In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden\1\ of the information collections described below. ---------------------------------------------------------------------------

Federal Register, Volume 81 Issue 113 (Monday, June 13, 2016)
[Federal Register Volume 81, Number 113 (Monday, June 13, 2016)]
[Notices]
[Pages 38169-38175]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-13922]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC16-11-000]


Commission Information Collection Activities (FERC Form Nos. 6, 
580, 1, 1-F, and 3-Q); Consolidated Comment Request; Extension

AGENCY: Federal Energy Regulatory Commission.

ACTION: Notice of information collections and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory 
Commission (Commission or FERC) is soliciting public comment on the 
requirements and burden\1\ of the information collections described 
below.
---------------------------------------------------------------------------

    \1\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.

DATES: Comments on the collections of information are due August 12, 
---------------------------------------------------------------------------
2016.

ADDRESSES: You may submit comments (identified by Docket No. IC16-11-
000) by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Please reference the specific collection number and/or title in 
your comments.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.
    FOR FURTHER INFORMATION: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Type of Request: Three-year extension of the information collection 
requirements for all collections described below with no changes to the 
current reporting requirements. Please note that each collection is 
distinct from the next.
    Comments: Comments are invited on: (1) whether the collections of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance

[[Page 38170]]

the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

FERC Form No. 6, Annual Report of Oil Pipeline Companies \2\
---------------------------------------------------------------------------

    \2\ The renewal request for the FERC Form No. 6 in this IC 
docket is for the current form, with no change to the reporting 
requirements.
    The FERC Form No. 6 is also part of the Forms Refresh effort 
(started in Docket No. AD15-11), which is a separate activity and 
not addressed in this Notice.
    In addition, there is a pending Docket No. RM15-19 which is a 
separate activity and is not addressed in this Notice.
---------------------------------------------------------------------------

    OMB Control No.: 1902-0022
    Abstract: Under the Interstate Commerce Act (ICA), (Section 20, 54 
Stat. 916), the Interstate Commerce Commission (ICC) was authorized and 
empowered to make investigations and to collect and record data to the 
extent considered necessary or useful for the purpose of carrying out 
the provisions of the ICA.
    In 1977, the Department of Energy Organization Act transferred to 
the Commission from the ICC the responsibility to regulate oil pipeline 
companies. In accordance with the transfer of authority, the Commission 
was delegated the responsibility to require oil pipelines to file 
annual reports of information necessary for the Commission to exercise 
its statutory responsibilities.\3\ The transfer included the Form P, 
the predecessor to the FERC Form No. 6, Annual Report of Oil Pipeline 
Companies (Form 6).\4\
---------------------------------------------------------------------------

    \3\ Section 402(b) of the Department of Energy Organization Act 
(DOE Act), 42 U.S.C. 7172 provides that; ``[t]here are hereby 
transferred to, and vested in, the Commission all functions and 
authority of the Interstate Commerce Commission or any officer or 
component of such Commission where the regulatory function 
establishes rates or charges for the transportation of oil by 
pipeline or established the valuation of any such pipeline.''
    \4\ The ICC developed the Form P to collect information on an 
annual basis to enable it to carry out its regulation of oil 
pipeline companies under the Interstate Commerce Act. A 
comprehensive review of the reporting requirements for oil pipeline 
companies was performed on September 21, 1982, when the Commission 
issued Order 260 revising the former ICC Form P, ``Annual Report of 
Carriers by Pipeline'' and redesignating it as FERC Form No. 6, 
``Annual Report of Oil Pipeline Companies''.
---------------------------------------------------------------------------

    To reduce burden on industry, the FERC Form No. 6 has three tiers 
of reporting requirements:
    1. Each oil pipeline carrier whose annual jurisdictional operating 
revenues has been $500,000 or more for each of the three previous 
calendar years must file FERC Form No. 6. Oil pipeline carriers 
submitting a complete FERC Form No. 6 must submit FERC Form 6-Q.\5\ 
Newly established entities must use projected data to determine whether 
FERC Form No. 6 must be filed.
---------------------------------------------------------------------------

    \5\ FERC Form 6-Q is covered separately and is approved by OMB 
under OMB Control No. 1902-0206. It is not a subject of this Notice; 
FERC Form 6-Q is being addressed separately in Docket No. IC16-7-
000.
---------------------------------------------------------------------------

    2. Oil pipeline carriers exempt from filing FERC Form No. 6 whose 
annual jurisdictional operating revenues have been more than $350,000 
but less than $500,000 for each of the three previous calendar years 
must prepare and file page 301, ``Operating Revenue Accounts (Account 
600), and page 700, ``Annual cost of Service Based Analysis Schedule,'' 
of FERC Form No. 6. When submitting pages 301 and 700, each exempt oil 
pipeline carrier must include page 1 of the FERC Form No. 6, the 
Identification and Attestation schedules.
    3. Oil pipeline carriers exempt from filing FERC Form No. 6 and 
page 301 and whose annual jurisdictional operating revenues were 
$350,000 or less for each of the three previous calendar years must 
prepare and file page 700, ``Annual Cost of Service Based Analysis 
Schedule,'' of FERC Form No. 6.
    The Commission uses the FERC Form No. 6 information in:
     implementation of its financial audits and programs, the 
continuous review of the financial condition of regulated companies, 
and the assessment of energy markets
     various rate proceedings and economic analyses
     background research for use in litigation
     programs relating to the administration of the ICA
     computation of annual charges, which are required by 
Section 3401 of the Omnibus Budget Reconciliation Act of 1986.
    Type of Respondent: Oil Pipelines.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden \6\ and cost \7\ for the FERC Form No. 6 
information collection as follows.
---------------------------------------------------------------------------

    \6\ The burden associated with the one-time re-filing of Page 
700 data for Years 2009-2011 has been completed and is not included.
    \7\ The cost is based on FERC's 2016 average cost (salary plus 
benefits) of $74.50/hour. The Commission staff believes that the 
industry's level and skill set is comparable to FERC.

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual number                                              Total annual burden
                                          Number of     of responses    Total number     Average burden & cost     hours & total annual      Cost per
                                         respondents   per respondent   of responses         per response                  cost           respondent ($)
                                                  (1)             (2)     (1) * (2) =  (4).....................  (3) * (4) = (5)........       (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC-6...............................             198               1             198  161.06 hrs.;............  31.889.88 hrs.;........      $11,998.97
                                                                                       $11,998.97..............  $2,375,796.06..........
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC Form No. 580, Interrogatory on Fuel and Energy Purchase Practices

OMB Control No.: 1902-0137

    Abstract: FERC Form No. 580 is collected in even numbered years. 
The Public Utility Regulatory Policies Act (PURPA) \8\ amended the 
Federal Power Act (FPA) and directed the Commission to make 
comprehensive biennial reviews of certain matters related to automatic 
adjustment clauses (AACs) in wholesale rate schedules used by public 
utilities subject to the Commission's jurisdiction. Specifically, the 
Commission is required to examine whether the clauses effectively 
provide the incentives for efficient use of resources and whether the 
clauses reflect only those costs that are either ``subject to periodic 
fluctuations'' or ``not susceptible to precise determinations'' in rate 
cases prior to the time the costs are incurred.
---------------------------------------------------------------------------

    \8\ Enacted November 8, 1978
---------------------------------------------------------------------------

    The Commission is also required to review the practices of each 
public utility under AACs ``to insure efficient use of resources under 
such clauses.'' \9\ In response to the PURPA directive, the Commission 
(Docket Number IN79-6-000) established an investigation. Beginning in 
1982, the Commission collected ``Interrogatory on Fuel and Energy 
Purchase Practices'' data every other year.
---------------------------------------------------------------------------

    \9\ The review requirement is set forth in two paragraphs of 
Section 208 of PURPA, 49 Stat.851; 16 U.S.C. 824d.

---------------------------------------------------------------------------

[[Page 38171]]

    Based on filer comments in response to the new electronic form used 
in the 2014 collections, FERC recommends the following changes to the 
instructions. FERC is not changing the requirements of the information 
collection.
Question 2a
--Revise Question 2a columns as follows:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
Docket number under which rate schedule  Docket number under which rate
 containing AAC through which costs       schedule containing AAC
 were passed during 2012 and/or 2013      through which costs were
 was accepted for filing by FERC.         passed during 2014 and/or 2015
                                          was accepted for filing by
                                          FERC.
Was rate schedule superseded or          Was rate schedule superseded or
 abandoned during 2012-2013? If so,       abandoned during 2014-2015? If
 provide dates.                           so, provide dates.
------------------------------------------------------------------------

Question 2b
--Revise the paragraph under Question 2b to read:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
If any of the Utility's wholesale rate   If any of the Utility's
 and/or service agreements containing     wholesale rate and/or service
 an AAC listed in Question 2a, that was   agreements containing an AAC
 used during 2012 and/or 2013, was        listed in Question 2a, that
 filed with the Commission before         was used during 2014 and/or
 January 1, 1990, attach an electronic    2015, was filed with the
 copy of it with this filing. List the    Commission before January 1,
 documents you are submitting below.      1990, attach an electronic
 Note: Once this information is           copy of it with this filing.
 submitted electronically in a text-      List the documents you are
 searchable format it will not be         submitting below. Note: Once
 necessary to submit it in future Form    this information is submitted
 580 filings. See: http://www.ferc.gov/   electronically in a text-
 docs-filing/elibrary/accept-file-        searchable format it will not
 formats.asp for listing of Commission    be necessary to submit it in
 accepted document types.                 future Form 580 filings. See:
                                          http://www.ferc.gov/docs-filing/elibrary/accept-file-formats.asp for listing of
                                          Commission accepted document
                                          types.
------------------------------------------------------------------------

Question 3
--Revise the paragraph under Question 3 to read:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
If during the 2012-2013 period, the      If during the 2014-2015 period,
 Utility had any contracts or             the Utility had any contracts
 agreements for the purchase of either    or agreements for the purchase
 energy or capacity under which all or    of either energy or capacity
 any portion of the purchase costs were   under which all or any portion
 passed through a fuel adjustment         of the purchase costs were
 clause (FAC), for each purchase from a   passed through a fuel
 PURPA Qualifying Facility (QF) or        adjustment clause (FAC), for
 Independent Power Producer (IPP)         each purchase from a PURPA
 provide the information requested in     Qualifying Facility (QF) or
 the non-shaded columns of the table      Independent Power Producer
 below. Provide the information           (IPP) provide the information
 separately for each reporting year       requested in the non-shaded
 2012 and 2013. Do not report purchased   columns of the table below.
 power where none of the costs were       Provide the information
 recovered through an FAC. For each       separately for each reporting
 purchase where costs were flowed         year 2014 and 2015. Do not
 through an FAC, fill-in the non-shaded   report purchased power where
 columns and either ``Only energy         none of the costs were
 charges'' or ``The total cost of the     recovered through an FAC. For
 purchase of economic power'' columns,    each purchase where costs were
 whichever apply.                         flowed through an FAC, fill-in
                                          the non-shaded columns and
                                          either ``Only energy charges''
                                          or ``The total cost of the
                                          purchase of economic power''
                                          columns, whichever apply.
------------------------------------------------------------------------

Question 4a
--Revise Question 4a columns as follows:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
If emission allowance costs were         If emission allowance costs
 incurred by the Utility in 2012 and/or   were incurred by the Utility
 2013 and were recovered through a FAC,   in 2014 and/or 2015 and were
 provide the following information.       recovered through a FAC,
                                          provide the following
                                          information.
Dollar value of emission allowance cost  Dollar value of emission
 passed through a FAC: 2012-2013.         allowance cost passed through
                                          a FAC: 2014-2015.
------------------------------------------------------------------------

Question 5
--Revise the paragraph under Question 5 as follows:

[[Page 38172]]



------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
Provide the information requested below  Provide the information
 regarding the Utility's fuel             requested below regarding the
 procurement policies and practices in    Utility's fuel procurement
 place during 2012 and/or 2013 for        policies and practices in
 fuels whose costs were subject to 18     place during 2014 and/or 2015
 CFR 35.14. Note: Responses to this       for fuels whose costs were
 question may be filed as Privileged.     subject to 18 CFR 35.14. Note:
 To do so, skip this question now and     Responses to this question may
 answer it via the Fuel Procurement       be filed as Privileged. To do
 Policies and Practices Privileged        so, skip this question now and
 Addendum provided. Otherwise, answer     answer it via the Fuel
 it here and your responses will be       Procurement Policies and
 made public.                             Practices Privileged Addendum
                                          provided. Otherwise, answer it
                                          here and your responses will
                                          be made public.
------------------------------------------------------------------------

Question 6
--Revise the paragraph under Question 6 as follows:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
For each fuel supply contract, of        For each fuel supply contract,
 longer than one year in duration, in     of longer than one year in
 force at any time during 2012 and/or     duration, in force at any time
 2013, where costs were subject to 18     during 2014 and/or 2015, where
 CFR 35.14, (including informal           costs were subject to 18 CFR
 agreements with associated companies),   35.14, (including informal
 provide the requested information.       agreements with associated
 Report the information individually      companies), provide the
 for each contract, for each calendar     requested information. Report
 year. [No response to any part of        the information individually
 Question 6 for fuel oil no. 2 is         for each contract, for each
 necessary.] Report all fuels consumed    calendar year. [No response to
 for electric power generation and        any part of Question 6 for
 thermal energy associated with the       fuel oil no. 2 is necessary.]
 production of electricity. Information   Report all fuels consumed for
 for only coal, natural gas, and oil      electric power generation and
 should be reported.                      thermal energy associated with
                                          the production of electricity.
                                          Information for only coal,
                                          natural gas, and oil should be
                                          reported.
------------------------------------------------------------------------

Question 7
--Revise the paragraph under Question 6 as follows:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
For each fuel supply contract,           For each fuel supply contract,
 including informal agreements with       including informal agreements
 associated or affiliated companies in    with associated or affiliated
 force at any time during 2012 or 2013    companies in force at any time
 WHERE CONTRACT SHORTFALL COSTS WERE      during 2014 or 2015 WHERE
 PASSED THROUGH an FAC subject to 18      CONTRACT SHORTFALL COSTS WERE
 CFR 35.14, provide for each contract     PASSED THROUGH an FAC subject
 separately the information requested     to 18 CFR 35.14, provide for
 below. Only report the information       each contract separately the
 requested for shortfalls that occurred   information requested below.
 under your contracts during reporting    Only report the information
 years 2012 or 2013 and that are not      requested for shortfalls that
 under dispute i.e. parties agree there   occurred under your contracts
 was indeed a shortfall.                  during reporting years 2014 or
                                          2015 and that are not under
                                          dispute i.e. parties agree
                                          there was indeed a shortfall.
------------------------------------------------------------------------

Question 8
--Revise the paragraph under Question 8 as follows:

------------------------------------------------------------------------
                  From                                  To
------------------------------------------------------------------------
For each fuel supply contract that was   For each fuel supply contract
 bought-out or bought-down, including     that was bought-out or bought-
 informal agreements with associated or   down, including informal
 affiliated companies in force at any     agreements with associated or
 time during 2012 or 2013 WHERE           affiliated companies in force
 CONTRACT BUY-OUT AND/OR BUY-DOWN COSTS   at any time during 2014 or
 WERE PASSED THROUGH an FAC subject to    2015 WHERE CONTRACT BUY-OUT
 18 CFR 35.14, provide for each           AND/OR BUY-DOWN COSTS WERE
 contract separately the information      PASSED THROUGH an FAC subject
 requested below. Only report the         to 18 CFR 35.14, provide for
 information requested for contract buy-  each contract separately the
 downs and buy-outs that occurred under   information requested below.
 your contracts during reporting years    Only report the information
 2012 or 2013 and that are not under      requested for contract buy-
 dispute i.e. parties agree there was     downs and buy-outs that
 indeed a shortfall.                      occurred under your contracts
                                          during reporting years 2014 or
                                          2015 and that are not under
                                          dispute i.e. parties agree
                                          there was indeed a shortfall.
------------------------------------------------------------------------


[[Page 38173]]

    Access to the Revised Materials: A copy of the form, desk 
reference, and glossary are attached to this Notice, but they will not 
be published in the Federal Register.\10\ Interested parties can see 
the form electronically as part of this notice in FERC's eLibrary 
(http://www.ferc.gov/docs-filing/elibrary.asp) by searching Docket No. 
IC16-11-000.
---------------------------------------------------------------------------

    \10\ The attached form is for illustrative purposes only and 
does not include all the interactive features of the actual form.
---------------------------------------------------------------------------

    Type of Respondent: Large electric public utilities within FERC 
jurisdiction.
    Estimate of Annual Burden \11\: The Commission estimates the annual 
\12\ public reporting burden for the information collection as:
---------------------------------------------------------------------------

    \11\ The Commission defines burden as the total time, effort, or 
financial resources expended by persons to generate, maintain, 
retain, or disclose or provide information to or for a Federal 
agency. For further explanation of what is included in the 
information collection burden, reference 5 Code of Federal 
Regulations 1320.3.
    \12\ The FERC Form 580 data is collected on a biennial basis. In 
order to represent the burden appropriately, the ``Annual Number of 
Responses per Respondent'' is assigned a figure of 0.5. This figure 
means that one response per respondent is received on average for 
each two year period. The ``Total Annual Burden Hours & Total Annual 
Cost'' figures are all annual figures based on the biennial 
frequency assumption.

                                           FERC Form 580 (Interrogatory on Fuel and Energy Purchase Practices)
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual number                                              Total annual burden      Annual cost
                                          Number of     of responses    Total number     Average burden & cost     hours & total annual   per respondent
                                         respondents   per respondent   of responses       per response \13\               cost                 ($)
                                                  (1)             (2)     (1) * (2) =  (4).....................  (3) * (4) = (5)........       (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Respondents with FACs................              37             0.5            18.5  103 hrs.; $7,673.50.....  1,905.5 hrs.;                 $3,836.75
                                                                                                                  $141,959.75.
Respondents with AACs, but no FACs...              10             0.5               5  20 hrs.; $1,490.........  100 hrs.; $7,450.......            $745
Respondents with no AACs nor FACs....              35             0.5            17.5  2 hrs.; $149............  35 hrs.; $2,607.50.....          $74.50
                                      ------------------------------------------------                                                   ---------------
    Total............................                                              41                            2,040.5 hrs.;
                                                                                                                  $152,017.25.
--------------------------------------------------------------------------------------------------------------------------------------------------------
\13\ The estimates for cost per response are derived using the 2016 FERC average salary plus benefits of $154,647/year (or $74.50/hour). Commission
  staff finds that the work done for this information collection is typically done by wage categories similar to those at FERC.

FERC Form No. 1, Annual Report of Major Electric Utilities, Licensees, 
and Others

OMB Control No.: 1902-0021

    Abstract: The FERC Form No. 1 (Form No.1) is a comprehensive 
financial and operating report submitted annually for electric rate 
regulation, market oversight analysis, and financial audits by Major 
electric utilities, licensees and others. Major is defined as having in 
each of the three previous calendar years, sales or transmission 
services that exceed one of the following: (1) One million megawatt 
hours of total annual sales; (2) 100 megawatt hours of annual sales for 
resale; (3) 500 megawatt hours of annual power exchanges delivered; or 
(4) 500 megawatt hours of annual wheeling for others (deliveries plus 
losses).\14\
---------------------------------------------------------------------------

    \14\ As detailed in 18 CFR 101 (Uniform System of Accounts 
Prescribed for Public Utilities and Licensees Subject to the 
Provision of the Federal Power Act, General Instructions) and 18 CFR 
141.1.
---------------------------------------------------------------------------

    The Form No.1 is designed to collect financial and operational 
information and is considered to be a non-confidential public use form. 
The Form No.1 includes a basic set of financial statements: Comparative 
Balance Sheet, Statement of Income, Statement of Retained Earnings, 
Statement of Cash Flows, Statements of Accumulated Comprehensive 
Income, Comprehensive Income, and Hedging Activities; and Notes to 
Financial Statements. Supporting schedules contain supplementary 
information and outlines of corporate structure and governance; 
information on formula rates; and description of important changes 
during the year. Other schedules provide information on revenues and 
the related quantities of electric sales and electricity transmitted; 
account balances for all electric operation and maintenance expenses; 
selected plant cost data; and other statistical information.
    Type of Respondent: Major electric utilities
    Estimate of Annual Burden: The estimated annual burden and cost 
\15\ follow:
---------------------------------------------------------------------------

    \15\ The cost estimate (wages plus benefits) is $78.66/hour and 
is used for the Form Nos. 1, 1-F, and 3-Q. The $78.66/hour (wages 
plus benefits) is based on figures from the Bureau of Labor 
Statistics National Industry-Specific Occupational and Employment 
Wage Estimates (May 2015 estimates at http://www.bls.gov/oes/current/naics2_22.htm, and benefits information for December 2015 at 
http://www.bls.gov/news.release/ecec.nr0.htm) and is an average of 
the following:
     Management (code 11-0000) of $88.94/hour
     business and financial operations occupations (code 13-
0000) of $56.86/hour
     legal (code 23-0000) of $128.94/hour
     office and administrative support (code 43-0000) of 
$39.91/hour.

                                                   Form No. 1
----------------------------------------------------------------------------------------------------------------
                                                                                   Total annual
                                Annual number   Total number    Average burden    burden hours &     Cost per
    Number of respondents       of responses    of responses   hours & cost per    total annual   respondent ($)
                               per respondent                      response            cost
(1)                                       (2)     (1) * (2) =  (4).............  (3) * (4) = (5)       (5) / (1)
                                                          (3)
----------------------------------------------------------------------------------------------------------------
210..........................               1             210  1,169 hrs.;       245,490 hrs.;        $91,953.54
                                                                $91,953.54.       $19,310,243.40.
----------------------------------------------------------------------------------------------------------------


[[Page 38174]]

FERC Form No. 1-F, Annual Report for Nonmajor Public Utilities and 
Licensees

OMB Control No.: 1902-0029

    Abstract: The FERC Form No. 1-F (Form No.1-F) is a financial and 
operating report submitted annually for electric rate regulation, 
market oversight analysis, and financial audits by Nonmajor electric 
utilities and licensees. Nonmajor is defined as having total annual 
sales of 10,000 megawatt-hours or more in the previous calendar year 
and not classified as Major.\16\
---------------------------------------------------------------------------

    \16\ As detailed in 18 CFR 101 (Uniform System of Accounts 
Prescribed for Public Utilities and Licensees Subject to the 
Provision of the Federal Power Act, General Instructions) and 18 CFR 
141.2.
---------------------------------------------------------------------------

    The Form No.1-F is designed to collect financial and operational 
information and is considered to be a non-confidential public use form. 
The Form No.1-F includes a basic set of financial statements: 
Comparative Balance Sheet, Statement of Retained Earnings, Statement of 
Cash Flows, Statement of Comprehensive Income and Hedging Activities, 
and Notes to Financial Statements. Supporting schedules contain 
supplementary information and include revenues and the related 
quantities of electric sales and electricity transmitted; account 
balances for all electric operation and maintenance expenses; selected 
plant cost data; and other statistical information.
    Type of Respondent: Nonmajor electric utilities
    Estimate of Annual Burden: The estimated annual burden and cost 
follow. (The estimated hourly cost used for the Form No. 1-F is $78.66 
(wages plus benefits) and is described above, under the Form No. 1.):

                                                  Form No. 1-F
----------------------------------------------------------------------------------------------------------------
                                                                                   Total annual
                                Annual number   Total number    Average burden    burden hours &     Cost per
    Number of respondents       of responses    of responses   hours & cost per    total annual   respondent ($)
                               per respondent                      response            cost
(1)                                       (2)     (1) * (2) =  (4).............  (3) * (4) = (5)       (5) / (1)
                                                          (3)
----------------------------------------------------------------------------------------------------------------
5............................               1               5  123 hrs.;         615 hrs.;             $9,675.18
                                                                $9,675.18.        $48,375.90.
----------------------------------------------------------------------------------------------------------------

FERC Form No. 3-Q, Quarterly Financial Report of Electric Utilities, 
Licensees, and Natural Gas Companies

OMB Control No.: 1902-0205

    Abstract: The FERC Form No. 3-Q (Form No. 3-Q) is a quarterly 
financial and operating report for rate regulation, market oversight 
analysis, and financial audits which supplements the (a) Form Nos. 1 
and 1-F for the electric industry, or the (b) Form No. 2 (Major Natural 
Gas Pipeline Annual Report; OMB Control No. 1902-0028) and Form No. 2-A 
(Nonmajor Natural Gas Pipeline Annual Report; OMB Control No. 1902-
0030) (for the natural gas industry). The Form No. 3-Q is submitted for 
all Major and Nonmajor electric utilities and licensees; and natural 
gas companies\17\.
---------------------------------------------------------------------------

    \17\ 18 CFR Sec.  260.1(b) states that for natural gas 
companies, Major, as defined by the Natural Gas Act, pertains to a 
company whose combined gas transported or stored for a fee exceed 50 
million Dth in each of the three previous calendar years. 18 CFR 
Sec.  260.2(b) states that for natural gas companies, Nonmajor as 
defined by the Natural Gas Act, pertains to a company not meeting 
the filing threshold for Major, but having total gas sales or volume 
transactions exceeding 200,000 Dth in each of the three previous 
calendar years.
---------------------------------------------------------------------------

    Form No. 3-Q includes a basic set of financial statements: 
Comparative Balance Sheet, Statement of Income and Statement of 
Retained Earnings, Statement of Cash Flows, Statement of Comprehensive 
Income and Hedging Activities and supporting schedules containing 
supplementary information. Electric respondents report revenues and the 
related quantities of electric sales and electricity transmitted; 
account balances for all electric operation and maintenance expenses; 
selected plant cost data; and other statistical information. Natural 
gas respondents include monthly and quarterly quantities of gas 
transported and associated revenues; storage, terminaling and 
processing services; natural gas customer accounts and details of 
service; and operational expenses, depreciation, depletion and 
amortization of gas plant.
    Type of Respondent: Major and nonmajor electric utilities and 
natural gas pipelines.
    Estimate of Annual Burden: The estimated annual burden and cost (as 
rounded) follow. (The estimated hourly cost used for the Form No. 3-Q 
is $78.66 (wages plus benefits) and is described above, under the Form 
No. 1.):

                                                                      Form No. 3-Q
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                        Annual number                                              Total annual burden      Annual cost
                                          Number of     of responses    Total number    Average burden hours &     hours & total annual   per respondent
                                         respondents   per respondent   of responses       cost per response               cost                ($)
                                                  (1)             (2)     (1) * (2) =  (4).....................  (3) * (4) = (5)........       (5) / (1)
                                                                                  (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
FERC 3-Q (electric)..................        213 \18\               3             639  168 hrs.;...............  107,352 hrs.;..........      $39,644.64
                                                                                       $13,214.88..............  $8,444,308.............
FERC 3-Q (gas).......................             167               3             501  167 hrs.;...............  83,667 hrs.;...........      $39,408.66
                                                                                       $13,136.22..............  $6,581,246.............
    Total for FERC 3-Q...............                                           1,140                            191,019 hrs.;..........
                                                                                                                 $15,025,554............
--------------------------------------------------------------------------------------------------------------------------------------------------------
\18\ The estimated number of electric filers of the Form No. 3-Q is 213 (rather than the 215 total for the number of filers of the Form Nos. 1 and 1-F)
  due to standing waivers for two coops who do not file the Form No. 3-Q.



[[Page 38175]]

    DATED: June 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-13922 Filed 6-10-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices                                                       38169

                                                  Filed Date: 6/7/16.                                      Accession Number: 20160607–5082.                    Reduction Act of 1995, 44 U.S.C.
                                                  Accession Number: 20160607–5179.                         Comments Due: 5 p.m. ET 6/28/16.                    3506(c)(2)(A), the Federal Energy
                                                  Comments Due: 5 p.m. ET 6/28/16.                         Docket Numbers: ER16–1892–000.                      Regulatory Commission (Commission or
                                                  Docket Numbers: ER16–758–000.                            Applicants: Copper Mountain Solar 2,                FERC) is soliciting public comment on
                                                  Applicants: New England Power                         LLC.                                                   the requirements and burden1 of the
                                                Company.                                                   Description: § 205(d) Rate Filing:                  information collections described
                                                  Description: Report Filing: Refund                    Copper Mountain Solar 2, LLC                           below.
                                                Report re Amendments to Schedule III–                   Amended Joint Use Agreement for Gen-                   DATES: Comments on the collections of
                                                B IFA Provisions to be effective N/A.                   tie Poles to be effective 6/8/2016.                    information are due August 12, 2016.
                                                  Filed Date: 6/7/16.                                      Filed Date: 6/7/16.                                 ADDRESSES: You may submit comments
                                                  Accession Number: 20160607–5151.                         Accession Number: 20160607–5101.                    (identified by Docket No. IC16–11–000)
                                                  Comments Due: 5 p.m. ET 6/28/16.                         Comments Due: 5 p.m. ET 6/28/16.                    by either of the following methods:
                                                  Docket Numbers: ER16–1275–001.                           Docket Numbers: ER16–1893–000.                         • eFiling at Commission’s Web site:
                                                  Applicants: Innovative Solar 46, LLC.                    Applicants: Duke Energy Progress,                   http://www.ferc.gov/docs-filing/
                                                  Description: Tariff Amendment:                        LLC.                                                   efiling.asp
                                                Amendment to 1 to be effective 12/31/                      Description: § 205(d) Rate Filing:                     • Mail/Hand Delivery/Courier:
                                                9998.                                                   Amendment to PWC Fayetteville PSA                      Federal Energy Regulatory Commission,
                                                  Filed Date: 6/7/16.                                   RS No. 184 to be effective 1/1/2015.                   Secretary of the Commission, 888 First
                                                  Accession Number: 20160607–5182.                         Filed Date: 6/7/16.                                 Street NE., Washington, DC 20426.
                                                  Comments Due: 5 p.m. ET 6/28/16.                         Accession Number: 20160607–5114.                       Please reference the specific
                                                  Docket Numbers: ER16–1887–000.                           Comments Due: 5 p.m. ET 6/28/16.                    collection number and/or title in your
                                                  Applicants: Apple Energy LLC.                            The filings are accessible in the                   comments.
                                                  Description: Baseline eTariff Filing:                 Commission’s eLibrary system by                           Instructions: All submissions must be
                                                Apple Energy LLC MBR Tariff                             clicking on the links or querying the                  formatted and filed in accordance with
                                                Application to be effective 8/5/2016.                   docket number.                                         submission guidelines at: http://
                                                  Filed Date: 6/6/16.                                      Any person desiring to intervene or                 www.ferc.gov/help/submission-
                                                  Accession Number: 20160606–5243.                      protest in any of the above proceedings                guide.asp. For user assistance contact
                                                  Comments Due: 5 p.m. ET 6/27/16.                      must file in accordance with Rules 211                 FERC Online Support by email at
                                                  Docket Numbers: ER16–1888–000.                        and 214 of the Commission’s                            ferconlinesupport@ferc.gov, or by phone
                                                  Applicants: Tidal Energy Marketing                    Regulations (18 CFR 385.211 and                        at: (866) 208–3676 (toll-free), or (202)
                                                Inc.                                                    385.214) on or before 5:00 p.m. Eastern                502–8659 for TTY.
                                                  Description: Baseline eTariff Filing:                 time on the specified comment date.                       Docket: Users interested in receiving
                                                Tidal baseline tariff to be effective 8/5/              Protests may be considered, but                        automatic notification of activity in this
                                                2016; also filed was a Supplement to                    intervention is necessary to become a                  docket or in viewing/downloading
                                                June 6, 2016 Tidal Energy Marketing                     party to the proceeding.                               comments and issuances in this docket
                                                Inc. tariff filing (Asset and Affiliate                    eFiling is encouraged. More detailed                may do so at http://www.ferc.gov/docs-
                                                Index).                                                 information relating to filing                         filing/docs-filing.asp.
                                                  Filed Date: 6/6/16.                                   requirements, interventions, protests,                    FOR FURTHER INFORMATION:
                                                  Accession Number: 20160606–5244,                      service, and qualifying facilities filings             Ellen Brown may be reached by email
                                                20160606–5345.                                          can be found at: http://www.ferc.gov/                  at DataClearance@FERC.gov, telephone
                                                  Comments Due: 5 p.m. ET 6/27/16.                      docs-filing/efiling/filing-req.pdf. For                at (202) 502–8663, and fax at (202) 273–
                                                                                                        other information, call (866) 208–3676                 0873.
                                                  Docket Numbers: ER16–1889–000.                        (toll free). For TTY, call (202) 502–8659.
                                                  Applicants: American Transmission                                                                            SUPPLEMENTARY INFORMATION:
                                                Systems, Incorporated, Metropolitan                       Dated: June 7, 2016.                                    Type of Request: Three-year extension
                                                Edison Company, PJM Interconnection,                    Nathaniel J. Davis, Sr.,                               of the information collection
                                                L.L.C.                                                  Deputy Secretary.                                      requirements for all collections
                                                  Description: § 205(d) Rate Filing:                    [FR Doc. 2016–13898 Filed 6–10–16; 8:45 am]            described below with no changes to the
                                                ATSI and MetEd submit SA Nos. 4464,                     BILLING CODE 6717–01–P
                                                                                                                                                               current reporting requirements. Please
                                                4465, 4466. and 4467 to be effective 6/                                                                        note that each collection is distinct from
                                                8/2016.                                                                                                        the next.
                                                  Filed Date: 6/7/16.                                   DEPARTMENT OF ENERGY                                      Comments: Comments are invited on:
                                                  Accession Number: 20160607–5070.                                                                             (1) whether the collections of
                                                  Comments Due: 5 p.m. ET 6/28/16.                      Federal Energy Regulatory                              information are necessary for the proper
                                                                                                        Commission                                             performance of the functions of the
                                                  Docket Numbers: ER16–1890–000.
                                                                                                                                                               Commission, including whether the
                                                  Applicants: OriGen Energy LLC.                        [Docket No. IC16–11–000]
                                                                                                                                                               information will have practical utility;
                                                  Description: Notice of cancellation of
                                                                                                        Commission Information Collection                      (2) the accuracy of the agency’s
                                                market based tariff of OriGen Energy
                                                                                                        Activities (FERC Form Nos. 6, 580, 1,                  estimates of the burden and cost of the
                                                LLC.
                                                                                                        1–F, and 3–Q); Consolidated Comment                    collections of information, including the
                                                  Filed Date: 6/6/16.
                                                                                                        Request; Extension                                     validity of the methodology and
                                                  Accession Number: 20160606–5331.
srobinson on DSK5SPTVN1PROD with NOTICES




                                                                                                                                                               assumptions used; (3) ways to enhance
                                                  Comments Due: 5 p.m. ET 6/27/16.                      AGENCY:  Federal Energy Regulatory
                                                  Docket Numbers: ER16–1891–000.                        Commission.                                              1 The Commission defines burden as the total

                                                  Applicants: Engelhart CTP (US) LLC.                   ACTION: Notice of information                          time, effort, or financial resources expended by
                                                  Description: Compliance filing:                                                                              persons to generate, maintain, retain, or disclose or
                                                                                                        collections and request for comments.                  provide information to or for a Federal agency. For
                                                Engelhart—Market-Based Rate Tariff to                                                                          further explanation of what is included in the
                                                be effective 6/7/2016.                                  SUMMARY: In compliance with the                        information collection burden, reference 5 Code of
                                                  Filed Date: 6/7/16.                                   requirements of the Paperwork                          Federal Regulations 1320.3.



                                           VerDate Sep<11>2014   20:48 Jun 10, 2016   Jkt 238001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\13JNN1.SGM   13JNN1


                                                38170                             Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices

                                                the quality, utility and clarity of the                   Form No. 6, Annual Report of Oil                             and whose annual jurisdictional
                                                information collections; and (4) ways to                  Pipeline Companies (Form 6).4                                operating revenues were $350,000 or
                                                minimize the burden of the collections                       To reduce burden on industry, the                         less for each of the three previous
                                                of information on those who are to                        FERC Form No. 6 has three tiers of                           calendar years must prepare and file
                                                respond, including the use of automated                   reporting requirements:                                      page 700, ‘‘Annual Cost of Service
                                                collection techniques or other forms of                      1. Each oil pipeline carrier whose                        Based Analysis Schedule,’’ of FERC
                                                information technology.                                   annual jurisdictional operating revenues                     Form No. 6.
                                                FERC Form No. 6, Annual Report of Oil                     has been $500,000 or more for each of                           The Commission uses the FERC Form
                                                Pipeline Companies 2                                      the three previous calendar years must                       No. 6 information in:
                                                   OMB Control No.: 1902–0022
                                                                                                          file FERC Form No. 6. Oil pipeline                              • implementation of its financial
                                                                                                          carriers submitting a complete FERC                          audits and programs, the continuous
                                                   Abstract: Under the Interstate
                                                Commerce Act (ICA), (Section 20, 54                       Form No. 6 must submit FERC Form 6–                          review of the financial condition of
                                                Stat. 916), the Interstate Commerce                       Q.5 Newly established entities must use                      regulated companies, and the
                                                Commission (ICC) was authorized and                       projected data to determine whether                          assessment of energy markets
                                                empowered to make investigations and                      FERC Form No. 6 must be filed.                                  • various rate proceedings and
                                                to collect and record data to the extent                     2. Oil pipeline carriers exempt from                      economic analyses
                                                considered necessary or useful for the                    filing FERC Form No. 6 whose annual                             • background research for use in
                                                purpose of carrying out the provisions                    jurisdictional operating revenues have                       litigation
                                                of the ICA.                                               been more than $350,000 but less than
                                                                                                          $500,000 for each of the three previous                         • programs relating to the
                                                   In 1977, the Department of Energy                                                                                   administration of the ICA
                                                Organization Act transferred to the                       calendar years must prepare and file
                                                Commission from the ICC the                               page 301, ‘‘Operating Revenue Accounts                          • computation of annual charges,
                                                responsibility to regulate oil pipeline                   (Account 600), and page 700, ‘‘Annual                        which are required by Section 3401 of
                                                companies. In accordance with the                         cost of Service Based Analysis                               the Omnibus Budget Reconciliation Act
                                                transfer of authority, the Commission                     Schedule,’’ of FERC Form No. 6. When                         of 1986.
                                                was delegated the responsibility to                       submitting pages 301 and 700, each                              Type of Respondent: Oil Pipelines.
                                                require oil pipelines to file annual                      exempt oil pipeline carrier must include                        Estimate of Annual Burden: The
                                                reports of information necessary for the                  page 1 of the FERC Form No. 6, the                           Commission estimates the annual public
                                                Commission to exercise its statutory                      Identification and Attestation schedules.                    reporting burden 6 and cost 7 for the
                                                responsibilities.3 The transfer included                     3. Oil pipeline carriers exempt from                      FERC Form No. 6 information collection
                                                the Form P, the predecessor to the FERC                   filing FERC Form No. 6 and page 301                          as follows.

                                                                                                         Annual                                                                      Total annual
                                                                                                                         Total number                  Average                                                 Cost per
                                                                                   Number of            number of                                                                    burden hours
                                                                                                                               of                    burden & cost                                            respondent
                                                                                  respondents        responses per                                                                      & total
                                                                                                                          responses                  per response                                                 ($)
                                                                                                       respondent                                                                     annual cost

                                                                                        (1)                (2)           (1) * (2) = (3)                   (4)                       (3) * (4) = (5)           (5) ÷ (1)

                                                FERC–6 ........................               198                    1                  198   161.06 hrs.; .................   31.889.88 hrs.; ............    $11,998.97
                                                                                                                                              $11,998.97 ..................    $2,375,796.06 .............



                                                FERC Form No. 580, Interrogatory on                       wholesale rate schedules used by public                        The Commission is also required to
                                                Fuel and Energy Purchase Practices                        utilities subject to the Commission’s                        review the practices of each public
                                                                                                          jurisdiction. Specifically, the                              utility under AACs ‘‘to insure efficient
                                                OMB Control No.: 1902–0137
                                                                                                          Commission is required to examine                            use of resources under such clauses.’’ 9
                                                  Abstract: FERC Form No. 580 is                          whether the clauses effectively provide                      In response to the PURPA directive, the
                                                collected in even numbered years. The                     the incentives for efficient use of                          Commission (Docket Number IN79–6–
                                                Public Utility Regulatory Policies Act                    resources and whether the clauses                            000) established an investigation.
                                                (PURPA) 8 amended the Federal Power                       reflect only those costs that are either                     Beginning in 1982, the Commission
                                                Act (FPA) and directed the Commission                     ‘‘subject to periodic fluctuations’’ or                      collected ‘‘Interrogatory on Fuel and
                                                to make comprehensive biennial                            ‘‘not susceptible to precise                                 Energy Purchase Practices’’ data every
                                                reviews of certain matters related to                     determinations’’ in rate cases prior to                      other year.
                                                automatic adjustment clauses (AACs) in                    the time the costs are incurred.
                                                  2 The renewal request for the FERC Form No. 6           or any officer or component of such Commission               0206. It is not a subject of this Notice; FERC Form
                                                in this IC docket is for the current form, with no        where the regulatory function establishes rates or           6–Q is being addressed separately in Docket No.
                                                change to the reporting requirements.                     charges for the transportation of oil by pipeline or         IC16–7–000.
                                                  The FERC Form No. 6 is also part of the Forms           established the valuation of any such pipeline.’’               6 The burden associated with the one-time re-
                                                                                                             4 The ICC developed the Form P to collect
                                                Refresh effort (started in Docket No. AD15–11),                                                                        filing of Page 700 data for Years 2009–2011 has
                                                which is a separate activity and not addressed in         information on an annual basis to enable it to carry
                                                                                                          out its regulation of oil pipeline companies under           been completed and is not included.
srobinson on DSK5SPTVN1PROD with NOTICES




                                                this Notice.                                                                                                              7 The cost is based on FERC’s 2016 average cost
                                                                                                          the Interstate Commerce Act. A comprehensive
                                                  In addition, there is a pending Docket No. RM15–        review of the reporting requirements for oil pipeline        (salary plus benefits) of $74.50/hour. The
                                                19 which is a separate activity and is not addressed      companies was performed on September 21, 1982,               Commission staff believes that the industry’s level
                                                in this Notice.                                           when the Commission issued Order 260 revising
                                                  3 Section 402(b) of the Department of Energy
                                                                                                                                                                       and skill set is comparable to FERC.
                                                                                                          the former ICC Form P, ‘‘Annual Report of Carriers              8 Enacted November 8, 1978
                                                Organization Act (DOE Act), 42 U.S.C. 7172                by Pipeline’’ and redesignating it as FERC Form No.
                                                                                                                                                                          9 The review requirement is set forth in two
                                                provides that; ‘‘[t]here are hereby transferred to, and   6, ‘‘Annual Report of Oil Pipeline Companies’’.
                                                vested in, the Commission all functions and                  5 FERC Form 6–Q is covered separately and is              paragraphs of Section 208 of PURPA, 49 Stat.851;
                                                authority of the Interstate Commerce Commission           approved by OMB under OMB Control No. 1902–                  16 U.S.C. 824d.



                                           VerDate Sep<11>2014     21:41 Jun 10, 2016   Jkt 238001   PO 00000    Frm 00044   Fmt 4703    Sfmt 4703   E:\FR\FM\13JNN1.SGM        13JNN1


                                                                               Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices                                                   38171

                                                  Based on filer comments in response                   following changes to the instructions.                 Question 2a
                                                to the new electronic form used in the                  FERC is not changing the requirements                  —Revise Question 2a columns as
                                                2014 collections, FERC recommends the                   of the information collection.                          follows:

                                                                                      From                                                                               To

                                                Docket number under which rate schedule containing AAC through                       Docket number under which rate schedule containing AAC through
                                                  which costs were passed during 2012 and/or 2013 was accepted for                     which costs were passed during 2014 and/or 2015 was accepted for
                                                  filing by FERC.                                                                      filing by FERC.
                                                Was rate schedule superseded or abandoned during 2012–2013? If so,                   Was rate schedule superseded or abandoned during 2014–2015? If so,
                                                  provide dates.                                                                       provide dates.



                                                Question 2b
                                                —Revise the paragraph under Question
                                                 2b to read:

                                                                                      From                                                                               To

                                                If any of the Utility’s wholesale rate and/or service agreements con-                If any of the Utility’s wholesale rate and/or service agreements con-
                                                   taining an AAC listed in Question 2a, that was used during 2012                      taining an AAC listed in Question 2a, that was used during 2014
                                                   and/or 2013, was filed with the Commission before January 1, 1990,                   and/or 2015, was filed with the Commission before January 1, 1990,
                                                   attach an electronic copy of it with this filing. List the documents you             attach an electronic copy of it with this filing. List the documents you
                                                   are submitting below. Note: Once this information is submitted elec-                 are submitting below. Note: Once this information is submitted elec-
                                                   tronically in a text-searchable format it will not be necessary to sub-              tronically in a text-searchable format it will not be necessary to sub-
                                                   mit it in future Form 580 filings. See: http://www.ferc.gov/docs-filing/             mit it in future Form 580 filings. See: http://www.ferc.gov/docs-filing/
                                                   elibrary/accept-file-formats.asp for listing of Commission accepted                  elibrary/accept-file-formats.asp for listing of Commission accepted
                                                   document types.                                                                      document types.



                                                Question 3
                                                —Revise the paragraph under Question
                                                 3 to read:

                                                                                      From                                                                               To

                                                If during the 2012–2013 period, the Utility had any contracts or agree-              If during the 2014–2015 period, the Utility had any contracts or agree-
                                                   ments for the purchase of either energy or capacity under which all                  ments for the purchase of either energy or capacity under which all
                                                   or any portion of the purchase costs were passed through a fuel ad-                  or any portion of the purchase costs were passed through a fuel ad-
                                                   justment clause (FAC), for each purchase from a PURPA Qualifying                     justment clause (FAC), for each purchase from a PURPA Qualifying
                                                   Facility (QF) or Independent Power Producer (IPP) provide the infor-                 Facility (QF) or Independent Power Producer (IPP) provide the infor-
                                                   mation requested in the non-shaded columns of the table below. Pro-                  mation requested in the non-shaded columns of the table below.
                                                   vide the information separately for each reporting year 2012 and                     Provide the information separately for each reporting year 2014 and
                                                   2013. Do not report purchased power where none of the costs were                     2015. Do not report purchased power where none of the costs were
                                                   recovered through an FAC. For each purchase where costs were                         recovered through an FAC. For each purchase where costs were
                                                   flowed through an FAC, fill-in the non-shaded columns and either                     flowed through an FAC, fill-in the non-shaded columns and either
                                                   ‘‘Only energy charges’’ or ‘‘The total cost of the purchase of eco-                  ‘‘Only energy charges’’ or ‘‘The total cost of the purchase of eco-
                                                   nomic power’’ columns, whichever apply.                                              nomic power’’ columns, whichever apply.



                                                Question 4a
                                                —Revise Question 4a columns as
                                                 follows:

                                                                                      From                                                                               To

                                                If emission allowance costs were incurred by the Utility in 2012 and/or              If emission allowance costs were incurred by the Utility in 2014 and/or
                                                   2013 and were recovered through a FAC, provide the following infor-                  2015 and were recovered through a FAC, provide the following infor-
                                                   mation.                                                                              mation.
                                                Dollar value of emission allowance cost passed through a FAC: 2012–                  Dollar value of emission allowance cost passed through a FAC: 2014–
                                                   2013.                                                                                2015.
srobinson on DSK5SPTVN1PROD with NOTICES




                                                Question 5
                                                —Revise the paragraph under Question
                                                 5 as follows:




                                           VerDate Sep<11>2014   20:48 Jun 10, 2016   Jkt 238001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\13JNN1.SGM   13JNN1


                                                38172                           Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices

                                                                                      From                                                                               To

                                                Provide the information requested below regarding the Utility’s fuel pro-            Provide the information requested below regarding the Utility’s fuel pro-
                                                  curement policies and practices in place during 2012 and/or 2013 for                 curement policies and practices in place during 2014 and/or 2015 for
                                                  fuels whose costs were subject to 18 CFR 35.14. Note: Responses                      fuels whose costs were subject to 18 CFR 35.14. Note: Responses
                                                  to this question may be filed as Privileged. To do so, skip this ques-               to this question may be filed as Privileged. To do so, skip this ques-
                                                  tion now and answer it via the Fuel Procurement Policies and Prac-                   tion now and answer it via the Fuel Procurement Policies and Prac-
                                                  tices Privileged Addendum provided. Otherwise, answer it here and                    tices Privileged Addendum provided. Otherwise, answer it here and
                                                  your responses will be made public.                                                  your responses will be made public.



                                                Question 6
                                                —Revise the paragraph under Question
                                                 6 as follows:

                                                                                      From                                                                               To

                                                For each fuel supply contract, of longer than one year in duration, in               For each fuel supply contract, of longer than one year in duration, in
                                                  force at any time during 2012 and/or 2013, where costs were subject                  force at any time during 2014 and/or 2015, where costs were subject
                                                  to 18 CFR 35.14, (including informal agreements with associated                      to 18 CFR 35.14, (including informal agreements with associated
                                                  companies), provide the requested information. Report the informa-                   companies), provide the requested information. Report the informa-
                                                  tion individually for each contract, for each calendar year. [No re-                 tion individually for each contract, for each calendar year. [No re-
                                                  sponse to any part of Question 6 for fuel oil no. 2 is necessary.] Re-               sponse to any part of Question 6 for fuel oil no. 2 is necessary.] Re-
                                                  port all fuels consumed for electric power generation and thermal en-                port all fuels consumed for electric power generation and thermal en-
                                                  ergy associated with the production of electricity. Information for only             ergy associated with the production of electricity. Information for only
                                                  coal, natural gas, and oil should be reported.                                       coal, natural gas, and oil should be reported.



                                                Question 7
                                                —Revise the paragraph under Question
                                                 6 as follows:

                                                                                      From                                                                               To

                                                For each fuel supply contract, including informal agreements with asso-              For each fuel supply contract, including informal agreements with asso-
                                                  ciated or affiliated companies in force at any time during 2012 or                   ciated or affiliated companies in force at any time during 2014 or
                                                  2013 WHERE CONTRACT SHORTFALL COSTS WERE PASSED                                      2015 WHERE CONTRACT SHORTFALL COSTS WERE PASSED
                                                  THROUGH an FAC subject to 18 CFR 35.14, provide for each con-                        THROUGH an FAC subject to 18 CFR 35.14, provide for each con-
                                                  tract separately the information requested below. Only report the in-                tract separately the information requested below. Only report the in-
                                                  formation requested for shortfalls that occurred under your contracts                formation requested for shortfalls that occurred under your contracts
                                                  during reporting years 2012 or 2013 and that are not under dispute                   during reporting years 2014 or 2015 and that are not under dispute
                                                  i.e. parties agree there was indeed a shortfall.                                     i.e. parties agree there was indeed a shortfall.



                                                Question 8
                                                —Revise the paragraph under Question
                                                 8 as follows:

                                                                                      From                                                                               To

                                                For each fuel supply contract that was bought-out or bought-down, in-                For each fuel supply contract that was bought-out or bought-down, in-
                                                  cluding informal agreements with associated or affiliated companies                  cluding informal agreements with associated or affiliated companies
                                                  in force at any time during 2012 or 2013 WHERE CONTRACT BUY-                         in force at any time during 2014 or 2015 WHERE CONTRACT BUY-
                                                  OUT AND/OR BUY-DOWN COSTS WERE PASSED THROUGH an                                     OUT AND/OR BUY-DOWN COSTS WERE PASSED THROUGH an
                                                  FAC subject to 18 CFR 35.14, provide for each contract separately                    FAC subject to 18 CFR 35.14, provide for each contract separately
                                                  the information requested below. Only report the information re-                     the information requested below. Only report the information re-
                                                  quested for contract buy-downs and buy-outs that occurred under                      quested for contract buy-downs and buy-outs that occurred under
                                                  your contracts during reporting years 2012 or 2013 and that are not                  your contracts during reporting years 2014 or 2015 and that are not
                                                  under dispute i.e. parties agree there was indeed a shortfall.                       under dispute i.e. parties agree there was indeed a shortfall.
srobinson on DSK5SPTVN1PROD with NOTICES




                                                  10 The attached form is for illustrative purposes

                                                only and does not include all the interactive
                                                features of the actual form.



                                           VerDate Sep<11>2014   20:48 Jun 10, 2016   Jkt 238001   PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:\FR\FM\13JNN1.SGM   13JNN1


                                                                                         Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices                                                            38173

                                                  Access to the Revised Materials: A                               of this notice in FERC’s eLibrary (http://                    Estimate of Annual Burden 11: The
                                                copy of the form, desk reference, and                              www.ferc.gov/docs-filing/elibrary.asp)                      Commission estimates the annual 12
                                                glossary are attached to this Notice, but                          by searching Docket No. IC16–11–000.                        public reporting burden for the
                                                they will not be published in the                                    Type of Respondent: Large electric                        information collection as:
                                                Federal Register.10 Interested parties                             public utilities within FERC
                                                can see the form electronically as part                            jurisdiction.

                                                                                  FERC FORM 580 (INTERROGATORY ON FUEL AND ENERGY PURCHASE PRACTICES)
                                                                                                                 Annual                                                                     Total annual                Annual
                                                                                                                 number                                         Average
                                                                                           Number of                               Total number                                             burden hours               cost per
                                                                                                              of responses                                    burden & cost
                                                                                          respondents                              of responses                                                & total               respondent
                                                                                                                   per                                       per response 13                 annual cost                  ($)
                                                                                                               respondent

                                                                                                (1)                 (2)            (1) * (2) = (3)                 (4)                      (3) * (4) = (5)           (5) ÷ (1)

                                                Respondents with FACs                                  37                   0.5               18.5    103 hrs.; $7,673.50 .....        1,905.5 hrs.;                    $3,836.75
                                                                                                                                                                                         $141,959.75.
                                                Respondents with                                       10                   0.5                   5   20 hrs.; $1,490 ............     100 hrs.; $7,450 ..........            $745
                                                  AACs, but no FACs.
                                                Respondents with no                                    35                   0.5               17.5    2 hrs.; $149 .................   35 hrs.; $2,607.50 .......           $74.50
                                                  AACs nor FACs.

                                                      Total ......................                                                               41                                    2,040.5 hrs.;
                                                                                                                                                                                         $152,017.25.
                                                  13 The estimates for cost per response are derived using the 2016 FERC average salary plus benefits of $154,647/year (or $74.50/hour). Com-
                                                mission staff finds that the work done for this information collection is typically done by wage categories similar to those at FERC.


                                                FERC Form No. 1, Annual Report of                                  resale; (3) 500 megawatt hours of annual                    supplementary information and outlines
                                                Major Electric Utilities, Licensees, and                           power exchanges delivered; or (4) 500                       of corporate structure and governance;
                                                Others                                                             megawatt hours of annual wheeling for                       information on formula rates; and
                                                                                                                   others (deliveries plus losses).14                          description of important changes during
                                                OMB Control No.: 1902–0021
                                                                                                                      The Form No.1 is designed to collect                     the year. Other schedules provide
                                                   Abstract: The FERC Form No. 1 (Form                             financial and operational information                       information on revenues and the related
                                                No.1) is a comprehensive financial and                             and is considered to be a non-                              quantities of electric sales and
                                                operating report submitted annually for                            confidential public use form. The Form                      electricity transmitted; account balances
                                                electric rate regulation, market oversight                         No.1 includes a basic set of financial                      for all electric operation and
                                                analysis, and financial audits by Major                            statements: Comparative Balance Sheet,                      maintenance expenses; selected plant
                                                electric utilities, licensees and others.                          Statement of Income, Statement of                           cost data; and other statistical
                                                Major is defined as having in each of the                          Retained Earnings, Statement of Cash                        information.
                                                three previous calendar years, sales or                            Flows, Statements of Accumulated                              Type of Respondent: Major electric
                                                transmission services that exceed one of                           Comprehensive Income, Comprehensive                         utilities
                                                the following: (1) One million megawatt                            Income, and Hedging Activities; and                           Estimate of Annual Burden: The
                                                hours of total annual sales; (2) 100                               Notes to Financial Statements.                              estimated annual burden and cost 15
                                                megawatt hours of annual sales for                                 Supporting schedules contain                                follow:

                                                                                                                                        FORM NO. 1
                                                                                                    Annual                                           Average                             Total annual                 Cost per
                                                              Number of                            number of        Total number                  burden hours                           burden hours                respondent
                                                             respondents                        responses per       of responses                   & cost per                            & total annual                  ($)
                                                                                                  respondent                                        response                                  cost

                                                                    (1)                               (2)           (1) * (2) = (3)                     (4)                              (3) * (4) = (5)              (5) ÷ (1)

                                                210 .........................................                  1                  210    1,169 hrs.; $91,953.54 .........      245,490 hrs.; $19,310,243.40            $91,953.54




                                                  10 The attached form is for illustrative purposes                per Respondent’’ is assigned a figure of 0.5. This          based on figures from the Bureau of Labor Statistics
                                                only and does not include all the interactive                      figure means that one response per respondent is            National Industry-Specific Occupational and
                                                features of the actual form.                                       received on average for each two year period. The           Employment Wage Estimates (May 2015 estimates
                                                  11 The Commission defines burden as the total                    ‘‘Total Annual Burden Hours & Total Annual Cost’’           at http://www.bls.gov/oes/current/naics2_22.htm,
srobinson on DSK5SPTVN1PROD with NOTICES




                                                time, effort, or financial resources expended by                   figures are all annual figures based on the biennial        and benefits information for December 2015 at
                                                persons to generate, maintain, retain, or disclose or              frequency assumption.                                       http://www.bls.gov/news.release/ecec.nr0.htm) and
                                                provide information to or for a Federal agency. For                   14 As detailed in 18 CFR 101 (Uniform System of          is an average of the following:
                                                further explanation of what is included in the                     Accounts Prescribed for Public Utilities and                   • Management (code 11–0000) of $88.94/hour
                                                information collection burden, reference 5 Code of                 Licensees Subject to the Provision of the Federal              • business and financial operations occupations
                                                Federal Regulations 1320.3.                                        Power Act, General Instructions) and 18 CFR 141.1.          (code 13–0000) of $56.86/hour
                                                  12 The FERC Form 580 data is collected on a                         15 The cost estimate (wages plus benefits) is               • legal (code 23–0000) of $128.94/hour
                                                biennial basis. In order to represent the burden                   $78.66/hour and is used for the Form Nos. 1, 1–F,              • office and administrative support (code 43–
                                                appropriately, the ‘‘Annual Number of Responses                    and 3–Q. The $78.66/hour (wages plus benefits) is           0000) of $39.91/hour.



                                           VerDate Sep<11>2014        20:48 Jun 10, 2016        Jkt 238001   PO 00000     Frm 00047   Fmt 4703   Sfmt 4703    E:\FR\FM\13JNN1.SGM       13JNN1


                                                38174                                      Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices

                                                FERC Form No. 1–F, Annual Report for                                   calendar year and not classified as                            the related quantities of electric sales
                                                Nonmajor Public Utilities and Licensees                                Major.16                                                       and electricity transmitted; account
                                                                                                                          The Form No.1–F is designed to                              balances for all electric operation and
                                                OMB Control No.: 1902–0029                                             collect financial and operational                              maintenance expenses; selected plant
                                                                                                                       information and is considered to be a                          cost data; and other statistical
                                                   Abstract: The FERC Form No. 1–F
                                                                                                                       non-confidential public use form. The                          information.
                                                (Form No.1–F) is a financial and
                                                                                                                       Form No.1–F includes a basic set of
                                                operating report submitted annually for                                financial statements: Comparative                                Type of Respondent: Nonmajor
                                                electric rate regulation, market oversight                             Balance Sheet, Statement of Retained                           electric utilities
                                                analysis, and financial audits by                                      Earnings, Statement of Cash Flows,                               Estimate of Annual Burden: The
                                                Nonmajor electric utilities and                                        Statement of Comprehensive Income                              estimated annual burden and cost
                                                licensees. Nonmajor is defined as                                      and Hedging Activities, and Notes to                           follow. (The estimated hourly cost used
                                                having total annual sales of 10,000                                    Financial Statements. Supporting                               for the Form No. 1–F is $78.66 (wages
                                                megawatt-hours or more in the previous                                 schedules contain supplementary                                plus benefits) and is described above,
                                                                                                                       information and include revenues and                           under the Form No. 1.):

                                                                                                                                          FORM NO. 1–F
                                                                                                      Annual                                              Average                               Total annual                    Cost per
                                                              Number of                              number of          Total number                   burden hours                             burden hours                   respondent
                                                             respondents                          responses per         of responses                    & cost per                              & total annual                     ($)
                                                                                                    respondent                                           response                                    cost

                                                                     (1)                                  (2)           (1) * (2) = (3)                      (4)                                (3) * (4) = (5)                 (5) ÷ (1)

                                                5 .............................................                    1                      5   123 hrs.; $9,675.18 ..............      615 hrs.; $48,375.90 ............           $9,675.18



                                                FERC Form No. 3–Q, Quarterly                                           Nonmajor electric utilities and                                quarterly quantities of gas transported
                                                Financial Report of Electric Utilities,                                licensees; and natural gas companies17.                        and associated revenues; storage,
                                                Licensees, and Natural Gas Companies                                      Form No. 3–Q includes a basic set of                        terminaling and processing services;
                                                                                                                       financial statements: Comparative                              natural gas customer accounts and
                                                OMB Control No.: 1902–0205                                             Balance Sheet, Statement of Income and                         details of service; and operational
                                                   Abstract: The FERC Form No. 3–Q                                     Statement of Retained Earnings,                                expenses, depreciation, depletion and
                                                (Form No. 3–Q) is a quarterly financial                                Statement of Cash Flows, Statement of                          amortization of gas plant.
                                                and operating report for rate regulation,                              Comprehensive Income and Hedging
                                                market oversight analysis, and financial                                                                                                Type of Respondent: Major and
                                                                                                                       Activities and supporting schedules
                                                audits which supplements the (a) Form                                                                                                 nonmajor electric utilities and natural
                                                                                                                       containing supplementary information.
                                                Nos. 1 and 1–F for the electric industry,                              Electric respondents report revenues                           gas pipelines.
                                                or the (b) Form No. 2 (Major Natural Gas                               and the related quantities of electric                           Estimate of Annual Burden: The
                                                Pipeline Annual Report; OMB Control                                    sales and electricity transmitted;                             estimated annual burden and cost (as
                                                No. 1902–0028) and Form No. 2–A                                        account balances for all electric                              rounded) follow. (The estimated hourly
                                                (Nonmajor Natural Gas Pipeline Annual                                  operation and maintenance expenses;                            cost used for the Form No. 3–Q is
                                                Report; OMB Control No. 1902–0030)                                     selected plant cost data; and other                            $78.66 (wages plus benefits) and is
                                                (for the natural gas industry). The Form                               statistical information. Natural gas                           described above, under the Form No.
                                                No. 3–Q is submitted for all Major and                                 respondents include monthly and                                1.):

                                                                                                                                          FORM NO. 3–Q
                                                                                                                                                                                                                               Annual cost
                                                                                                                     Annual                                                                     Total annual burden                per
                                                                                            Number of               number of         Total number          Average burden hours                hours & total annual           respondent
                                                                                           respondents           responses per        of responses           & cost per response                        cost                       ($)
                                                                                                                   respondent

                                                                                                  (1)                   (2)           (1) * (2) = (3)                    (4)                        (3) * (4) = (5)             (5) ÷ (1)

                                                FERC 3–Q (electric) .....                               213 18                    3                  639   168 hrs.; ......................   107,352 hrs.; ...............      $39,644.64
                                                                                                                                                           $13,214.88 ..................      $8,444,308 ..................
                                                FERC 3–Q (gas) ..........                                 167                     3                  501   167 hrs.; ......................   83,667 hrs.; .................     $39,408.66
                                                                                                                                                           $13,136.22 ..................      $6,581,246 ..................
                                                      Total for FERC 3–                                                                           1,140                                       191,019 hrs.; ...............
                                                        Q.                                                                                                                                    $15,025,554 ................
                                                  18 The estimated number of electric filers of the Form No. 3–Q is 213 (rather than the 215 total for the number of filers of the Form Nos. 1 and
srobinson on DSK5SPTVN1PROD with NOTICES




                                                1–F) due to standing waivers for two coops who do not file the Form No. 3–Q.

                                                  16 As detailed in 18 CFR 101 (Uniform System of                         17 18 CFR § 260.1(b) states that for natural gas            Nonmajor as defined by the Natural Gas Act,
                                                Accounts Prescribed for Public Utilities and                           companies, Major, as defined by the Natural Gas                pertains to a company not meeting the filing
                                                Licensees Subject to the Provision of the Federal                      Act, pertains to a company whose combined gas                  threshold for Major, but having total gas sales or
                                                Power Act, General Instructions) and 18 CFR 141.2.                     transported or stored for a fee exceed 50 million Dth          volume transactions exceeding 200,000 Dth in each
                                                                                                                       in each of the three previous calendar years. 18 CFR
                                                                                                                                                                                      of the three previous calendar years.
                                                                                                                       § 260.2(b) states that for natural gas companies,



                                           VerDate Sep<11>2014          21:41 Jun 10, 2016        Jkt 238001     PO 00000     Frm 00048   Fmt 4703    Sfmt 4703    E:\FR\FM\13JNN1.SGM         13JNN1


                                                                               Federal Register / Vol. 81, No. 113 / Monday, June 13, 2016 / Notices                                                   38175

                                                  DATED: June 7, 2016.                                     Description: § 4(d) Rate Filing:                      Filed Date: 6/1/16.
                                                Kimberly D. Bose,                                       Negotiated Capacity Release                              Accession Number: 20160601–5338.
                                                Secretary.                                              Agreements—6/01/2016 to be effective                     Comments Due: 5 p.m. ET 6/13/16.
                                                [FR Doc. 2016–13922 Filed 6–10–16; 8:45 am]             6/1/2016.                                                Docket Numbers: RP16–1013–000.
                                                BILLING CODE 6717–01–P
                                                                                                           Filed Date: 6/1/16.                                   Applicants: MarkWest Pioneer, L.L.C.
                                                                                                           Accession Number: 20160601–5227.                      Description: Quarterly Fuel
                                                                                                           Comments Due: 5 p.m. ET 6/13/16.                    Adjustment Filing of MarkWest Pioneer,
                                                DEPARTMENT OF ENERGY                                       Docket Numbers: RP16–1006–000.                      L.L.C. under RP16–1013.
                                                                                                           Applicants: Columbia Gas                              Filed Date: 6/1/16.
                                                Federal Energy Regulatory                               Transmission, LLC.                                       Accession Number: 20160601–5391.
                                                Commission                                                 Description: § 4(d) Rate Filing: GEH—                 Comments Due: 5 p.m. ET 6/13/16.
                                                                                                        Multi-Party Contracts to be effective                    Any person desiring to intervene or
                                                Combined Notice of Filings                              7/1/2016.                                              protest in any of the above proceedings
                                                  Take notice that the Commission has                      Filed Date: 6/1/16.                                 must file in accordance with Rules 211
                                                received the following Natural Gas                         Accession Number: 20160601–5289.                    and 214 of the Commission’s
                                                Pipeline Rate and Refund Report filings:                   Comments Due: 5 p.m. ET 6/13/16.                    Regulations (18 CFR 385.211 and
                                                                                                           Docket Numbers: RP16–1007–000.                      § 385.214) on or before 5:00 p.m. Eastern
                                                Filings Instituting Proceedings                                                                                time on the specified comment date.
                                                                                                           Applicants: Columbia Gulf
                                                  Docket Numbers: RP16–1000–000.                        Transmission, LLC.                                     Protests may be considered, but
                                                  Applicants: Columbia Gas                                 Description: § 4(d) Rate Filing: GEH—               intervention is necessary to become a
                                                Transmission, LLC.                                      Multi-Party Contracts to be effective                  party to the proceeding.
                                                  Description: § 4(d) Rate Filing:                      7/1/2016.                                              Filings in Existing Proceedings
                                                Negotiated & Non-Conforming Service                        Filed Date: 6/1/16.
                                                Agreement—Kentucky Power to be                                                                                    Docket Numbers: RP16–549–002.
                                                                                                           Accession Number: 20160601–5290.
                                                effective 6/1/2016.                                                                                               Applicants: PGPipeline LLC.
                                                                                                           Comments Due: 5 p.m. ET 6/13/16.
                                                                                                                                                                  Description: Compliance filing
                                                  Filed Date: 5/31/16.                                     Docket Numbers: RP16–1008–000.                      NAESB 3.0 Compliance Filing to be
                                                  Accession Number: 20160531–5595.                         Applicants: UGI Sunbury, LLC.                       effective 4/1/2016.
                                                  Comments Due: 5 p.m. ET 6/13/16.                         Description: Compliance Tariff Filing                  Filed Date: 5/31/16.
                                                  Docket Numbers: RP16–1001–000.                        [of Pro Forma tariff sheets—CP15–525]                     Accession Number: 20160531–5607.
                                                  Applicants: Discovery Gas                             and Request for Waiver of UGI Sunbury,                    Comments Due: 5 p.m. ET 6/13/16.
                                                Transmission LLC.                                       LLC.                                                      Any person desiring to protest in any
                                                  Description: § 4(d) Rate Filing: 2016                    Filed Date: 5/31/16.                                of the above proceedings must file in
                                                FL&U Submittal to be effective                             Accession Number: 20160531–5736.                    accordance with Rule 211 of the
                                                7/1/2016.                                                  Comments Due: 5 p.m. ET 6/13/16.                    Commission’s Regulations (18 CFR
                                                  Filed Date: 5/31/16.                                     Docket Numbers: RP16–1009–000.                      385.211) on or before 5:00 p.m. Eastern
                                                  Accession Number: 20160531–5604.                         Applicants: Crossroads Pipeline                     time on the specified comment date.
                                                  Comments Due: 5 p.m. ET 6/13/16.                      Company.                                                  The filings are accessible in the
                                                  Docket Numbers: RP16–1002–000.                           Description: § 4(d) Rate Filing: GEH—               Commission’s eLibrary system by
                                                  Applicants: Algonquin Gas                             Multi-Party Contracts to be effective                  clicking on the links or querying the
                                                Transmission, LLC.                                      7/1/2016.                                              docket number.
                                                  Description: § 4(d) Rate Filing: Non-                    Filed Date: 6/1/16.                                    eFiling is encouraged. More detailed
                                                Conforming Agreements—Colonial                             Accession Number: 20160601–5293.                    information relating to filing
                                                510025 and Narragansett 510075 to be                       Comments Due: 5 p.m. ET 6/13/16.                    requirements, interventions, protests,
                                                effective 6/1/2016.                                        Docket Numbers: RP16–1010–000.                      service, and qualifying facilities filings
                                                  Filed Date: 5/31/16.                                     Applicants: Central Kentucky                        can be found at: http://www.ferc.gov/
                                                  Accession Number: 20160531–5614.                      Transmission Company.                                  docs-filing/efiling/filing-req.pdf. For
                                                  Comments Due: 5 p.m. ET 6/13/16.                         Description: § 4(d) Rate Filing: GEH—               other information, call (866) 208–3676
                                                  Docket Numbers: RP16–1003–000.                        Multi-Party Contracts to be effective                  (toll free). For TTY, call (202) 502–8659.
                                                  Applicants: Algonquin Gas                             7/1/2016.                                                Dated: June 6, 2016.
                                                Transmission, LLC.                                         Filed Date: 6/1/16.                                 Nathaniel J. Davis, Sr.,
                                                  Description: § 4(d) Rate Filing: Non-                    Accession Number: 20160601–5300.                    Deputy Secretary.
                                                Conforming Agreement—Narragansett                          Comments Due: 5 p.m. ET 6/13/16.                    [FR Doc. 2016–13897 Filed 6–10–16; 8:45 am]
                                                510209 to be effective 6/1/2016.                           Docket Numbers: RP16–1011–000.                      BILLING CODE 6717–01–P
                                                  Filed Date: 6/1/16.                                      Applicants: Millennium Pipeline
                                                  Accession Number: 20160601–5124.                      Company, LLC.
                                                  Comments Due: 5 p.m. ET 6/13/16.                         Description: § 4(d) Rate Filing:                    ENVIRONMENTAL PROTECTION
                                                  Docket Numbers: RP16–1004–000.                        Operational Sales at Pool Filing to be                 AGENCY
                                                  Applicants: Gulf South Pipeline                       effective 7/1/2016.
                                                Company, LP.                                               Filed Date: 6/1/16.                                 [FRL–9947–63–Region 2]
                                                  Description: § 4(d) Rate Filing: Cap                     Accession Number: 20160601–5301.
srobinson on DSK5SPTVN1PROD with NOTICES




                                                Rel Neg Rate Agmt (QEP 37657 to Trans                      Comments Due: 5 p.m. ET 6/13/16.                    Notice of Availability of Final NPDES
                                                LA 46521) to be effective 6/2/2016.                                                                            General Permit for Small Municipal
                                                                                                           Docket Numbers: RP16–1012–000.                      Separate Storm Sewer Systems and
                                                  Filed Date: 6/1/16.                                      Applicants: Rockies Express Pipeline
                                                  Accession Number: 20160601–5181.                                                                             Federal Facilities Within the
                                                                                                        LLC.                                                   Commonwealth of Puerto Rico
                                                  Comments Due: 5 p.m. ET 6/13/16.                         Description: § 4(d) Rate Filing: Neg
                                                  Docket Numbers: RP16–1005–000.                        Rate 2016–06–01 Perm Partial BP to be                  AGENCY: Environmental Protection
                                                  Applicants: Equitrans, L.P.                           effective 6/1/2016.                                    Agency (EPA).


                                           VerDate Sep<11>2014   20:48 Jun 10, 2016   Jkt 238001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\13JNN1.SGM   13JNN1



Document Created: 2018-02-08 07:39:55
Document Modified: 2018-02-08 07:39:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collections and request for comments.
DatesComments on the collections of information are due August 12,
FR Citation81 FR 38169 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR