81_FR_4353 81 FR 4337 - Petitions for Modification of Application of Existing Mandatory Safety Standards

81 FR 4337 - Petitions for Modification of Application of Existing Mandatory Safety Standards

DEPARTMENT OF LABOR
Mine Safety and Health Administration

Federal Register Volume 81, Issue 16 (January 26, 2016)

Page Range4337-4338
FR Document2016-01429

Section 101(c) of the Federal Mine Safety and Health Act of 1977 and Title 30 of the Code of Federal Regulations Part 44 govern the application, processing, and disposition of petitions for modification. This notice is a summary of petitions for modification submitted to the Mine Safety and Health Administration (MSHA) by the parties listed below.

Federal Register, Volume 81 Issue 16 (Tuesday, January 26, 2016)
[Federal Register Volume 81, Number 16 (Tuesday, January 26, 2016)]
[Notices]
[Pages 4337-4338]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-01429]


-----------------------------------------------------------------------

DEPARTMENT OF LABOR

Mine Safety and Health Administration


Petitions for Modification of Application of Existing Mandatory 
Safety Standards

AGENCY: Mine Safety and Health Administration, Labor.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Section 101(c) of the Federal Mine Safety and Health Act of 
1977 and Title 30 of the Code of Federal Regulations Part 44 govern the 
application, processing, and disposition of petitions for modification. 
This notice is a summary of petitions for modification submitted to the 
Mine Safety and Health Administration (MSHA) by the parties listed 
below.

DATES: All comments on the petitions must be received by the MSHA's 
Office of Standards, Regulations, and Variances on or before February 
25, 2016.

ADDRESSES: You may submit your comments, identified by ``docket 
number'' on the subject line, by any of the following methods:
    1. Electronic Mail: [email protected]. Include the docket 
number of the petition in the subject line of the message.
    2. Facsimile: 202-693-9441.
    3. Regular Mail or Hand Delivery: MSHA, Office of Standards, 
Regulations, and Variances, 201 12th Street South, Suite 4E401, 
Arlington, Virginia 22202-5452, Attention: Sheila McConnell, Acting 
Director, Office of Standards, Regulations, and Variances. Persons 
delivering documents are required to check in at the receptionist's 
desk in Suite 4E401. Individuals may inspect copies of the petitions 
and comments during normal business hours at the address listed above.
    MSHA will consider only comments postmarked by the U.S. Postal 
Service or proof of delivery from another delivery service such as UPS 
or Federal Express on or before the deadline for comments.

FOR FURTHER INFORMATION CONTACT: Barbara Barron, Office of Standards, 
Regulations, and Variances at 202-693-9447 (Voice), 
[email protected] (Email), or 202-693-9441 (Facsimile). [These are 
not toll-free numbers.]

SUPPLEMENTARY INFORMATION:

 I. Background

    Section 101(c) of the Federal Mine Safety and Health Act of 1977 
(Mine Act) allows the mine operator or representative of miners to file 
a petition to modify the application of any mandatory safety standard 
to a coal or other mine if the Secretary of Labor determines that:
    1. An alternative method of achieving the result of such standard 
exists which will at all times guarantee no less than the same measure 
of protection afforded the miners of such mine by such standard; or
    2. That the application of such standard to such mine will result 
in a diminution of safety to the miners in such mine.
    In addition, the regulations at 30 CFR 44.10 and 44.11 establish 
the requirements and procedures for filing petitions for modification.

II. Petitions for Modification

    Docket Number: M-2015-007-M.
    Petitioner: Frontier-Kemper Constructors, Inc., 1695 Allen Road, 
Evansville, Indiana 47710-3394.
    Mine: Solvay Chemicals, Inc., P.O. Box 1167, 400 County Road 85, 
Green River, Wyoming 82935, MSHA I.D. No. 48-01295, located in 
Sweetwater County, Wyoming.
    Regulation Affected: 30 CFR 57.22606(a) and (c) (Explosive 
materials and blasting units (III mines).
    Modification Request: The petitioner requests a modification of the 
existing standard to permit the use of nonpermissible detonators to 
detonate explosives in the blast holes during work at the construction 
of the No. 4 shaft. The petitioner states that application of the 
standard introduces a safety risk to the miners and the alternative 
method outlined in the petition will at all times guarantee no less 
than the same measure of protection afforded the miners by the 
standard. The petitioner states that:
    (1) Frontier-Kemper Constructors, Inc. (FKCI), working as an 
independent contractor for Solvay Chemicals, will construct a twenty-
two foot finished diameter shaft. The shaft will be raise-drilled to 
sixteen feet, six inches in diameter and then slashed to a final 
excavated diameter ranging from twenty-four to twenty-eight feet. The 
concrete lining of the shaft will advance concurrently with the 
slashing operation to minimize the miner's exposure to open ground.
    (2) FKCI is requesting to use nonpermissible detonators during 
slashing operations because geological ground conditions in this area 
are highly conductive and interfere with permissible electric donators. 
The ground inhibits the ability to safely conduct electricity to 
detonate a blast round. Because of this, the workers and the mine are 
at a risk of misfires and partial round detonation.
    FKCI proposes to use the following blasting methods and practices 
for the excavation required during construction of Solvay Chemicals 
Shaft #4:

--Only the explosives and detonators specified in this plan or 
explosive materials MSHA approved in 30 CFR part 15 will be used.
--Before initiating a blast, all persons will be withdrawn from the 
shaft. All blasts will be initiated from the surface.
--The air will be tested immediately prior to loading of the blast 
round and continuously monitored with an instrument capable of 
providing both visual and audible alarms as required in 30 CFR 
57.22227.
--If 1.0 percent or more methane is found prior to loading blast holes 
or after loading has commenced, the loading will immediately cease and 
procedures as required in 30 CFR 57.22234 will be followed.
--A minimum air flow of 6000 cfm will be maintained in the shaft at all 
times during loading of blast holes as required in 30 CFR 57.22213.
--All regulations in the 30 CFR and safeguards in MSDS sheets will be 
adhered to.
--In the event of mine ventilation loss, the entire mine including 
Solvay Shaft #4 will be evacuated.
--Warning will be given to the employees working underground at Solvay 
Shaft #4 before a blast round is initiated.
--Non-electric tubing will be inspected for cuts, nicks and abrasions. 
The tubing must be free of defects in order to confine the detonation 
and will not be used if these defects are found.
--A visual inspection around the plug will be done prior to moving the 
work deck to ensure nothing is caught. In addition, only personnel 
responsible for loading the round will be on the bench. The round will 
be initiated with an electric cap.

    The petitioner states that:

[[Page 4338]]

    (1) Blasting for this project will utilize MS delays. FKCI's past 
experience using MS delays in similar environments has been successful. 
The Nonel MS caps and detonation cord significantly reduces the amount 
of cutoffs and misfires when blasting in a ``shaft bottom'' 
environment. FKCI has successfully used this method in areas of methane 
without incident.
    (2) Included in this petition are blast pattern drawings indicating 
MS delay times and drilling depth, manufacturer data sheets for 
blasting materials, and a ventilation plan showing the route of 
blasting smoke out of the mine.
    (3) FKCI believes that the intent of 30 CFR 57.22606(a) and (c) 
will be achieved along with the other safety concerns contained in this 
petition.
    The petitioner asserts that application of the existing standard 
will result in a diminution of safety to the miners and that the 
proposed alternative method will at all times guarantee no less than 
the same measure of protection afforded by the existing standard.

Sheila McConnell,
Acting Director, Office of Standards, Regulations, and Variances.
[FR Doc. 2016-01429 Filed 1-25-16; 8:45 am]
BILLING CODE 4520-43-P



                                                                                Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices                                            4337

                                                  Correction                                              service such as UPS or Federal Express                 excavated diameter ranging from
                                                    In the Federal Register of December                   on or before the deadline for comments.                twenty-four to twenty-eight feet. The
                                                  23, 2015, in FR Doc. 2015–32304, on                     FOR FURTHER INFORMATION CONTACT:                       concrete lining of the shaft will advance
                                                  page 79934, (80 FR 79934) in the first                  Barbara Barron, Office of Standards,                   concurrently with the slashing
                                                  column, correct the DATES caption to                    Regulations, and Variances at 202–693–                 operation to minimize the miner’s
                                                  read:                                                   9447 (Voice), barron.barbara@dol.gov                   exposure to open ground.
                                                                                                          (Email), or 202–693–9441 (Facsimile).                    (2) FKCI is requesting to use
                                                  DATES: The OMB will consider all                                                                               nonpermissible detonators during
                                                  written comments that agency receives                   [These are not toll-free numbers.]
                                                                                                          SUPPLEMENTARY INFORMATION:
                                                                                                                                                                 slashing operations because geological
                                                  on or before January 29, 2016.                                                                                 ground conditions in this area are
                                                    Dated: January 20, 2016.                              I. Background                                          highly conductive and interfere with
                                                  Michel Smyth,                                             Section 101(c) of the Federal Mine                   permissible electric donators. The
                                                  Departmental Clearance Officer.                         Safety and Health Act of 1977 (Mine                    ground inhibits the ability to safely
                                                  [FR Doc. 2016–01554 Filed 1–25–16; 8:45 am]             Act) allows the mine operator or                       conduct electricity to detonate a blast
                                                  BILLING CODE 4510–29–P                                  representative of miners to file a                     round. Because of this, the workers and
                                                                                                          petition to modify the application of any              the mine are at a risk of misfires and
                                                                                                          mandatory safety standard to a coal or                 partial round detonation.
                                                  DEPARTMENT OF LABOR                                     other mine if the Secretary of Labor                     FKCI proposes to use the following
                                                                                                          determines that:                                       blasting methods and practices for the
                                                  Mine Safety and Health Administration                     1. An alternative method of achieving                excavation required during construction
                                                                                                          the result of such standard exists which               of Solvay Chemicals Shaft #4:
                                                  Petitions for Modification of                                                                                  —Only the explosives and detonators
                                                                                                          will at all times guarantee no less than
                                                  Application of Existing Mandatory                                                                                specified in this plan or explosive
                                                                                                          the same measure of protection afforded
                                                  Safety Standards                                                                                                 materials MSHA approved in 30 CFR
                                                                                                          the miners of such mine by such
                                                  AGENCY: Mine Safety and Health                          standard; or                                             part 15 will be used.
                                                  Administration, Labor.                                    2. That the application of such                      —Before initiating a blast, all persons
                                                  ACTION: Notice.                                         standard to such mine will result in a                   will be withdrawn from the shaft. All
                                                                                                          diminution of safety to the miners in                    blasts will be initiated from the
                                                  SUMMARY:    Section 101(c) of the Federal               such mine.                                               surface.
                                                  Mine Safety and Health Act of 1977 and                    In addition, the regulations at 30 CFR               —The air will be tested immediately
                                                  Title 30 of the Code of Federal                         44.10 and 44.11 establish the                            prior to loading of the blast round and
                                                  Regulations Part 44 govern the                          requirements and procedures for filing                   continuously monitored with an
                                                  application, processing, and disposition                petitions for modification.                              instrument capable of providing both
                                                  of petitions for modification. This notice                                                                       visual and audible alarms as required
                                                  is a summary of petitions for                           II. Petitions for Modification                           in 30 CFR 57.22227.
                                                  modification submitted to the Mine                         Docket Number: M–2015–007–M.                        —If 1.0 percent or more methane is
                                                  Safety and Health Administration                           Petitioner: Frontier-Kemper                           found prior to loading blast holes or
                                                  (MSHA) by the parties listed below.                     Constructors, Inc., 1695 Allen Road,                     after loading has commenced, the
                                                  DATES: All comments on the petitions                    Evansville, Indiana 47710–3394.                          loading will immediately cease and
                                                  must be received by the MSHA’s Office                      Mine: Solvay Chemicals, Inc., P.O.                    procedures as required in 30 CFR
                                                  of Standards, Regulations, and                          Box 1167, 400 County Road 85, Green                      57.22234 will be followed.
                                                  Variances on or before February 25,                     River, Wyoming 82935, MSHA I.D. No.                    —A minimum air flow of 6000 cfm will
                                                  2016.                                                   48–01295, located in Sweetwater                          be maintained in the shaft at all times
                                                  ADDRESSES: You may submit your                          County, Wyoming.                                         during loading of blast holes as
                                                  comments, identified by ‘‘docket                           Regulation Affected: 30 CFR                           required in 30 CFR 57.22213.
                                                                                                          57.22606(a) and (c) (Explosive materials               —All regulations in the 30 CFR and
                                                  number’’ on the subject line, by any of
                                                                                                          and blasting units (III mines).                          safeguards in MSDS sheets will be
                                                  the following methods:
                                                     1. Electronic Mail: zzMSHA-                             Modification Request: The petitioner                  adhered to.
                                                  comments@dol.gov. Include the docket                    requests a modification of the existing                —In the event of mine ventilation loss,
                                                  number of the petition in the subject                   standard to permit the use of                            the entire mine including Solvay
                                                  line of the message.                                    nonpermissible detonators to detonate                    Shaft #4 will be evacuated.
                                                     2. Facsimile: 202–693–9441.                          explosives in the blast holes during                   —Warning will be given to the
                                                     3. Regular Mail or Hand Delivery:                    work at the construction of the No. 4                    employees working underground at
                                                  MSHA, Office of Standards,                              shaft. The petitioner states that                        Solvay Shaft #4 before a blast round
                                                  Regulations, and Variances, 201 12th                    application of the standard introduces a                 is initiated.
                                                  Street South, Suite 4E401, Arlington,                   safety risk to the miners and the                      —Non-electric tubing will be inspected
                                                  Virginia 22202–5452, Attention: Sheila                  alternative method outlined in the                       for cuts, nicks and abrasions. The
                                                  McConnell, Acting Director, Office of                   petition will at all times guarantee no                  tubing must be free of defects in order
                                                  Standards, Regulations, and Variances.                  less than the same measure of protection                 to confine the detonation and will not
                                                  Persons delivering documents are                        afforded the miners by the standard.                     be used if these defects are found.
                                                                                                                                                                 —A visual inspection around the plug
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  required to check in at the receptionist’s              The petitioner states that:
                                                  desk in Suite 4E401. Individuals may                       (1) Frontier-Kemper Constructors, Inc.                will be done prior to moving the work
                                                  inspect copies of the petitions and                     (FKCI), working as an independent                        deck to ensure nothing is caught. In
                                                  comments during normal business                         contractor for Solvay Chemicals, will                    addition, only personnel responsible
                                                  hours at the address listed above.                      construct a twenty-two foot finished                     for loading the round will be on the
                                                     MSHA will consider only comments                     diameter shaft. The shaft will be raise-                 bench. The round will be initiated
                                                  postmarked by the U.S. Postal Service or                drilled to sixteen feet, six inches in                   with an electric cap.
                                                  proof of delivery from another delivery                 diameter and then slashed to a final                     The petitioner states that:


                                             VerDate Sep<11>2014   21:57 Jan 25, 2016   Jkt 238001   PO 00000   Frm 00093   Fmt 4703   Sfmt 4703   E:\FR\FM\26JAN1.SGM   26JAN1


                                                  4338                                   Federal Register / Vol. 81, No. 16 / Tuesday, January 26, 2016 / Notices

                                                    (1) Blasting for this project will utilize                             LEGAL SERVICES CORPORATION                                                telephone call-in directions provided
                                                  MS delays. FKCI’s past experience using                                                                                                            below.
                                                  MS delays in similar environments has                                    Sunshine Act Meeting
                                                                                                                                                                                                     CALL-IN DIRECTIONS FOR OPEN SESSIONS:
                                                  been successful. The Nonel MS caps
                                                  and detonation cord significantly                                        DATE AND TIME:  The Legal Services                                           • Call toll-free number: 1–866–451–
                                                  reduces the amount of cutoffs and                                        Corporation’s Board of Directors and its                                  4981;
                                                  misfires when blasting in a ‘‘shaft                                      six committees will meet January 28—                                         • When prompted, enter the
                                                  bottom’’ environment. FKCI has                                           30, 2016. On Thursday, January 28, the                                    following numeric pass code:
                                                  successfully used this method in areas                                   first meeting will commence at 1:00                                       5907707348–.
                                                  of methane without incident.                                             p.m., Eastern Standard Time (EST), with                                      • When connected to the call, please
                                                                                                                           the meeting thereafter commencing                                         immediately ‘‘MUTE’’ your telephone.
                                                    (2) Included in this petition are blast                                promptly upon adjournment of the
                                                  pattern drawings indicating MS delay                                                                                                                  • Combined Audit and Finance
                                                                                                                           immediately preceding meeting. On                                         Committee you may join the meeting
                                                  times and drilling depth, manufacturer                                   Friday, January 29, the first meeting will
                                                  data sheets for blasting materials, and a                                                                                                          online at https://global.gotomeeting.
                                                                                                                           commence at 2:00 p.m., EST, with the                                      com/join/324589357 or telephonically
                                                  ventilation plan showing the route of                                    next meeting commencing promptly
                                                  blasting smoke out of the mine.                                                                                                                    by dialing 1 (571) 317–3122.
                                                                                                                           upon adjournment of the immediately
                                                    (3) FKCI believes that the intent of 30                                preceding meeting. On Saturday,                                              • Online when prompted, enter the
                                                  CFR 57.22606(a) and (c) will be                                          January 30, the first meeting will                                        following access code: 324–589–357, the
                                                  achieved along with the other safety                                     commence at 9:30 a.m., EST, it will be                                    Audio Pin will be shown after joining
                                                  concerns contained in this petition.                                     followed by the closed session meeting                                    the meeting, for both online and
                                                                                                                           of the Board of Directors which will                                      telephonically the meeting ID code:
                                                    The petitioner asserts that application                                                                                                          324–589–357.
                                                  of the existing standard will result in a                                commence promptly upon adjournment
                                                                                                                           of the prior meeting.                                                        • When connected to the call, please
                                                  diminution of safety to the miners and                                                                                                             immediately ‘‘MUTE’’ your telephone.
                                                  that the proposed alternative method                                     LOCATION: The Mills House Wyndham
                                                                                                                           Grand Hotel, 115 Meeting Street,                                          Members of the public are asked to keep
                                                  will at all times guarantee no less than                                                                                                           their telephones muted to eliminate
                                                  the same measure of protection afforded                                  Charleston, South Carolina 29401.
                                                                                                                                                                                                     background noises. To avoid disrupting
                                                  by the existing standard.                                                PUBLIC OBSERVATION: Unless otherwise
                                                                                                                                                                                                     the meeting, please refrain from placing
                                                                                                                           noted herein, the Board and all
                                                  Sheila McConnell,                                                                                                                                  the call on hold if doing so will trigger
                                                                                                                           committee meetings will be open to
                                                  Acting Director, Office of Standards,                                                                                                              recorded music or other sound. From
                                                                                                                           public observation. Members of the
                                                  Regulations, and Variances.                                                                                                                        time to time, the presiding Chair may
                                                                                                                           public who are unable to attend in
                                                  [FR Doc. 2016–01429 Filed 1–25–16; 8:45 am]                                                                                                        solicit comments from the public.
                                                                                                                           person but wish to listen to the public
                                                  BILLING CODE 4520–43–P                                                   proceedings may do so by following the                                    Meeting Schedule

                                                                                                                       Thursday, January 28, 2016                                                                                         Time *

                                                  1. Operations & Regulations Committee .................................................................................................................................                     1:00 p.m.
                                                  2. Delivery of Legal Services Committee.
                                                  Friday, January 29, 2016
                                                  1. Institutional Advancement Committee .................................................................................................................................                    2:00 p.m.
                                                  2. Communications Subcommittee of the Institutional Advancement Committee
                                                  3. Audit Committee
                                                  4. Finance Committee
                                                  5. Combined Audit and Finance Committee
                                                  6. Governance & Performance Review Committee
                                                  Saturday, January 30, 2016
                                                  1. Board of Directors ...............................................................................................................................................................       9:30 a.m.
                                                     * Please note that all times in this notice are in Eastern Standard Time.


                                                  STATUS OF MEETING:   Open, except as                                       Institutional Advancement                                                  A verbatim written transcript will be
                                                  noted below.                                                             Committee—Open, except that, upon a                                       made of the closed session of the Board,
                                                    Board of Directors—Open, except                                        vote of the Board of Directors, the                                       Institutional Advancement Committee,
                                                  that, upon a vote of the Board of                                        meeting may be closed to the public to                                    Audit Committee, and Combined Audit
                                                  Directors, a portion of the meeting may                                  consider and act on recommendation of                                     and Finance Committee meetings. The
                                                  be closed to the public to hear briefings                                new prospective donors and to receive                                     transcript of any portions of the closed
                                                                                                                           a briefing on the donor report.**                                         sessions falling within the relevant
                                                  by management and LSC’s Inspector
                                                  General, and to consider and act on the                                    Audit Committee—Open, except that                                       provisions of the Government in the
                                                  General Counsel’s report on potential                                    the meeting may be closed to the public                                   Sunshine Act, 5 U.S.C. 552b(c)(6) and
                                                  and pending litigation involving LSC,                                    to hear a briefing on the Office of                                       (10), will not be available for public
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  and on a list of prospective funders.**                                  Compliance and Enforcement’s active                                       inspection. A copy of the General
                                                                                                                           enforcement matters.**                                                    Counsel’s Certification that, in his
                                                     ** Any portion of the closed session consisting                         Combined Audit and Finance                                              opinion, the closing is authorized by
                                                  soley of briefings does not fall within the Sunshine                     Committee—Open, except that the                                           law will be available upon request.
                                                  Act’s defintion of the term ‘‘meeting’’ and, therfore,
                                                  the reqiuremeents of the Sunshine Act do not apply
                                                                                                                           meeting may be closed to the public to                                    MATTERS TO BE CONSIDERED:
                                                  to such portionof the closed session. 5 U.S.C. 552b                      hear a briefing from the Corporation’s
                                                  (a)(2) and (b). See also 45 C.F.R. § 1622.2 & 1622.3.                    Auditor.**


                                             VerDate Sep<11>2014        21:57 Jan 25, 2016         Jkt 238001      PO 00000       Frm 00094       Fmt 4703       Sfmt 4703      E:\FR\FM\26JAN1.SGM             26JAN1



Document Created: 2018-02-02 12:38:30
Document Modified: 2018-02-02 12:38:30
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice.
DatesAll comments on the petitions must be received by the MSHA's Office of Standards, Regulations, and Variances on or before February 25, 2016.
ContactBarbara Barron, Office of Standards, Regulations, and Variances at 202-693-9447 (Voice), [email protected] (Email), or 202-693-9441 (Facsimile). [These are not toll-free numbers.]
FR Citation81 FR 4337 