81_FR_51344 81 FR 51195 - Pine Creek Mine, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

81 FR 51195 - Pine Creek Mine, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 149 (August 3, 2016)

Page Range51195-51196
FR Document2016-18362

Federal Register, Volume 81 Issue 149 (Wednesday, August 3, 2016)
[Federal Register Volume 81, Number 149 (Wednesday, August 3, 2016)]
[Notices]
[Pages 51195-51196]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-18362]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. P-12532-006]


Pine Creek Mine, LLC; Notice of Application Accepted for Filing, 
Soliciting Motions To Intervene and Protests, Ready for Environmental 
Analysis, and Soliciting Comments, Recommendations, Terms and 
Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor License.
    b. Project No.: 12532-006.
    c. Date filed: February 12, 2016.
    d. Applicant: Pine Creek Mine, LLC.
    e. Name of Project: Pine Creek Mine Tunnel Hydroelectric Project.
    f. Location: The project is located at Pine Creek Mine adjacent to 
Morgan and Pine Creeks in Inyo County, California. The project's mine 
access tunnel, mine plug, mine water storage cavity, penstock, 
generator, and most of its primary transmission line would be located 
under approximately 60 acres of federal land managed by the United 
States Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Craig Rossell, 228 West Bonita Avenue, 
Claremont, California 91711, (909) 482-1000.
    i. FERC Contact: Joseph Hassell, (202) 502-8079 or 
[email protected].
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments, recommendations, terms and conditions, and prescriptions 
using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-12532-006.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is now ready for 
environmental analysis.
    l. The proposed Pine Creek Tunnel Hydroelectric Project would 
utilize the groundwater discharge of Pine Creek Mine and consist of: 
(1) The existing Pine Creek Mine site, mine entrance tunnels, mine 
shafts, and concrete plug; (2) an existing 30-foot-long steel pipe that 
runs through the concrete plug, to be used as a proposed penstock; (3) 
a proposed Pelton turbine generating unit located in the mine tunnel 
with a total installed capacity of 1.5 megawatts; (4) a proposed 
underground power line that would run approximately 2,500 feet from the 
generating unit to the mine portal; and (5) another proposed 60-foot-
long transmission line from the mine portal to an existing substation 
on the mine site. The proposed project would have an average annual 
generation of 5.6 gigawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed on the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b), and 385.2010.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary      September 2016.
 terms and conditions, and preliminary
 fishway prescriptions.
Commission issues Draft EA or EIS.........  March 2017.
Comments on Draft EA or EIS...............  April 2017.
Modified Terms and Conditions.............  June 2017.
Commission Issues Final EA or EIS.........  September 2017.
------------------------------------------------------------------------

    p. A license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including

[[Page 51196]]

proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.
    q. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.

    Dated: July 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18362 Filed 8-2-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 81, No. 149 / Wednesday, August 3, 2016 / Notices                                                51195

