DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 131 (July 8, 2016)

Page Range44606-44606
FR Document2016-16167

Federal Register, Volume 81 Issue 131 (Friday, July 8, 2016)
[Federal Register Volume 81, Number 131 (Friday, July 8, 2016)]
[Notices]
[Page 44606]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-16167]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14787-000]


Black Canyon Hydro, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On June 13, 2016, the Black Canyon Hydro, LLC filed an application 
for a preliminary permit, pursuant to section 4(f) of the Federal Power 
Act (FPA), proposing to study the feasibility of the Seminoe Pumped 
Storage Project (project) to be located at the U.S. Bureau of 
Reclamation's (Reclamation) Seminoe Reservoir on the North Platte 
River, near Rawlins, Carbon County, Wyoming. The project would occupy 
lands managed by the U.S. Bureau of Reclamation and the U.S. Bureau of 
Land Management. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) Two new 
intake structures located in Reclamation's 20,291-acre Seminoe 
Reservoir; (2) two new concrete-faced, rock-fill upper reservoirs--one 
85 acres and one 63 acres--located on either side of, and about 1,000 
feet above, Seminoe Reservoir; (3) a 3,000-foot-long, 18.8-foot 
diameter, low pressure tunnel and 1,250-foot-long, 18.8-foot-diameter, 
pressure shaft leading to a 250-foot-long, 65-foot-wide, 170-foot-high 
powerhouse located 1,300 feet east of Seminoe Reservoir in an 
underground cavern with a 2,800-foot-long access tunnel and a 1,300-
foot-long, 22.6-foot wide tailrace; (5) a 1,300-foot-long, 22.6-foot-
diameter, low pressure tunnel and 1,800-foot-long, 16.1-foot-diameter 
pressure shaft leading to a 220-foot-long, 55-foot-wide, 120-foot-high 
powerhouse located 2,800 feet north-northwest of Seminoe reservoir in 
an underground cavern with a 800-foot-long access tunnel and a 2,800-
foot-long, 19.3-foot-diameter tailrace; (6) three 133.3-megawatt (MW) 
adjustable-speed, reversible pump turbines in the east powerhouse; and 
(7) three 100-MW adjustable-speed reversible pump-turbines in the west 
powerhouse. The project would also include a double-circuit, 230-
kilovolt (kV) transmission line connecting either at PacifiCorp's 
planned Aeolus Substation located northwest of Medicine Bow, Wyoming, 
or the planned northern terminal for the TransWest Express DC Line near 
Sinclair, Wyoming. If the Aeolus interconnection alternative is built, 
the line would parallel the existing Western Area Power 
Administration's (WAPA) Miracle Mile-Cheyenne-Ault 230-kV transmission 
line. If the TransWest interconnection alternative is built, the line 
would parallel or consist of a rebuild of the existing WAPA Miracle 
Mile-Sinclair, 115 kV transmission line. The estimated annual 
generation would be 1,839,600 MW-hours.
    Applicant Contact: Mr. Matthew Shapiro, Chief Executive Officer, 
Gridflex Energy, LLC, 1210 W. Franklin Street, Suite 2, Boise, ID 
83702, phone: (208) 246-9925.
    FERC Contact: Suzanne Novak; phone: (202) 502-6665.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14787-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14787) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 30, 2016.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-16167 Filed 7-7-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    44606                             Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices

                                                      Further information may be found at:                   DEPARTMENT OF ENERGY                                  planned Aeolus Substation located
                                                    http://www.nyiso.com/public/                                                                                   northwest of Medicine Bow, Wyoming,
                                                    committees/documents.jsp?com=bic_                        Federal Energy Regulatory                             or the planned northern terminal for the
                                                    espwg&directory=2016-07-26.                              Commission                                            TransWest Express DC Line near
                                                                                                             [Project No. 14787–000]                               Sinclair, Wyoming. If the Aeolus
                                                    The New York Independent System                                                                                interconnection alternative is built, the
                                                    Operator, Inc. Management Committee                      Black Canyon Hydro, LLC; Notice of                    line would parallel the existing Western
                                                    Meeting                                                  Preliminary Permit Application                        Area Power Administration’s (WAPA)
                                                    July 27, 2016, 10:00 a.m.–4:00 p.m.                      Accepted for Filing and Soliciting                    Miracle Mile-Cheyenne-Ault 230-kV
                                                    (EST)                                                    Comments, Motions To Intervene, and                   transmission line. If the TransWest
                                                                                                             Competing Applications                                interconnection alternative is built, the
                                                       The above-referenced meeting will be                                                                        line would parallel or consist of a
                                                    via web conference and teleconference.                      On June 13, 2016, the Black Canyon                 rebuild of the existing WAPA Miracle
                                                                                                             Hydro, LLC filed an application for a                 Mile-Sinclair, 115 kV transmission line.
                                                       The above-referenced meeting is open                  preliminary permit, pursuant to section               The estimated annual generation would
                                                    to stakeholders.                                         4(f) of the Federal Power Act (FPA),                  be 1,839,600 MW-hours.
                                                       Further information may be found at:                  proposing to study the feasibility of the                Applicant Contact: Mr. Matthew
                                                    http://www.nyiso.com/public/                             Seminoe Pumped Storage Project                        Shapiro, Chief Executive Officer,
                                                    committees/documents.jsp?com                             (project) to be located at the U.S. Bureau            Gridflex Energy, LLC, 1210 W. Franklin
                                                    =mc&directory=2016-07-27.                                of Reclamation’s (Reclamation) Seminoe                Street, Suite 2, Boise, ID 83702, phone:
                                                                                                             Reservoir on the North Platte River, near             (208) 246–9925.
                                                       The discussions at the meetings                       Rawlins, Carbon County, Wyoming. The
                                                    described above may address matters at                                                                            FERC Contact: Suzanne Novak;
                                                                                                             project would occupy lands managed by
                                                    issue in the following proceedings:                                                                            phone: (202) 502–6665.
                                                                                                             the U.S. Bureau of Reclamation and the
                                                                                                             U.S. Bureau of Land Management. The                      Deadline for filing comments, motions
                                                    New York Independent System                                                                                    to intervene, competing applications
                                                      Operator, Inc., Docket No. ER13–102.                   sole purpose of a preliminary permit, if
                                                                                                             issued, is to grant the permit holder                 (without notices of intent), or notices of
                                                    New York Independent System                              priority to file a license application                intent to file competing applications: 60
                                                      Operator, Inc., Docket No. ER15–                       during the permit term. A preliminary                 days from the issuance of this notice.
                                                      2059.                                                  permit does not authorize the permit                  Competing applications and notices of
                                                    New York Independent System                              holder to perform any land-disturbing                 intent must meet the requirements of 18
                                                      Operator, Inc., Docket No. ER13–                       activities or otherwise enter upon lands              CFR 4.36.
                                                      1942.                                                  or waters owned by others without the                    The Commission strongly encourages
                                                                                                             owners’ express permission.                           electronic filing. Please file comments,
                                                    New York Transco, LLC, Docket No.                           The proposed project would consist of              motions to intervene, notices of intent,
                                                      ER15–572.                                              the following: (1) Two new intake                     and competing applications using the
                                                    New York Independent System                              structures located in Reclamation’s                   Commission’s eFiling system at http://
                                                      Operator, Inc., Docket No. ER16–966.                   20,291-acre Seminoe Reservoir; (2) two                www.ferc.gov/docs-filing/efiling.asp.
                                                    New York Independent System                              new concrete-faced, rock-fill upper                   Commenters can submit brief comments
                                                      Operator, Inc., Docket No. ER16–                       reservoirs—one 85 acres and one 63                    up to 6,000 characters, without prior
                                                                                                             acres—located on either side of, and                  registration, using the eComment system
                                                      1968.
                                                                                                             about 1,000 feet above, Seminoe                       at http://www.ferc.gov/docs-filing/
                                                    Boundless Energy NE, LLC, CityGreen                      Reservoir; (3) a 3,000-foot-long, 18.8-               ecomment.asp. You must include your
                                                      Transmission, Inc., and Miller Bros. v.                foot diameter, low pressure tunnel and                name and contact information at the end
                                                      New York Independent System                            1,250-foot-long, 18.8-foot-diameter,                  of your comments. For assistance,
                                                      Operator, Inc., Docket No. EL16–84.                    pressure shaft leading to a 250-foot-long,            please contact FERC Online Support at
                                                    New York Independent System                              65-foot-wide, 170-foot-high powerhouse                FERCOnlineSupport@ferc.gov, (866)
                                                      Operator, Inc., Docket No. ER16–                       located 1,300 feet east of Seminoe                    208–3676 (toll free), or (202) 502–8659
                                                      1785.                                                  Reservoir in an underground cavern                    (TTY). In lieu of electronic filing, please
                                                                                                             with a 2,800-foot-long access tunnel and              send a paper copy to: Secretary, Federal
                                                      For more information, contact James                    a 1,300-foot-long, 22.6-foot wide                     Energy Regulatory Commission, 888
                                                    Eason, Office of Energy Market                           tailrace; (5) a 1,300-foot-long, 22.6-foot-           First Street NE., Washington, DC 20426.
                                                    Regulation, Federal Energy Regulatory                    diameter, low pressure tunnel and                     The first page of any filing should
                                                    Commission at (202) 502–8622 or                          1,800-foot-long, 16.1-foot-diameter                   include docket number P–14787–000.
                                                    James.Eason@ferc.gov.                                    pressure shaft leading to a 220-foot-long,               More information about this project,
                                                                                                             55-foot-wide, 120-foot-high powerhouse                including a copy of the application, can
                                                      Dated: June 30, 2016.
                                                                                                             located 2,800 feet north-northwest of                 be viewed or printed on the ‘‘eLibrary’’
                                                    Kimberly D. Bose,                                        Seminoe reservoir in an underground                   link of Commission’s Web site at http://
                                                    Secretary.                                               cavern with a 800-foot-long access                    www.ferc.gov/docs-filing/elibrary.asp.
                                                    [FR Doc. 2016–16163 Filed 7–7–16; 8:45 am]               tunnel and a 2,800-foot-long, 19.3-foot-              Enter the docket number (P–14787) in
                                                                                                             diameter tailrace; (6) three 133.3-
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    BILLING CODE 6717–01–P                                                                                         the docket number field to access the
                                                                                                             megawatt (MW) adjustable-speed,                       document. For assistance, contact FERC
                                                                                                             reversible pump turbines in the east                  Online Support.
                                                                                                             powerhouse; and (7) three 100-MW
                                                                                                             adjustable-speed reversible pump-                       Dated: June 30, 2016.
                                                                                                             turbines in the west powerhouse. The                  Kimberly D. Bose,
                                                                                                             project would also include a double-                  Secretary.
                                                                                                             circuit, 230-kilovolt (kV) transmission               [FR Doc. 2016–16167 Filed 7–7–16; 8:45 am]
                                                                                                             line connecting either at PacifiCorp’s                BILLING CODE 6717–01–P




                                               VerDate Sep<11>2014   17:00 Jul 07, 2016   Jkt 238001   PO 00000   Frm 00027   Fmt 4703   Sfmt 9990   E:\FR\FM\08JYN1.SGM   08JYN1



Document Created: 2016-07-08 00:18:06
Document Modified: 2016-07-08 00:18:06
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 44606 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR