81_FR_44739 81 FR 44608 - Environmental Impact Statements; Notice of Availability

81 FR 44608 - Environmental Impact Statements; Notice of Availability

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 81, Issue 131 (July 8, 2016)

Page Range44608-44608
FR Document2016-16310

Federal Register, Volume 81 Issue 131 (Friday, July 8, 2016)
[Federal Register Volume 81, Number 131 (Friday, July 8, 2016)]
[Notices]
[Page 44608]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-16310]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9027-9]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or http://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EISs)
Filed 06/27/2016 Through 07/01/2016
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: http://www.epa.gov/compliance/nepa/eisdata.html.

EIS No. 20160148, Final, USACE, NC, Figure Eight Island Shoreline 
Management Project, Review Period Ends: 08/08/2016, Contact: Mickey 
Sugg 910-251-4811.
EIS No. 20160149, Final, BIA, FL, Seminole Tribe of Florida Fee to 
Trust, Review Period Ends: 08/08/2016, Contact: Chester McGhee 615-564-
6830.
EIS No. 20160150, Final Supplement, NIGC, CA, Jamul Indian Village, 
Review Period Ends: 08/08/2016, Contact: Andrew Mendoza 202-634-0012.
EIS No. 20160151, Final, BLM, CO, Bull Mountain Unit Master Development 
Plan, Review Period Ends: 08/08/2016, Contact: Gina Jones 970-240-5300.
EIS No. 20160152, Draft, USFS, NM, Santa Fe National Forest Geothermal 
Leasing, Comment Period Ends: 08/22/2016, Contact: Larry Gore 575-289-
3264.

Amended Notices

EIS No. 20160128, Final, USACE, NC, Morehead City Harbor Integrated 
Dredged Material Management Plan, Review Period Ends: 08/11/2016, 
Contact: Jennifer Owens 910-251-4757.

    Revision to FR Notice Published 06/10/2016; Extending Review Period 
from 07/11/2016 to 08/11/2016.

    Dated: July 1, 2016.
Dawn Roberts,
Management Analyst, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2016-16310 Filed 7-7-16; 8:45 am]
 BILLING CODE 6560-50-P



                                                    44608                             Federal Register / Vol. 81, No. 131 / Friday, July 8, 2016 / Notices

                                                    planned schedule for the completion of                     The U.S. Army Corps of Engineers is                   Management Project, Review Period
                                                    the EA for the Project.                                  a cooperating agency in the preparation                 Ends: 08/08/2016, Contact: Mickey
                                                                                                             of the EA.                                              Sugg 910–251–4811.
                                                    Schedule for Environmental Review
                                                                                                                                                                   EIS No. 20160149, Final, BIA, FL,
                                                      Issuance of EA—August 23, 2016.                        Additional Information
                                                                                                                                                                     Seminole Tribe of Florida Fee to
                                                      90-day Federal Authorization                              In order to receive notification of the              Trust, Review Period Ends: 08/08/
                                                    Decision Deadline—November 21, 2016.                     issuance of the EA and to keep track of                 2016, Contact: Chester McGhee 615–
                                                      If a schedule change becomes                           all formal issuances and submittals in                  564–6830.
                                                    necessary, additional notice will be                     specific dockets, the Commission offers               EIS No. 20160150, Final Supplement,
                                                    provided so that the relevant agencies                   a free service called eSubscription. This               NIGC, CA, Jamul Indian Village,
                                                    are kept informed of the Project’s                       can reduce the amount of time you                       Review Period Ends: 08/08/2016,
                                                    progress.                                                spend researching proceedings by                        Contact: Andrew Mendoza 202–634–
                                                                                                             automatically providing you with                        0012.
                                                    Project Description                                      notification of these filings, document               EIS No. 20160151, Final, BLM, CO, Bull
                                                       Tennessee proposes to construct and                   summaries, and direct links to the                      Mountain Unit Master Development
                                                    operate pipeline facilities, modify                      documents. Go to www.ferc.gov/docs-                     Plan, Review Period Ends: 08/08/
                                                    existing aboveground facilities, and add                 filing/esubscription.asp.                               2016, Contact: Gina Jones 970–240–
                                                    new tie-in facilities in Wayne and Pike                     Additional information about the                     5300.
                                                    Counties, Pennsylvania.                                  Project is available from the                         EIS No. 20160152, Draft, USFS, NM,
                                                       The Project would consist of the                      Commission’s Office of External Affairs                 Santa Fe National Forest Geothermal
                                                    following facilities:                                    at (866) 208–FERC or on the FERC Web                    Leasing, Comment Period Ends:
                                                       • Approximately 12.9 miles of new                     site (www.ferc.gov). Using the                          08/22/2016, Contact: Larry Gore 575–
                                                    36-inch-diameter looping 1 pipeline in                   ‘‘eLibrary’’ link, select ‘‘General Search’’            289–3264.
                                                    Wayne and Pike Counties,                                 from the eLibrary menu, enter the
                                                    Pennsylvania;                                            selected date range and ‘‘Docket                      Amended Notices
                                                       • a new internal pipeline inspection                  Number’’ excluding the last three digits              EIS No. 20160128, Final, USACE, NC,
                                                    (‘‘pig’’) 2 launcher, crossover, and                     (i.e., CP16–4), and follow the                          Morehead City Harbor Integrated
                                                    connecting facilities at the beginning of                instructions. For assistance with access                Dredged Material Management Plan,
                                                    the proposed pipeline loop in Wayne                      to eLibrary, the helpline can be reached                Review Period Ends: 08/11/2016,
                                                    County;                                                  at (866) 208–3676, TTY (202) 502–8659,                  Contact: Jennifer Owens 910–251–
                                                       • a new pig receiver, crossover, and                  or at FERCOnlineSupport@ferc.gov. The                   4757.
                                                    connecting facilities at the end of the                  eLibrary link on the FERC Web site also
                                                    proposed pipeline loop in Pike County;                                                                           Revision to FR Notice Published
                                                                                                             provides access to the texts of formal                06/10/2016; Extending Review Period
                                                    and                                                      documents issued by the Commission,
                                                       • modifications at Tennessee’s                                                                              from 07/11/2016 to 08/11/2016.
                                                                                                             such as orders, notices, and rule
                                                    existing Compressor Station 323,                         makings.                                                Dated: July 1, 2016.
                                                    including rewheeling/restaging of an                                                                           Dawn Roberts,
                                                    existing compressor and other piping                       Dated: June 30, 2016.
                                                                                                                                                                   Management Analyst, NEPA Compliance
                                                    and appurtenant modifications.                           Kimberly D. Bose,                                     Division, Office of Federal Activities.
                                                                                                             Secretary.                                            [FR Doc. 2016–16310 Filed 7–7–16; 8:45 am]
                                                    Background
                                                                                                             [FR Doc. 2016–16168 Filed 7–7–16; 8:45 am]
                                                                                                                                                                   BILLING CODE 6560–50–P
                                                       On November 23, 2015, the                             BILLING CODE 6717–01–P
                                                    Commission issued a Notice of Intent to
                                                    Prepare an Environmental Assessment                                                                            ENVIRONMENTAL PROTECTION
                                                    for the Proposed Orion Project and                       ENVIRONMENTAL PROTECTION                              AGENCY
                                                    Request for Comments on                                  AGENCY
                                                    Environmental Issues (NOI). On                                                                                 [EPA–HQ–OAR–2016–0289; FRL–9948–75–
                                                    December 3, 2015, the Commission                         [ER–FRL–9027–9]                                       OAR]
                                                    issued a supplemental NOI extending
                                                                                                             Environmental Impact Statements;                      Draft Guidance on Progress Tracking
                                                    the scoping period for the Project. The
                                                                                                             Notice of Availability                                Metrics, Long-Term Strategies,
                                                    NOI and supplemental NOI were sent to
                                                                                                                                                                   Reasonable Progress Goals and Other
                                                    affected landowners; federal, state, and                   Responsible Agency: Office of Federal               Requirements for Regional Haze State
                                                    local government agencies; elected                       Activities, General Information (202)                 Implementation Plans for the Second
                                                    officials; environmental and public                      564–7146 or http://www.epa.gov/nepa.                  Implementation Period
                                                    interest groups; Native American tribes;                 Weekly receipt of Environmental Impact
                                                    other interested parties; and local                        Statements (EISs)                                   AGENCY: Environmental Protection
                                                    libraries and newspapers. In response to                 Filed 06/27/2016 Through 07/01/2016                   Agency (EPA).
                                                    the NOIs, the Commission received                        Pursuant to 40 CFR 1506.9.                            ACTION: Notice of availability and public
                                                    comments from the National Park                                                                                comment period.
                                                    Service and several individuals. The                     Notice
                                                    comments primarily concerned impacts                       Section 309(a) of the Clean Air Act                 SUMMARY:   Notice is hereby given that
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    on water resources, land use, recreation,                requires that EPA make public its                     the Environmental Protection Agency
                                                    air quality, and reliability and safety.                 comments on EISs issued by other                      (EPA) has posted on its Web site a draft
                                                                                                             Federal agencies. EPA’s comment letters               guidance document titled, ‘‘Draft
                                                      1 A pipeline loop is a segment of pipe constructed     on EISs are available at: http://                     Guidance on Progress Tracking Metrics,
                                                    parallel to an existing pipeline to increase capacity.   www.epa.gov/compliance/nepa/                          Long-Term Strategies, Reasonable
                                                      2 A ‘‘pig’’ is a tool that the pipeline company
                                                                                                             eisdata.html.                                         Progress Goals and Other Requirements
                                                    inserts into and pushes through the pipeline for
                                                    cleaning the pipeline, conducting internal               EIS No. 20160148, Final, USACE, NC,                   for Regional Haze State Implementation
                                                    inspections, or other purposes.                            Figure Eight Island Shoreline                       Plans for the Second Implementation


                                               VerDate Sep<11>2014   17:00 Jul 07, 2016   Jkt 238001   PO 00000   Frm 00029   Fmt 4703   Sfmt 4703   E:\FR\FM\08JYN1.SGM   08JYN1



Document Created: 2016-07-08 00:17:47
Document Modified: 2016-07-08 00:17:47
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 44608 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR