81_FR_3421 81 FR 3408 - Twain Resources, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 3408 - Twain Resources, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 13 (January 21, 2016)

Page Range3408-3408
FR Document2016-01123

Federal Register, Volume 81 Issue 13 (Thursday, January 21, 2016)
[Federal Register Volume 81, Number 13 (Thursday, January 21, 2016)]
[Notices]
[Page 3408]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-01123]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14702-000]


Twain Resources, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On August 25, 2015, Twain Resources, LLC, filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Scheelite Water Power 
Project (Scheelite Project or project) to be located along Pine Creek, 
near the City of Bishop, in Inyo County, California. The sole purpose 
of a preliminary permit, if issued, is to grant the permit holder 
priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would consist of the following: (1) An intake 
receiving the water discharge from the Tungstar Redux Water Power 
Project; (2) an18-inch-diameter, approximately 6,500-foot-long steel 
penstock, conveying water to; (3) a powerhouse containing a single 810-
kilowatt impulse turbine and an 840 kilovolt-ampere generator; (4) a 
new substation at the powerhouse; (5) an approximately 600-foot-long, 
12-kilovolt (kV) transmission line connecting the substation to a 12-kV 
California Edison-owned transmission line; and (6) appurtenant 
facilities. The estimated annual generation of the Scheelite Project 
would be 4,860 megawatt-hours.
    Applicant Contact: Mr. Doug Hicks, 280 Floreca Way, Reno, Nevada 
89511, phone (775) 997-3429.
    FERC Contact: Joseph Hassell; phone: (202) 502-8079.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14702-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14702) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01123 Filed 1-20-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    3408                         Federal Register / Vol. 81, No. 13 / Thursday, January 21, 2016 / Notices

                                                    Triennial MBR Update in Docket No.                        near the Town of North Hadley,                          Scheelite Project would be 4,860
                                                    ER10–3063 to be effective 3/14/2016.                      Hampshire County, Massachusetts.                        megawatt-hours.
                                                       Filed Date: 1/14/16.                                     The preliminary permit for Project                       Applicant Contact: Mr. Doug Hicks,
                                                       Accession Number: 20160114–5363.                       No. 14558 will remain in effect until the               280 Floreca Way, Reno, Nevada 89511,
                                                       Comments Due: 5 p.m. ET 3/14/16.                       close of business, February 13, 2016.                   phone (775) 997–3429.
                                                       Docket Numbers: ER16–732–000.                          But, if the Commission is closed on this                   FERC Contact: Joseph Hassell; phone:
                                                       Applicants: Consolidated Edison                        day, then the permit remains in effect                  (202) 502–8079.
                                                                                                              until the close of business on the next                    Deadline for filing comments, motions
                                                    Company of New York, Inc.
                                                                                                              day in which the Commission is open.3                   to intervene, competing applications
                                                       Description: § 205(d) Rate Filing:
                                                                                                              New applications for this site may not                  (without notices of intent), or notices of
                                                    Surcharge—Targeted Demand
                                                                                                              be submitted until after the permit                     intent to file competing applications: 60
                                                    Management Program and Demo
                                                                                                              surrender is effective.                                 days from the issuance of this notice.
                                                    Projects to be effective 1/15/2016.
                                                                                                                                                                      Competing applications and notices of
                                                       Filed Date: 1/14/16.                                     Dated: January 14, 2016.                              intent must meet the requirements of 18
                                                       Accession Number: 20160114–5378.                       Nathaniel J. Davis, Sr.,                                CFR 4.36.
                                                       Comments Due: 5 p.m. ET 2/4/16.                        Deputy Secretary.                                          The Commission strongly encourages
                                                       The filings are accessible in the                      [FR Doc. 2016–01122 Filed 1–20–16; 8:45 am]             electronic filing. Please file comments,
                                                    Commission’s eLibrary system by                           BILLING CODE 6717–01–P                                  motions to intervene, notices of intent,
                                                    clicking on the links or querying the                                                                             and competing applications using the
                                                    docket number.                                                                                                    Commission’s eFiling system at http://
                                                       Any person desiring to intervene or                    DEPARTMENT OF ENERGY                                    www.ferc.gov/docs-filing/efiling.asp.
                                                    protest in any of the above proceedings                                                                           Commenters can submit brief comments
                                                    must file in accordance with Rules 211                    Federal Energy Regulatory                               up to 6,000 characters, without prior
                                                    and 214 of the Commission’s                               Commission                                              registration, using the eComment system
                                                    Regulations (18 CFR 385.211 and                                                                                   at http://www.ferc.gov/docs-filing/
                                                    385.214) on or before 5:00 p.m. Eastern                   [Project No. 14702–000]                                 ecomment.asp. You must include your
                                                    time on the specified comment date.                                                                               name and contact information at the end
                                                    Protests may be considered, but                           Twain Resources, LLC; Notice of                         of your comments. For assistance,
                                                    intervention is necessary to become a                     Preliminary Permit Application                          please contact FERC Online Support at
                                                    party to the proceeding.                                  Accepted for Filing and Soliciting                      FERCOnlineSupport@ferc.gov, (866)
                                                       eFiling is encouraged. More detailed                   Comments, Motions To Intervene, and                     208–3676 (toll free), or (202) 502–8659
                                                    information relating to filing                            Competing Applications                                  (TTY). In lieu of electronic filing, please
                                                    requirements, interventions, protests,                                                                            send a paper copy to: Secretary, Federal
                                                    service, and qualifying facilities filings                   On August 25, 2015, Twain                            Energy Regulatory Commission, 888
                                                    can be found at: http://www.ferc.gov/                     Resources, LLC, filed an application for                First Street NE., Washington, DC 20426.
                                                    docs-filing/efiling/filing-req.pdf. For                   a preliminary permit, pursuant to                       The first page of any filing should
                                                    other information, call (866) 208–3676                    section 4(f) of the Federal Power Act                   include docket number P–14702–000.
                                                    (toll free). For TTY, call (202) 502–8659.                (FPA), proposing to study the feasibility                  More information about this project,
                                                                                                              of the Scheelite Water Power Project                    including a copy of the application, can
                                                      Dated: January 14, 2016.
                                                                                                              (Scheelite Project or project) to be                    be viewed or printed on the ‘‘eLibrary’’
                                                    Nathaniel J. Davis, Sr.,                                  located along Pine Creek, near the City                 link of Commission’s Web site at
                                                    Deputy Secretary.                                         of Bishop, in Inyo County, California.                  http://www.ferc.gov/docs-filing/
                                                    [FR Doc. 2016–01114 Filed 1–20–16; 8:45 am]               The sole purpose of a preliminary                       elibrary.asp. Enter the docket number
                                                    BILLING CODE 6717–01–P                                    permit, if issued, is to grant the permit               (P–14702) in the docket number field to
                                                                                                              holder priority to file a license                       access the document. For assistance,
                                                                                                              application during the permit term. A                   contact FERC Online Support.
                                                    DEPARTMENT OF ENERGY                                      preliminary permit does not authorize                     Dated: January 14, 2016.
                                                                                                              the permit holder to perform any land-
                                                    Federal Energy Regulatory                                                                                         Nathaniel J. Davis, Sr.,
                                                                                                              disturbing activities or otherwise enter
                                                    Commission                                                upon lands or waters owned by others                    Deputy Secretary.
                                                                                                              without the owners’ express permission.                 [FR Doc. 2016–01123 Filed 1–20–16; 8:45 am]
                                                    [Project No. 14558–001]
                                                                                                                 The proposed project would consist of                BILLING CODE 6717–01–P
                                                    KC Lake Hydro LLC; Notice of                              the following: (1) An intake receiving
                                                    Surrender of Preliminary Permit                           the water discharge from the Tungstar
                                                                                                              Redux Water Power Project; (2) an18-                    DEPARTMENT OF ENERGY
                                                       Take notice that KC Lake Hydro LLC                     inch-diameter, approximately 6,500-
                                                    (KC Hydro) filed a letter on January 7,                                                                           Federal Energy Regulatory
                                                                                                              foot-long steel penstock, conveying                     Commission
                                                    2016, describing its decision to abandon                  water to; (3) a powerhouse containing a
                                                    the preliminary permit for the proposed                   single 810-kilowatt impulse turbine and                 [Project No. 2533–059]
                                                    North Hadley Lake Warner Dam                              an 840 kilovolt-ampere generator; (4) a
                                                    Hydropower Project.1 The permit was                       new substation at the powerhouse; (5)                   City of Brainerd Public Utility
asabaliauskas on DSK9F6TC42PROD with NOTICES




                                                    issued on June 26, 2014, and would                        an approximately 600-foot-long, 12-                     Commission; Notice of Application
                                                    have expired on May 31, 2017.2 The                        kilovolt (kV) transmission line                         Accepted for Filing, Soliciting
                                                    project would have been located at the                    connecting the substation to a 12-kV                    Comments, Motions To Intervene, and
                                                    outlet of Lake Warner, on the Mill River,                 California Edison-owned transmission                    Protests

                                                      1 While not explicitly stated, KC Hydro’s filing
                                                                                                              line; and (6) appurtenant facilities. The                 Take notice that the following
                                                    constitutes a request to surrender its preliminary
                                                                                                              estimated annual generation of the                      hydroelectric application has been filed
                                                    permit.                                                                                                           with the Commission and is available
                                                      2 147 FERC ¶ 62,236 (2014).                               3 18   CFR 385.2007(a)(2) (2015).                     for public inspection:


                                               VerDate Sep<11>2014   18:26 Jan 20, 2016   Jkt 238001     PO 00000   Frm 00032    Fmt 4703   Sfmt 4703   E:\FR\FM\21JAN1.SGM   21JAN1



Document Created: 2018-02-02 12:33:23
Document Modified: 2018-02-02 12:33:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 3408 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR