81_FR_4295 81 FR 4279 - City of Broken Bow, Oklahoma; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

81 FR 4279 - City of Broken Bow, Oklahoma; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 16 (January 26, 2016)

Page Range4279-4280
FR Document2016-01466

Federal Register, Volume 81 Issue 16 (Tuesday, January 26, 2016)
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4279-4280]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-01466]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12646-014]


City of Broken Bow, Oklahoma; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Surrender of License.
    b. Project No.: 12646-014.
    c. Date Filed: December 21, 2015.
    d. Licensee: City of Broken Bow, Oklahoma.
    e. Name of Project: Pine Creek Lake Dam Hydropower Project.
    f. Location: The unconstructed project was licensed to be located 
at the U.S. Army Corps of Engineers Pine Creek Lake Dam on the Little 
River, near the town of Broken Bow, McCurtain County, Oklahoma.
    g. Filed Pursuant to: 18 CFR 6.2.
    h. Licensee Contact: Ms. Vickie Pieratt, City of Broken Bow, 210 
North Broadway, Broken Bow, Oklahoma 74728, Telephone: 580-584-2285.
    i. FERC Contact: Jennifer Polardino, (202) 502-6437, 
[email protected].
    j. Deadline for filing comments, interventions and protests is 30 
days from the issuance date of this notice. The Commission strongly 
encourages electronic filing. Please file motions to intervene, 
protests and comments using

[[Page 4280]]

the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-12646-014.
    k. Description of Project Facilities: The unconstructed project is 
authorized to be located on the downstream side of the U.S. Army Corps 
of Engineers Pine Creek Lake Dam. The project license approved the 
following new facilities: (1) a 130-foot-wide by 23-foot-long outlet 
structure connecting to an existing 13-foot-diameter outlet conduit; 
(2) a steel liner inside the 13-foot-diameter outlet conduit; (3) a 
112-foot-wide by 73-foot-long powerhouse containing two generating 
units having a total installed capacity of 6.4 megawatts; (4) a 
tailrace returning flows to the Little River; (5) a 0.7-mile-long, 
14.4-kilovolt (kV) primary transmission; and (6) appurtenant 
facilities.
    l. Description of Proceeding: On December 21, 2015, the City of 
Broken Bow, Oklahoma filed an application to surrender the license for 
the unconstructed Pine Creek Lake Dam Hydropower Project. In its 
filing, the licensee states the project is not financially feasible or 
constructible because it is unable to enter into a power sales 
agreement to sell project energy.
    m. This filing may be viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email [email protected], for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    q. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described proceeding. If any agency does not 
file comments within the time specified for filing comments, it will be 
presumed to have no comments.

    Dated: January 20, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01466 Filed 1-25-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices                                                      4279

                                                    A qualifying conduit hydropower                        deemed to meet all of the criteria shown
                                                  facility is one that is determined or                    in the table below.

                                                                                       TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                           Satisfies
                                                                  Statutory provision                                                               Description                                             (Y/N)

                                                  FPA 30(a)(3)(A), as amended by HREA .....             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or simi-       Y
                                                                                                          lar manmade water conveyance that is operated for the distribution of water for agri-
                                                                                                          cultural, municipal, or industrial consumption and not primarily for the generation of
                                                                                                          electricity.
                                                  FPA 30(a)(3)(C)(i), as amended by HREA ..             The facility is constructed, operated, or maintained for the generation of electric power          Y
                                                                                                          and uses for such generation only the hydroelectric potential of a non-federally
                                                                                                          owned conduit.
                                                  FPA 30(a)(3)(C)(ii), as amended by HREA               The facility has an installed capacity that does not exceed 5 megawatts ........................   Y
                                                  FPA 30(a)(3)(C)(iii), as amended by HREA              On or before August 9, 2013, the facility is not licensed, or exempted from the licensing          Y
                                                                                                          requirements of Part I of the FPA.



                                                     Preliminary Determination: The                        preliminary determination that the                       Dated: January 20, 2016.
                                                  proposed addition of the hydroelectric                   facility meets the qualifying criteria                 Nathaniel J. Davis, Sr.,
                                                  project to the Thoreson Family Ranch’s                   must set forth their evidentiary basis.                Deputy Secretary.
                                                  existing irrigation conduit will not alter                  The Commission strongly encourages                  [FR Doc. 2016–01461 Filed 1–25–16; 8:45 am]
                                                  its primary purpose of distributing
                                                                                                           electronic filing. Please file motions to              BILLING CODE 6717–01–P
                                                  water for irrigation. Thoreson Family
                                                                                                           intervene and comments using the
                                                  Ranch proposes to continue using the
                                                  conduit, as it has historically, to irrigate             Commission’s eFiling system at http://
                                                                                                           www.ferc.gov/docs-filing/efiling.asp.                  DEPARTMENT OF ENERGY
                                                  fields during July, August, and
                                                  September. Therefore, based upon the                     Commenters can submit brief comments                   Federal Energy Regulatory
                                                  above criteria, Commission staff                         up to 6,000 characters, without prior                  Commission
                                                  preliminarily determines that the                        registration, using the eComment system
                                                                                                           at http://www.ferc.gov/docs-filing/                    [Project No. 12646–014]
                                                  proposal satisfies the requirements for a
                                                  qualifying conduit hydropower facility,                  ecomment.asp. You must include your                    City of Broken Bow, Oklahoma; Notice
                                                  which is not required to be licensed or                  name and contact information at the end                of Application Accepted for Filing,
                                                  exempted from licensing.                                 of your comments. For assistance,                      Soliciting Comments, Motions To
                                                     Comments and Motions to Intervene:                    please contact FERC Online Support at                  Intervene, and Protests
                                                  Deadline for filing comments contesting                  FERCOnlineSupport@ferc.gov, (866)
                                                  whether the facility meets the qualifying                208–3676 (toll free), or (202) 502–8659                  Take notice that the following
                                                  criteria is 45 days from the issuance                    (TTY). In lieu of electronic filing, please            hydroelectric application has been filed
                                                  date of this notice.                                     send a paper copy to: Secretary, Federal               with the Commission and is available
                                                     Deadline for filing motions to                        Energy Regulatory Commission, 888                      for public inspection:
                                                  intervene is 30 days from the issuance                   First Street NE., Washington, DC 20426.                  a. Type of Proceeding: Surrender of
                                                  date of this notice.                                     A copy of all other filings in reference               License.
                                                     Anyone may submit comments or a                                                                                b. Project No.: 12646–014.
                                                                                                           to this application must be accompanied
                                                  motion to intervene in accordance with                                                                            c. Date Filed: December 21, 2015.
                                                                                                           by proof of service on all persons listed                d. Licensee: City of Broken Bow,
                                                  the requirements of Rules of Practice
                                                  and Procedure, 18 CFR 385.210 and                        in the service list prepared by the                    Oklahoma.
                                                  385.214. Any motions to intervene must                   Commission in this proceeding, in                        e. Name of Project: Pine Creek Lake
                                                  be received on or before the specified                   accordance with 18 CFR 4.34(b) and                     Dam Hydropower Project.
                                                  deadline date for the particular                         385.2010.                                                f. Location: The unconstructed project
                                                  proceeding.                                                 Locations of Notice of Intent: Copies               was licensed to be located at the U.S.
                                                     Filing and Service of Responsive                      of the notice of intent can be obtained                Army Corps of Engineers Pine Creek
                                                  Documents: All filings must (1) bear in                  directly from the applicant or such                    Lake Dam on the Little River, near the
                                                  all capital letters the ‘‘COMMENTS                       copies can be viewed and reproduced at                 town of Broken Bow, McCurtain
                                                  CONTESTING QUALIFICATION FOR A                           the Commission in its Public Reference                 County, Oklahoma.
                                                  CONDUIT HYDROPOWER FACILITY’’                            Room, Room 2A, 888 First Street NE.,                     g. Filed Pursuant to: 18 CFR 6.2.
                                                  or ‘‘MOTION TO INTERVENE,’’ as                           Washington, DC 20426. The filing may                     h. Licensee Contact: Ms. Vickie
                                                  applicable; (2) state in the heading the                 also be viewed on the Web at http://                   Pieratt, City of Broken Bow, 210 North
                                                  name of the applicant and the project                                                                           Broadway, Broken Bow, Oklahoma
                                                                                                           www.ferc.gov/docs-filing/elibrary.asp
                                                  number of the application to which the                                                                          74728, Telephone: 580–584–2285.
                                                                                                           using the ‘‘eLibrary’’ link. Enter the
                                                  filing responds; (3) state the name,                                                                              i. FERC Contact: Jennifer Polardino,
                                                                                                           docket number (i.e., CD16–5) in the
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  address, and telephone number of the                                                                            (202) 502–6437, Jennifer.Polardino@
                                                                                                           docket number field to access the                      ferc.gov.
                                                  person filing; and (4) otherwise comply
                                                  with the requirements of sections                        document. For assistance, call toll-free                  j. Deadline for filing comments,
                                                  385.2001 through 385.2005 of the                         1–866–208–3676 or email                                interventions and protests is 30 days
                                                  Commission’s regulations.1 All                           FERCOnlineSupport@ferc.gov. For TTY,                   from the issuance date of this notice.
                                                  comments contesting Commission staff’s                   call (202) 502–8659.                                   The Commission strongly encourages
                                                                                                                                                                  electronic filing. Please file motions to
                                                    1 18   CFR 385.2001–2005 (2015).                                                                              intervene, protests and comments using


                                             VerDate Sep<11>2014    21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1


                                                  4280                          Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices

                                                  the Commission’s eFiling system at                      so indicate by writing to the Secretary                  Dated: January 20, 2016.
                                                  http://www.ferc.gov/docs-filing/                        of the Commission.                                     Nathaniel J. Davis, Sr.,
                                                  efiling.asp. Commenters can submit                         o. Comments, Protests, or Motions to                Deputy Secretary.
                                                  brief comments up to 6,000 characters,                  Intervene: Anyone may submit                           [FR Doc. 2016–01466 Filed 1–25–16; 8:45 am]
                                                  without prior registration, using the                   comments, a protest, or a motion to                    BILLING CODE 6717–01–P
                                                  eComment system at http://www.ferc.                     intervene in accordance with the
                                                  gov/docs-filing/ecomment.asp. You                       requirements of Rules of Practice and
                                                  must include your name and contact                      Procedure, 18 CFR 385.210, .211, .212                  DEPARTMENT OF ENERGY
                                                  information at the end of your
                                                                                                          and .214. In determining the appropriate
                                                  comments. For assistance, please                                                                               Federal Energy Regulatory
                                                                                                          action to take, the Commission will
                                                  contact FERC Online Support at                                                                                 Commission
                                                                                                          consider all protests or other comments
                                                  FERCOnlineSupport@ferc.gov, (866)
                                                                                                          filed, but only those who file a motion
                                                  208–3676 (toll free), or (202) 502–8659                                                                        [Project No. 12470–010]
                                                  (TTY). In lieu of electronic filing, please             to intervene in accordance with the
                                                  send a paper copy to: Secretary, Federal                Commission’s Rules may become a                        City of Broken Bow, Oklahoma; Notice
                                                  Energy Regulatory Commission, 888                       party to the proceeding. Any comments,                 of Application Accepted for Filing,
                                                  First Street NE., Washington, DC 20426.                 protests, or motions to intervene must                 Soliciting Comments, Motions To
                                                  The first page of any filing should                     be received on or before the specified                 Intervene, and Protests
                                                  include docket number P–12646–014.                      comment date for the particular
                                                                                                          application.                                              Take notice that the following
                                                     k. Description of Project Facilities:
                                                                                                                                                                 hydroelectric application has been filed
                                                  The unconstructed project is authorized                    p. Filing and Service of Responsive                 with the Commission and is available
                                                  to be located on the downstream side of                 Documents: Any filing must (1) bear in                 for public inspection:
                                                  the U.S. Army Corps of Engineers Pine                   all capital letters the title                             a. Type of Proceeding: Surrender of
                                                  Creek Lake Dam. The project license                     ‘‘COMMENTS’’, ‘‘PROTEST’’, or                          License.
                                                  approved the following new facilities:                  ‘‘MOTION TO INTERVENE’’ as                                b. Project No.: 12470–010.
                                                  (1) a 130-foot-wide by 23-foot-long                     applicable; (2) set forth in the heading                  c. Date Filed: December 21, 2015.
                                                  outlet structure connecting to an                       the name of the applicant and the                         d. Licensee: City of Broken Bow,
                                                  existing 13-foot-diameter outlet conduit;               project number of the application to                   Oklahoma.
                                                  (2) a steel liner inside the 13-foot-                   which the filing responds; (3) furnish
                                                  diameter outlet conduit; (3) a 112-foot-                                                                          e. Name of Project: Broken Bow Re-
                                                                                                          the name, address, and telephone                       regulation Dam Hydropower Project.
                                                  wide by 73-foot-long powerhouse                         number of the person protesting or
                                                  containing two generating units having                                                                            f. Location: The unconstructed project
                                                                                                          intervening; and (4) otherwise comply                  was licensed to be located at the U.S.
                                                  a total installed capacity of 6.4                       with the requirements of 18 CFR
                                                  megawatts; (4) a tailrace returning flows                                                                      Army Corps of Engineers Broken Bow
                                                                                                          385.2001 through 385.2005. All                         Re-regulation Dam on the Little River,
                                                  to the Little River; (5) a 0.7-mile-long,               comments, motions to intervene, or
                                                  14.4-kilovolt (kV) primary transmission;                                                                       near the town of Broken Bow,
                                                                                                          protests must set forth their evidentiary              McCurtain County, Oklahoma.
                                                  and (6) appurtenant facilities.                         basis and otherwise comply with the
                                                     l. Description of Proceeding: On                                                                               g. Filed Pursuant to: 18 CFR 6.2.
                                                                                                          requirements of 18 CFR 4.34(b). All                       h. Licensee Contact: Mr. Larry
                                                  December 21, 2015, the City of Broken                   comments, motions to intervene, or
                                                  Bow, Oklahoma filed an application to                                                                          Bachman, City of Broken Bow, 210
                                                                                                          protests should relate to project works                North Broadway, Broken Bow,
                                                  surrender the license for the                           which are the subject of the license
                                                  unconstructed Pine Creek Lake Dam                                                                              Oklahoma 74728, Telephone: 580–584–
                                                                                                          surrender. Agencies may obtain copies                  2285.
                                                  Hydropower Project. In its filing, the                  of the application directly from the
                                                  licensee states the project is not                                                                                i. FERC Contact: Jennifer Polardino,
                                                                                                          applicant. A copy of any protest or                    (202) 502–6437, Jennifer.Polardino@
                                                  financially feasible or constructible
                                                                                                          motion to intervene must be served                     ferc.gov.
                                                  because it is unable to enter into a
                                                                                                          upon each representative of the                           j. Deadline for filing comments,
                                                  power sales agreement to sell project
                                                                                                          applicant specified in the particular                  interventions and protests is 30 days
                                                  energy.
                                                     m. This filing may be viewed on the                  application. If an intervener files                    from the issuance date of this notice.
                                                  Commission’s Web site at http://www.                    comments or documents with the                         The Commission strongly encourages
                                                  ferc.gov/docs-filing/elibrary.asp. Enter                Commission relating to the merits of an                electronic filing. Please file motions to
                                                  the docket number excluding the last                    issue that may affect the responsibilities             intervene, protests and comments using
                                                  three digits in the docket number field                 of a particular resource agency, they                  the Commission’s eFiling system at
                                                  to access the document. You may also                    must also serve a copy of the document                 http://www.ferc.gov/docs-filing/
                                                  register online at http://www.ferc.gov/                 on that resource agency. A copy of all                 efiling.asp. Commenters can submit
                                                  docs-filing/esubscription.asp to be                     other filings in reference to this                     brief comments up to 6,000 characters,
                                                  notified via email of new filings and                   application must be accompanied by                     without prior registration, using the
                                                  issuances related to this or other                      proof of service on all persons listed in              eComment system at http://www.ferc.
                                                  pending projects. For assistance, call 1–               the service list prepared by the                       gov/docs-filing/ecomment.asp. You
                                                  866–208–3676 or email                                   Commission in this proceeding, in                      must include your name and contact
                                                  FERCOnlineSupport@ferc.gov, for TTY,                    accordance with 18 CFR 4.34(b) and                     information at the end of your
                                                                                                          385.2010.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  call (202) 502–8659. A copy is also                                                                            comments. For assistance, please
                                                  available for inspection and                               q. Agency Comments—Federal, state,                  contact FERC Online Support at
                                                  reproduction in the Commission’s                        and local agencies are invited to file                 FERCOnlineSupport@ferc.gov, (866)
                                                  Public Reference Room located at 888                    comments on the described proceeding.                  208–3676 (toll free), or (202) 502–8659
                                                  First Street NE., Room 2A, Washington,                  If any agency does not file comments                   (TTY). In lieu of electronic filing, please
                                                  DC 20426, or by calling (202) 502–8371.                 within the time specified for filing                   send a paper copy to: Secretary, Federal
                                                     n. Individuals desiring to be included               comments, it will be presumed to have                  Energy Regulatory Commission, 888
                                                  on the Commission’s mailing list should                 no comments.                                           First Street NE., Washington, DC 20426.


                                             VerDate Sep<11>2014   21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1



Document Created: 2018-02-02 12:38:00
Document Modified: 2018-02-02 12:38:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 4279 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR