81 FR 28859 - Golden Spread Electric Cooperative, Inc.; Notice of Petition for Declaratory Order

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 90 (May 10, 2016)

Page Range28859-28860
FR Document2016-10907

Federal Register, Volume 81 Issue 90 (Tuesday, May 10, 2016)
[Federal Register Volume 81, Number 90 (Tuesday, May 10, 2016)]
[Notices]
[Pages 28859-28860]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-10907]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket Nos. EL16-62-000]


Golden Spread Electric Cooperative, Inc.; Notice of Petition for 
Declaratory Order

    Take notice that on April 28, 2016, pursuant to section 292.402 of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 292.402 (2015), Golden Spread Electric 
Cooperative, Inc., (Golden Spread), on behalf of itself and its sixteen 
(16) distribution cooperative members-owners (collectively, 
Participating Members),\1\ filed a petition for a

[[Page 28860]]

declaratory order requesting a partial waiver of certain obligations 
imposed on Golden Spread and the Participating Members under sections 
292.303(a) and 292.303(b) \2\ of the Commission's regulations 
implementing section 210 of the Public Utility Regulatory Policies Act 
of 1978, all as more fully explained in the petition.
---------------------------------------------------------------------------

    \1\ The Participating Members include: Bailey County Electric 
Cooperative Association; Big Country Electric Cooperative, Inc.; 
Coleman County Electric Cooperative, Inc.; Concho Valley Electric 
Cooperative, Inc.; Deaf Smith Electric Cooperative, Inc.; Greenbelt 
Electric Cooperative, Inc.; Lamb County Electric Cooperative, Inc.; 
Lighthouse Electric Cooperative, Inc.; Lyntegar Electric 
Cooperative, Inc.; North Plains Electric Cooperative, Inc.; Rita 
Blanca Electric Cooperative, Inc.; South Plains Electric 
Cooperative, Inc.; Southwest Texas Electric Cooperative, Inc.; 
Swisher Electric Cooperative, Inc.; Taylor Electric Cooperative, 
Inc.; and Tri-County Electric Cooperative, Inc.
    \2\ 18 CFR 292.303(a) and 292.303(b).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at http://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance any FERC Online service, please email 
[email protected], or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern time on May 31, 2016.

    Dated: April 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-10907 Filed 5-9-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 81, No. 90 / Tuesday, May 10, 2016 / Notices                                                      28859

                                                      3. The factors that affect accuracy of                   3. How to manage the effects of                    combined facility; (ii) the operational
                                                    cost and schedule estimates and how                     project withdrawals from the                          understanding, telemetry, and metering
                                                    estimate variances can be reduced.                      interconnection queue and possible best               of the combined facility; and (iii) the
                                                      4. How other queued facilities that                   practices to keep the queue moving                    appropriate interconnection process for
                                                    may impact an interconnection                           despite project withdrawal. The                       adding storage to an existing generation
                                                    customer’s request are identified and                   appropriate balance between attempts to               facility.
                                                    when interconnection customers are                      prevent speculative projects from                       4. Potential processes to facilitate the
                                                    made aware of such facilities (e.g., a                  entering the queue and the recognition                interconnection of electric storage
                                                    lower-queued project being informed                     that the study process is designed to                 resources.
                                                    that the withdrawal of a specific higher-               iteratively provide information that                    5. Interconnection of distribution-
                                                    queued project may affect it). The                      project developers will use to decide                 level and aggregated electric storage
                                                    challenges of identifying those facilities              whether to proceed or withdraw                        resources that participate in the RTO
                                                    that may impact an interconnection                      (possibly causing restudies).                         and ISO markets.
                                                    request.                                                   4. How transmission providers,                     Panelists:
                                                    Panelists:                                              transmission owners, and
                                                                                                            interconnection customers coordinate                  • David Egan, Manager—
                                                    • Tim Aliff, Director of Reliability                    during the interconnection process, and               Interconnection Projects, PJM
                                                    Planning, Midcontinent Independent                      possible areas for improvement.                       Interconnection, L.L.C.
                                                    System Operator, Inc.                                      5. Technologies, tools, or                         • Mason Emnett, Senior Attorney,
                                                    • Dean Gosselin, Vice President of                      administrative processes that could                   NextEra Energy, Inc.
                                                    Business Management Transmission                        improve the accuracy of cost and time
                                                    Services, NextEra Energy Resources                      estimates, reduce the processing time, or             • John Fernandes, Director, Policy &
                                                    LLC                                                     increase the efficiency of the                        Market Development, RES Americas
                                                    • Paul Kelly, Director, Federal
                                                                                                            interconnection queue process.                        • David Gabbard, Director, Electric
                                                    Regulatory Policy, Northern Indiana                     Panelists:                                            Generation Interconnection, Pacific Gas
                                                    Public Service Company                                                                                        and Electric Company
                                                                                                            • Tim Aliff, Director of Reliability
                                                    • Omar Martino, Director,                               Planning, Midcontinent Independent                    • Alan McBride, Director,
                                                    Transmission, EDF Renewable Energy                      System Operator, Inc.                                 Transmission Strategy and Services,
                                                                                                                                                                  ISO New England, Inc.
                                                    • Alan McBride, Director,                               • David Angell, Customer Operations
                                                    Transmission Strategy and Services,                     Planning Manager, Idaho Power                         • Stephen Rutty, Director of Grid
                                                    ISO New England, Inc.                                                                                         Assets, California Independent System
                                                                                                            • Jennifer Ayers-Brasher, Director,                   Operator, Inc.
                                                    • Stephen Rutty, Director of Grid                       Transmission & Market Analysis, E.ON
                                                    Assets, California Independent System                   Climate & Renewables NA                               4:45 p.m.–4:55 p.m.         Closing Remarks
                                                    Operator, Inc.                                                                                                [FR Doc. 2016–10967 Filed 5–9–16; 8:45 am]
                                                                                                            • Daniel Barr, Principal Engineer, ITC
                                                    • Rick Vail, Vice President,                            Holdings                                              BILLING CODE 6717–01–P
                                                    Transmission, PacifiCorp
                                                                                                            • Charles Hendrix, Manager,
                                                    2:10 p.m.–2:20 p.m.         Break                       Generation Interconnection Studies,                   DEPARTMENT OF ENERGY
                                                    2:20 p.m.–3:30 p.m. Other                               Southwest Power Pool, Inc.
                                                    Interconnection Queue Coordination                                                                            Federal Energy Regulatory
                                                                                                            • Paul Kelly, Director, Federal
                                                    and Management Issues                                                                                         Commission
                                                                                                            Regulatory Policy, Northern Indiana
                                                      Panelists should be prepared to                       Public Service Company                                [Docket Nos. EL16–62–000]
                                                    discuss the following topics:                           • Omar Martino, Director,
                                                      1. Coordinating interconnection                                                                             Golden Spread Electric Cooperative,
                                                                                                            Transmission, EDF Renewable Energy                    Inc.; Notice of Petition for Declaratory
                                                    requests with affected systems 2 and the
                                                    challenges associated with affected                     • Steven Naumann, Vice President,                     Order
                                                    system coordination and areas for                       Exelon Corporation
                                                                                                                                                                    Take notice that on April 28, 2016,
                                                    improvement.                                            3:30 p.m.–4:45 p.m. Interconnection of                pursuant to section 292.402 of the
                                                      2. The types of changes to a project                  Electric Storage Resources                            Federal Energy Regulatory
                                                    that should be allowed without                                                                                Commission’s (Commission) Rules of
                                                    changing the project’s position in the                    Panelists should be prepared to
                                                                                                            discuss the following topics:                         Practice and Procedure, 18 CFR 292.402
                                                    queue, i.e., determining an appropriate                                                                       (2015), Golden Spread Electric
                                                    threshold for modifications to a project                  1. Whether existing small and large
                                                                                                            pro forma interconnection agreements                  Cooperative, Inc., (Golden Spread), on
                                                    before it should lose its place in the                                                                        behalf of itself and its sixteen (16)
                                                    queue.                                                  and procedures are sufficient to
                                                                                                            accommodate the interconnection of                    distribution cooperative members-
                                                      2 As defined in the pro forma LGIA and pro forma      electric storage resources.                           owners (collectively, Participating
                                                    LGIP, Affected System refers to an electric system        2. Modeling of electric storage                     Members),1 filed a petition for a
                                                                                                            resources for interconnection studies,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    other than the transmission provider’s transmission
                                                    system that may be affected by the proposed             including potential means for                           1 The Participating Members include: Bailey

                                                    interconnection. Order No. 2003–A, FERC Stats. &                                                              County Electric Cooperative Association; Big
                                                    Regs. ¶ 31,160 at App. 6 (Standard Large Generator      interconnection studies to better reflect             Country Electric Cooperative, Inc.; Coleman County
                                                    Interconnection Agreement), art. 1, order on reh’g,     the intended operation of electric                    Electric Cooperative, Inc.; Concho Valley Electric
                                                    Order No. 2003–B, FERC Stats. & Regs. ¶ 31,171          storage devices.                                      Cooperative, Inc.; Deaf Smith Electric Cooperative,
                                                    (2004), order on reh’g, Order No. 2003–C, FERC            3. Interconnection of combined                      Inc.; Greenbelt Electric Cooperative, Inc.; Lamb
                                                    Stats. & Regs. ¶ 31,190 (2005), aff’d sub nom. Nat’l                                                          County Electric Cooperative, Inc.; Lighthouse
                                                    Ass’n of Regulatory Util. Comm’rs v. FERC, 475
                                                                                                            storage and generation facilities,                    Electric Cooperative, Inc.; Lyntegar Electric
                                                    F.3d 1277 (D.C. Cir. 2007), cert. denied, 552 U.S.      including (i) the appropriate level of                Cooperative, Inc.; North Plains Electric Cooperative,
                                                    1230 (2008).                                            interconnection service for the                                                                  Continued




                                               VerDate Sep<11>2014   17:33 May 09, 2016   Jkt 238001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\10MYN1.SGM   10MYN1


                                                    28860                            Federal Register / Vol. 81, No. 90 / Tuesday, May 10, 2016 / Notices

                                                    declaratory order requesting a partial                  DEPARTMENT OF ENERGY                                  FERCOnlineSupport@ferc.gov. or call
                                                    waiver of certain obligations imposed                                                                         (866) 208–3676 (toll free). For TTY, call
                                                    on Golden Spread and the Participating                  Federal Energy Regulatory                             (202) 502–8659.
                                                    Members under sections 292.303(a) and                   Commission                                              Dated: April 28, 2016.
                                                    292.303(b) 2 of the Commission’s                        [Docket No. ER16–1509–000]                            Kimberly D. Bose,
                                                    regulations implementing section 210 of                                                                       Secretary.
                                                    the Public Utility Regulatory Policies                  New Wave Energy Corp; Supplemental
                                                                                                                                                                  [FR Doc. 2016–10908 Filed 5–9–16; 8:45 am]
                                                    Act of 1978, all as more fully explained                Notice That Initial Market-Based Rate
                                                                                                                                                                  BILLING CODE 6717–01–P
                                                    in the petition.                                        Filing Includes Request For Blanket
                                                                                                            Section 204 Authorization
                                                       Any person desiring to intervene or to
                                                    protest this filing must file in                           This is a supplemental notice in the               DEPARTMENT OF ENERGY
                                                    accordance with Rules 211 and 214 of                    above-referenced proceeding of New
                                                    the Commission’s Rules of Practice and                  Wave Energy Corp’s application for                    Federal Energy Regulatory
                                                                                                            market-based rate authority, with an                  Commission
                                                    Procedure (18 CFR 385.211 and
                                                    385.214). Protests will be considered by                accompanying rate tariff, noting that
                                                                                                                                                                  Combined Notice of Filings #1
                                                    the Commission in determining the                       such application includes a request for
                                                    appropriate action to be taken, but will                blanket authorization, under 18 CFR                      Take notice that the Commission
                                                    not serve to make protestants parties to                part 34, of future issuances of securities            received the following electric corporate
                                                    the proceeding. Any person wishing to                   and assumptions of liability.                         filings:
                                                                                                               Any person desiring to intervene or to                Docket Numbers: EC16–108–000.
                                                    become a party must file a notice of
                                                                                                            protest should file with the Federal                     Applicants: Tenaska Alabama II
                                                    intervention or motion to intervene, as                 Energy Regulatory Commission, 888
                                                    appropriate. Such notices, motions, or                                                                        Partners, L.P.
                                                                                                            First Street NE., Washington, DC 20426,                  Description: Tenaska Alabama II
                                                    protests must be filed on or before the                 in accordance with Rules 211 and 214
                                                    comment date. Anyone filing a motion                                                                          Partners, L.P. Application for Approval
                                                                                                            of the Commission’s Rules of Practice                 Under Section 203 of the Federal Power
                                                    to intervene or protest must serve a copy               and Procedure (18 CFR 385.211 and                     Act and Request for Expedited Action.
                                                    of that document on the Petitioner.                     385.214). Anyone filing a motion to                      Filed Date: 4/27/16.
                                                       The Commission encourages                            intervene or protest must serve a copy                   Accession Number: 20160427–5340.
                                                    electronic submission of protests and                   of that document on the Applicant.                       Comments Due: 5 p.m. ET 5/18/16.
                                                    interventions in lieu of paper using the                   Notice is hereby given that the
                                                                                                                                                                     Take notice that the Commission
                                                    ‘‘eFiling’’ link at http://www.ferc.gov.                deadline for filing protests with regard
                                                                                                                                                                  received the following electric rate
                                                    Persons unable to file electronically                   to the applicant’s request for blanket
                                                                                                                                                                  filings:
                                                    should submit an original and 5 copies                  authorization, under 18 CFR part 34, of
                                                                                                            future issuances of securities and                       Docket Numbers: ER16–1051–001.
                                                    of the protest or intervention to the                                                                            Applicants: Graphic Packaging
                                                    Federal Energy Regulatory Commission,                   assumptions of liability, is May 18,
                                                                                                            2016.                                                 International Inc.
                                                    888 First Street NE., Washington, DC                       The Commission encourages                             Description: Tariff Amendment:
                                                    20426.                                                  electronic submission of protests and                 Supplement to Application for Order
                                                       This filing is accessible on-line at                 interventions in lieu of paper, using the             Accepting Initial Market-Based Rate
                                                    http://www.ferc.gov, using the                          FERC Online links at http://                          Tariff to be effective 3/1/2016.
                                                    ‘‘eLibrary’’ link and is available for                  www.ferc.gov. To facilitate electronic                   Filed Date: 4/28/16.
                                                    review in the Commission’s Public                       service, persons with Internet access                    Accession Number: 20160428–5085.
                                                                                                            who will eFile a document and/or be                      Comments Due: 5 p.m. ET 5/19/16.
                                                    Reference Room in Washington, DC.
                                                    There is an ‘‘eSubscription’’ link on the               listed as a contact for an intervenor                    Docket Numbers: ER16–1152–001.
                                                    Web site that enables subscribers to                    must create and validate an                              Applicants: Jericho Rise Wind Farm
                                                                                                            eRegistration account using the                       LLC.
                                                    receive email notification when a
                                                                                                            eRegistration link. Select the eFiling                   Description: Tariff Amendment:
                                                    document is added to a subscribed
                                                                                                            link to log on and submit the                         Revised Proposed MBR Tariff to be
                                                    docket(s). For assistance any FERC                                                                            effective 5/14/2016.
                                                    Online service, please email                            intervention or protests.
                                                                                                               Persons unable to file electronically                 Filed Date: 4/27/16.
                                                    FERCOnlineSupport@ferc.gov, or call                                                                              Accession Number: 20160427–5244.
                                                                                                            should submit an original and 5 copies
                                                    (866) 208–3676 (toll free). For TTY, call                                                                        Comments Due: 5 p.m. ET 5/18/16.
                                                                                                            of the intervention or protest to the
                                                    (202) 502–8659.                                                                                                  Docket Numbers: ER16–1154–001.
                                                                                                            Federal Energy Regulatory Commission,
                                                       Comment Date: 5:00 p.m. Eastern time                 888 First Street NE., Washington, DC                     Applicants: Parrey, LLC.
                                                    on May 31, 2016.                                        20426.                                                   Description: Tariff Amendment:
                                                      Dated: April 28, 2016.                                   The filings in the above-referenced                Supplement to App. for MBR
                                                                                                            proceeding are accessible in the                      Authorization in Response to Informal
                                                    Kimberly D. Bose,
                                                                                                            Commission’s eLibrary system by                       Staff Request to be effective 4/1/2016.
                                                    Secretary.                                              clicking on the appropriate link in the                  Filed Date: 4/27/16.
                                                    [FR Doc. 2016–10907 Filed 5–9–16; 8:45 am]              above list. They are also available for                  Accession Number: 20160427–5243.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    BILLING CODE 6717–01–P                                  electronic review in the Commission’s                    Comments Due: 5 p.m. ET 5/18/16.
                                                                                                            Public Reference Room in Washington,                     Docket Numbers: ER16–1509–000.
                                                                                                            DC. There is an eSubscription link on                    Applicants: New Wave Energy Corp.
                                                    Inc.; Rita Blanca Electric Cooperative, Inc.; South
                                                    Plains Electric Cooperative, Inc.; Southwest Texas
                                                                                                            the Web site that enables subscribers to                 Description: Baseline eTariff Filing:
                                                    Electric Cooperative, Inc.; Swisher Electric            receive email notification when a                     New Wave Energy Corporation to be
                                                    Cooperative, Inc.; Taylor Electric Cooperative, Inc.;   document is added to a subscribed                     effective 6/27/2016.
                                                    and Tri-County Electric Cooperative, Inc.               docket(s). For assistance with any FERC                  Filed Date: 4/27/16.
                                                      2 18 CFR 292.303(a) and 292.303(b).                   Online service, please email                             Accession Number: 20160427–5291.


                                               VerDate Sep<11>2014   17:33 May 09, 2016   Jkt 238001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\10MYN1.SGM   10MYN1



Document Created: 2016-05-10 05:18:44
Document Modified: 2016-05-10 05:18:44
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
Dates5:00 p.m. Eastern time on May 31, 2016.
FR Citation81 FR 28859 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR