with the Endangered
                                                                                             Species Act (ESA) and Marine Mammal Protec-
                                                                                             tion Act (MMPA); including agreements and miti-
                                                                                             gating measures designed to avoid or minimize
                                                                                             adverse effects and incidental take of endangered
                                                                                             species or critical habitat.

                                                    802; 902(e) ....................       Notify BOEM of archaeological resource within 72                                        3 ..............................    1 notice ......................               3
                                                                                             hours of discovery.

                                                    802(b), (c) .....................      If requested, conduct further archaeological inves-                                     10 ............................     1 report ......................             10
                                                                                              tigations and submit report/information.

                                                    802(d) ............................    If applicable, submit payment for BOEM costs in                                         .5 .............................    1 payment .................                   1
                                                                                              carrying out National Historic Preservation Act re-
                                                                                              sponsibilities.

                                                    803 ................................   If required, conduct additional surveys to define                                       15 ............................     2 survey/report ..........                  30
                                                                                              boundaries and avoidance distances and submit
                                                                                              report.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    *** 810; 614; 627;                     Submit safety management system description with                                        35 ............................     2 submissions ...........                   70
                                                       632(b); 651.                          the SAP, COP, or GAP.

                                                    813(b)(1) .......................      Report within 24 hours when any required equip-                                         .5 .............................    2 reports ....................                1
                                                                                            ment taken out of service for more than 12 hours;
                                                                                            provide written confirmation if reported orally.

                                                                                                                                                                                   1 ..............................    1 written confirmation                        1




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00095        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                    24878                                  Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                                                                                                         BURDEN TABLE—Continued
                                                                                                                                                                                                                                 Non-hour cost burdens
                                                          Section(s) in 30                        Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                     Average number of               Annual burden
                                                                                                                                                                                                                         annual responses                   hours

                                                    813(b)(3) .......................      Notify BOEM when equipment returned to service;                                         .5 .............................    2 notices ....................                1
                                                                                            provide written confirmation if reported orally.

                                                    815(c) ............................    When required, analyze cable, P/L, or facility dam-                                     1.5 ...........................     1 report ......................               2
                                                                                            age or failures to determine cause and as soon as
                                                                                            available submit comprehensive written report.

                                                    816 ................................   Submit plan of corrective action report on observed                                     2 ..............................    1 plan/report ..............                  2
                                                                                             detrimental effects on cable, P/L, or facility within
                                                                                             30 days of discovery; take remedial action and
                                                                                             submit report of remedial action within 30 days
                                                                                             after completion.

                                                    822(a)(2)(iii), (b) ............       Maintain records of design, construction, operation,                                    1 ..............................    4 records retention ....                      4
                                                                                            maintenance, repairs, and investigation on or re-
                                                                                            lated to lease or ROW/RUE area; make available
                                                                                            to BOEM for inspection.

                                                    823 ................................   Request reimbursement within 90 days for food,                                          2 ..............................    1 request ...................                 2
                                                                                            quarters, and transportation provided to BOEM
                                                                                            reps during inspection.

                                                    824(a) 2 ..........................    Develop annual self-inspection plan covering all fa-                                    24 ............................     2 plans .......................             48
                                                                                            cilities; retain with records, and make available to
                                                                                            BOEM upon request.

                                                    824(b) ............................    Conduct annual self-inspection and submit report by                                     36 ............................     2 reports ....................              72
                                                                                            November 1.

                                                    825 ................................   Based on API RP 2A–WSD, perform assessment of                                           60 ............................     2 assessments/ac-                          120
                                                                                             structures, initiate mitigation actions for structures                                                                      tions.
                                                                                             that do not pass assessment process, retain infor-
                                                                                             mation, and make available to BOEM upon re-
                                                                                             quest.

                                                    830(a), (c); 831 thru 833              Immediately report incidents to BOEM via oral com-                                      Oral .5 .....................       2 incidents .................                 1
                                                                                             munications, submit written follow-up report within
                                                                                             15 business days after the incident, and submit
                                                                                             any required additional information.

                                                                                                                                                                                   Written 4 ..................        1 incident ...................                4

                                                    830(d) ............................    Report oil spills as required by BSEE 30 CFR 254 ...                                    Burden covered under BSEE 1014–0007                                               0

                                                          Subtotal ..................      .....................................................................................   .................................   32 responses .............                 386

                                                                                                                                           Subpart I—Decommissioning

                                                    Four **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references
                                                      throughout part 585 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, re-
                                                      quests, applications, plans, etc., the burdens for which are covered elsewhere in part 585.

                                                    **** 902; 905, 906; 907;               Submit for approval, in format specified, copies of                                     20 ............................     1 application ..............                20
                                                       908(c); 909.                          the SAP, COP, or GAP decommissioning applica-
                                                                                             tion and site clearance plan at least 2 years be-
                                                                                             fore decommissioning activities begin, 90 days
                                                                                             after completion of activities, or 90 days after can-
                                                                                             cellation, relinquishment, or other termination of
                                                                                             lease or grant. Include documentation of coordina-
                                                                                             tion efforts w/States/CZMA agencies, local or trib-
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                             al governments, requests that certain facilities re-
                                                                                             main in place for other activities, be converted to
                                                                                             an artificial reef, or be toppled in place. Submit
                                                                                             additional information/evidence requested or mod-
                                                                                             ify and resubmit application.

                                                    902(d); 908 ....................       Notify BOEM at least 60 days before commencing                                          1 ..............................    1 notice ......................               1
                                                                                             decommissioning activities.




                                               VerDate Sep<11>2014        17:29 Apr 26, 2016       Jkt 238001        PO 00000        Frm 00096        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                                                            Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                                                                            24879

                                                                                                                                           BURDEN TABLE—Continued
                                                                                                                                                                                                                                   Non-hour cost burdens
                                                          Section(s) in 30                          Reporting and recordkeeping requirement 1                                              Hour burden
                                                             CFR 585                                                                                                                                                       Average number of               Annual burden
                                                                                                                                                                                                                           annual responses                   hours

                                                    910 ................................    Within 60 days after removing a facility, verify to                                      1 ..............................    1 verification ..............                 1
                                                                                             BOEM that site is cleared.

                                                    912 ................................    Within 60 days after removing a facility, cable, or                                      8 ..............................    1 report ......................               8
                                                                                             pipeline, submit a written report.

                                                    BOEM does not anticipate decommissioning activities for at least 5 years so the requirements have been given a minimal burden.

                                                          Subtotal ..................        .....................................................................................   .................................   4 responses ...............                 30

                                                                                           Subpart J—RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities

                                                    1004, 1005, 1006 ..........             Contact owner of existing facility and/or lessee of                                      1 ..............................    1 request ...................                 1
                                                                                             the area to reach preliminary agreement to use fa-
                                                                                             cility and obtain concurring signatures; submit re-
                                                                                             quest to BOEM for an alternative use RUE, includ-
                                                                                             ing all required information/modifications.

                                                    1007(a), (b), (c) .............         Submit indication of competitive interest in response                                    4 ..............................    1 submission .............                    4
                                                                                              to Federal Register notice.

                                                    1007(c) ..........................      Submit description of proposed activities and re-                                        5 ..............................    1 submission .............                    5
                                                                                              quired information in response to Federal Reg-
                                                                                              ister notice of competitive offering.

                                                    1007(f) ...........................     Lessee or owner of facility submits decision to ac-                                      1 ..............................    1 submission .............                    1
                                                                                              cept or reject proposals deemed acceptable by
                                                                                              BOEM.

                                                    1010(c) ..........................      Request renewal of Alternate Use RUE ....................                                6 ..............................    1 request ...................                 6

                                                    1012; 1016(b) ................          Provide financial assurance as BOEM determines in                                        1 ..............................    1 submission .............                    1
                                                                                              approving RUE for an existing facility, including
                                                                                              additional security if required.

                                                    1013 ..............................     Submit request for assignment of an alternative use                                      1 ..............................    1 request ...................                 1
                                                                                              RUE for an existing facility, including all required
                                                                                              information.

                                                    1015 ..............................     Request relinquishment of RUE for an existing facil-                                     1 ..............................    1 request ...................                 1
                                                                                             ity.

                                                          Subtotal ..................        .....................................................................................   .................................   8 responses ...............                 20

                                                                Total Burden ...             .....................................................................................   .................................   290 responses ...........                25,688

                                                                                                                                                                                                                           $3,816,000 Non-Hour Cost Burdens
                                                       1 In   the future, BOEM may require electronic filing of certain submissions.
                                                       2 Retention    of these records is usual and customary business practice; the burden is primarily to make them available to BOEM and CVAs.


                                                      Estimated Reporting and                                                   collection of information, you are not                                        minimize the burden on the
                                                    Recordkeeping Non-Hour Cost Burden:                                         obligated to respond.                                                         respondents, including the use of
                                                    The estimated non-hour cost burdens                                            Comments: Section 3506(c)(2)(A) of                                         technology.
                                                    total $3,816,000. The non-hour cost                                         the PRA (44 U.S.C. 3501, et seq.,)                                              To comply with the public
                                                    burdens consist of service fees for                                         requires each agency ‘‘. . . to provide                                       consultation process, on December 17,
                                                    BOEM document/study preparation,                                            notice . . . and otherwise consult with                                       2015, BOEM published a Federal
                                                    costs for paying a contractor instead of                                    members of the public and affected                                            Register notice (80 FR 78756)
                                                    BOEM, and costs for a site-specific                                         agencies concerning each proposed                                             announcing that we would submit this
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    study and report to evaluate the cause                                      collection of information . . .’’ Agencies                                    ICR to OMB for approval. This notice
                                                    of harm to natural resources.                                               must specifically solicit comments to:                                        provided the required 60-day comment
                                                      Public Disclosure Statement: The PRA                                      (a) Evaluate whether the collection is                                        period. BOEM received no comments.
                                                    (44 U.S.C. 3501, et seq.) provides that an                                  necessary or useful; (b) evaluate the                                           Public Availability of Comments:
                                                    agency may not conduct or sponsor a                                         accuracy of the burden of the proposed                                        Before including your address, phone
                                                    collection of information unless it                                         collection of information; (c) enhance                                        number, email address, or other
                                                    displays a currently valid OMB control                                      the quality, usefulness, and clarity of                                       personal identifying information in your
                                                    number. Until OMB approves a                                                the information to be collected; and (d)                                      comment, you should be aware that


                                               VerDate Sep<11>2014        17:29 Apr 26, 2016         Jkt 238001        PO 00000        Frm 00097        Fmt 4703        Sfmt 4703      E:\FR\FM\27APN1.SGM               27APN1


                                                    24880                        Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                    your entire comment—including your                      SUPPLEMENTARY INFORMATION:     The                    DEPARTMENT OF JUSTICE
                                                    personal identifying information—may                    Commission instituted this investigation
                                                    be made publicly available at any time.                 on February 29, 2016, based on a                      Antitrust Division
                                                    While you can ask us in your comment                    complaint filed by Edgewell Personal
                                                    to withhold your personal identifying                                                                         United States v. Len Blavatnik;
                                                                                                            Care Brands, LLC, of Chesterfield,
                                                    information from public review, we                                                                            Proposed Final Judgment and
                                                                                                            Missouri, and International Refills                   Competitive Impact Statement
                                                    cannot guarantee that we will be able to                Company, Ltd., of Christ Church,
                                                    do so.                                                  Barbados (collectively,                                  Notice is hereby given pursuant to the
                                                      Dated: March 7, 2016.                                 ‘‘Complainants’’). 81 FR 10277–78. The                Antitrust Procedures and Penalties Act,
                                                    Deanna Meyer-Pietruszka,                                complaint alleges violations of section               15 U.S.C. 16(b)–(h), that a proposed
                                                    Chief, Office of Policy, Regulations and                337 of the Tariff Act of 1930, as                     Final Judgment, Stipulation, and
                                                    Analysis.                                               amended, 19 U.S.C. 1337 (‘‘section                    Competitive Impact Statement have
                                                    [FR Doc. 2016–09709 Filed 4–26–16; 8:45 am]             337’’), in the importation into the                   been filed with the United States
                                                                                                            United States, the sale for importation,              District Court for the District of
                                                    BILLING CODE 4310–MR–P
                                                                                                                                                                  Columbia in United States of America v.
                                                                                                            and the sale within the United States
                                                                                                                                                                  Len Blavatnik, Civil Action No. 1:15–
                                                                                                            after importation of certain diaper
                                                                                                                                                                  cv–01631–RDM. On October 6, 2015,
                                                    INTERNATIONAL TRADE                                     disposal systems and components                       the United States filed a Complaint
                                                    COMMISSION                                              thereof, including diaper refill cassettes,           alleging that Len Blavatnik violated the
                                                                                                            by reason of infringement of certain                  premerger notification and waiting
                                                    [Investigation No. 337–TA–986]                          claims of U.S. Patent Nos. 6,974,029 and              period requirements of the Hart-Scott-
                                                                                                            8,899,420. Id. at 10277. The                          Rodino Antitrust Improvements Act of
                                                    Certain Diaper Disposal Systems and                     Commission’s notice of investigation                  1976, 15 U.S.C. 18a, with respect to his
                                                    Components Thereof, Including Diaper                    named as respondents Munchkin, Inc.,                  acquisition of voting securities of
                                                    Refill Cassettes; Notice of Commission
                                                                                                            of Van Nuys, California; Munchkin Baby                TangoMe, Inc. The proposed Final
                                                    Determination Not To Review an Initial
                                                                                                            Canada Ltd., of Brampton, Canada; and                 Judgment, filed at the same time as the
                                                    Determination Granting Complainants’
                                                                                                            Lianyungang Brilliant Daily Products                  Complaint, requires Blavatnik to pay a
                                                    Motion To Amend the Complaint and
                                                                                                            Co. Ltd., of Lianyungang, China. Id. at               civil penalty of $656,000.
                                                    the Notice of Investigation                                                                                      Copies of the Complaint, proposed
                                                                                                            10278. The Office of Unfair Import
                                                    AGENCY: U.S. International Trade                        Investigations is not participating in this           Final Judgment, and Competitive Impact
                                                    Commission.                                             investigation. Id.                                    Statement are available for inspection
                                                    ACTION: Notice.
                                                                                                                                                                  on the Antitrust Division’s Web site at
                                                                                                               On March 31, 2016, Complainants
                                                                                                                                                                  http://www.justice.gov/atr and at the
                                                                                                            filed an unopposed motion to amend                    Office of the Clerk of the United States
                                                    SUMMARY:   Notice is hereby given that
                                                                                                            the complaint and the notice of                       District Court for the District of
                                                    the U.S. International Trade
                                                                                                            investigation in order to add two                     Columbia. Copies of these materials may
                                                    Commission has determined not to
                                                                                                            respondents: Lianyungang Rainbow                      be obtained from the Antitrust Division
                                                    review an initial determination (‘‘ID’’)
                                                    (Order No. 7) issued by the presiding                   Daily Products Co., Ltd., of                          upon request and payment of the
                                                    administrative law judge (‘‘ALJ’’) on                   Lianyungang, China; and Munchkin                      copying fee set by Department of Justice
                                                    April 8, 2016, granting the                             Asia Limited, of Hong Kong, China.                    regulations.
                                                    complainants’ unopposed motion to                       Complainants argue that they learned                     Public comment is invited within 60
                                                    amend the complaint and notice of                       through discovery that these parties are              days of the date of this notice. Such
                                                    investigation to add two respondents.                   involved in the manufacture and/or sale               comments, including the name of the
                                                    FOR FURTHER INFORMATION CONTACT:
                                                                                                            for importation of the accused products               submitter, and responses thereto, will be
                                                    Robert Needham, Office of the General                   in this investigation.                                posted on the Antitrust Division’s Web
                                                    Counsel, U.S. International Trade                          On April 8, 2016, the ALJ issued the               site, filed with the Court, and, under
                                                    Commission, 500 E Street SW.,                           subject ID and granted Complainants’                  certain circumstances, published in the
                                                    Washington, DC 20436, telephone (202)                   motion to amend the complaint and the                 Federal Register. Comments should be
                                                    708–5468. Copies of non-confidential                    notice of investigation. No petitions for             directed to Daniel P. Ducore, Special
                                                    documents filed in connection with this                 review were filed.                                    Attorney, c/o Federal Trade
                                                    investigation are or will be available for                                                                    Commission, 600 Pennsylvania Avenue
                                                                                                               The Commission has determined not                  NW., CC–8416, Washington, DC 20580
                                                    inspection during official business                     to review the subject ID.
                                                    hours (8:45 a.m. to 5:15 p.m.) in the                                                                         (telephone: 202–326–2526; email:
                                                    Office of the Secretary, U.S.                              The authority for the Commission’s                 dducore@ftc.gov).
                                                    International Trade Commission, 500 E                   determination is contained in section                 Patricia A. Brink,
                                                    Street SW., Washington, DC 20436,                       337 of the Tariff Act of 1930, as                     Director of Civil Enforcement.
                                                    telephone (202) 205–2000. General                       amended (19 U.S.C. 1337), and in Part
                                                    information concerning the Commission                   210 of the Commission’s Rules of                      IN THE UNITED STATES DISTRICT
                                                    may also be obtained by accessing its                   Practice and Procedure (19 CFR part                   COURT FOR THE DISTRICT OF
                                                    Internet server (http://www.usitc.gov).                 210).                                                 COLUMBIA
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    The public record for this investigation                  By order of the Commission.                           UNITED STATES OF AMERICA c/o
                                                    may be viewed on the Commission’s                                                                             Department of Justice, Washington, D.C.
                                                                                                              Issued: April 22, 2016.
                                                    electronic docket (EDIS) at http://                                                                           20530, Plaintiff, v. LEN BLAVATNIK c/
                                                    edis.usitc.gov. Hearing-impaired                        William R. Bishop,                                    o Access Industries, 28 Kensington
                                                    persons are advised that information on                 Supervisory Hearings and Information                  Church Street, 4th Floor, London,
                                                    this matter can be obtained by                          Officer.                                              United Kingdom W8 4EP, Defendant.
                                                    contacting the Commission’s TDD                         [FR Doc. 2016–09827 Filed 4–26–16; 8:45 am]           CASE NO.: 1:15–cv–01631
                                                    terminal on (202) 205–1810.                             BILLING CODE 7020–02–P                                JUDGE: Randolph D. Moss


                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00098   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1



Document Created: 2018-02-07 13:55:51
Document Modified: 2018-02-07 13:55:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Action30-Day notice.
DatesSubmit written comments by May 27, 2016.
ContactOffice of Policy, Regulations, and Analysis at or (202) 208-6352. You may review the ICR online at http:// www.reginfo.gov. Follow the instructions to review Department of the Interior collections under review by OMB.
FR Citation81 FR 24869 

2025 Federal Register | Disclaimer | Privacy Policy