81_FR_4297 81 FR 4281 - Palo Verde Power; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 4281 - Palo Verde Power; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 16 (January 26, 2016)

Page Range4281-4282
FR Document2016-01458

Federal Register, Volume 81 Issue 16 (Tuesday, January 26, 2016)
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4281-4282]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-01458]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14730-000]


Palo Verde Power; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On November 19, 2015, Palo Verde Power filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the Palo Verde 
Hydroelectric Project (Palo Verde Project or project) to be located on 
the Colorado River, near Blythe, Riverside County, California. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    The proposed project would be located near the existing discharge 
channel north of Palo Verde Irrigation District's Palo Verde diversion 
dam. The applicant proposes to generate power by bypassing the releases 
the irrigation district now makes through the discharge channel's gates 
into the project's new penstock. The proposed project would consist of: 
(1) a new 30-foot-long concrete and steel penstock; (2) a new 45-foot-
long, 45-foot-wide powerhouse containing a single turbine generator 
unit with an installed capacity of 29 megawatts; (3) a tailrace 
discharging powerhouse flows to the existing diversion spill area; (4) 
less than a mile of 161-kilovolt transmission line; and (5) appurtenant 
facilities. The project would have an estimated average annual energy 
generation of 161 gigawatt-hours. There are no federal lands associated 
with the project.
    Applicant Contact: Michael Blakey, Palo Verde Power, 9734 Diablo 
Vista Ave., Galt, CA 95632; phone: (209) 251-3105.
    FERC Contact: Jim Fargo; phone: (202) 502-6095.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments,

[[Page 4282]]

motions to intervene, notices of intent, and competing applications 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14730-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14730) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01458 Filed 1-25-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices                                            4281

                                                  The first page of any filing should                     comment date for the particular                        DEPARTMENT OF ENERGY
                                                  include docket number P–12470–010.                      application.
                                                     k. Description of Project Facilities:                                                                       Federal Energy Regulatory
                                                                                                             p. Filing and Service of Responsive
                                                  The unconstructed project is authorized                                                                        Commission
                                                                                                          Documents: Any filing must (1) bear in
                                                  to be located on the downstream side of                 all capital letters the title                          [Project No. 14730–000]
                                                  the U.S. Army Corps of Engineers                        ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                                  Broken Bow Re-Regulation Dam. The                                                                              Palo Verde Power; Notice of
                                                                                                          ‘‘MOTION TO INTERVENE’’ as
                                                  project license approved the following                                                                         Preliminary Permit Application
                                                                                                          applicable; (2) set forth in the heading
                                                  new facilities: (1) Three steel 93.5-foot-                                                                     Accepted for Filing and Soliciting
                                                  long penstocks inside the 10-foot-                      the name of the applicant and the
                                                                                                                                                                 Comments, Motions To Intervene, and
                                                  diameter outlet conduit; (2) trashracks;                project number of the application to                   Competing Applications
                                                  (3) a 112-foot-wide by 23-foot-long                     which the filing responds; (3) furnish
                                                  powerhouse containing three generating                  the name, address, and telephone                          On November 19, 2015, Palo Verde
                                                  units having a total installed capacity of              number of the person protesting or                     Power filed an application for a
                                                  4.0 megawatts; (4) a tailrace returning                 intervening; and (4) otherwise comply                  preliminary permit, pursuant to section
                                                  flows to the Little River; (5) a 1,891-foot-            with the requirements of 18 CFR                        4(f) of the Federal Power Act (FPA),
                                                  long, 13.5-kilovolt (kV) primary                        385.2001 through 385.2005. All                         proposing to study the feasibility of the
                                                  transmission; and (6) appurtenant                       comments, motions to intervene, or                     Palo Verde Hydroelectric Project (Palo
                                                  facilities.                                             protests must set forth their evidentiary              Verde Project or project) to be located
                                                                                                          basis and otherwise comply with the                    on the Colorado River, near Blythe,
                                                     l. Description of Proceeding: On
                                                                                                          requirements of 18 CFR 4.34(b). All                    Riverside County, California. The sole
                                                  December 21, 2015, the City of Broken
                                                                                                                                                                 purpose of a preliminary permit, if
                                                  Bow, Oklahoma filed an application to                   comments, motions to intervene, or
                                                                                                                                                                 issued, is to grant the permit holder
                                                  surrender the license for the                           protests should relate to project works
                                                                                                                                                                 priority to file a license application
                                                  unconstructed Broken Bow Re-                            which are the subject of the license                   during the permit term. A preliminary
                                                  Regulation Dam Hydropower Project. In                   surrender. Agencies may obtain copies                  permit does not authorize the permit
                                                  its filing, the licensee states the project             of the application directly from the                   holder to perform any land-disturbing
                                                  is not financially feasible or                          applicant. A copy of any protest or                    activities or otherwise enter upon lands
                                                  constructible because it is unable to                   motion to intervene must be served                     or waters owned by others without the
                                                  enter into a power sales agreement to                   upon each representative of the                        owners’ express permission.
                                                  sell project energy.                                    applicant specified in the particular                     The proposed project would be
                                                     m. This filing may be viewed on the                  application. If an intervener files                    located near the existing discharge
                                                  Commission’s Web site at http://www.                    comments or documents with the                         channel north of Palo Verde Irrigation
                                                  ferc.gov/docs-filing/elibrary.asp. Enter                Commission relating to the merits of an                District’s Palo Verde diversion dam. The
                                                  the docket number excluding the last                    issue that may affect the responsibilities             applicant proposes to generate power by
                                                  three digits in the docket number field                                                                        bypassing the releases the irrigation
                                                                                                          of a particular resource agency, they
                                                  to access the document. You may also                                                                           district now makes through the
                                                                                                          must also serve a copy of the document
                                                  register online at http://www.ferc.gov/                                                                        discharge channel’s gates into the
                                                  docs-filing/esubscription.asp to be                     on that resource agency. A copy of all
                                                                                                          other filings in reference to this                     project’s new penstock. The proposed
                                                  notified via email of new filings and                                                                          project would consist of: (1) a new 30-
                                                  issuances related to this or other                      application must be accompanied by
                                                                                                          proof of service on all persons listed in              foot-long concrete and steel penstock;
                                                  pending projects. For assistance, call 1–                                                                      (2) a new 45-foot-long, 45-foot-wide
                                                  866–208–3676 or email                                   the service list prepared by the
                                                                                                          Commission in this proceeding, in                      powerhouse containing a single turbine
                                                  FERCOnlineSupport@ferc.gov, for TTY,                                                                           generator unit with an installed capacity
                                                  call (202) 502–8659. A copy is also                     accordance with 18 CFR 4.34(b) and
                                                                                                                                                                 of 29 megawatts; (3) a tailrace
                                                  available for inspection and                            385.2010.
                                                                                                                                                                 discharging powerhouse flows to the
                                                  reproduction in the Commission’s                           q. Agency Comments—Federal, state,                  existing diversion spill area; (4) less
                                                  Public Reference Room located at 888                    and local agencies are invited to file                 than a mile of 161-kilovolt transmission
                                                  First Street NE., Room 2A, Washington,                  comments on the described proceeding.                  line; and (5) appurtenant facilities. The
                                                  DC 20426, or by calling (202) 502–8371.                 If any agency does not file comments                   project would have an estimated average
                                                     n. Individuals desiring to be included               within the time specified for filing                   annual energy generation of 161
                                                  on the Commission’s mailing list should                 comments, it will be presumed to have                  gigawatt-hours. There are no federal
                                                  so indicate by writing to the Secretary                 no comments.                                           lands associated with the project.
                                                  of the Commission.                                                                                                Applicant Contact: Michael Blakey,
                                                     o. Comments, Protests, or Motions to                   Dated: January 20, 2016.
                                                                                                                                                                 Palo Verde Power, 9734 Diablo Vista
                                                  Intervene: Anyone may submit                            Nathaniel J. Davis, Sr.,                               Ave., Galt, CA 95632; phone: (209) 251–
                                                  comments, a protest, or a motion to                     Deputy Secretary.                                      3105.
                                                  intervene in accordance with the                        [FR Doc. 2016–01467 Filed 1–25–16; 8:45 am]               FERC Contact: Jim Fargo; phone: (202)
                                                  requirements of Rules of Practice and                   BILLING CODE 6717–01–P                                 502–6095.
                                                  Procedure, 18 CFR 385.210, .211, .212                                                                             Deadline for filing comments, motions
                                                  and .214. In determining the appropriate                                                                       to intervene, competing applications
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  action to take, the Commission will                                                                            (without notices of intent), or notices of
                                                  consider all protests or other comments                                                                        intent to file competing applications: 60
                                                  filed, but only those who file a motion                                                                        days from the issuance of this notice.
                                                  to intervene in accordance with the                                                                            Competing applications and notices of
                                                  Commission’s Rules may become a                                                                                intent must meet the requirements of 18
                                                  party to the proceeding. Any comments,                                                                         CFR 4.36.
                                                  protests, or motions to intervene must                                                                            The Commission strongly encourages
                                                  be received on or before the specified                                                                         electronic filing. Please file comments,


                                             VerDate Sep<11>2014   21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1


                                                  4282                          Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices

                                                  motions to intervene, notices of intent,                   The proposed project would consist of                 Dated: January 19, 2016.
                                                  and competing applications using the                    the following: (1) a 770-foot-long, 300-               Nathaniel J. Davis, Sr.,
                                                  Commission’s eFiling system at http://                  foot-wide intake channel with a 85-foot-               Deputy Secretary.
                                                  www.ferc.gov/docs-filing/efiling.asp.                   long retaining wall; (2) a 98-foot-long,               [FR Doc. 2016–01460 Filed 1–25–16; 8:45 am]
                                                  Commenters can submit brief comments                    82-foot-wide powerhouse containing                     BILLING CODE 6717–01–P
                                                  up to 6,000 characters, without prior                   two generating units with a total
                                                  registration, using the eComment system                 capacity of 10 megawatts; (3) a 1,000-
                                                  at http://www.ferc.gov/docs-filing/                     foot-long, 220-foot-wide tailrace with a               DEPARTMENT OF ENERGY
                                                  ecomment.asp. You must include your                     40-foot-long retaining wall; (4) a 4.16/69
                                                  name and contact information at the end                 kilo-Volt (kV) substation; and (5) a 1-                Federal Energy Regulatory
                                                  of your comments. For assistance,                                                                              Commission
                                                                                                          mile-long, 69 kV transmission line. The
                                                  please contact FERC Online Support at                   proposed project would have an average
                                                  FERCOnlineSupport@ferc.gov, (866)                                                                              Combined Notice of Filings #2
                                                                                                          annual generation of 54,900 megawatt-
                                                  208–3676 (toll free), or (202) 502–8659                                                                           Take notice that the Commission
                                                                                                          hours, and operate utilizing surplus
                                                  (TTY). In lieu of electronic filing, please                                                                    received the following exempt
                                                                                                          water from the Green River Lock and
                                                  send a paper copy to: Secretary, Federal                                                                       wholesale generator filings:
                                                  Energy Regulatory Commission, 888                       Dam No. 3, as directed by the Corps.
                                                                                                             Applicant Contact: Mr. Ander                           Docket Numbers: EG16–39–000.
                                                  First Street NE., Washington, DC 20426.
                                                                                                          Gonzalez, Energy Resources USA, Inc.,                     Applicants: Bethel Wind Farm LLC.
                                                  The first page of any filing should
                                                                                                                                                                    Description: Notice of Self-
                                                  include docket number P–14730–000.                      2655 Le Jeune Road, Suite 804, Coral
                                                                                                                                                                 Certification of Exempt Wholesale
                                                     More information about this project,                 Gables, Florida 33134. (954) 248–8425.
                                                                                                                                                                 Generator Status of Bethel Wind Farm
                                                  including a copy of the application, can                   FERC Contact: Dustin Wilson,                        LLC.
                                                  be viewed or printed on the ‘‘eLibrary’’                Dustin.Wilson@ferc.gov; (202) 502–                        Filed Date: 1/20/16.
                                                  link of Commission’s Web site at http://                6528.                                                     Accession Number: 20160120–5083.
                                                  www.ferc.gov/docs-filing/elibrary.asp.                                                                            Comments Due: 5 p.m. ET 2/10/16.
                                                  Enter the docket number (P–14730) in                       Deadline for filing comments, motions
                                                                                                          to intervene, competing applications                      Docket Numbers: EG16–40–000.
                                                  the docket number field to access the
                                                                                                          (without notices of intent), or notices of                Applicants: Tenaska Pennsylvania
                                                  document. For assistance, contact FERC
                                                                                                          intent to file competing applications: 60              Partners, LLC.
                                                  Online Support.
                                                                                                          days from the issuance of this notice.                    Description: Notice of Self-
                                                    Dated: January 19, 2016.                                                                                     Certification of Exempt Wholesale
                                                                                                          Competing applications and notices of
                                                  Nathaniel J. Davis, Sr.,                                intent must meet the requirements of 18                Generator Status of Tenaska
                                                  Deputy Secretary.                                       CFR 4.36. Comments, motions to                         Pennsylvania Partners, LLC.
                                                  [FR Doc. 2016–01458 Filed 1–25–16; 8:45 am]             intervene, notices of intent, and                         Filed Date: 1/19/16.
                                                  BILLING CODE 6717–01–P                                  competing applications may be filed                       Accession Number: 20160119–5422.
                                                                                                          electronically via the Internet. See 18                   Comments Due: 5 p.m. ET 2/9/16.
                                                                                                          CFR 385.2001(a)(1)(iii) and the                           Take notice that the Commission
                                                  DEPARTMENT OF ENERGY                                    instructions on the Commission’s Web                   received the following electric rate
                                                                                                          site http://www.ferc.gov/docs-filing/                  filings:
                                                  Federal Energy Regulatory
                                                                                                          efiling.asp. Commenters can submit                        Docket Numbers: ER10–2331–052;
                                                  Commission
                                                                                                          brief comments up to 6,000 characters,                 ER14–630–027; ER10–2319–043; ER10–
                                                                                                          without prior registration, using the                  2317–043; ER13–1351–025; ER10–2330–
                                                  [Project No. 14732–000]                                                                                        050.
                                                                                                          eComment system at http://www.ferc.
                                                                                                          gov/docs-filing/ecomment.asp. You                         Applicants: J.P. Morgan Ventures
                                                  Energy Resources USA, Inc.; Notice of
                                                                                                          must include your name and contact                     Energy Corporation, AlphaGen Power
                                                  Preliminary Permit Application
                                                                                                          information at the end of your                         LLC, BE Alabama LLC, BE CA LLC,
                                                  Accepted for Filing And Soliciting
                                                                                                          comments. For assistance, please                       Florida Power Development LLC, Utility
                                                  Comments, Motions To Intervene, and
                                                                                                          contact FERC Online Support at                         Contract Funding, L.L.C.
                                                  Competing Applications
                                                                                                          FERCOnlineSupport@ferc.gov or toll                        Description: Non-Material Change in
                                                     On November 27, 2015, Energy                         free at 1–866–208–3676, or for TTY,                    Status of the J.P. Morgan Sellers.
                                                  Resources, USA, Inc. filed an                           (202) 502–8659. Although the                              Filed Date: 1/19/16.
                                                  application for a preliminary permit,                                                                             Accession Number: 20160119–5414.
                                                                                                          Commission strongly encourages
                                                  pursuant to section 4(f) of the Federal                                                                           Comments Due: 5 p.m. ET 2/9/16.
                                                                                                          electronic filing, documents may also be
                                                  Power Act (FPA), proposing to study the                 paper-filed. To paper-file, mail an                       Docket Numbers: ER12–1436–010;
                                                  feasibility of a hydropower project                     original and seven copies to: Kimberly                 ER14–152–005; ER14–153–005; ER14–
                                                  located at the U.S. Army Corps of                       D. Bose, Secretary, Federal Energy                     154–005; ER13–1793–007; ER10–3300–
                                                  Engineers’ (Corps) Green River Lock and                 Regulatory Commission, 888 First Street                010; ER13–2386–006; ER10–3099–016;
                                                  Dam No. 3, located on the Green River                   NE., Washington, DC 20426.                             ER10–2740–009; ER10–3143–017;
                                                  in Muhlenberg County, Kentucky. The                                                                            ER10–2742–008; ER12–1260–009;
                                                  sole purpose of a preliminary permit, if                   More information about this project,                ER10–2329–007.
                                                                                                          including a copy of the application, can
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  issued, is to grant the permit holder                                                                             Applicants: Eagle Point Power
                                                  priority to file a license application                  be viewed or printed on the ‘‘eLibrary’’               Generation LLC, Elgin Energy Center,
                                                  during the permit term. A preliminary                   link of Commission’s Web site at http://               LLC, Gibson City Energy Center, LLC,
                                                  permit does not authorize the permit                    www.ferc.gov/docs-filing/elibrary.asp.                 Grand Tower Energy Center, LLC, Hazle
                                                  holder to perform any land-disturbing                   Enter the docket number (P–14732–000)                  Spindle, LLC, La Paloma Generating
                                                  activities or otherwise enter upon lands                in the docket number field to access the               Company, LLC, Lakeswind Power
                                                  or waters owned by others without the                   document. For assistance, contact FERC                 Partners, LLC, RC Cape May Holdings,
                                                  owners’ express permission.                             Online Support.                                        LLC, Rocky Road Power, LLC, Sabine


                                             VerDate Sep<11>2014   21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00038   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1



Document Created: 2018-02-02 12:38:21
Document Modified: 2018-02-02 12:38:21
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 4281 