                                                    and (4) ways to minimize the burden of                  at http://www.ferc.gov/docs-filing/                      n. Anyone may submit comments, a
                                                    the collection of information on those                  ecomment.asp. You must include your                   protest, or a motion to intervene in
                                                    who are to respond, including the use                   name and contact information at the end               accordance with the requirements of
                                                    of automated collection techniques or                   of your comments. For assistance,                     Rules of Practice and Procedure, 18 CFR
                                                    other forms of information technology.                  please contact FERC Online Support at                 385.210, .211, and .214. In determining
                                                                                                            FERCOnlineSupport@ferc.gov, (866)                     the appropriate action to take, the
                                                    Nathaniel J. Davis, Sr.,
                                                                                                            208–3676 (toll free), or (202) 502–8659               Commission will consider all protests or
                                                    Deputy Secretary.                                       (TTY). In lieu of electronic filing, please           other comments filed, but only those
                                                    [FR Doc. R1–2016–17896 Filed 8–2–16; 8:45 am]           send a paper copy to: Secretary, Federal              who file a motion to intervene in
                                                    BILLING CODE 1505–01–D                                  Energy Regulatory Commission, 888                     accordance with the Commission’s
                                                                                                            First Street NE., Washington, DC 20426.               Rules may become a party to the
                                                                                                            The first page of any filing should                   proceeding. Any comments, protests, or
                                                    DEPARTMENT OF ENERGY                                    include docket number P–12532–006.                    motions to intervene must be received
                                                    Federal Energy Regulatory                                  The Commission’s Rules of Practice                 on or before the specified comment date
                                                    Commission                                              require all intervenors filing documents              for the particular application.
                                                                                                            with the Commission to serve a copy of                   All filings must (1) bear in all capital
                                                    [Project No. P–12532–006]                               that document on each person on the                   letters the title ‘‘PROTEST,’’ ‘‘MOTION
                                                                                                            official service list for the project.                TO INTERVENE,’’ ‘‘COMMENTS,’’
                                                    Pine Creek Mine, LLC; Notice of                         Further, if an intervenor files comments              ‘‘REPLY COMMENTS,’’
                                                    Application Accepted for Filing,                        or documents with the Commission                      ‘‘RECOMMENDATIONS,’’
                                                    Soliciting Motions To Intervene and                     relating to the merits of an issue that               ‘‘PRELIMINARY TERMS AND
                                                    Protests, Ready for Environmental                       may affect the responsibilities of a                  CONDITIONS,’’ or ‘‘PRELIMINARY
                                                    Analysis, and Soliciting Comments,                      particular resource agency, they must                 FISHWAY PRESCRIPTIONS;’’ (2) set
                                                    Recommendations, Terms and                              also serve a copy of the document on                  forth in the heading the name of the
                                                    Conditions, and Prescriptions                           that resource agency.                                 applicant and the project number of the
                                                      Take notice that the following                           k. This application has been accepted              application to which the filing
                                                    hydroelectric application has been filed                and is now ready for environmental                    responds; (3) furnish the name, address,
                                                    with the Commission and is available                    analysis.                                             and telephone number of the person
                                                    for public inspection.                                     l. The proposed Pine Creek Tunnel                  submitting the filing; and (4) otherwise
                                                      a. Type of Application: Minor                         Hydroelectric Project would utilize the               comply with the requirements of 18 CFR
                                                    License.                                                groundwater discharge of Pine Creek                   385.2001 through 385.2005. All
                                                      b. Project No.: 12532–006.                            Mine and consist of: (1) The existing                 comments, recommendations, terms and
                                                      c. Date filed: February 12, 2016.                     Pine Creek Mine site, mine entrance                   conditions or prescriptions must set
                                                      d. Applicant: Pine Creek Mine, LLC.                   tunnels, mine shafts, and concrete plug;              forth their evidentiary basis and
                                                      e. Name of Project: Pine Creek Mine                   (2) an existing 30-foot-long steel pipe               otherwise comply with the requirements
                                                    Tunnel Hydroelectric Project.                           that runs through the concrete plug, to               of 18 CFR 4.34(b). Agencies may obtain
                                                      f. Location: The project is located at                be used as a proposed penstock; (3) a                 copies of the application directly from
                                                    Pine Creek Mine adjacent to Morgan and                  proposed Pelton turbine generating unit               the applicant. A copy of all other filings
                                                    Pine Creeks in Inyo County, California.                 located in the mine tunnel with a total               in reference to this application must be
                                                    The project’s mine access tunnel, mine                  installed capacity of 1.5 megawatts; (4)              accompanied by proof of service on all
                                                    plug, mine water storage cavity,                        a proposed underground power line that                persons listed on the service list
                                                    penstock, generator, and most of its                    would run approximately 2,500 feet                    prepared by the Commission in this
                                                    primary transmission line would be                      from the generating unit to the mine                  proceeding, in accordance with 18 CFR
                                                    located under approximately 60 acres of                 portal; and (5) another proposed 60-foot-             4.34(b), and 385.2010.
                                                    federal land managed by the United                      long transmission line from the mine                     o. Procedural Schedule: The
                                                    States Forest Service.                                  portal to an existing substation on the               application will be processed according
                                                      g. Filed Pursuant to: Federal Power                   mine site. The proposed project would                 to the following revised Hydro
                                                    Act 16 U.S.C. 791(a)–825(r).                            have an average annual generation of 5.6              Licensing Schedule. Revisions to the
                                                      h. Applicant Contact: Craig Rossell,                  gigawatt-hours.                                       schedule may be made as appropriate.
                                                    228 West Bonita Avenue, Claremont,                         m. A copy of the application is
                                                                                                                                                                             Milestone             Target date
                                                    California 91711, (909) 482–1000.                       available for review at the Commission
                                                      i. FERC Contact: Joseph Hassell, (202)                in the Public Reference Room or may be                Filing of recommendations,      September
                                                    502–8079 or joseph.hassell@ferc.gov.                    viewed on the Commission’s Web site at                   preliminary terms and con-     2016.
                                                       j. Deadline for filing comments,                     http://www.ferc.gov using the                            ditions, and preliminary
                                                    recommendations, terms and                              ‘‘eLibrary’’ link. Enter the docket                      fishway prescriptions.
                                                    conditions, and prescriptions: 60 days                  number excluding the last three digits in             Commission issues Draft EA      March 2017.
                                                    from the issuance date of this notice;                  the docket number field to access the                    or EIS.
                                                    reply comments are due 105 days from                    document. For assistance, contact FERC                Comments on Draft EA or         April 2017.
                                                                                                                                                                     EIS.
                                                    the issuance date of this notice.                       Online Support. A copy is also available              Modified Terms and Condi-       June 2017.
                                                       The Commission strongly encourages                   for inspection and reproduction at the
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                     tions.
                                                    electronic filing. Please file comments,                address in item h above.                              Commission Issues Final EA      September
                                                    recommendations, terms and                                 Register online at http://                            or EIS.                        2017.
                                                    conditions, and prescriptions using the                 www.ferc.gov/docs-filing/
                                                    Commission’s eFiling system at http://                  esubscription.asp to be notified via                     p. A license applicant must file no
                                                    www.ferc.gov/docs-filing/efiling.asp.                   email of new filings and issuances                    later than 60 days following the date of
                                                    Commenters can submit brief comments                    related to this or other pending projects.            issuance of this notice: (1) A copy of the
                                                    up to 6,000 characters, without prior                   For assistance, contact FERC Online                   water quality certification; (2) a copy of
                                                    registration, using the eComment system                 Support.                                              the request for certification, including


                                               VerDate Sep<11>2014   18:21 Aug 02, 2016   Jkt 238001   PO 00000   Frm 00022   Fmt 4703   Sfmt 4703   E:\FR\FM\03AUN1.SGM   03AUN1


                                                    51196                      Federal Register / Vol. 81, No. 149 / Wednesday, August 3, 2016 / Notices

                                                    proof of the date on which the certifying               informed the Commission that the                      of 2013 (HREA). The proposed
                                                    agency received the request; or (3)                     exemption from licensing for the                      Barkhamsted Transmission Hydro No. 1
                                                    evidence of waiver of water quality                     Hanover Pond Dam Hydroelectric                        Project would have an installed capacity
                                                    certification.                                          Project No. 14550, originally issued May              of 250 kilowatts (kW) and would be
                                                       q. Any qualified applicant desiring to               19, 2016 1 has been transferred to                    located at a 48-inch-diameter gravity
                                                    file a competing application must                       Hanover Pond Hydro, LLC. The project                  pressure raw water supply pipe. The
                                                    submit to the Commission, on or before                  is located on the Quinnipiac River in                 project would be located near the City
                                                    the specified intervention deadline date,               New Haven County, Connecticut. The                    of New Hartford in Lichfield County,
                                                    a competing development application,                    transfer of an exemption does not                     Connecticut.
                                                    or a notice of intent to file such an                   require Commission approval.
                                                    application. Submission of a timely                        2. Hanover Pond Hydro, LLC is now                    Applicant Contact: Scott Jellison,
                                                    notice of intent allows an interested                   the exemptee of the Hanover Pond Dam                  Metropolitan District, 555 Main Street,
                                                    person to file the competing                            Hydroelectric Project, No. 14550. All                 Hartford, CT 06142, Phone No. (860)
                                                    development application no later than                   correspondence should be forwarded to:                278–7850, Ext 3522.
                                                    120 days after the specified intervention               Mr. Michael C. Kerr, CEO, Hanover                       FERC Contact: Robert Bell, Phone No.
                                                    deadline date. Applications for                         Pond Hydro, LLC, 100 Cummings                         (202) 502–6062, email: robert.bell@
                                                    preliminary permits will not be                         Center Drive, Suite 428N, Beverly, MA                 ferc.gov.
                                                    accepted in response to this notice.                    01915.
                                                       A notice of intent must specify the                                                                          Qualifying Conduit Hydropower
                                                    exact name, business address, and                         Dated: July 28, 2016.                               Facility Description: The proposed
                                                    telephone number of the prospective                     Kimberly D. Bose,                                     project would consist of: (1) A proposed
                                                    applicant, and must include an                          Secretary.                                            250-kW turbine replacing the existing
                                                    unequivocal statement of intent to                      [FR Doc. 2016–18359 Filed 8–2–16; 8:45 am]            booster pump (which is unused) in the
                                                    submit a development application. A                     BILLING CODE 6717–01–P                                Puddletown booster pump station and
                                                    notice of intent must be served on the                                                                        (2) appurtenant facilities. The proposed
                                                    applicant(s) named in this public notice.                                                                     project would have an estimated annual
                                                      Dated: July 28, 2016.                                 DEPARTMENT OF ENERGY                                  generating capacity of 1,475 megawatt-
                                                    Kimberly D. Bose,                                                                                             hours.
                                                                                                            Federal Energy Regulatory
                                                    Secretary.                                              Commission                                              A qualifying conduit hydropower
                                                    [FR Doc. 2016–18362 Filed 8–2–16; 8:45 am]                                                                    facility is one that is determined or
                                                    BILLING CODE 6717–01–P                                  [Docket No. CD16–16–000]                              deemed to meet all of the criteria shown
                                                                                                                                                                  in the table below.
                                                                                                            Metropolitan District; Notice of
                                                    DEPARTMENT OF ENERGY                                    Preliminary Determination of a
                                                                                                            Qualifying Conduit Hydropower
                                                    Federal Energy Regulatory                               Facility and Soliciting Comments and
                                                    Commission                                              Motions To Intervene
                                                    [Project No. 14550–001]                                   On July 22, 2016, the Metropolitan
                                                                                                            District filed a notice of intent to
                                                    New England Hydropower Company,
                                                                                                            construct a qualifying conduit
                                                    LLC, Hanover Pond Hydro, LLC; Notice
                                                                                                            hydropower facility, pursuant to section
                                                    of Transfer of Exemption
                                                                                                            30 of the Federal Power Act (FPA), as
                                                      1. By letter filed July 20, 2016, New                 amended by section 4 of the
                                                    England Hydropower Company, LLC                         Hydropower Regulatory Efficiency Act

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                    Satisfies
                                                                Statutory provision                                                            Description                                           (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ..             The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade            Y
                                                                                                         water conveyance that is operated for the distribution of water for agricultural,
                                                                                                         municipal, or industrial consumption and not primarily for the generation of elec-
                                                                                                         tricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                         power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                         erally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                      HREA.
                                                    FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                      HREA.                                             censing requirements of Part I of the FPA.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                      Preliminary Determination: Based                      the proposal satisfies the requirements               exempted from the licensing
                                                    upon the above criteria, Commission                     for a qualifying conduit hydropower                   requirements of the FPA.
                                                    staff has preliminarily determined that                 facility under 16 U.S.C. 823a, and is


                                                     1 Order Granting Exemption From Licensing (10

                                                    MW or Less), 155 FERC ¶ 62,132 (2016).


                                               VerDate Sep<11>2014   18:21 Aug 02, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\03AUN1.SGM   03AUN1



Document Created: 2016-08-02 23:44:00
Document Modified: 2016-08-02 23:44:00
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 51195 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR