81_FR_4294 81 FR 4278 - Thoreson Family Ranch, LLC; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 4278 - Thoreson Family Ranch, LLC; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 16 (January 26, 2016)

Page Range4278-4279
FR Document2016-01461

Federal Register, Volume 81 Issue 16 (Tuesday, January 26, 2016)
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4278-4279]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-01461]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-5-000]


Thoreson Family Ranch, LLC; Notice of Preliminary Determination 
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On January 5, 2016, as supplemented on January 14 and 15, 2016, 
Thoreson Family Ranch, LLC, filed a notice of intent to construct a 
qualifying conduit hydropower facility, pursuant to section 30 of the 
Federal Power Act (FPA), as amended by section 4 of the Hydropower 
Regulatory Efficiency Act of 2013 (HREA). The proposed Thoreson Family 
Ranch Project would have an installed capacity of 2 kilowatts (kW), and 
would be located at the end of an existing 6-inch-diameter irrigation 
pipeline. The project would be located near Cottage Grove, in Lane 
County, Oregon.
    Applicant Contact: Stephen Joel Thoreson, 319 North 20th Street, 
Cottage Grove, Oregon 97424, Phone No. (541) 942-7407.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) An existing pump house, approximately 8 
feet by 10 feet, at the end of an existing 6-inch-diameter irrigation 
pipeline; (2) one turbine/generator unit with an installed capacity of 
2 kW; (3) an approximately 5-foot-long tailrace, discharging to 
Damewood Creek; and (4) appurtenant facilities.
    The proposed project would have a total installed capacity of 2 kW.

[[Page 4279]]

    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision             Description       Satisfies  (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by  The conduit the         Y
 HREA.                           facility uses is a
                                 tunnel, canal,
                                 pipeline, aqueduct,
                                 flume, ditch, or
                                 similar manmade water
                                 conveyance that is
                                 operated for the
                                 distribution of water
                                 for agricultural,
                                 municipal, or
                                 industrial
                                 consumption and not
                                 primarily for the
                                 generation of
                                 electricity.
FPA 30(a)(3)(C)(i), as amended  The facility is         Y
 by HREA.                        constructed,
                                 operated, or
                                 maintained for the
                                 generation of
                                 electric power and
                                 uses for such
                                 generation only the
                                 hydroelectric
                                 potential of a non-
                                 federally owned
                                 conduit.
FPA 30(a)(3)(C)(ii), as         The facility has an     Y
 amended by HREA.                installed capacity
                                 that does not exceed
                                 5 megawatts.
FPA 30(a)(3)(C)(iii), as        On or before August 9,  Y
 amended by HREA.                2013, the facility is
                                 not licensed, or
                                 exempted from the
                                 licensing
                                 requirements of Part
                                 I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed addition of the 
hydroelectric project to the Thoreson Family Ranch's existing 
irrigation conduit will not alter its primary purpose of distributing 
water for irrigation. Thoreson Family Ranch proposes to continue using 
the conduit, as it has historically, to irrigate fields during July, 
August, and September. Therefore, based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility, which is 
not required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the Web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (i.e., CD16-5) in the 
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email [email protected]. For TTY, call 
(202) 502-8659.

    Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01461 Filed 1-25-16; 8:45 am]
BILLING CODE 6717-01-P



                                                  4278                          Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices

                                                  Environmental Mailing List                              Support at FercOnlineSupport@ferc.gov                  385.214) on or before 5:00 p.m. Eastern
                                                     The environmental mailing list                       or toll free at (866) 208–3676, or for                 time on the specified comment date.
                                                  federal, state, and local government                    TTY, contact (202) 502–8659. The                       Protests may be considered, but
                                                  representatives and agencies; elected                   eLibrary link also provides access to the              intervention is necessary to become a
                                                  officials; environmental and public                     texts of formal documents issued by the                party to the proceeding.
                                                  interest groups; Native American Tribes;                Commission, such as orders, notices,                      eFiling is encouraged. More detailed
                                                  other interested parties; and local                     and rulemakings.                                       information relating to filing
                                                                                                             In addition, the Commission offers a                requirements, interventions, protests,
                                                  libraries and newspapers. This list also
                                                                                                          free service called eSubscription which                service, and qualifying facilities filings
                                                  includes all affected landowners (as
                                                                                                          allows you to keep track of all formal                 can be found at: http://www.ferc.gov/
                                                  defined in the Commission’s
                                                                                                          issuances and submittals in specific                   docs-filing/efiling/filing-req.pdf. For
                                                  regulations) who are potential right-of-
                                                                                                          dockets. This can reduce the amount of                 other information, call (866) 208–3676
                                                  way grantors, whose property may be
                                                                                                          time you spend researching proceedings                 (toll free). For TTY, call (202) 502–8659.
                                                  used temporarily for project purposes,
                                                                                                          by automatically providing you with                      Dated: January 14, 2016.
                                                  or who own homes within certain
                                                                                                          notification of these filings, document
                                                  distances of aboveground facilities, and                                                                       Nathaniel J. Davis, Sr.,
                                                                                                          summaries, and direct links to the
                                                  anyone who submits comments on the                                                                             Deputy Secretary.
                                                                                                          documents. Go to www.ferc.gov/docs-
                                                  project. We will update the                                                                                    [FR Doc. 2016–01454 Filed 1–25–16; 8:45 am]
                                                                                                          filing/esubscription.asp.
                                                  environmental mailing list as the
                                                                                                             Finally, public meetings or site visits             BILLING CODE 6717–01–P
                                                  analysis proceeds to ensure that we
                                                                                                          will be posted on the Commission’s
                                                  send the information related to this
                                                                                                          calendar located at www.ferc.gov/
                                                  environmental review to all individuals,                                                                       DEPARTMENT OF ENERGY
                                                                                                          EventCalendar/EventsList.aspx along
                                                  organizations, and government entities
                                                                                                          with other related information.                        Federal Energy Regulatory
                                                  interested in and/or potentially affected
                                                  by the proposed project.                                  Dated: January 20, 2016.                             Commission
                                                     If we publish and distribute the EA,                 Nathaniel J. Davis, Sr.,
                                                                                                                                                                 [Docket No. CD16–5–000]
                                                  copies of the EA will be sent to the                    Deputy Secretary.
                                                  environmental mailing list for public                   [FR Doc. 2016–01464 Filed 1–25–16; 8:45 am]            Thoreson Family Ranch, LLC; Notice
                                                  review and comment. If you would                        BILLING CODE 6717–01–P                                 of Preliminary Determination of a
                                                  prefer to receive a paper copy of the                                                                          Qualifying Conduit Hydropower
                                                  document instead of the CD version or                                                                          Facility and Soliciting Comments and
                                                  would like to remove your name from                     DEPARTMENT OF ENERGY                                   Motions To Intervene
                                                  the mailing list, please return the
                                                  attached Information Request (appendix                  Federal Energy Regulatory                                On January 5, 2016, as supplemented
                                                  2).                                                     Commission                                             on January 14 and 15, 2016, Thoreson
                                                                                                                                                                 Family Ranch, LLC, filed a notice of
                                                  Becoming an Intervenor                                  Combined Notice of Filings                             intent to construct a qualifying conduit
                                                     In addition to involvement in the EA                   Take notice that the Commission has                  hydropower facility, pursuant to section
                                                  scoping process, you may want to                        received the following Natural Gas                     30 of the Federal Power Act (FPA), as
                                                  become an ‘‘intervenor’’ which is an                    Pipeline Rate and Refund Report filings:               amended by section 4 of the
                                                  official party to the Commission’s                                                                             Hydropower Regulatory Efficiency Act
                                                  proceeding. Intervenors play a more                     Filings Instituting Proceedings                        of 2013 (HREA). The proposed Thoreson
                                                  formal role in the process and are able                    Docket Numbers: RP16–381–000.                       Family Ranch Project would have an
                                                  to file briefs, appear at hearings, and be                 Applicants: Transcontinental Gas                    installed capacity of 2 kilowatts (kW),
                                                  heard by the courts if they choose to                   Pipe Line Company.                                     and would be located at the end of an
                                                  appeal the Commission’s final ruling.                      Description: Section 4(d) Rate Filing:              existing 6-inch-diameter irrigation
                                                  An intervenor formally participates in                  LSS and SS–2 Tracker Effective                         pipeline. The project would be located
                                                  the proceeding by filing a request to                   November 1, 2015 to be effective 11/1/                 near Cottage Grove, in Lane County,
                                                  intervene. Instructions for becoming an                 2015.                                                  Oregon.
                                                  intervenor are in the ‘‘Document-less                      Filed Date: 1/13/16.                                  Applicant Contact: Stephen Joel
                                                  Intervention Guide’’ under the ‘‘e-filing’’                Accession Number: 20160113–5104.                    Thoreson, 319 North 20th Street,
                                                  link on the Commission’s Web site.                         Comments Due: 5 p.m. ET 1/25/16.                    Cottage Grove, Oregon 97424, Phone No.
                                                  Motions to intervene are more fully                        Docket Numbers: RP16–382–000.                       (541) 942–7407.
                                                  described at http://www.ferc.gov/                          Applicants: Alliance Pipeline L.P.                    FERC Contact: Christopher Chaney,
                                                  resources/guides/how-to/intervene.asp.                     Description: Section 4(d) Rate Filing:              Phone No. (202) 502–6778, email:
                                                                                                          Contract 1000591 Correction & Others to                christopher.chaney@ferc.gov.
                                                  Additional Information                                  be effective 12/1/2015.                                  Qualifying Conduit Hydropower
                                                     Additional information about the                        Filed Date: 1/13/16.                                Facility Description: The proposed
                                                  project is available from the                              Accession Number: 20160113–5246.                    project would consist of: (1) An existing
                                                  Commission’s Office of External Affairs,                   Comments Due: 5 p.m. ET 1/25/16.                    pump house, approximately 8 feet by 10
                                                  at (866) 208–FERC, or on the FERC Web                      The filings are accessible in the                   feet, at the end of an existing 6-inch-
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  site at www.ferc.gov using the                          Commission’s eLibrary system by                        diameter irrigation pipeline; (2) one
                                                  ‘‘eLibrary’’ link. Click on the eLibrary                clicking on the links or querying the                  turbine/generator unit with an installed
                                                  link, click on ‘‘General Search’’ and                   docket number.                                         capacity of 2 kW; (3) an approximately
                                                  enter the docket number, excluding the                     Any person desiring to intervene or                 5-foot-long tailrace, discharging to
                                                  last three digits in the Docket Number                  protest in any of the above proceedings                Damewood Creek; and (4) appurtenant
                                                  field (i.e., CP16–28). Be sure you have                 must file in accordance with Rules 211                 facilities.
                                                  selected an appropriate date range. For                 and 214 of the Commission’s                              The proposed project would have a
                                                  assistance, please contact FERC Online                  Regulations (18 CFR 385.211 and                        total installed capacity of 2 kW.


                                             VerDate Sep<11>2014   21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1


                                                                                 Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices                                                      4279

                                                    A qualifying conduit hydropower                        deemed to meet all of the criteria shown
                                                  facility is one that is determined or                    in the table below.

                                                                                       TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                           Satisfies
                                                                  Statutory provision                                                               Description                                             (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA .....             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or simi-       Y
                                                                                                          lar manmade water conveyance that is operated for the distribution of water for agri-
                                                                                                          cultural, municipal, or industrial consumption and not primarily for the generation of
                                                                                                          electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA ..             The facility is constructed, operated, or maintained for the generation of electric power          Y
                                                                                                          and uses for such generation only the hydroelectric potential of a non-federally
                                                                                                          owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended by HREA               The facility has an installed capacity that does not exceed 5 megawatts ........................   Y
                                                  FPA 30(a)(3)(C)(iii), as amended by HREA              On or before August 9, 2013, the facility is not licensed, or exempted from the licensing          Y
                                                                                                          requirements of Part I of the FPA.



                                                     Preliminary Determination: The                        preliminary determination that the                       Dated: January 20, 2016.
                                                  proposed addition of the hydroelectric                   facility meets the qualifying criteria                 Nathaniel J. Davis, Sr.,
                                                  project to the Thoreson Family Ranch’s                   must set forth their evidentiary basis.                Deputy Secretary.
                                                  existing irrigation conduit will not alter                  The Commission strongly encourages                  [FR Doc. 2016–01461 Filed 1–25–16; 8:45 am]
                                                  its primary purpose of distributing
                                                                                                           electronic filing. Please file motions to              BILLING CODE 6717–01–P
                                                  water for irrigation. Thoreson Family
                                                                                                           intervene and comments using the
                                                  Ranch proposes to continue using the
                                                  conduit, as it has historically, to irrigate             Commission’s eFiling system at http://
                                                                                                           www.ferc.gov/docs-filing/efiling.asp.                  DEPARTMENT OF ENERGY
                                                  fields during July, August, and
                                                  September. Therefore, based upon the                     Commenters can submit brief comments                   Federal Energy Regulatory
                                                  above criteria, Commission staff                         up to 6,000 characters, without prior                  Commission
                                                  preliminarily determines that the                        registration, using the eComment system
                                                                                                           at http://www.ferc.gov/docs-filing/                    [Project No. 12646–014]
                                                  proposal satisfies the requirements for a
                                                  qualifying conduit hydropower facility,                  ecomment.asp. You must include your                    City of Broken Bow, Oklahoma; Notice
                                                  which is not required to be licensed or                  name and contact information at the end                of Application Accepted for Filing,
                                                  exempted from licensing.                                 of your comments. For assistance,                      Soliciting Comments, Motions To
                                                     Comments and Motions to Intervene:                    please contact FERC Online Support at                  Intervene, and Protests
                                                  Deadline for filing comments contesting                  FERCOnlineSupport@ferc.gov, (866)
                                                  whether the facility meets the qualifying                208–3676 (toll free), or (202) 502–8659                  Take notice that the following
                                                  criteria is 45 days from the issuance                    (TTY). In lieu of electronic filing, please            hydroelectric application has been filed
                                                  date of this notice.                                     send a paper copy to: Secretary, Federal               with the Commission and is available
                                                     Deadline for filing motions to                        Energy Regulatory Commission, 888                      for public inspection:
                                                  intervene is 30 days from the issuance                   First Street NE., Washington, DC 20426.                  a. Type of Proceeding: Surrender of
                                                  date of this notice.                                     A copy of all other filings in reference               License.
                                                     Anyone may submit comments or a                                                                                b. Project No.: 12646–014.
                                                                                                           to this application must be accompanied
                                                  motion to intervene in accordance with                                                                            c. Date Filed: December 21, 2015.
                                                                                                           by proof of service on all persons listed                d. Licensee: City of Broken Bow,
                                                  the requirements of Rules of Practice
                                                  and Procedure, 18 CFR 385.210 and                        in the service list prepared by the                    Oklahoma.
                                                  385.214. Any motions to intervene must                   Commission in this proceeding, in                        e. Name of Project: Pine Creek Lake
                                                  be received on or before the specified                   accordance with 18 CFR 4.34(b) and                     Dam Hydropower Project.
                                                  deadline date for the particular                         385.2010.                                                f. Location: The unconstructed project
                                                  proceeding.                                                 Locations of Notice of Intent: Copies               was licensed to be located at the U.S.
                                                     Filing and Service of Responsive                      of the notice of intent can be obtained                Army Corps of Engineers Pine Creek
                                                  Documents: All filings must (1) bear in                  directly from the applicant or such                    Lake Dam on the Little River, near the
                                                  all capital letters the ‘‘COMMENTS                       copies can be viewed and reproduced at                 town of Broken Bow, McCurtain
                                                  CONTESTING QUALIFICATION FOR A                           the Commission in its Public Reference                 County, Oklahoma.
                                                  CONDUIT HYDROPOWER FACILITY’’                            Room, Room 2A, 888 First Street NE.,                     g. Filed Pursuant to: 18 CFR 6.2.
                                                  or ‘‘MOTION TO INTERVENE,’’ as                           Washington, DC 20426. The filing may                     h. Licensee Contact: Ms. Vickie
                                                  applicable; (2) state in the heading the                 also be viewed on the Web at http://                   Pieratt, City of Broken Bow, 210 North
                                                  name of the applicant and the project                                                                           Broadway, Broken Bow, Oklahoma
                                                                                                           www.ferc.gov/docs-filing/elibrary.asp
                                                  number of the application to which the                                                                          74728, Telephone: 580–584–2285.
                                                                                                           using the ‘‘eLibrary’’ link. Enter the
                                                  filing responds; (3) state the name,                                                                              i. FERC Contact: Jennifer Polardino,
                                                                                                           docket number (i.e., CD16–5) in the
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  address, and telephone number of the                                                                            (202) 502–6437, Jennifer.Polardino@
                                                                                                           docket number field to access the                      ferc.gov.
                                                  person filing; and (4) otherwise comply
                                                  with the requirements of sections                        document. For assistance, call toll-free                  j. Deadline for filing comments,
                                                  385.2001 through 385.2005 of the                         1–866–208–3676 or email                                interventions and protests is 30 days
                                                  Commission’s regulations.1 All                           FERCOnlineSupport@ferc.gov. For TTY,                   from the issuance date of this notice.
                                                  comments contesting Commission staff’s                   call (202) 502–8659.                                   The Commission strongly encourages
                                                                                                                                                                  electronic filing. Please file motions to
                                                    1 18   CFR 385.2001–2005 (2015).                                                                              intervene, protests and comments using


                                             VerDate Sep<11>2014    21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1



Document Created: 2018-02-02 12:38:11
Document Modified: 2018-02-02 12:38:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 4278 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR