DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 11 (January 19, 2016)

Page Range2857-2858
FR Document2016-00819

Federal Register, Volume 81 Issue 11 (Tuesday, January 19, 2016)
[Federal Register Volume 81, Number 11 (Tuesday, January 19, 2016)]
[Notices]
[Pages 2857-2858]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-00819]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2343-086]


PE Hydro Generation, LLC; Notice of Application Tendered for 
Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2343-086.
    c. Date Filed: December 30, 2015.
    d. Applicant: PE Hydro Generation, LLC (PE Hydro).
    e. Name of Project: Millville Hydroelectric Project.
    f. Location: The existing project is located on the Shenandoah 
River, near the town of Harpers Ferry in Jefferson County, West 
Virginia. No federal lands are occupied by project works or located 
within the project boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Juan Kimble, President, PE Hydro Generation, 
LLC, 5425 Wisconsin Avenue, 6th Floor, Chevy Chase, MD 20815; 
Telephone--(301) 718-4496.
    i. FERC Contact: Michael Spencer, (202) 502-6093, or 
[email protected].
    j. This application is not ready for environmental analysis (EA) at 
this time.
    k. Project Description: The Millville project consists of: (1) A 
14.0-foot-high concrete and stone dam consisting of three sections: a 
36-foot-long non-overflow abutment on the east bank; an 813-foot long, 
non-gated spillway section; and a 122-foot-long intake structure, 
equipped with four vertical lift gates and one canal gate, and 
extending to the west riverbank; (2) a 100 acre reservoir with gross 
storage capacity of 900 acre-feet at elevation 324.0 mean sea level; 
(3) a 1,600-foot-long, 30-foot-wide, 12-foot-high masonry and concrete 
sided headrace canal; (4) a 125-foot-long, 40-foot-wide brick 
powerhouse containing 3 turbine-generating units with a combined 
capacity of 2.84 megawatts; (5) a 550-foot-long tailrace, excavated in 
bedrock and returning flow to the river channel; and (6) a 1,006-foot-
long, 2.4 kilovolt (kV) transmission line to a transformer, with a 794-
foot-long, 34.5 kV transmission line to the interconnection with the 
local grid.
    PE Hydro operates the project in a run-of-river mode, with a 
minimum flow of 200 cfs, or inflow, whichever is less. Under an 
agreement with the US Fish and Wildlife Service the licensee shuts down 
Project nightly from September 15 to December 15 in an effort to reduce 
entrainment of downstream-migrating American eels. The project 
generates an annual average of 10,159.431 MWh.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). A copy is also available for inspection 
and reproduction at the address in item (h) above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

[[Page 2858]]



------------------------------------------------------------------------
 
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for    February 2016.
 Environmental Analysis.
Filing of recommendations, preliminary      April 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA......................  August 2016.
Comments on EA............................  September 2016.
Modified Terms and Conditions.............  November 2016.
Commission Issues Final EA, if necessary..  February 2017.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00819 Filed 1-15-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                        Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices                                                    2857

                                                    CFR 1501.6, made under 18 CFR                                       ascending order. These filings are                      last three digits, in the docket number
                                                    385.2201(e) (1) (v).                                                available for electronic review at the                  field to access the document. For
                                                       The following is a list of off-the-                              Commission in the Public Reference                      assistance, please contact FERC Online
                                                    record communications recently                                      Room or may be viewed on the                            Support at FERCOnlineSupport@
                                                    received by the Secretary of the                                    Commission’s Web site at http://                        ferc.gov or toll free at (866) 208–3676, or
                                                    Commission. The communications                                      www.ferc.gov using the eLibrary link.                   for TTY, contact (202)502–8659.
                                                    listed are grouped by docket numbers in                             Enter the docket number, excluding the

                                                                                      Docket No.                                               File date                                Presenter or requester

                                                    Prohibited:
                                                        1. CP15–554–000 ...........................................................              12–28–2015       William Long.
                                                        2. CP–15–554–000 .........................................................               12–28–2015       Bobby Albrite.
                                                        3. CP15–554–000 ...........................................................              12–28–2015       James Lee.
                                                        4. CP16–21–000 .............................................................               1–4–2016       Peter Stasiowski.
                                                        5. EL15–623–000, EL15–29–000, EL15–70–000, EL15–                                           1–5–2016       FERC Staff.1
                                                          71–000, EL15–72–000, EL15–82–000.
                                                        6. CP16–21–000 .............................................................                  1–5–2016    Christine Dudley-Marling.
                                                        7. CP15–520–000 ...........................................................                   1–8–2016    FERC Staff.2
                                                    Exempt:
                                                        1. CP15–558–000 ...........................................................              12–28–2015       Delaware Township, New Jersey Municipal Clerk Judith
                                                                                                                                                                    Allen.
                                                         2.   CP15–558–000 ...........................................................           12–28–2015       Township of Hopewell, New Jersey Mayor Harvey Lester.
                                                         3.   CP16–21–000 .............................................................            1–4–2016       U.S. House Representative Paul D. Tonko.
                                                         4.   CP16–21–000 .............................................................            1–4–2016       State of Massachusetts Senate President Stan Rosenberg.
                                                         5.   CP16–9–000 ...............................................................           1–4–2016       U.S. House Representative Stephen F. Lynch.
                                                         6.   CP16–21–000 .............................................................            1–5–2016       U.S. Senator Kirsten Gillibrand.
                                                       1 Memo     forwarding post conference notes and transcript for PJM Interconnection, LLM Capacity Performance filing.
                                                       2 Meeting    Summary from January 8, 2016 conference call with Shannon Miller and Jacqueline Rocan of Tennessee Gas Pipeline Company,
                                                    LLC.


                                                      Dated: January 12, 2016.                                             g. Filed Pursuant to: Federal Power                     PE Hydro operates the project in a
                                                    Nathaniel J. Davis, Sr.,                                            Act, 16 U.S.C. 791 (a)-825(r).                          run-of-river mode, with a minimum
                                                    Deputy Secretary.                                                      h. Applicant Contact: Juan Kimble,                   flow of 200 cfs, or inflow, whichever is
                                                    [FR Doc. 2016–00817 Filed 1–15–16; 8:45 am]                         President, PE Hydro Generation, LLC,                    less. Under an agreement with the US
                                                    BILLING CODE 6717–01–P
                                                                                                                        5425 Wisconsin Avenue, 6th Floor,                       Fish and Wildlife Service the licensee
                                                                                                                        Chevy Chase, MD 20815; Telephone—                       shuts down Project nightly from
                                                                                                                        (301) 718–4496.                                         September 15 to December 15 in an
                                                    DEPARTMENT OF ENERGY                                                   i. FERC Contact: Michael Spencer,                    effort to reduce entrainment of
                                                                                                                        (202) 502–6093, or michael.spencer@                     downstream-migrating American eels.
                                                    Federal Energy Regulatory                                           ferc.gov.                                               The project generates an annual average
                                                    Commission                                                             j. This application is not ready for                 of 10,159.431 MWh.
                                                                                                                        environmental analysis (EA) at this                        l. A copy of the application is
                                                    [Project No. 2343–086]                                              time.                                                   available for review at the Commission
                                                                                                                           k. Project Description: The Millville
                                                                                                                                                                                in the Public Reference Room or may be
                                                    PE Hydro Generation, LLC; Notice of                                 project consists of: (1) A 14.0-foot-high
                                                                                                                                                                                viewed on the Commission’s Web site at
                                                    Application Tendered for Filing With                                concrete and stone dam consisting of
                                                                                                                        three sections: a 36-foot-long non-                     http://www.ferc.gov, using the
                                                    the Commission and Establishing                                                                                             ‘‘eLibrary’’ link. Enter the docket
                                                    Procedural Schedule for Licensing and                               overflow abutment on the east bank; an
                                                                                                                        813-foot long, non-gated spillway                       number excluding the last three digits in
                                                    Deadline for Submission of Final                                                                                            the docket number field to access the
                                                    Amendments                                                          section; and a 122-foot-long intake
                                                                                                                        structure, equipped with four vertical                  document. For assistance, contact FERC
                                                      Take notice that the following                                    lift gates and one canal gate, and                      Online Support at
                                                    hydroelectric application has been filed                            extending to the west riverbank; (2) a                  FERCOnlineSupport@ferc.gov, (866)
                                                    with the Commission and is available                                100 acre reservoir with gross storage                   208–3676 (toll free), or (202) 502–8659
                                                    for public inspection.                                              capacity of 900 acre-feet at elevation                  (TTY). A copy is also available for
                                                      a. Type of Application: New Major                                 324.0 mean sea level; (3) a 1,600-foot-                 inspection and reproduction at the
                                                    License.                                                            long, 30-foot-wide, 12-foot-high                        address in item (h) above.
                                                      b. Project No.: 2343–086.                                         masonry and concrete sided headrace                        You may also register online at http://
                                                      c. Date Filed: December 30, 2015.                                 canal; (4) a 125-foot-long, 40-foot-wide                www.ferc.gov/docs-filing/
                                                      d. Applicant: PE Hydro Generation,                                brick powerhouse containing 3 turbine-                  esubscription.asp to be notified via
                                                    LLC (PE Hydro).                                                     generating units with a combined                        email of new filings and issuances
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                      e. Name of Project: Millville                                     capacity of 2.84 megawatts; (5) a 550-                  related to this or other pending projects.
                                                    Hydroelectric Project.                                              foot-long tailrace, excavated in bedrock                For assistance, contact FERC Online
                                                      f. Location: The existing project is                              and returning flow to the river channel;                Support.
                                                    located on the Shenandoah River, near                               and (6) a 1,006-foot-long, 2.4 kilovolt                    m. Procedural Schedule: The
                                                    the town of Harpers Ferry in Jefferson                              (kV) transmission line to a transformer,                application will be processed according
                                                    County, West Virginia. No federal lands                             with a 794-foot-long, 34.5 kV                           to the following preliminary Hydro
                                                    are occupied by project works or located                            transmission line to the interconnection                Licensing Schedule. Revisions to the
                                                    within the project boundary.                                        with the local grid.                                    schedule will be made as appropriate.


                                               VerDate Sep<11>2014       18:44 Jan 15, 2016      Jkt 238001     PO 00000      Frm 00021    Fmt 4703   Sfmt 4703   E:\FR\FM\19JAN1.SGM    19JAN1


                                                    2858                                 Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices

                                                                                                                      Filed Date: 1/8/16.                                  other information, call (866) 208–3676
                                                                                                                      Accession Number: 20160108–5149.                     (toll free). For TTY, call (202) 502–8659.
                                                    Notice of Acceptance/Notice of Ready              February        Comments Due: 5 p.m. ET 1/20/16.                       Dated: January 11, 2016.
                                                       for Environmental Analysis.                      2016.
                                                    Filing of recommendations, prelimi-               April 2016.     Docket Numbers: RP16–372–000.                        Nathaniel J. Davis, Sr.,
                                                       nary terms and conditions, and                                 Applicants: Texas Eastern OFO.                       Deputy Secretary.
                                                       fishway prescriptions.                                         Description: Compliance filing Report
                                                    Commission issues EA .......................      August                                                               [FR Doc. 2016–00809 Filed 1–15–16; 8:45 am]
                                                                                                                    of Refund—S–2 Customer Share of
                                                                                                        2016.                                                              BILLING CODE 6717–01–P
                                                    Comments on EA ................................   September     Texas Eastern OFO Penalty
                                                                                                        2016.       Disbursement to be effective N/A.
                                                    Modified Terms and Conditions ..........          November        Filed Date: 1/8/16.
                                                                                                        2016.                                                              DEPARTMENT OF ENERGY
                                                                                                                      Accession Number: 20160108–5179.
                                                    Commission Issues Final EA, if nec-               February
                                                      essary.                                           2017.
                                                                                                                      Comments Due: 5 p.m. ET 1/20/16.                     Federal Energy Regulatory
                                                                                                                      Docket Numbers: RP16–373–000.                        Commission
                                                      o. Final amendments to the                                      Applicants: Southwest Energy, L.P.
                                                                                                                      Description: § 4(d) Rate Filing:                     [Docket No. ER16–701–000]
                                                    application must be filed with the
                                                    Commission no later than 30 days from                           Negotiated Rate PAL Agreement—
                                                                                                                                                                           CPV Valley, LLC; Supplemental Notice
                                                    the issuance date of the notice of ready                        Southwest Energy, L.P. to be effective 1/
                                                                                                                                                                           That Initial Market-Based Rate Filing
                                                    for environmental analysis.                                     10/2016.
                                                                                                                                                                           Includes Request for Blanket Section
                                                                                                                      Filed Date: 1/8/16.
                                                      Dated: January 12, 2016.                                                                                             204 Authorization
                                                                                                                      Accession Number: 20160108–5203.
                                                    Nathaniel J. Davis, Sr.,                                          Comments Due: 5 p.m. ET 1/20/16.                        This is a supplemental notice in the
                                                    Deputy Secretary.
                                                                                                                      Docket Numbers: RP16–374–000.                        above-referenced proceeding of CPV
                                                    [FR Doc. 2016–00819 Filed 1–15–16; 8:45 am]                       Applicants: Trailblazer Pipeline                     Valley, LLC’s application for market-
                                                    BILLING CODE 6717–01–P                                          Company LLC.                                           based rate authority, with an
                                                                                                                      Description: § 4(d) Rate Filing: Neg                 accompanying rate tariff, noting that
                                                                                                                    Rate 2016–01–08 Mieco to be effective                  such application includes a request for
                                                    DEPARTMENT OF ENERGY                                            1/9/2016.                                              blanket authorization, under 18 CFR
                                                    Federal Energy Regulatory                                         Filed Date: 1/8/16.                                  part 34, of future issuances of securities
                                                    Commission                                                        Accession Number: 20160108–5224.                     and assumptions of liability.
                                                                                                                      Comments Due: 5 p.m. ET 1/20/16.                        Any person desiring to intervene or to
                                                    Combined Notice of Filings                                        Any person desiring to intervene or                  protest should file with the Federal
                                                                                                                    protest in any of the above proceedings                Energy Regulatory Commission, 888
                                                      Take notice that the Commission has                           must file in accordance with Rules 211                 First Street NE., Washington, DC 20426,
                                                    received the following Natural Gas                              and 214 of the Commission’s                            in accordance with Rules 211 and 214
                                                    Pipeline Rate and Refund Report filings:                        Regulations (18 CFR 385.211 and                        of the Commission’s Rules of Practice
                                                    Filings Instituting Proceedings                                 § 385.214) on or before 5:00 p.m. Eastern              and Procedure (18 CFR 385.211 and
                                                                                                                    time on the specified comment date.                    385.214). Anyone filing a motion to
                                                       Docket Numbers: RP16–368–000.
                                                                                                                    Protests may be considered, but                        intervene or protest must serve a copy
                                                       Applicants: Guardian Pipeline, L.L.C.
                                                       Description: § 4(d) Rate Filing:                             intervention is necessary to become a                  of that document on the Applicant.
                                                    Negotiated Rate PAL Agreement—                                  party to the proceeding.                                  Notice is hereby given that the
                                                    Exelon Generation Comp., LLC to be                                                                                     deadline for filing protests with regard
                                                                                                                    Filings in Existing Proceedings                        to the applicant’s request for blanket
                                                    effective 1/8/2016.
                                                       Filed Date: 1/7/16.                                             Docket Numbers: RP16–233–001.                       authorization, under 18 CFR part 34, of
                                                       Accession Number: 20160107–5157.                                Applicants: No Applicants listed for                future issuances of securities and
                                                       Comments Due: 5 p.m. ET 1/19/16.                             this docket/subdocket.                                 assumptions of liability, is February 1,
                                                                                                                       Description: Compliance filing SG                   2016.
                                                       Docket Numbers: RP16–369–000.
                                                       Applicants: Columbia Gas                                     Resources Mississippi, L.L.C.—                            The Commission encourages
                                                    Transmission, LLC.                                              Compliance Filing to be effective 12/31/               electronic submission of protests and
                                                       Description: § 4(d) Rate Filing: Penalty                     2015.                                                  interventions in lieu of paper, using the
                                                    Clean Up Filing to be effective 2/1/2016.                          Filed Date: 1/8/16.                                 FERC Online links at http://
                                                       Filed Date: 1/7/16.                                             Accession Number: 20160108–5057.                    www.ferc.gov. To facilitate electronic
                                                       Accession Number: 20160107–5193.                                Comments Due: 5 p.m. ET 1/20/16.                    service, persons with Internet access
                                                       Comments Due: 5 p.m. ET 1/19/16.                                Any person desiring to protest in any               who will eFile a document and/or be
                                                       Docket Numbers: RP16–370–000.                                of the above proceedings must file in                  listed as a contact for an intervenor
                                                       Applicants: Enable Mississippi River                         accordance with Rule 211 of the                        must create and validate an
                                                    Transmission, L.                                                Commission’s Regulations (18 CFR                       eRegistration account using the
                                                       Description: § 4(d) Rate Filing:                             385.211) on or before 5:00 p.m. Eastern                eRegistration link. Select the eFiling
                                                    Negotiated Rate Filing to Amend LER                             time on the specified comment date.                    link to log on and submit the
                                                    5680’s Attachment A_1_7_16 to be                                   The filings are accessible in the                   intervention or protests.
                                                                                                                    Commission’s eLibrary system by                           Persons unable to file electronically
asabaliauskas on DSK5VPTVN1PROD with NOTICES




                                                    effective 1/7/2016.
                                                       Filed Date: 1/7/16.                                          clicking on the links or querying the                  should submit an original and 5 copies
                                                       Accession Number: 20160107–5222.                             docket number.                                         of the intervention or protest to the
                                                       Comments Due: 5 p.m. ET 1/19/16.                                eFiling is encouraged. More detailed                Federal Energy Regulatory Commission,
                                                       Docket Numbers: RP16–371–000.                                information relating to filing                         888 First Street NE., Washington, DC
                                                       Applicants: Millennium Pipeline                              requirements, interventions, protests,                 20426.
                                                    Company, L.L.C.                                                 service, and qualifying facilities filings                The filings in the above-referenced
                                                       Description: Penalty Revenue                                 can be found at: http://www.ferc.gov/                  proceeding are accessible in the
                                                    Crediting Report of under RP16–371.                             docs-filing/efiling/filing-req.pdf. For                Commission’s eLibrary system by


                                               VerDate Sep<11>2014       17:50 Jan 15, 2016      Jkt 238001    PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\19JAN1.SGM   19JAN1



Document Created: 2016-01-16 01:11:28
Document Modified: 2016-01-16 01:11:28
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 2857 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR