The U.S. Nuclear Regulatory Commission (NRC) is issuing a confirmatory order (Order) to C&D Technologies, Inc. (C&D), to memorialize the agreements reached during an alternative dispute resolution mediation session held on March 10, 2016. This Order will resolve the issues that were identified during an NRC inspection at the C&D facility located in Blue Bell, Pennsylvania. This Order is effective 30 calendar days after its issuance.

Federal Register, Volume 81 Issue 81 (Wednesday, April 27, 2016)
[Federal Register Volume 81, Number 81 (Wednesday, April 27, 2016)]
[Notices]
[Pages 24895-24900]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-09917]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 99901385; EA-15-212; NRC-2016-0086]


In the Matter of C&D Technologies, Inc.

AGENCY: Nuclear Regulatory Commission.

ACTION: Confirmatory order; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing a 
confirmatory order (Order) to C&D Technologies, Inc. (C&D), to 
memorialize the agreements reached during an alternative dispute 
resolution mediation session held on March 10, 2016. This Order will 
resolve the issues that were identified during an NRC inspection at the 
C&D facility located in Blue Bell, Pennsylvania. This Order is 
effective 30 calendar days after its issuance.

DATES: Effective Date: The confirmatory order becomes effective on May 
20, 2016.

ADDRESSES: Please refer to Docket ID NRC-2016-0086 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2016-0086. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For questions about this Order, 
contact the individual listed in the FOR FURTHER INFORMATION CONTACT 
section of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Gerald Gulla, Office of Enforcement, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-001; 
telephone: 301-415-2872, email: [email protected].

SUPPLEMENTARY INFORMATION: The text of the Order is attached.

    Dated at Rockville, Maryland, this 20th day of April 2016.

    For the Nuclear Regulatory Commission.
Patricia K. Holahan,
Director, Office of Enforcement.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

In the Matter of ) Docket No. 99901385
C&D Technologies, Inc. ) EA-15-212

CONFIRMATORY ORDER

I

    C&D Technologies, Inc., (C&D) provides Class 1E batteries for 
safety-related applications to nuclear power plants located in the 
United States. The C&D main office is located in Blue Bell, 
Pennsylvania.
    This Confirmatory Order (Order) is the result of an agreement 
reached between C&D and the U.S. Nuclear Regulatory Commission (NRC) 
during an alternative dispute resolution (ADR)

[[Page 24896]]

mediation session conducted on March 10, 2016.

II

    From September 21 to September 25, 2015, the NRC conducted an 
inspection at the C&D facility in Blue Bell. The purpose of this 
limited-scope inspection was to assess C&D's compliance with the 
provisions of selected portions of title 10 of the Code of Federal 
Regulations (10 CFR) Part 50, Appendix B ``Quality Assurance Criteria 
for Nuclear Power Plants and Fuel Reprocessing Plants,'' and 10 CFR 
part 21, ``Reporting of Defects and Noncompliance.''
    On January 8, 2016, the NRC issued Inspection Report 99901385/2015-
201 to C&D, which documented three apparent violations being considered 
for escalated enforcement action in accordance with the NRC Enforcement 
Policy.
    The first apparent violation concerned C&D's failure to implement 
an adequate 10 CFR part 21 program to perform a timely and thorough 
evaluation of a deviation to identify defects, which if left 
uncorrected, could result in substantial safety hazards. The NRC 
identified that C&D's initial evaluation of a deviation in station 
battery cell separators lacked an adequate technical basis to support 
closing the evaluation in accordance with 10 CFR 21.21(a)(1). When C&D 
completed a more thorough evaluation of this deviation, a defect in the 
battery manufacturing process was identified. This defect was reported 
to the NRC in accordance with 10 CFR 21.21(d)(1); however, the report 
was made over 2\1/2\ years greater than the 60 day requirement. The 
second apparent violation concerned multiple additional instances where 
C&D failed to provide an adequate technical justification to support 
closing the evaluations of deviations in accordance with 10 CFR 
21.21(a)(1). The third apparent violation concerned multiple additional 
instances where C&D failed to prepare and submit interim reports to the 
NRC when an evaluation could not be completed within 60 days from the 
date of discovery in accordance with 10 CFR 21.21(a)(2).
    In response to the NRC's letter dated January 8, 2016, (Agencywide 
Documents Access and Management System (ADAMS) Accession No. 
ML15307A198), C&D requested the use of the NRC's ADR process to resolve 
these issues. Alternative Dispute Resolution is a process in which a 
neutral mediator with no decision-making authority assists the parties 
in reaching an agreement on resolving any differences regarding a 
dispute. This Order is being issued pursuant to the preliminary 
agreement reached between C&D and the NRC.

III

    During the ADR mediation session, C&D and the NRC reached a 
preliminary settlement agreement. The elements of the agreement 
consisted of the following:
    1. To ensure that C&D achieves full compliance for all currently 
identified violations, C&D will take the following actions:
    A. By 30 calendar days from the issuance date of an Order, C&D 
shall confirm that all outstanding 10 CFR part 21 evaluations are 
complete and that all required interim reports are submitted in 
accordance with the timelines required by 10 CFR part 21.
    B. By 45 calendar days from the issuance date of an Order, C&D 
shall review and revise, as necessary, all policies and procedures to 
provide reasonable assurance that Part 21 evaluations are conducted in 
accordance with 10 CFR 50, Appendix B quality assurance program 
requirements.
    a. C&D shall define the Part 21 ``discovery date'' within their 
procedures as the date the issue is entered into the Part 21 process, 
corrective action system, nonconformance process, or reported in the 
customer complaint database, whichever occurs first.
    b. C&D procedures shall provide reasonable assurance that the 
evaluation process of all deviations includes a documented technical 
evaluation and basis for why the identified deviation would or would 
not result in a substantial safety hazard, if left uncorrected.
    C. By 45 calendar days from the issuance date of an Order, C&D 
shall contract an independent (not an employee or customer of C&D) 
third party expert to conduct an assessment of the C&D corrective 
action program (CAP), and the administrative controls and management 
controls in place to provide reasonable assurance of an effective part 
21 program, including 10 CFR 50, Appendix B requirements. The initial 
assessment shall be completed by the end of the calendar year 2016 and 
assessments will continue annually.
    D. C&D shall report the completion of items 1.A, 1.B and 1.C, in 
writing to the Director, Division of Construction Inspection and 
Operational Programs (DCIP), Nuclear Regulatory Commission (NRC), 
Office of New Reactors, no later than 75 calendar days from issuance of 
the Order.
    2. To ensure that C&D senior management, first-line supervision and 
employees are committed to, and accountable for, complying with NRC 
requirements, and maintaining a robust safety culture, C&D will take 
the following actions:
    A. By 30 calendar days from the issuance date of an Order, C&D 
shall issue a letter from President and Chief Executive Officer (CEO) 
\1\ to employees in all C&D locations, working with nuclear-related 
activities, outlining C&D's management's expectations, including a 
commitment that all nuclear-related activities are performed and 
documented in a complete and accurate manner in accordance with 
approved procedures. C&D shall notify the DCIP Director no later than 
30 calendar days after issuance of the letter and shall provide a copy 
of the letter to the DCIP Director. The letter shall address the 
following:
---------------------------------------------------------------------------

    \1\ In lieu of a letter to all employees, the NRC would consider 
it to be acceptable if C&D produced a video message from the CEO and 
other senior managers that would have wide-spread distribution and 
be shown at required all-hands meeting(s).
---------------------------------------------------------------------------

    (1) Where the NRC inspection report can be found that describe the 
2015 apparent violations;
    (2) include a brief overview of the apparent violations;
    (3) C&D senior management, mid-level managers and first-line 
supervisors expect all employees to follow approved policies and 
procedures; and
    (4) C&D management has an expectation that all employees are to 
report procedure concerns to their supervisors (or to another 
appropriate level of management), and that supervisors are responsible 
for encouraging this reporting by staff and ensuring procedure issues 
are resolved appropriately and in a timely manner.
    B. By 90 calendar days from the issuance date of an Order, Senior 
Management's commitment and expectations will be further reinforced 
through the use of conspicuously posted company-wide posters and/or 
other appropriate forms of communication. Communications will 
specifically discuss 10 CFR part 21 requirements, and best practices 
identified by C&D's evaluation of issues and violations (including root 
causes), corrective actions to prevent recurrence, and promote a strong 
safety culture.
    C. Management expectations shall be further reinforced at the local 
level with an overt commitment from mid-level management and first-line 
supervisors regarding procedure adherence. Opportunities to communicate 
this commitment may include organizational all-hands meetings during 
which site

[[Page 24897]]

managers and/or supervisors can convey the lessons learned from NRC 
inspections and any applicable industry assessments (e.g., Nuclear 
Procurement Issues Committee (NUPIC)), and explain how to handle 
similar situations if and when they should arise in their organization 
or group.
    3. To ensure that C&D policies, procedures and work practices 
provide the necessary guidance to promote compliance with NRC 
requirements, C&D shall take the following actions:
    A. By 180 calendar days of the issuance date of an Order, C&D shall 
enter the existing issue of procedure compliance into its corrective 
action program (CAP), and this issue shall be considered a significant 
condition adverse to quality. As a result, C&D shall conduct a formal 
root cause analysis of known procedure violations to determine the 
extent of condition of C&D work practices and identify corrective 
actions to improve procedure guidance. In addition, the extent of 
condition shall address the last five years of C&D's nuclear-related 
customer complaints, corrective actions, or nonconformances that meet 
the Part 21 definition of a deviation. C&D shall ensure that the extent 
of condition review is complete and that all 10 CFR part 21 deviations 
are identified and entered into C&D's Part 21 (A-14) procedure to 
ensure that they are adequately evaluated for reportable defects. By 30 
calendar days of corrective action completion, C&D shall provide the 
results of its root cause and extent of condition report to the DCIP 
Director.
    B. By 60 calendar days of the issuance date of an Order, C&Ds 
corrective action program shall be revised to have the ability to trend 
10 CFR part 21 related issues, such as failure to follow 10 CFR part 21 
procedure requirements or failure to enter a deviation into the 10 CFR 
part 21 process.
    4. To ensure that all C&D employees understand their roles and 
responsibilities regarding compliance with NRC requirements, C&D will 
provide training and other forms of continuous reinforcement to its 
employees:
    By 90 calendar days from the issuance date of an Order, C&D will 
complete the development of a training program as described below. The 
initial training shall be submitted to the NRC for review and comment 
before being implemented. The NRC will review the draft training 
provided by C&D within 10 business days. The Initial training shall 
then be conducted and documented for all current employees and 
supervisors no later than 30 calendar days from the completion of the 
NRC review. C&D shall report to the DCIP Director by telephone within 7 
calendar days of completion of the initial training.
    A. Training (initial and annual) shall cover the basic regulatory 
requirements of 10 CFR; the legal authority granted to the NRC to 
inspect for compliance; the enforcement actions that can be taken 
against the company, the customer and company employees for 
noncompliance; 10 CFR 50, Appendix B and 10 CFR part 21 requirements; 
and the associated C&D procedures. This shall be documented and 
provided to all employees involved in nuclear-related work activities, 
including management.
    B. Develop, implement and document initial training and annual 
refresher training for item 4.A.
    C. For employees involved in nuclear-related activities (including 
supervisors) hired after the date of initial training completion, the 
initial training shall be provided and documented within 45 calendar 
days of hire.
    D. For 3 years following the effective date of the Order, C&D shall 
assess the effectiveness of training and procedure compliance by 
reviewing and trending information obtained from C&D's CAP.
    In addition to the elements described above, C&D has taken or 
committed to take the following corrective actions.
    1. Complete implementation of an improved process that customers 
use to report information (i.e., the iSight system) to C&D for battery 
issues. This process shall assure prompt entry and classification of 
issues to determine if the issue is a deviation, if applicable.
    2. Complete implementation of a new 10 CFR part 21 process that 
includes biweekly meetings that are attended by executive management, 
and logs of actions and schedules for reporting to the NRC.
    3. Complete implementation of new qualification report 
documentation to reconstitute the design basis of the K and L battery 
product lines by linking the specification requirements to specific 
test results required by the Institute of Electrical and Electronics 
Engineers (IEEE) specifications.
    4. Complete implementation of new internal reporting requirements. 
Quality assurance issues shall be reported to the CEO.
    5. Hold monthly corrective action meetings with plant managers and 
the executive team to ensure timely correction of identified issues.
    6. Complete implementation of more robust Safety Committee meetings 
conducted with particular attention paid to due dates. In addition, the 
process for initial reporting of customer identified issues has been 
established so that the Quality Systems manager conducts the first 
review of the issue as soon as correspondence begins with a nuclear 
customer.
    7. Complete institution of a third party 10 CFR part 21 and 
Appendix B audit program, using experienced and qualified personnel 
reporting directly to the CEO and General Counsel. The audits shall be 
executed annually. Inputs to the audits will include all customer 
communications, customer complaint information, and 10 CFR part 21 and 
Safety Committee records. The initial audit shall occur by the end of 
March 2016 for the 10 CFR part 21 program and by September 2016 of 
Appendix B to 10 CFR part 50.
    Based on the actions described above, and the commitments described 
in Section V below, the NRC agrees to the following conditions:
    1. The NRC will consider this Order as an escalated enforcement 
action for the purposes of determining future enforcement action per 
the NRC Enforcement Policy,
    2. The NRC will refrain from issuing a proposed imposition of a 
civil penalty and a Notice of Violation for the above-referenced 
apparent violations.
    On April 12, 2016, C&D consented to issuing this Order with the 
commitments, as described in Section V below. C&D further agreed that 
this Order is to be effective 30 calendar days after its issuance, the 
agreement memorialized in this Order settles the matter between the 
parties, and that C&D has waived its right to a hearing.

IV

    I find that C&D's actions completed or committed to take, as 
described in Section III above, combined with the commitments as set 
forth in Section V are acceptable and necessary, and conclude that with 
these commitments the public health and safety are reasonably assured. 
In view of the foregoing, I have determined that public health and 
safety require that C&D's commitments be confirmed by this Order. Based 
on the above and C&D's consent, this Order is effective 30 calendar 
days after its issuance.

V

    Accordingly, pursuant to Sections 161b, 161i, 161o, 182 and 186 of 
the Atomic Energy Act of 1954, as amended, and the Commission's 
regulations in 10 CFR 2.202 and 10 CFR parts 21, and 50, it is hereby 
ordered that:
A. Compliance with 10 CFR part 21
    1. By 45 calendar days from the issuance date of this Order, C&D 
shall

[[Page 24898]]

confirm that all outstanding 10 CFR part 21 evaluations are complete 
and that all required interim reports are submitted in accordance with 
the timelines required by 10 CFR part 21.
    2. By 45 calendar days from the issuance date of this Order, C&D 
shall review and revise, as necessary, all policies and procedures to 
provide reasonable assurance that Part 21 evaluations are conducted in 
accordance with 10 CFR 50, Appendix B quality assurance program 
requirements.
    a. C&D shall define the Part 21 ``discovery date'' within their 
procedures as ''the date the issue is entered into the Part 21 process, 
corrective action system, nonconformance process, or reported in the 
customer complaint database, whichever occurs first.''
    b. C&D procedures shall provide reasonable assurance that the 
evaluation process used for all deviations includes a documented 
technical evaluation and basis for why the identified deviation would 
or would not result in a substantial safety hazard, if left 
uncorrected.
    3. By 45 calendar days from the issuance date of this Order, C&D 
shall contract an independent third party expert (not an employee or 
customer of C&D) to conduct an assessment of the C&D corrective action 
program, and the administrative controls and management controls in 
place to provide reasonable assurance of an effective Part 21 program, 
including 10 CFR 50, Appendix B requirements. The initial assessment 
shall be completed by the end of the calendar year 2016 and assessments 
will continue annually thereafter.
    4. C&D shall report the completion of items A.1, A.2, and A.3, in 
writing to the DCIP Director no later than 75 calendar days from 
issuance of this Order.
B. Communications
    1. By 45 calendar days from the issuance date of this Order, C&D 
shall issue a letter and/or video message from the President and CEO to 
employees in all C&D locations working with nuclear-related activities, 
outlining C&D's management's expectations, including a commitment that 
all nuclear-related activities are performed and documented in a 
complete and accurate manner in accordance with approved procedures. 
C&D shall notify the DCIP Director no later than 30 calendar days after 
issuance of the letter and shall provide a copy of the letter to the 
DCIP Director. The letter shall address the following:
    a. how to obtain the NRC inspection report that describes the 2015 
apparent violations;
    b. a brief overview of the apparent violations;
    c. a statement that C&D senior management, mid-level managers, and 
first-line supervisors expect all employees to follow approved policies 
and procedures; and
    d. a statement that C&D management has an expectation that all 
employees are to report procedure concerns to their supervisors, or to 
another appropriate level of management, and that supervisors are 
responsible for encouraging this reporting by staff, and ensuring 
procedure issues are resolved appropriately and in a timely manner.
    2. By 90 calendar days from the issuance date of this Order, C&D 
senior management's commitment and expectations will be further 
reinforced through the use of conspicuously posted company-wide posters 
and/or other appropriate forms of communication. Communications will 
specifically discuss 10 CFR part 21 requirements, and best practices 
identified by C&D's evaluation of issues and violations (including root 
causes), corrective actions to prevent recurrence, and promote a strong 
safety culture.
C. Work Processes
    1. C&D shall ensure that the existing issue of procedure compliance 
has been entered into its CAP, and this issue shall be considered a 
significant condition adverse to quality. As a result, within 180 days 
of the issuance date of this Order, C&D shall conduct a formal root 
cause analysis of known procedure violations to determine the extent of 
condition of C&D work practices and identify corrective actions to 
improve procedure guidance. In addition, the extent of condition shall 
address the last five years of C&D's nuclear-related customer 
complaints, corrective actions, or nonconformances that meet the Part 
21 definition of a ``deviation.'' C&D shall ensure that the extent of 
condition review is complete and that all 10 CFR part 21 deviations are 
identified and entered into C&D's 10 CFR part 21 program to ensure that 
they are adequately evaluated for reportable defects. By 30 calendar 
days of corrective action completion, C&D shall provide the results of 
its root cause and extent of condition report to the DCIP Director.
    2. By 60 calendar days of the issuance date of this Order, C&Ds CAP 
shall be revised to have the ability to trend 10 CFR part 21 related 
issues, such as failure to follow 10 CFR part 21 procedure requirements 
or failure to enter a deviation into the 10 CFR part 21 process.
D. Training
    1. By 90 calendar days from the issuance date of this Order, C&D 
will develop a training program as described below. The training 
program, including the initial training, shall be submitted to the NRC 
for review and comment before being implemented. Within 10 business 
days of submission, the NRC will perform an initial review and provide 
comments to C&D. Within 30 days of receiving NRC comments, C&D shall 
adequately address these comments in writing, at which time the NRC 
will provide a final review of the program. The NRC will inform C&D of 
its approval of the training program in writing and by telephone within 
10 days of re-submittal by C&D. The initial training shall then be 
conducted and documented for all current employees and supervisors no 
later than 30 calendar days from the NRC final approval date. C&D shall 
report to the DCIP Director in writing and by telephone within 7 
calendar days of completion of the initial training.
    a. Training (initial and annual) shall cover the basic requirements 
(e.g., what they are and how they apply) of 10 CFR 50, Appendix B and 
10 CFR part 21; the legal authority granted to the NRC to inspect for 
compliance; the enforcement actions that can be taken against the 
company, the customer and company employees for noncompliance; and the 
associated C&D procedures. This training shall be provided to all 
employees involved in nuclear-related work activities, including 
management.
    b. Develop, implement and document initial training and annual 
refresher training for item D.1.a.
    c. For employees involved in nuclear-related activities, including 
supervisors, who are hired after the date of initial training 
completion, the initial training shall be provided and documented 
within 45 calendar days of hire.
    d. For three years following the effective date of this Order, C&D 
shall assess the effectiveness of training and procedure compliance by 
reviewing and trending information obtained from C&D's CAP.
    The terms of this Order apply to the successors and assigns of C&D.
    The Director, Office of Enforcement, may, in writing, relax or 
rescind any of the above conditions upon demonstration by C&D of good 
cause.

VI

    In accordance with 10 CFR 2.202 and 10 CFR 2.309, any person 
adversely affected by this Order, other than C&D,

[[Page 24899]]

may request a hearing within 30 days of the issuance date of this 
Order. Where good cause is shown, consideration will be given to 
extending the time to request a hearing. A request for extension of 
time must be directed to the Director, Office of Enforcement, U.S. 
Nuclear Regulatory Commission, and include a statement of good cause 
for the extension.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139; 
August 28, 2007), as amended by 77 FR 46562; August 3, 2012 (codified 
in pertinent part at 10 CFR part 2, subpart C). The E-Filing process 
requires participants to submit and serve all adjudicatory documents 
over the internet, or in some cases to mail copies on electronic 
storage media. Participants may not submit paper copies of their 
filings unless they seek an exemption in accordance with the procedures 
described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the participant should 
contact the Office of the Secretary by email at [email protected], 
or by telephone at 301-415-1677, to (1) request a digital 
identification (ID) certificate, which allows the participant (or its 
counsel or representative) to digitally sign documents and access the 
E-Submittal server for any proceeding in which it is participating; and 
(2) advise the Secretary that the participant will be submitting a 
request or petition for hearing (even in instances in which the 
participant, or its counsel or representative, already holds an NRC-
issued digital identification (ID) certificate. Based upon this 
information, the Secretary will establish an electronic docket for the 
hearing in this proceeding if the Secretary has not already established 
an electronic docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. System requirements for accessing the E-Submittal 
server are detailed in NRC's ``Guidance for Electronic Submission,'' 
which is available on the agency's public Web site at http://www.nrc.gov/site-help/e-submittals.html. Participants may attempt to 
use other software not listed on the Web site, but should note that the 
NRC's E-Filing system does not support unlisted software, and the NRC 
Meta System Help Desk will not be able to offer assistance in using 
unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, Web-based submission form. In order to 
serve documents through the Electronic Information Exchange System, 
users will be required to install a Web browser plug-in from the NRC 
Web site. Further information on the Web-based submission form, 
including the installation of the Web browser plug-in, is available on 
the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene through the EIE. Submissions 
should be in Portable Document Format (PDF) in accordance with NRC 
guidance available on the NRC's public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the 
time the documents are submitted through the NRC's E-Filing system. To 
be timely, an electronic filing must be submitted to the E-Filing 
system no later than 11:59 p.m. Eastern Time (ET) on the due date. Upon 
receipt of a transmission, the E-Filing system time-stamps the document 
and sends the submitter an email notice confirming receipt of the 
document. The E-Filing system also distributes an email notice that 
provides access to the document to the NRC's Office of the General 
Counsel and any others who have advised the Office of the Secretary 
that they wish to participate in the proceeding, so that the filer need 
not serve the documents on those participants separately. Therefore, 
any others who wish to participate in the proceeding (or their counsel 
or representative) must apply for and receive a digital ID certificate 
before a hearing request/petition to intervene is filed so that they 
can obtain access to the document via the E-Filing system.
    A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC's Web site 
at http://www.nrc.gov/site-help/e-submittals.html, by email to 
[email protected], or by a toll-free call at (866) 672-7640. The 
NRC Meta System Help Desk is available between 8:00 a.m. and 8:00 p.m., 
ET, Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in the 
NRC's electronic hearing docket, which is available to the public at 
http://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. 
However, in some instances, a request to intervene will require 
including information on local residence in order to demonstrate a 
proximity assertion of interest in the proceeding. With respect to 
copyrighted works, participants are requested not to include 
copyrighted materials in their submission, except for limited excerpts 
that serve the purpose of the adjudicatory filings and would constitute 
a Fair Use application.
    If a person other than the licensee requests a hearing, that person 
shall set forth with particularity the manner in which his interest is 
adversely affected by this Order and shall address the

[[Page 24900]]

criteria set forth in 10 CFR 2.309(d) and (f).
    If a hearing is requested by a person whose interest is adversely 
affected, the Commission will issue a separate Order designating the 
time and place of any hearings, as appropriate. If a hearing is held, 
the issue to be considered at such hearing shall be whether this Order 
should be sustained.
    In the absence of any request for hearing, or written approval of 
an extension of time in which to request a hearing, the provisions 
specified in Section V above shall be final 30 days after issuance of 
this Order without further order or proceedings. If an extension of 
time for requesting a hearing has been approved, the provisions 
specified in Section V shall be final when the extension expires if a 
hearing request has not been received.

    Dated at Rockville, Maryland, this 20th day of April 2016.

    For the Nuclear Regulatory Commission.

Patricia K. Holahan, Director, Office of Enforcement.
[FR Doc. 2016-09917 Filed 4-26-16; 8:45 am]
 BILLING CODE 7590-01-P



                                                                                 Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                             24895

                                                      Dated: April 20, 2016.                                   Detailed meeting agendas and meeting                  • Federal Rulemaking Web Site: Go to
                                                    Mark L. Banks,                                          transcripts are available on the NRC                  http://www.regulations.gov and search
                                                    Chief, Technical Support Branch, Advisory               Web site at http://www.nrc.gov/reading-               for Docket ID NRC–2016–0086. Address
                                                    Committee on Reactor Safeguards.                        rm/doc-collections/acrs. Information                  questions about NRC dockets to Carol
                                                    [FR Doc. 2016–09914 Filed 4–26–16; 8:45 am]             regarding topics to be discussed,                     Gallagher; telephone: 301–415–3463;
                                                    BILLING CODE 7590–01–P                                  changes to the agenda, whether the                    email: Carol.Gallagher@nrc.gov. For
                                                                                                            meeting has been canceled or                          questions about this Order, contact the
                                                                                                            rescheduled, and the time allotted to                 individual listed in the FOR FURTHER
                                                    NUCLEAR REGULATORY                                      present oral statements can be obtained               INFORMATION CONTACT section of this
                                                    COMMISSION                                              from the Web site cited above or by                   document.
                                                                                                            contacting the identified DFO.                           • NRC’s Agencywide Documents
                                                    Advisory Committee on Reactor                           Moreover, in view of the possibility that             Access and Management System
                                                    Safeguards (ACRS) Meeting of the                        the schedule for ACRS meetings may be                 (ADAMS): You may obtain publicly-
                                                    ACRS Subcommittee on Regulatory                         adjusted by the Chairman as necessary                 available documents online in the
                                                    Policies and Practices; Notice of                       to facilitate the conduct of the meeting,             ADAMS Public Documents collection at
                                                    Meeting                                                 persons planning to attend should check               http://www.nrc.gov/reading-rm/
                                                                                                            with these references if such                         adams.html. To begin the search, select
                                                       The ACRS Subcommittee on
                                                                                                            rescheduling would result in a major                  ‘‘ADAMS Public Documents’’ and then
                                                    Regulatory Policies and Practices will
                                                                                                            inconvenience.                                        select ‘‘Begin Web-based ADAMS
                                                    hold a meeting on May 19, 2016, Room
                                                                                                               If attending this meeting, please enter            Search.’’ For problems with ADAMS,
                                                    T–2B1, 11545 Rockville Pike, Rockville,
                                                                                                            through the One White Flint North                     please contact the NRC’s Public
                                                    Maryland.
                                                                                                            building, 11555 Rockville Pike,                       Document Room (PDR) reference staff at
                                                       The meeting will be open to public
                                                                                                            Rockville, MD. After registering with                 1–800–397–4209, 301–415–4737, or by
                                                    attendance.
                                                                                                            security, please contact Mr. Theron                   email to pdr.resource@nrc.gov. The
                                                       The agenda for the subject meeting
                                                                                                            Brown (Telephone 240–888–9835) to be                  ADAMS accession number for each
                                                    shall be as follows:
                                                                                                            escorted to the meeting room.                         document referenced (if it is available in
                                                    Thursday, May 19, 2016—8:30 a.m.                          Dated: April 20, 2016.                              ADAMS) is provided the first time that
                                                    until 5:00 p.m.                                         Mark L. Banks,                                        it is mentioned in this document.
                                                       The Subcommittee will discuss the                    Chief, Technical Support Branch, Advisory                • NRC’s PDR: You may examine and
                                                    State-of-the-Art Reactor Consequence                    Committee on Reactor Safeguards.                      purchase copies of public documents at
                                                    Analyses Project (SOARCA) Project,                      [FR Doc. 2016–09886 Filed 4–26–16; 8:45 am]           the NRC’s PDR, Room O1–F21, One
                                                    Sequoyah (a PWR with Ice-Condenser                      BILLING CODE 7590–01–P
                                                                                                                                                                  White Flint North, 11555 Rockville
                                                    Containment) plant. The Subcommittee                                                                          Pike, Rockville, Maryland 20852.
                                                    will hear presentations by and hold                                                                           FOR FURTHER INFORMATION CONTACT:
                                                    discussions with the NRC staff and                      NUCLEAR REGULATORY                                    Gerald Gulla, Office of Enforcement,
                                                    other interested persons regarding this                 COMMISSION                                            U.S. Nuclear Regulatory Commission,
                                                    matter. The Subcommittee will gather                                                                          Washington, DC 20555–001; telephone:
                                                                                                            [Docket No. 99901385; EA–15–212; NRC–
                                                    information, analyze relevant issues and                2016–0086]                                            301–415–2872, email: Gerald.Gulla@
                                                    facts, and formulate proposed positions                                                                       nrc.gov.
                                                    and actions, as appropriate, for                        In the Matter of C&D Technologies, Inc.               SUPPLEMENTARY INFORMATION:       The text of
                                                    deliberation by the Full Committee.                                                                           the Order is attached.
                                                       Members of the public desiring to                    AGENCY:  Nuclear Regulatory
                                                    provide oral statements and/or written                  Commission.                                             Dated at Rockville, Maryland, this 20th day
                                                                                                            ACTION: Confirmatory order; issuance.                 of April 2016.
                                                    comments should notify the Designated
                                                    Federal Official (DFO), Hossein                                                                                 For the Nuclear Regulatory Commission.
                                                                                                            SUMMARY:   The U.S. Nuclear Regulatory                Patricia K. Holahan,
                                                    Nourbakhsh (Telephone 301–415–5622                      Commission (NRC) is issuing a
                                                    or Email: Hossein.Nourbakhsh@nrc.gov)                                                                         Director, Office of Enforcement.
                                                                                                            confirmatory order (Order) to C&D
                                                    five days prior to the meeting, if                      Technologies, Inc. (C&D), to                          UNITED STATES OF AMERICA
                                                    possible, so that appropriate                           memorialize the agreements reached                    NUCLEAR REGULATORY
                                                    arrangements can be made. Thirty-five                   during an alternative dispute resolution              COMMISSION
                                                    hard copies of each presentation or                     mediation session held on March 10,
                                                    handout should be provided to the DFO                                                                         In the Matter of    ) Docket No.
                                                                                                            2016. This Order will resolve the issues                99901385
                                                    thirty minutes before the meeting. In                   that were identified during an NRC
                                                    addition, one electronic copy of each                                                                         C&D Technologies, Inc. ) EA–15–212
                                                                                                            inspection at the C&D facility located in
                                                    presentation should be emailed to the                   Blue Bell, Pennsylvania. This Order is                CONFIRMATORY ORDER
                                                    DFO one day before the meeting. If an                   effective 30 calendar days after its
                                                    electronic copy cannot be provided                                                                            I
                                                                                                            issuance.
                                                    within this timeframe, presenters                                                                               C&D Technologies, Inc., (C&D)
                                                    should provide the DFO with a CD                        DATES: Effective Date: The confirmatory               provides Class 1E batteries for safety-
                                                    containing each presentation at least                   order becomes effective on May 20,                    related applications to nuclear power
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    thirty minutes before the meeting.                      2016.                                                 plants located in the United States. The
                                                    Electronic recordings will be permitted                 ADDRESSES: Please refer to Docket ID                  C&D main office is located in Blue Bell,
                                                    only during those portions of the                       NRC–2016–0086 when contacting the                     Pennsylvania.
                                                    meeting that are open to the public.                    NRC about the availability of                           This Confirmatory Order (Order) is
                                                    Detailed procedures for the conduct of                  information regarding this document.                  the result of an agreement reached
                                                    and participation in ACRS meetings                      You may obtain publicly-available                     between C&D and the U.S. Nuclear
                                                    were published in the Federal Register                  information related to this document                  Regulatory Commission (NRC) during
                                                    on October 21, 2015 (80 FR 63846).                      using any of the following methods:                   an alternative dispute resolution (ADR)


                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00113   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1


                                                    24896                        Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                    mediation session conducted on March                    Order is being issued pursuant to the                    2. To ensure that C&D senior
                                                    10, 2016.                                               preliminary agreement reached between                 management, first-line supervision and
                                                                                                            C&D and the NRC.                                      employees are committed to, and
                                                    II
                                                                                                                                                                  accountable for, complying with NRC
                                                       From September 21 to September 25,                   III
                                                                                                                                                                  requirements, and maintaining a robust
                                                    2015, the NRC conducted an inspection                      During the ADR mediation session,                  safety culture, C&D will take the
                                                    at the C&D facility in Blue Bell. The                   C&D and the NRC reached a preliminary                 following actions:
                                                    purpose of this limited-scope inspection                settlement agreement. The elements of                    A. By 30 calendar days from the
                                                    was to assess C&D’s compliance with                     the agreement consisted of the                        issuance date of an Order, C&D shall
                                                    the provisions of selected portions of                  following:                                            issue a letter from President and Chief
                                                    title 10 of the Code of Federal                            1. To ensure that C&D achieves full                Executive Officer (CEO) 1 to employees
                                                    Regulations (10 CFR) Part 50, Appendix                  compliance for all currently identified               in all C&D locations, working with
                                                    B ‘‘Quality Assurance Criteria for                      violations, C&D will take the following               nuclear-related activities, outlining
                                                    Nuclear Power Plants and Fuel                           actions:                                              C&D’s management’s expectations,
                                                    Reprocessing Plants,’’ and 10 CFR part                     A. By 30 calendar days from the                    including a commitment that all
                                                    21, ‘‘Reporting of Defects and                          issuance date of an Order, C&D shall                  nuclear-related activities are performed
                                                    Noncompliance.’’                                        confirm that all outstanding 10 CFR part              and documented in a complete and
                                                       On January 8, 2016, the NRC issued                   21 evaluations are complete and that all              accurate manner in accordance with
                                                    Inspection Report 99901385/2015–201                     required interim reports are submitted                approved procedures. C&D shall notify
                                                    to C&D, which documented three                          in accordance with the timelines                      the DCIP Director no later than 30
                                                    apparent violations being considered for                                                                      calendar days after issuance of the letter
                                                                                                            required by 10 CFR part 21.
                                                    escalated enforcement action in                                                                               and shall provide a copy of the letter to
                                                                                                               B. By 45 calendar days from the
                                                    accordance with the NRC Enforcement                                                                           the DCIP Director. The letter shall
                                                                                                            issuance date of an Order, C&D shall
                                                    Policy.                                                                                                       address the following:
                                                       The first apparent violation concerned               review and revise, as necessary, all
                                                                                                            policies and procedures to provide                       (1) Where the NRC inspection report
                                                    C&D’s failure to implement an adequate                                                                        can be found that describe the 2015
                                                    10 CFR part 21 program to perform a                     reasonable assurance that Part 21
                                                                                                                                                                  apparent violations;
                                                    timely and thorough evaluation of a                     evaluations are conducted in
                                                                                                                                                                     (2) include a brief overview of the
                                                    deviation to identify defects, which if                 accordance with 10 CFR 50, Appendix
                                                                                                                                                                  apparent violations;
                                                    left uncorrected, could result in                       B quality assurance program                              (3) C&D senior management, mid-
                                                    substantial safety hazards. The NRC                     requirements.                                         level managers and first-line supervisors
                                                    identified that C&D’s initial evaluation                   a. C&D shall define the Part 21                    expect all employees to follow approved
                                                    of a deviation in station battery cell                  ‘‘discovery date’’ within their                       policies and procedures; and
                                                    separators lacked an adequate technical                 procedures as the date the issue is                      (4) C&D management has an
                                                    basis to support closing the evaluation                 entered into the Part 21 process,                     expectation that all employees are to
                                                    in accordance with 10 CFR 21.21(a)(1).                  corrective action system,                             report procedure concerns to their
                                                    When C&D completed a more thorough                      nonconformance process, or reported in                supervisors (or to another appropriate
                                                    evaluation of this deviation, a defect in               the customer complaint database,                      level of management), and that
                                                    the battery manufacturing process was                   whichever occurs first.                               supervisors are responsible for
                                                    identified. This defect was reported to                    b. C&D procedures shall provide                    encouraging this reporting by staff and
                                                    the NRC in accordance with 10 CFR                       reasonable assurance that the evaluation              ensuring procedure issues are resolved
                                                    21.21(d)(1); however, the report was                    process of all deviations includes a                  appropriately and in a timely manner.
                                                    made over 21⁄2 years greater than the 60                documented technical evaluation and                      B. By 90 calendar days from the
                                                    day requirement. The second apparent                    basis for why the identified deviation                issuance date of an Order, Senior
                                                    violation concerned multiple additional                 would or would not result in a                        Management’s commitment and
                                                    instances where C&D failed to provide                   substantial safety hazard, if left                    expectations will be further reinforced
                                                    an adequate technical justification to                  uncorrected.                                          through the use of conspicuously posted
                                                    support closing the evaluations of                         C. By 45 calendar days from the                    company-wide posters and/or other
                                                    deviations in accordance with 10 CFR                    issuance date of an Order, C&D shall                  appropriate forms of communication.
                                                    21.21(a)(1). The third apparent violation               contract an independent (not an                       Communications will specifically
                                                    concerned multiple additional instances                 employee or customer of C&D) third                    discuss 10 CFR part 21 requirements,
                                                    where C&D failed to prepare and submit                  party expert to conduct an assessment of              and best practices identified by C&D’s
                                                    interim reports to the NRC when an                      the C&D corrective action program                     evaluation of issues and violations
                                                    evaluation could not be completed                       (CAP), and the administrative controls                (including root causes), corrective
                                                    within 60 days from the date of                         and management controls in place to                   actions to prevent recurrence, and
                                                    discovery in accordance with 10 CFR                     provide reasonable assurance of an                    promote a strong safety culture.
                                                    21.21(a)(2).                                            effective part 21 program, including 10                  C. Management expectations shall be
                                                       In response to the NRC’s letter dated                CFR 50, Appendix B requirements. The                  further reinforced at the local level with
                                                    January 8, 2016, (Agencywide                            initial assessment shall be completed by              an overt commitment from mid-level
                                                    Documents Access and Management                         the end of the calendar year 2016 and                 management and first-line supervisors
                                                    System (ADAMS) Accession No.                            assessments will continue annually.                   regarding procedure adherence.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    ML15307A198), C&D requested the use                        D. C&D shall report the completion of              Opportunities to communicate this
                                                    of the NRC’s ADR process to resolve                     items 1.A, 1.B and 1.C, in writing to the             commitment may include organizational
                                                    these issues. Alternative Dispute                       Director, Division of Construction                    all-hands meetings during which site
                                                    Resolution is a process in which a                      Inspection and Operational Programs
                                                                                                                                                                    1 In lieu of a letter to all employees, the NRC
                                                    neutral mediator with no decision-                      (DCIP), Nuclear Regulatory Commission
                                                                                                                                                                  would consider it to be acceptable if C&D produced
                                                    making authority assists the parties in                 (NRC), Office of New Reactors, no later               a video message from the CEO and other senior
                                                    reaching an agreement on resolving any                  than 75 calendar days from issuance of                managers that would have wide-spread distribution
                                                    differences regarding a dispute. This                   the Order.                                            and be shown at required all-hands meeting(s).



                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00114   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1


                                                                                 Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                          24897

                                                    managers and/or supervisors can convey                  calendar days from the completion of                  identified issues has been established so
                                                    the lessons learned from NRC                            the NRC review. C&D shall report to the               that the Quality Systems manager
                                                    inspections and any applicable industry                 DCIP Director by telephone within 7                   conducts the first review of the issue as
                                                    assessments (e.g., Nuclear Procurement                  calendar days of completion of the                    soon as correspondence begins with a
                                                    Issues Committee (NUPIC)), and explain                  initial training.                                     nuclear customer.
                                                    how to handle similar situations if and                    A. Training (initial and annual) shall                7. Complete institution of a third
                                                    when they should arise in their                         cover the basic regulatory requirements               party 10 CFR part 21 and Appendix B
                                                    organization or group.                                  of 10 CFR; the legal authority granted to             audit program, using experienced and
                                                       3. To ensure that C&D policies,                      the NRC to inspect for compliance; the                qualified personnel reporting directly to
                                                    procedures and work practices provide                   enforcement actions that can be taken                 the CEO and General Counsel. The
                                                    the necessary guidance to promote                       against the company, the customer and                 audits shall be executed annually.
                                                    compliance with NRC requirements,                       company employees for noncompliance;                  Inputs to the audits will include all
                                                    C&D shall take the following actions:                   10 CFR 50, Appendix B and 10 CFR part                 customer communications, customer
                                                       A. By 180 calendar days of the                       21 requirements; and the associated                   complaint information, and 10 CFR part
                                                    issuance date of an Order, C&D shall                    C&D procedures. This shall be                         21 and Safety Committee records. The
                                                    enter the existing issue of procedure                   documented and provided to all                        initial audit shall occur by the end of
                                                    compliance into its corrective action                   employees involved in nuclear-related                 March 2016 for the 10 CFR part 21
                                                    program (CAP), and this issue shall be                  work activities, including management.                program and by September 2016 of
                                                    considered a significant condition                         B. Develop, implement and document                 Appendix B to 10 CFR part 50.
                                                    adverse to quality. As a result, C&D                    initial training and annual refresher                    Based on the actions described above,
                                                    shall conduct a formal root cause                       training for item 4.A.                                and the commitments described in
                                                    analysis of known procedure violations                     C. For employees involved in nuclear-              Section V below, the NRC agrees to the
                                                    to determine the extent of condition of                 related activities (including supervisors)            following conditions:
                                                    C&D work practices and identify                         hired after the date of initial training                 1. The NRC will consider this Order
                                                    corrective actions to improve procedure                 completion, the initial training shall be             as an escalated enforcement action for
                                                    guidance. In addition, the extent of                    provided and documented within 45                     the purposes of determining future
                                                    condition shall address the last five                   calendar days of hire.                                enforcement action per the NRC
                                                    years of C&D’s nuclear-related customer                    D. For 3 years following the effective             Enforcement Policy,
                                                    complaints, corrective actions, or                      date of the Order, C&D shall assess the                  2. The NRC will refrain from issuing
                                                    nonconformances that meet the Part 21                   effectiveness of training and procedure               a proposed imposition of a civil penalty
                                                    definition of a deviation. C&D shall                    compliance by reviewing and trending                  and a Notice of Violation for the above-
                                                    ensure that the extent of condition                     information obtained from C&D’s CAP.                  referenced apparent violations.
                                                    review is complete and that all 10 CFR                     In addition to the elements described                 On April 12, 2016, C&D consented to
                                                    part 21 deviations are identified and                   above, C&D has taken or committed to                  issuing this Order with the
                                                    entered into C&D’s Part 21 (A–14)                       take the following corrective actions.                commitments, as described in Section V
                                                    procedure to ensure that they are                          1. Complete implementation of an                   below. C&D further agreed that this
                                                    adequately evaluated for reportable                     improved process that customers use to                Order is to be effective 30 calendar days
                                                    defects. By 30 calendar days of                         report information (i.e., the iSight                  after its issuance, the agreement
                                                    corrective action completion, C&D shall                 system) to C&D for battery issues. This               memorialized in this Order settles the
                                                    provide the results of its root cause and               process shall assure prompt entry and                 matter between the parties, and that
                                                    extent of condition report to the DCIP                  classification of issues to determine if              C&D has waived its right to a hearing.
                                                    Director.                                               the issue is a deviation, if applicable.
                                                       B. By 60 calendar days of the issuance                  2. Complete implementation of a new                IV
                                                    date of an Order, C&Ds corrective action                10 CFR part 21 process that includes                    I find that C&D’s actions completed or
                                                    program shall be revised to have the                    biweekly meetings that are attended by                committed to take, as described in
                                                    ability to trend 10 CFR part 21 related                 executive management, and logs of                     Section III above, combined with the
                                                    issues, such as failure to follow 10 CFR                actions and schedules for reporting to                commitments as set forth in Section V
                                                    part 21 procedure requirements or                       the NRC.                                              are acceptable and necessary, and
                                                    failure to enter a deviation into the 10                   3. Complete implementation of new                  conclude that with these commitments
                                                    CFR part 21 process.                                    qualification report documentation to                 the public health and safety are
                                                       4. To ensure that all C&D employees                  reconstitute the design basis of the K                reasonably assured. In view of the
                                                    understand their roles and                              and L battery product lines by linking                foregoing, I have determined that public
                                                    responsibilities regarding compliance                   the specification requirements to                     health and safety require that C&D’s
                                                    with NRC requirements, C&D will                         specific test results required by the                 commitments be confirmed by this
                                                    provide training and other forms of                     Institute of Electrical and Electronics               Order. Based on the above and C&D’s
                                                    continuous reinforcement to its                         Engineers (IEEE) specifications.                      consent, this Order is effective 30
                                                    employees:                                                 4. Complete implementation of new                  calendar days after its issuance.
                                                       By 90 calendar days from the issuance                internal reporting requirements. Quality
                                                    date of an Order, C&D will complete the                 assurance issues shall be reported to the             V
                                                    development of a training program as                    CEO.                                                     Accordingly, pursuant to Sections
                                                    described below. The initial training                      5. Hold monthly corrective action
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  161b, 161i, 161o, 182 and 186 of the
                                                    shall be submitted to the NRC for review                meetings with plant managers and the                  Atomic Energy Act of 1954, as amended,
                                                    and comment before being                                executive team to ensure timely                       and the Commission’s regulations in 10
                                                    implemented. The NRC will review the                    correction of identified issues.                      CFR 2.202 and 10 CFR parts 21, and 50,
                                                    draft training provided by C&D within                      6. Complete implementation of more                 it is hereby ordered that:
                                                    10 business days. The Initial training                  robust Safety Committee meetings
                                                    shall then be conducted and                             conducted with particular attention                   A. Compliance with 10 CFR part 21
                                                    documented for all current employees                    paid to due dates. In addition, the                      1. By 45 calendar days from the
                                                    and supervisors no later than 30                        process for initial reporting of customer             issuance date of this Order, C&D shall


                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00115   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1


                                                    24898                        Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                    confirm that all outstanding 10 CFR part                   a. how to obtain the NRC inspection                enter a deviation into the 10 CFR part
                                                    21 evaluations are complete and that all                report that describes the 2015 apparent               21 process.
                                                    required interim reports are submitted                  violations;
                                                                                                               b. a brief overview of the apparent                D. Training
                                                    in accordance with the timelines
                                                    required by 10 CFR part 21.                             violations;                                              1. By 90 calendar days from the
                                                       2. By 45 calendar days from the                         c. a statement that C&D senior                     issuance date of this Order, C&D will
                                                    issuance date of this Order, C&D shall                  management, mid-level managers, and                   develop a training program as described
                                                    review and revise, as necessary, all                    first-line supervisors expect all                     below. The training program, including
                                                    policies and procedures to provide                      employees to follow approved policies                 the initial training, shall be submitted to
                                                    reasonable assurance that Part 21                       and procedures; and                                   the NRC for review and comment before
                                                    evaluations are conducted in                               d. a statement that C&D management                 being implemented. Within 10 business
                                                    accordance with 10 CFR 50, Appendix                     has an expectation that all employees                 days of submission, the NRC will
                                                    B quality assurance program                             are to report procedure concerns to their             perform an initial review and provide
                                                    requirements.                                           supervisors, or to another appropriate                comments to C&D. Within 30 days of
                                                       a. C&D shall define the Part 21                      level of management, and that                         receiving NRC comments, C&D shall
                                                    ‘‘discovery date’’ within their                         supervisors are responsible for                       adequately address these comments in
                                                    procedures as ’’the date the issue is                   encouraging this reporting by staff, and              writing, at which time the NRC will
                                                    entered into the Part 21 process,                       ensuring procedure issues are resolved                provide a final review of the program.
                                                    corrective action system,                               appropriately and in a timely manner.                 The NRC will inform C&D of its
                                                    nonconformance process, or reported in                     2. By 90 calendar days from the                    approval of the training program in
                                                    the customer complaint database,                        issuance date of this Order, C&D senior               writing and by telephone within 10 days
                                                    whichever occurs first.’’                               management’s commitment and                           of re-submittal by C&D. The initial
                                                       b. C&D procedures shall provide                      expectations will be further reinforced               training shall then be conducted and
                                                    reasonable assurance that the evaluation                through the use of conspicuously posted               documented for all current employees
                                                    process used for all deviations includes                company-wide posters and/or other                     and supervisors no later than 30
                                                    a documented technical evaluation and                   appropriate forms of communication.                   calendar days from the NRC final
                                                    basis for why the identified deviation                  Communications will specifically                      approval date. C&D shall report to the
                                                    would or would not result in a                          discuss 10 CFR part 21 requirements,                  DCIP Director in writing and by
                                                    substantial safety hazard, if left                      and best practices identified by C&D’s                telephone within 7 calendar days of
                                                    uncorrected.                                            evaluation of issues and violations                   completion of the initial training.
                                                       3. By 45 calendar days from the                      (including root causes), corrective                      a. Training (initial and annual) shall
                                                    issuance date of this Order, C&D shall                  actions to prevent recurrence, and                    cover the basic requirements (e.g., what
                                                    contract an independent third party                     promote a strong safety culture.                      they are and how they apply) of 10 CFR
                                                    expert (not an employee or customer of                                                                        50, Appendix B and 10 CFR part 21; the
                                                                                                            C. Work Processes
                                                    C&D) to conduct an assessment of the                                                                          legal authority granted to the NRC to
                                                    C&D corrective action program, and the                     1. C&D shall ensure that the existing
                                                                                                                                                                  inspect for compliance; the enforcement
                                                    administrative controls and                             issue of procedure compliance has been
                                                                                                                                                                  actions that can be taken against the
                                                    management controls in place to                         entered into its CAP, and this issue shall
                                                                                                                                                                  company, the customer and company
                                                    provide reasonable assurance of an                      be considered a significant condition
                                                                                                                                                                  employees for noncompliance; and the
                                                    effective Part 21 program, including 10                 adverse to quality. As a result, within
                                                                                                                                                                  associated C&D procedures. This
                                                    CFR 50, Appendix B requirements. The                    180 days of the issuance date of this
                                                                                                                                                                  training shall be provided to all
                                                    initial assessment shall be completed by                Order, C&D shall conduct a formal root
                                                                                                                                                                  employees involved in nuclear-related
                                                    the end of the calendar year 2016 and                   cause analysis of known procedure
                                                                                                                                                                  work activities, including management.
                                                    assessments will continue annually                      violations to determine the extent of                    b. Develop, implement and document
                                                    thereafter.                                             condition of C&D work practices and                   initial training and annual refresher
                                                       4. C&D shall report the completion of                identify corrective actions to improve                training for item D.1.a.
                                                    items A.1, A.2, and A.3, in writing to                  procedure guidance. In addition, the                     c. For employees involved in nuclear-
                                                    the DCIP Director no later than 75                      extent of condition shall address the last            related activities, including supervisors,
                                                    calendar days from issuance of this                     five years of C&D’s nuclear-related                   who are hired after the date of initial
                                                    Order.                                                  customer complaints, corrective actions,              training completion, the initial training
                                                                                                            or nonconformances that meet the Part                 shall be provided and documented
                                                    B. Communications                                       21 definition of a ‘‘deviation.’’ C&D                 within 45 calendar days of hire.
                                                       1. By 45 calendar days from the                      shall ensure that the extent of condition                d. For three years following the
                                                    issuance date of this Order, C&D shall                  review is complete and that all 10 CFR                effective date of this Order, C&D shall
                                                    issue a letter and/or video message from                part 21 deviations are identified and                 assess the effectiveness of training and
                                                    the President and CEO to employees in                   entered into C&D’s 10 CFR part 21                     procedure compliance by reviewing and
                                                    all C&D locations working with nuclear-                 program to ensure that they are                       trending information obtained from
                                                    related activities, outlining C&D’s                     adequately evaluated for reportable                   C&D’s CAP.
                                                    management’s expectations, including a                  defects. By 30 calendar days of                          The terms of this Order apply to the
                                                    commitment that all nuclear-related                     corrective action completion, C&D shall               successors and assigns of C&D.
                                                    activities are performed and                            provide the results of its root cause and
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                     The Director, Office of Enforcement,
                                                    documented in a complete and accurate                   extent of condition report to the DCIP                may, in writing, relax or rescind any of
                                                    manner in accordance with approved                      Director.                                             the above conditions upon
                                                    procedures. C&D shall notify the DCIP                      2. By 60 calendar days of the issuance             demonstration by C&D of good cause.
                                                    Director no later than 30 calendar days                 date of this Order, C&Ds CAP shall be
                                                    after issuance of the letter and shall                  revised to have the ability to trend 10               VI
                                                    provide a copy of the letter to the DCIP                CFR part 21 related issues, such as                      In accordance with 10 CFR 2.202 and
                                                    Director. The letter shall address the                  failure to follow 10 CFR part 21                      10 CFR 2.309, any person adversely
                                                    following:                                              procedure requirements or failure to                  affected by this Order, other than C&D,


                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00116   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1


                                                                                 Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices                                           24899

                                                    may request a hearing within 30 days of                 on the Web site, but should note that the             between 8:00 a.m. and 8:00 p.m., ET,
                                                    the issuance date of this Order. Where                  NRC’s E-Filing system does not support                Monday through Friday, excluding
                                                    good cause is shown, consideration will                 unlisted software, and the NRC Meta                   government holidays.
                                                    be given to extending the time to request               System Help Desk will not be able to                     Participants who believe that they
                                                    a hearing. A request for extension of                   offer assistance in using unlisted                    have a good cause for not submitting
                                                    time must be directed to the Director,                  software.                                             documents electronically must file an
                                                    Office of Enforcement, U.S. Nuclear                        If a participant is electronically                 exemption request, in accordance with
                                                    Regulatory Commission, and include a                    submitting a document to the NRC in                   10 CFR 2.302(g), with their initial paper
                                                    statement of good cause for the                         accordance with the E-Filing rule, the                filing requesting authorization to
                                                    extension.                                              participant must file the document                    continue to submit documents in paper
                                                       All documents filed in NRC                           using the NRC’s online, Web-based                     format. Such filings must be submitted
                                                    adjudicatory proceedings, including a                   submission form. In order to serve                    by: (1) First class mail addressed to the
                                                    request for hearing, a petition for leave               documents through the Electronic                      Office of the Secretary of the
                                                    to intervene, any motion or other                       Information Exchange System, users                    Commission, U.S. Nuclear Regulatory
                                                    document filed in the proceeding prior                  will be required to install a Web                     Commission, Washington, DC 20555–
                                                    to the submission of a request for                      browser plug-in from the NRC Web site.                0001, Attention: Rulemaking and
                                                    hearing or petition to intervene, and                   Further information on the Web-based                  Adjudications Staff; or (2) courier,
                                                    documents filed by interested                           submission form, including the                        express mail, or expedited delivery
                                                    governmental entities participating                     installation of the Web browser plug-in,              service to the Office of the Secretary,
                                                    under 10 CFR 2.315(c), must be filed in                 is available on the NRC’s public Web                  Sixteenth Floor, One White Flint North,
                                                    accordance with the NRC’s E-Filing rule                 site at http://www.nrc.gov/site-help/e-               11555 Rockville Pike, Rockville,
                                                    (72 FR 49139; August 28, 2007), as                      submittals.html.                                      Maryland, 20852, Attention:
                                                    amended by 77 FR 46562; August 3,                          Once a participant has obtained a                  Rulemaking and Adjudications Staff.
                                                    2012 (codified in pertinent part at 10                  digital ID certificate and a docket has               Participants filing a document in this
                                                    CFR part 2, subpart C). The E-Filing                    been created, the participant can then                manner are responsible for serving the
                                                    process requires participants to submit                 submit a request for hearing or petition              document on all other participants.
                                                    and serve all adjudicatory documents                    for leave to intervene through the EIE.               Filing is considered complete by first-
                                                    over the internet, or in some cases to                  Submissions should be in Portable                     class mail as of the time of deposit in
                                                    mail copies on electronic storage media.                Document Format (PDF) in accordance                   the mail, or by courier, express mail, or
                                                    Participants may not submit paper                       with NRC guidance available on the                    expedited delivery service upon
                                                    copies of their filings unless they seek                NRC’s public Web site at http://                      depositing the document with the
                                                    an exemption in accordance with the                     www.nrc.gov/site-help/e-                              provider of the service. A presiding
                                                    procedures described below.                             submittals.html. A filing is considered               officer, having granted an exemption
                                                       To comply with the procedural                        complete at the time the documents are                request from using E-Filing, may require
                                                    requirements of E-Filing, at least ten                  submitted through the NRC’s E-Filing                  a participant or party to use E-Filing if
                                                    (10) days prior to the filing deadline, the             system. To be timely, an electronic                   the presiding officer subsequently
                                                    participant should contact the Office of                filing must be submitted to the E-Filing              determines that the reason for granting
                                                    the Secretary by email at                               system no later than 11:59 p.m. Eastern               the exemption from use of E-Filing no
                                                    hearing.docket@nrc.gov, or by telephone                 Time (ET) on the due date. Upon receipt               longer exists.
                                                    at 301–415–1677, to (1) request a digital               of a transmission, the E-Filing system                   Documents submitted in adjudicatory
                                                    identification (ID) certificate, which                  time-stamps the document and sends                    proceedings will appear in the NRC’s
                                                    allows the participant (or its counsel or               the submitter an email notice                         electronic hearing docket, which is
                                                    representative) to digitally sign                       confirming receipt of the document. The               available to the public at http://
                                                    documents and access the E-Submittal                    E-Filing system also distributes an email             ehd1.nrc.gov/ehd/, unless excluded
                                                    server for any proceeding in which it is                notice that provides access to the                    pursuant to an order of the Commission
                                                    participating; and (2) advise the                       document to the NRC’s Office of the                   or the presiding officer. Participants are
                                                    Secretary that the participant will be                  General Counsel and any others who                    requested not to include personal
                                                    submitting a request or petition for                    have advised the Office of the Secretary              privacy information, such as social
                                                    hearing (even in instances in which the                 that they wish to participate in the                  security numbers, home addresses, or
                                                    participant, or its counsel or                          proceeding, so that the filer need not                home phone numbers in their filings,
                                                    representative, already holds an NRC-                   serve the documents on those                          unless an NRC regulation or other law
                                                    issued digital identification (ID)                      participants separately. Therefore, any               requires submission of such
                                                    certificate. Based upon this information,               others who wish to participate in the                 information. However, in some
                                                    the Secretary will establish an electronic              proceeding (or their counsel or                       instances, a request to intervene will
                                                    docket for the hearing in this proceeding               representative) must apply for and                    require including information on local
                                                    if the Secretary has not already                        receive a digital ID certificate before a             residence in order to demonstrate a
                                                    established an electronic docket.                       hearing request/petition to intervene is              proximity assertion of interest in the
                                                       Information about applying for a                     filed so that they can obtain access to               proceeding. With respect to copyrighted
                                                    digital ID certificate is available on                  the document via the E-Filing system.                 works, participants are requested not to
                                                    NRC’s public Web site at http://                           A person filing electronically using               include copyrighted materials in their
                                                    www.nrc.gov/site-help/e-                                the NRC’s adjudicatory E-Filing system                submission, except for limited excerpts
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    submittals.html. System requirements                    may seek assistance by contacting the                 that serve the purpose of the
                                                    for accessing the E-Submittal server are                NRC Meta System Help Desk through                     adjudicatory filings and would
                                                    detailed in NRC’s ‘‘Guidance for                        the ‘‘Contact Us’’ link located on the                constitute a Fair Use application.
                                                    Electronic Submission,’’ which is                       NRC’s Web site at http://www.nrc.gov/                    If a person other than the licensee
                                                    available on the agency’s public Web                    site-help/e-submittals.html, by email to              requests a hearing, that person shall set
                                                    site at http://www.nrc.gov/site-help/e-                 MSHD.Resource@nrc.gov, or by a toll-                  forth with particularity the manner in
                                                    submittals.html. Participants may                       free call at (866) 672–7640. The NRC                  which his interest is adversely affected
                                                    attempt to use other software not listed                Meta System Help Desk is available                    by this Order and shall address the


                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00117   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1


                                                    24900                        Federal Register / Vol. 81, No. 81 / Wednesday, April 27, 2016 / Notices

                                                    criteria set forth in 10 CFR 2.309(d) and                  • NRC’s Agencywide Documents                       NUCLEAR REGULATORY
                                                    (f).                                                    Access and Management System                          COMMISSION
                                                       If a hearing is requested by a person                (ADAMS): You may obtain publicly-
                                                    whose interest is adversely affected, the               available documents online in the                     [Docket No. 50–389; NRC–2016–0085]
                                                    Commission will issue a separate Order                  ADAMS Public Documents collection at
                                                    designating the time and place of any                   http://www.nrc.gov/reading-rm/                        Florida Power & Light Company; St.
                                                    hearings, as appropriate. If a hearing is               adams.html. To begin the search, select               Lucie Plant, Unit No. 2
                                                    held, the issue to be considered at such                ‘‘ADAMS Public Documents’’ and then
                                                    hearing shall be whether this Order                     select ‘‘Begin Web-based ADAMS                        AGENCY:  Nuclear Regulatory
                                                    should be sustained.                                    Search.’’ For problems with ADAMS,                    Commission.
                                                       In the absence of any request for                    please contact the NRC’s Public                       ACTION: Exemption; issuance.
                                                    hearing, or written approval of an                      Document Room (PDR) reference staff at
                                                    extension of time in which to request a                                                                       SUMMARY:   The U.S. Nuclear Regulatory
                                                                                                            1–800–397–4209, 301–415–4737, or by
                                                    hearing, the provisions specified in                                                                          Commission (NRC) is issuing an
                                                                                                            email to pdr.resource@nrc.gov. The
                                                    Section V above shall be final 30 days                                                                        exemption in response to a December
                                                                                                            ADAMS accession number for each                       30, 2014, request from Florida Power &
                                                    after issuance of this Order without                    document referenced (if it is available in
                                                    further order or proceedings. If an                                                                           Light Company for the use of a different
                                                                                                            ADAMS) is provided the first time that                fuel rod cladding material (AREVA
                                                    extension of time for requesting a                      it is mentioned in this document.
                                                    hearing has been approved, the                                                                                M5®).
                                                                                                               • NRC’s PDR: You may examine and
                                                    provisions specified in Section V shall                                                                       ADDRESSES:   Please refer to Docket ID
                                                                                                            purchase copies of public documents at
                                                    be final when the extension expires if a                                                                      NRC–2016–0085 when contacting the
                                                                                                            the NRC’s PDR, Room O1–F21, One
                                                    hearing request has not been received.                                                                        NRC about the availability of
                                                                                                            White Flint North, 11555 Rockville
                                                      Dated at Rockville, Maryland, this 20th day                                                                 information regarding this document.
                                                                                                            Pike, Rockville, Maryland 20852.
                                                    of April 2016.                                                                                                You may obtain publicly-available
                                                                                                            FOR FURTHER INFORMATION CONTACT:                      information related to this document
                                                      For the Nuclear Regulatory Commission.
                                                                                                            James Shea, Office of New Reactors,                   using any of the following methods:
                                                    Patricia K. Holahan, Director,                                                                                   • Federal Rulemaking Web site: Go to
                                                                                                            U.S. Nuclear Regulatory Commission,
                                                    Office of Enforcement.                                  Washington, DC 20555–0001; telephone:                 http://www.regulations.gov and search
                                                    [FR Doc. 2016–09917 Filed 4–26–16; 8:45 am]
                                                                                                            301–415–1388, email: James.Shea@                      for Docket ID NRC–2016–0085. Address
                                                    BILLING CODE 7590–01–P                                                                                        questions about NRC dockets to Carol
                                                                                                            nrc.gov.
                                                                                                                                                                  Gallagher; telephone: 301–415–3463;
                                                                                                            SUPPLEMENTARY INFORMATION:      The                   email: Carol.Gallagher@nrc.gov. For
                                                    NUCLEAR REGULATORY                                      Virginia Electric and Power Company,                  technical questions, contact the
                                                    COMMISSION                                              doing business as Dominion Virginia                   individuals listed in the FOR FURTHER
                                                                                                            Power (Applicant) has filed an                        INFORMATION CONTACT section of this
                                                    [Docket Nos. 52–017; NRC–2008–0066]
                                                                                                            application for a COL with the NRC                    document.
                                                    Dominion Virginia Power; North Anna,                    under Section 103 of the Atomic Energy                   • NRC’s Agencywide Documents
                                                    Unit 3; Combined License Application                    Act of 1954, as amended, and part 52 of               Access and Management System
                                                                                                            title 10 of the Code of Federal                       (ADAMS): You may obtain publicly-
                                                    AGENCY:  Nuclear Regulatory                             Regulations (10 CFR), ‘‘Licenses,                     available documents online in the
                                                    Commission.                                             Certifications, and Approvals for                     ADAMS Public Documents collection at
                                                    ACTION: Combined license application;                   Nuclear Power Plants.’’ Through the                   http://www.nrc.gov/reading-rm/
                                                    receipt.                                                Application, which is currently under                 adams.html. To begin the search, select
                                                                                                            review by the NRC staff, the Applicant                ‘‘ADAMS Public Documents’’ and then
                                                    SUMMARY:   The U.S. Nuclear Regulatory                  seeks to construct and operate an                     select ‘‘Begin Web-based ADAMS
                                                    Commission (NRC) is giving notice once                  Economic Simplified Boiling-Water                     Search.’’ For problems with ADAMS,
                                                    each week for four consecutive weeks of                 Reactor at the North Anna Power                       please contact the NRC’s Public
                                                    the North Anna Unit 3 combined license                  Station, which is located in Louisa                   Document Room (PDR) reference staff at
                                                    (COL) application from Dominion                         County, Virginia. An applicant may seek               1–800–397–4209, 301–415–4737, or by
                                                    Virginia Power (Dominion).                              a COL in accordance with subpart C of                 email to pdr.resource@nrc.gov. The
                                                    DATES: April 27, 2016.                                  10 CFR part 52. The information                       ADAMS accession number for each
                                                    ADDRESSES: Please refer to Docket ID                    submitted by the applicant includes                   document referenced (if it is available in
                                                    NRC–2008–0066 when contacting the                       certain administrative information, such              ADAMS) is provided the first time that
                                                    NRC about the availability of                           as financial qualifications submitted                 it is mentioned in this document.
                                                    information regarding this document.                    pursuant to 10 CFR 52.77, as well as                     • NRC’s PDR:You may examine and
                                                    You may obtain publicly-available                       technical information submitted                       purchase copies of public documents at
                                                    information related to this document                    pursuant to 10 CFR 52.79. These notices               the NRC’s PDR, Room O1–F21, One
                                                    using the following methods:                            are being provided in accordance with                 White Flint North, 11555 Rockville
                                                      • Federal Rulemaking Web site: Go to                  the requirements in 10 CFR 50.43(a)(3).               Pike, Rockville, Maryland 20852.
                                                    http://www.regulations.gov and search                                                                         FOR FURTHER INFORMATION CONTACT:
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                              Dated at Rockville, Maryland, this 21th day
                                                    for Docket ID NRC–2008–0066. Address                    of April, 2016.                                       Perry H. Buckberg; telephone: 301–415–
                                                    questions about NRC dockets to Carol                                                                          1383; email: Perry.Buckberg@nrc.gov; or
                                                                                                              For the Nuclear Regulatory Commission.
                                                    Gallagher; telephone: 301–415–3463;                                                                           Robert L. Gladney; telephone: 301–415–
                                                    email: Carol.Gallagher@nrc.gov. For                     Ronaldo Jenkins,                                      1022; email: Robert.Gladney@nrc.gov.
                                                    technical questions, contact the                        Chief, Licensing Branch 3, Division of New            Both are staff of the Office of Nuclear
                                                    individual listed in the FOR FURTHER                    Reactor Licensing, Office of New Reactors.            Reactor Regulation, U.S. Nuclear
                                                    INFORMATION CONTACT section of this                     [FR Doc. 2016–09847 Filed 4–26–16; 8:45 am]           Regulatory Commission, Washington,
                                                    document.                                               BILLING CODE 7590–01–P                                DC 20555–0001.


                                               VerDate Sep<11>2014   17:29 Apr 26, 2016   Jkt 238001   PO 00000   Frm 00118   Fmt 4703   Sfmt 4703   E:\FR\FM\27APN1.SGM   27APN1



Document Created: 2018-02-07 13:55:28
Document Modified: 2018-02-07 13:55:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionConfirmatory order; issuance.
DatesEffective Date: The confirmatory order becomes effective on May 20, 2016.
ContactGerald Gulla, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-001; telephone: 301-415-2872, email: [email protected]