81_FR_46803 81 FR 46666 - Texas Eastern Transmission, LP; Notice of Schedule for Environmental Review of the Access South, Adair Southwest, and Lebanon Extension Projects

81 FR 46666 - Texas Eastern Transmission, LP; Notice of Schedule for Environmental Review of the Access South, Adair Southwest, and Lebanon Extension Projects

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 137 (July 18, 2016)

Page Range46666-46667
FR Document2016-16900

Federal Register, Volume 81 Issue 137 (Monday, July 18, 2016)
[Federal Register Volume 81, Number 137 (Monday, July 18, 2016)]
[Notices]
[Pages 46666-46667]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-16900]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP16-3-000 and CP16-3-001]


Texas Eastern Transmission, LP; Notice of Schedule for 
Environmental Review of the Access South, Adair Southwest, and Lebanon 
Extension Projects

    On October 8, 2015, Texas Eastern Transmission, LP (Texas Eastern) 
filed an application requesting a Certificate of Public Convenience and 
Necessity pursuant to Section 7(c) of the Natural Gas Act to construct, 
operate, and maintain pipeline loops, install additional compression, 
and allow for reverse flow capabilities. The proposed projects, known 
as Access South, Adair Southwest, and the Lebanon Extension Projects 
would enable Texas Eastern to transport up to an additional 622,000 
dekatherms per day of natural gas on its mainline system from 
Uniontown, Pennsylvania to points in Ohio, Kentucky, and Mississippi.
    On October 22, 2015, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the projects. 
Among

[[Page 46667]]

other things, the Notice of Application alerted agencies issuing 
federal authorizations of the requirement to complete all necessary 
reviews and to reach a final decision on a request for a federal 
authorization within 90 days of the date of issuance of the Commission 
staff's Environmental Assessment (EA) for the projects. This instant 
notice identifies the FERC staff's planned schedule for the completion 
of the EA for the projects.

Schedule for Environmental Review

    Issuance of EA--August 8, 2016
    90-day Federal Authorization Decision Deadline--November 6, 2016

    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
projects' progress.

Project Description

    The projects would include (1) construction and maintenance of 
approximately 15.8 miles of 36-inch-diameter pipeline at three 
locations in Meigs and Monroe Counties, Ohio and 0.5 mile of 16-inch-
diameter replacement pipeline within its existing right-of-way in 
Attala County, Mississippi; (2) installation of a new 16,875 horsepower 
compressor unit at an existing compressor station in Tompkinsville, 
Kentucky; and (3) modification of 12 existing compressor stations to 
allow for reverse flow capabilities in Pennsylvania, Ohio, Kentucky, 
Tennessee, Alabama, and Mississippi.

Background

    On August 11, 2015, the Commission issued a Notice of Intent to 
Prepare an Environmental Assessment for the Planned Access South, Adair 
Southwest, and the Lebanon Extension Projects and Request for Comments 
on Environmental Issues (NOI). The NOI was issued during the pre-filing 
review of the projects in Docket No. PF15-17-000 and was sent to 
affected landowners; federal, state, and local government agencies; 
elected officials; environmental and public interest groups; Native 
American tribes; other interested parties; and local libraries and 
newspapers.
    In response to the NOI, the Commission received environmental 
comments from the Ohio Department of Natural Resources, the U.S. Fish 
and Wildlife Service, the U.S. Army Corps of Engineers, a landowner, 
and combined comments from the Allegheny Defense Project, Buckeye 
Forest Council, Center for Biological Diversity, Freshwater 
Accountability Project, Heartwood, Kentucky Heartwood, and the Ohio 
Valley Environmental Coalition. The primary issues raised by the 
commentors included location of pipeline on an affected landowner's 
property; federally-listed threatened and endangered species; state-
listed endangered species; migratory birds; permitting requirements; 
minimization and avoidance of impacts on streams and wetlands; direct, 
indirect and cumulative project impacts; connected actions; forest 
fragmentation; and noise.
    On May 17, 2016, the Commission issued a Supplemental Notice of 
Intent to Prepare an Environmental Assessment for the Proposed Access 
South, Adair Southwest, and the Lebanon Extension Projects and Request 
for Comments on Environmental Issues (Supplemental NOI). The 
Supplemental NOI was sent to landowners within one half mile of the 
compressor stations who had not been included in Texas Eastern's 
original landowner list. In response to the Supplemental NOI, we 
received one comment from the U.S. Fish and Wildlife Service stating 
that it had no comments on the projects.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the ``eLibrary'' link, select 
``General Search'' from the eLibrary menu, enter the selected date 
range and ``Docket Number'' excluding the last three digits (i.e., 
CP16-3), and follow the instructions. For assistance with access to 
eLibrary, the helpline can be reached at (866) 208-3676, TTY (202) 502-
8659, or at [email protected]. The eLibrary link on the FERC 
Web site also provides access to the texts of formal documents issued 
by the Commission, such as orders, notices, and rule makings.

    Dated: July 12, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-16900 Filed 7-15-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    46666                            Federal Register / Vol. 81, No. 137 / Monday, July 18, 2016 / Notices

                                                    approximately 10 percent (or 94) of the                            requirements for applicability under the                                     burden and cost of the new standard
                                                    registered generator owners have                                   new standard. The estimated annual                                           follow.13
                                                    interconnection facilities that meet the

                                                                                  FERC–725M—CHANGES DUE TO FAC–003–4 IN DOCKET NO. RD16–4–000
                                                                                                                                                                                                                                          Total annual
                                                                                                                 Number of                                           Average burden hours
                                                      Requirements/meas-             Number of                                             Total number                                                       Total annual burden           cost per
                                                                                                               responses per                                                  and
                                                            ures 14                respondents 15                                          of responses                                                         hours and cost            respondent
                                                                                                                 respondent                                            cost per response                                                       ($)

                                                                                            (1)                         (2)                  (1)*(2)=(3)                            (4)                            (3)*(4)=(5)

                                                    Strategies, documenta-                           414                            1                       414      4 hrs.; $248.64 ............            1,656 hrs.;                            $248.64
                                                      tion, processes, &                                                                                                                                       $102,936.96
                                                      procedures (M3)                                                                                                                                          [@$62.16/hr.].
                                                      [one-time].
                                                    Record Retention                                 414                             1                     414       1 hr.; $31.76 ................          414 hrs.; $13,148.64                      31.76
                                                      (Compliance 1.2) [on-                                                                                                                                    [@$31.76/hr.].
                                                      going].

                                                         Total Net Change,         ........................    ........................   ........................   .....................................   2,070 hrs.;                 ........................
                                                           due to RD16–4.                                                                                                                                      $116,085.60 16.



                                                      Comments: Comments are invited on:                               DEPARTMENT OF ENERGY                                                         DEPARTMENT OF ENERGY
                                                    (1) Whether the collection of
                                                    information is necessary for the proper                            Federal Energy Regulatory                                                    Federal Energy Regulatory
                                                    performance of the functions of the                                Commission                                                                   Commission
                                                    Commission, including whether the
                                                                                                                                                                                                    [Docket Nos. CP16–3–000 and CP16–3–001]
                                                    information will have practical utility;                           [Project No. 12965–002]
                                                    (2) the accuracy of the agency’s                                                                                                                Texas Eastern Transmission, LP;
                                                    estimates of the burden and cost of the                            Wickiup Hydro Group, LLC; Notice of
                                                                                                                                                                                                    Notice of Schedule for Environmental
                                                    collections of information, including the                          Schedule Change                                                              Review of the Access South, Adair
                                                    validity of the methodology and                                                                                                                 Southwest, and Lebanon Extension
                                                    assumptions used; (3) ways to enhance                                 On June 27, 2016, the Commission
                                                                                                                                                                                                    Projects
                                                    the quality, utility and clarity of the                            issued a ‘‘Notice of Teleconference to
                                                    information collection; and (4) ways to                            Discuss Endangered Species Act                                                  On October 8, 2015, Texas Eastern
                                                    minimize the burden of the collection of                           Consultation’’ for the Wickiup Dam                                           Transmission, LP (Texas Eastern) filed
                                                    information on those who are to                                    Hydroelectric Project, FERC Project No.                                      an application requesting a Certificate of
                                                    respond, including the use of automated                            12965. This teleconference has been                                          Public Convenience and Necessity
                                                    collection techniques or other forms of                            rescheduled due to unforeseen                                                pursuant to Section 7(c) of the Natural
                                                                                                                       scheduling conflicts to August 1, 2016                                       Gas Act to construct, operate, and
                                                    information technology.
                                                                                                                       at 1:00 p.m. Pacific Daylight Time (4:00                                     maintain pipeline loops, install
                                                      Dated: July 11, 2016.                                                                                                                         additional compression, and allow for
                                                                                                                       p.m. Eastern Daylight Time). Please
                                                    Kimberly D. Bose,                                                  email Karen Sughrue at karen.sughrue@                                        reverse flow capabilities. The proposed
                                                    Secretary.                                                         ferc.gov to RSVP.                                                            projects, known as Access South, Adair
                                                    [FR Doc. 2016–16899 Filed 7–15–16; 8:45 am]                                                                                                     Southwest, and the Lebanon Extension
                                                                                                                         Dated: July 11, 2016.                                                      Projects would enable Texas Eastern to
                                                    BILLING CODE 6717–01–P
                                                                                                                       Kimberly D. Bose,                                                            transport up to an additional 622,000
                                                                                                                       Secretary.                                                                   dekatherms per day of natural gas on its
                                                                                                                       [FR Doc. 2016–16898 Filed 7–15–16; 8:45 am]                                  mainline system from Uniontown,
                                                                                                                       BILLING CODE 6717–01–P
                                                                                                                                                                                                    Pennsylvania to points in Ohio,
                                                                                                                                                                                                    Kentucky, and Mississippi.
                                                                                                                                                                                                       On October 22, 2015, the Federal
                                                                                                                                                                                                    Energy Regulatory Commission
                                                                                                                                                                                                    (Commission or FERC) issued its Notice
                                                                                                                                                                                                    of Application for the projects. Among
                                                      13 The estimates for cost per hour (for salary plus                14 The Order in Docket No. RD16–4 does not                                    15 We estimate a total of 414 respondents (320

                                                    benefits) are derived from the Bureau of Labor and                 modify the following requirements. However, due                              TOs and 94 GOs) are affected.
                                                    Statistics’ figures for May 2015 (at http://                       to normal fluctuations in industry, the number of                               16 This is the estimate for Year 1 (including one-
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    www.bls.gov/oes/current/naics2_22.htm#11-0000                      respondents (TOs and GOs), in the submittal to
                                                                                                                                                                                                    time implementation cost plus ongoing record
                                                    and benefits [updated March 10, 2016] at http://                   OMB will be updated as follows.
                                                                                                                                                                                                    retention costs). In subsequent years, only the
                                                    www.bls.gov/news.release/ecec.nr0.htm), as                           • The Quarterly Reporting (Compliance 1.4) is
                                                    follows:                                                           required of 102 respondents (94 GOs and 8 Regional                           record retention costs ($13,148.64, annual total for
                                                      • $62.16/hour for salary plus benefits [based on                 Entities), rather than 96 respondents.                                       all respondents) will continue.
                                                    the average for an electrical engineer (code 17–                     • The requirements for Annual Vegetation                                      For the submittal to OMB (available in
                                                    2071, at $64.20/hour), a first-line supervisor of                  Inspection Document (M6), annual vegetation work                             reginfo.gov), the one-time implementation burden
                                                    forestry workers (code 45–1011, at $33.34/hour),                   plan (M7), evidence of management of vegetation                              and cost (which will be completed in Year 1) will
                                                    and a manager (code 11–0000, at $88.94/hour)]                      (M1 and M2), confirmed vegetation condition (M4),                            be averaged over Years 1–3.
                                                      • $31.76/hour, salary plus benefits for an                       and corrective action (M5) are required of 94
                                                    information and record clerk (code 43–4000).                       respondents (rather than 88).



                                               VerDate Sep<11>2014   17:52 Jul 15, 2016    Jkt 238001         PO 00000        Frm 00027      Fmt 4703        Sfmt 4703      E:\FR\FM\18JYN1.SGM              18JYN1


                                                                                    Federal Register / Vol. 81, No. 137 / Monday, July 18, 2016 / Notices                                           46667

                                                    other things, the Notice of Application                  Kentucky Heartwood, and the Ohio                      DEPARTMENT OF ENERGY
                                                    alerted agencies issuing federal                         Valley Environmental Coalition. The
                                                    authorizations of the requirement to                     primary issues raised by the                          Federal Energy Regulatory
                                                    complete all necessary reviews and to                    commentors included location of                       Commission
                                                    reach a final decision on a request for                  pipeline on an affected landowner’s
                                                    a federal authorization within 90 days of                property; federally-listed threatened and             Notice of Staff Attendance at the
                                                    the date of issuance of the Commission                   endangered species; state-listed                      Southwest Power Pool Regional Entity
                                                    staff’s Environmental Assessment (EA)                    endangered species; migratory birds;                  Trustee, Members’ Committee and
                                                    for the projects. This instant notice                    permitting requirements; minimization                 Board of Directors’ Meetings
                                                    identifies the FERC staff’s planned                      and avoidance of impacts on streams                      The Federal Energy Regulatory
                                                    schedule for the completion of the EA                    and wetlands; direct, indirect and                    Commission (Commission) hereby gives
                                                    for the projects.                                        cumulative project impacts; connected                 notice that members of its staff may
                                                    Schedule for Environmental Review                        actions; forest fragmentation; and noise.             attend the meetings of the Southwest
                                                                                                                On May 17, 2016, the Commission                    Power Pool, Inc. Regional Entity Trustee
                                                      Issuance of EA—August 8, 2016
                                                      90-day Federal Authorization                           issued a Supplemental Notice of Intent                (RE), Members’ Committee and Board of
                                                    Decision Deadline—November 6, 2016                       to Prepare an Environmental                           Directors as noted below. Their
                                                                                                             Assessment for the Proposed Access                    attendance is part of the Commission’s
                                                      If a schedule change becomes
                                                                                                             South, Adair Southwest, and the                       ongoing outreach efforts.
                                                    necessary, additional notice will be
                                                                                                             Lebanon Extension Projects and Request                   All meetings will be held at the
                                                    provided so that the relevant agencies
                                                                                                             for Comments on Environmental Issues                  Rushmore Plaza Holiday Inn, 505 North
                                                    are kept informed of the projects’
                                                                                                             (Supplemental NOI). The Supplemental                  Fifth St., Rapid City, SD 57701. The
                                                    progress.
                                                                                                             NOI was sent to landowners within one                 hotel phone number is (605) 348–4000.
                                                    Project Description                                      half mile of the compressor stations who              All meetings are Mountain Time.
                                                       The projects would include (1)                        had not been included in Texas
                                                                                                                                                                   SPP RE
                                                    construction and maintenance of                          Eastern’s original landowner list. In
                                                                                                             response to the Supplemental NOI, we                  July 25, 2016 (7:30 a.m.–12:00 p.m.)
                                                    approximately 15.8 miles of 36-inch-
                                                    diameter pipeline at three locations in                  received one comment from the U.S.                    SPP Members/Board of Directors
                                                    Meigs and Monroe Counties, Ohio and                      Fish and Wildlife Service stating that it
                                                                                                             had no comments on the projects.                      July 25, 2016 (12:00 p.m.–5:00 p.m.)
                                                    0.5 mile of 16-inch-diameter                                                                                   July 26, 2016 (8:00 a.m.–12:00 p.m.)
                                                    replacement pipeline within its existing                 Additional Information                                   The discussions may address matters
                                                    right-of-way in Attala County,
                                                                                                                In order to receive notification of the            at issue in the following proceedings:
                                                    Mississippi; (2) installation of a new
                                                    16,875 horsepower compressor unit at                     issuance of the EA and to keep track of               Docket No. ER11–1844, Midcontinent
                                                    an existing compressor station in                        all formal issuances and submittals in                   Independent System Operator, Inc.
                                                                                                             specific dockets, the Commission offers               Docket No. EL12–60, Southwest Power
                                                    Tompkinsville, Kentucky; and (3)
                                                                                                             a free service called eSubscription. This                Pool, Inc., et al.
                                                    modification of 12 existing compressor
                                                                                                             can reduce the amount of time you                     Docket No. ER12–959, Southwest Power
                                                    stations to allow for reverse flow
                                                                                                             spend researching proceedings by                         Pool, Inc.
                                                    capabilities in Pennsylvania, Ohio,                                                                            Docket No. ER12–1179, Southwest
                                                    Kentucky, Tennessee, Alabama, and                        automatically providing you with
                                                                                                             notification of these filings, document                  Power Pool, Inc.
                                                    Mississippi.                                                                                                   Docket No. ER12–1586, Southwest
                                                                                                             summaries, and direct links to the
                                                    Background                                                                                                        Power Pool, Inc.
                                                                                                             documents. Go to www.ferc.gov/docs-
                                                                                                                                                                   Docket No. EL15–66, Southern
                                                       On August 11, 2015, the Commission                    filing/esubscription.asp.
                                                                                                                                                                      Company Services, et al. v.
                                                    issued a Notice of Intent to Prepare an                     Additional information about the                      Midcontinent Independent System
                                                    Environmental Assessment for the                         project is available from the                            Operator, Inc.
                                                    Planned Access South, Adair                              Commission’s Office of External Affairs               Docket No. EL15–77, Morgan Stanley
                                                    Southwest, and the Lebanon Extension                     at (866) 208–FERC or on the FERC Web                     Capital Group Inc. v. Midcontinent
                                                    Projects and Request for Comments on                     site (www.ferc.gov). Using the                           Independent System Operator, Inc.
                                                    Environmental Issues (NOI). The NOI                      ‘‘eLibrary’’ link, select ‘‘General Search’’          Docket No. ER14–1183, Southwestern
                                                    was issued during the pre-filing review                  from the eLibrary menu, enter the                        Electric Power Company
                                                    of the projects in Docket No. PF15–17–                   selected date range and ‘‘Docket                      Docket No. ER14–2445, Midcontinent
                                                    000 and was sent to affected                             Number’’ excluding the last three digits                 Independent System Operator, Inc.
                                                    landowners; federal, state, and local                    (i.e., CP16–3), and follow the                        Docket No. ER14–2850, Southwest
                                                    government agencies; elected officials;                  instructions. For assistance with access                 Power Pool, Inc.
                                                    environmental and public interest                        to eLibrary, the helpline can be reached              Docket No. ER15–1499, Southwest
                                                    groups; Native American tribes; other                    at (866) 208–3676, TTY (202) 502–8659,                   Power Pool, Inc.
                                                    interested parties; and local libraries                  or at FERCOnlineSupport@ferc.gov. The                 Docket No. ER15–1775, Southwest
                                                    and newspapers.                                          eLibrary link on the FERC Web site also                  Power Pool, Inc.
                                                       In response to the NOI, the                           provides access to the texts of formal                Docket No. ER15–1777, Southwest
                                                    Commission received environmental
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                             documents issued by the Commission,                      Power Pool, Inc.
                                                    comments from the Ohio Department of                     such as orders, notices, and rule                     Docket No. ER15–1943, Southwest
                                                    Natural Resources, the U.S. Fish and                     makings.                                                 Power Pool, Inc.
                                                    Wildlife Service, the U.S. Army Corps of                                                                       Docket No. ER15–1976, Southwest
                                                    Engineers, a landowner, and combined                       Dated: July 12, 2016.
                                                                                                                                                                      Power Pool, Inc.
                                                    comments from the Allegheny Defense                      Kimberly D. Bose,                                     Docket No. ER15–2028, Southwest
                                                    Project, Buckeye Forest Council, Center                  Secretary.                                               Power Pool, Inc.
                                                    for Biological Diversity, Freshwater                     [FR Doc. 2016–16900 Filed 7–15–16; 8:45 am]           Docket No. ER15–2069, Northwestern
                                                    Accountability Project, Heartwood,                       BILLING CODE 6717–01–P                                   Corporation


                                               VerDate Sep<11>2014   17:52 Jul 15, 2016   Jkt 238001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\18JYN1.SGM   18JYN1



Document Created: 2016-07-16 02:28:29
Document Modified: 2016-07-16 02:28:29
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 46666 