81_FR_51345 81 FR 51196 - Metropolitan District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 51196 - Metropolitan District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 149 (August 3, 2016)

Page Range51196-51197
FR Document2016-18361

Federal Register, Volume 81 Issue 149 (Wednesday, August 3, 2016)
[Federal Register Volume 81, Number 149 (Wednesday, August 3, 2016)]
[Notices]
[Pages 51196-51197]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-18361]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD16-16-000]


Metropolitan District; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On July 22, 2016, the Metropolitan District filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed Barkhamsted Transmission Hydro No. 1 Project would have an 
installed capacity of 250 kilowatts (kW) and would be located at a 48-
inch-diameter gravity pressure raw water supply pipe. The project would 
be located near the City of New Hartford in Lichfield County, 
Connecticut.
    Applicant Contact: Scott Jellison, Metropolitan District, 555 Main 
Street, Hartford, CT 06142, Phone No. (860) 278-7850, Ext 3522.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed 250-kW turbine replacing the 
existing booster pump (which is unused) in the Puddletown booster pump 
station and (2) appurtenant facilities. The proposed project would have 
an estimated annual generating capacity of 1,475 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit is a                     Y
 HREA.                            tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.

[[Page 51197]]

    Comments and Motions to Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at http://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD16-16-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email [email protected]. For TTY, 
call (202) 502-8659.

    Dated: July 28, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-18361 Filed 8-2-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                    51196                      Federal Register / Vol. 81, No. 149 / Wednesday, August 3, 2016 / Notices

                                                    proof of the date on which the certifying               informed the Commission that the                      of 2013 (HREA). The proposed
                                                    agency received the request; or (3)                     exemption from licensing for the                      Barkhamsted Transmission Hydro No. 1
                                                    evidence of waiver of water quality                     Hanover Pond Dam Hydroelectric                        Project would have an installed capacity
                                                    certification.                                          Project No. 14550, originally issued May              of 250 kilowatts (kW) and would be
                                                       q. Any qualified applicant desiring to               19, 2016 1 has been transferred to                    located at a 48-inch-diameter gravity
                                                    file a competing application must                       Hanover Pond Hydro, LLC. The project                  pressure raw water supply pipe. The
                                                    submit to the Commission, on or before                  is located on the Quinnipiac River in                 project would be located near the City
                                                    the specified intervention deadline date,               New Haven County, Connecticut. The                    of New Hartford in Lichfield County,
                                                    a competing development application,                    transfer of an exemption does not                     Connecticut.
                                                    or a notice of intent to file such an                   require Commission approval.
                                                    application. Submission of a timely                        2. Hanover Pond Hydro, LLC is now                    Applicant Contact: Scott Jellison,
                                                    notice of intent allows an interested                   the exemptee of the Hanover Pond Dam                  Metropolitan District, 555 Main Street,
                                                    person to file the competing                            Hydroelectric Project, No. 14550. All                 Hartford, CT 06142, Phone No. (860)
                                                    development application no later than                   correspondence should be forwarded to:                278–7850, Ext 3522.
                                                    120 days after the specified intervention               Mr. Michael C. Kerr, CEO, Hanover                       FERC Contact: Robert Bell, Phone No.
                                                    deadline date. Applications for                         Pond Hydro, LLC, 100 Cummings                         (202) 502–6062, email: robert.bell@
                                                    preliminary permits will not be                         Center Drive, Suite 428N, Beverly, MA                 ferc.gov.
                                                    accepted in response to this notice.                    01915.
                                                       A notice of intent must specify the                                                                          Qualifying Conduit Hydropower
                                                    exact name, business address, and                         Dated: July 28, 2016.                               Facility Description: The proposed
                                                    telephone number of the prospective                     Kimberly D. Bose,                                     project would consist of: (1) A proposed
                                                    applicant, and must include an                          Secretary.                                            250-kW turbine replacing the existing
                                                    unequivocal statement of intent to                      [FR Doc. 2016–18359 Filed 8–2–16; 8:45 am]            booster pump (which is unused) in the
                                                    submit a development application. A                     BILLING CODE 6717–01–P                                Puddletown booster pump station and
                                                    notice of intent must be served on the                                                                        (2) appurtenant facilities. The proposed
                                                    applicant(s) named in this public notice.                                                                     project would have an estimated annual
                                                      Dated: July 28, 2016.                                 DEPARTMENT OF ENERGY                                  generating capacity of 1,475 megawatt-
                                                    Kimberly D. Bose,                                                                                             hours.
                                                                                                            Federal Energy Regulatory
                                                    Secretary.                                              Commission                                              A qualifying conduit hydropower
                                                    [FR Doc. 2016–18362 Filed 8–2–16; 8:45 am]                                                                    facility is one that is determined or
                                                    BILLING CODE 6717–01–P                                  [Docket No. CD16–16–000]                              deemed to meet all of the criteria shown
                                                                                                                                                                  in the table below.
                                                                                                            Metropolitan District; Notice of
                                                    DEPARTMENT OF ENERGY                                    Preliminary Determination of a
                                                                                                            Qualifying Conduit Hydropower
                                                    Federal Energy Regulatory                               Facility and Soliciting Comments and
                                                    Commission                                              Motions To Intervene
                                                    [Project No. 14550–001]                                   On July 22, 2016, the Metropolitan
                                                                                                            District filed a notice of intent to
                                                    New England Hydropower Company,
                                                                                                            construct a qualifying conduit
                                                    LLC, Hanover Pond Hydro, LLC; Notice
                                                                                                            hydropower facility, pursuant to section
                                                    of Transfer of Exemption
                                                                                                            30 of the Federal Power Act (FPA), as
                                                      1. By letter filed July 20, 2016, New                 amended by section 4 of the
                                                    England Hydropower Company, LLC                         Hydropower Regulatory Efficiency Act

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                    Satisfies
                                                                Statutory provision                                                            Description                                           (Y/N)

                                                    FPA 30(a)(3)(A), as amended by HREA ..             The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade            Y
                                                                                                         water conveyance that is operated for the distribution of water for agricultural,
                                                                                                         municipal, or industrial consumption and not primarily for the generation of elec-
                                                                                                         tricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                         power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                         erally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                      HREA.
                                                    FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                      HREA.                                             censing requirements of Part I of the FPA.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                      Preliminary Determination: Based                      the proposal satisfies the requirements               exempted from the licensing
                                                    upon the above criteria, Commission                     for a qualifying conduit hydropower                   requirements of the FPA.
                                                    staff has preliminarily determined that                 facility under 16 U.S.C. 823a, and is


                                                     1 Order Granting Exemption From Licensing (10

                                                    MW or Less), 155 FERC ¶ 62,132 (2016).


                                               VerDate Sep<11>2014   18:21 Aug 02, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\03AUN1.SGM   03AUN1


                                                                                Federal Register / Vol. 81, No. 149 / Wednesday, August 3, 2016 / Notices                                                   51197

                                                       Comments and Motions to Intervene:                    208–3676 (toll free), or (202) 502–8659                to construct a qualifying conduit
                                                    The deadline for filing comments                         (TTY). In lieu of electronic filing, please            hydropower facility, pursuant to section
                                                    contesting whether the facility meets the                send a paper copy to: Secretary, Federal               30 of the Federal Power Act (FPA), as
                                                    qualifying criteria is 45 days from the                  Energy Regulatory Commission, 888                      amended by section 4 of the
                                                    issuance date of this notice.                            First Street NE., Washington, DC 20426.                Hydropower Regulatory Efficiency Act
                                                       The deadline for filing motions to                    A copy of all other filings in reference               of 2013 (HREA). The proposed Drop 8
                                                    intervene is 30 days from the issuance                   to this application must be accompanied                Facility would have an installed
                                                    date of this notice.                                     by proof of service on all persons listed              capacity of 40 kilowatts (kW), and
                                                       Anyone may submit comments or a                       in the service list prepared by the
                                                    motion to intervene in accordance with                                                                          would be located at the existing Drop 8
                                                                                                             Commission in this proceeding, in
                                                    the requirements of Rules of Practice                                                                           check structure of Elephant Butte
                                                                                                             accordance with 18 CFR 4.34(b) and
                                                    and Procedure, 18 CFR 385.210 and                                                                               Irrigation District’s Westside Irrigation
                                                                                                             385.2010.
                                                    385.214. Any motions to intervene must                     Locations of Notice of Intent: Copies                Canal. The project would be located
                                                    be received on or before the specified                   of the notice of intent can be obtained                near La Mesa in Doña Ana County, New
                                                    deadline date for the particular                         directly from the applicant or such                    Mexico.
                                                    proceeding.                                              copies can be viewed and reproduced at                    Applicant Contact: Gary L. Esslinger,
                                                       Filing and Service of Responsive                      the Commission in its Public Reference                 Treasurer/Manager, Elephant Butte
                                                    Documents: All filings must (1) bear in                  Room, Room 2A, 888 First Street NE.,                   Irrigation District, 530 S. Melendres, Las
                                                    all capital letters the ‘‘COMMENTS                       Washington, DC 20426. The filing may                   Cruces, NM 88005, Phone No. (575)
                                                    CONTESTING QUALIFICATION FOR A                           also be viewed on the web at http://                   526–6671.
                                                    CONDUIT HYDROPOWER FACILITY’’                            www.ferc.gov/docs-filing/elibrary.asp
                                                    or ‘‘MOTION TO INTERVENE,’’ as                           using the ‘‘eLibrary’’ link. Enter the                    FERC Contact: Christopher Chaney,
                                                    applicable; (2) state in the heading the                 docket number (e.g., CD16–16–000) in                   Phone No. (202) 502–6778, email:
                                                    name of the applicant and the project                    the docket number field to access the                  Christopher.Chaney@ferc.gov.
                                                    number of the application to which the                   document. For assistance, call toll-free                  Qualifying Conduit Hydropower
                                                    filing responds; (3) state the name,                     1–866–208–3676 or email                                Facility Description: The proposed
                                                    address, and telephone number of the                     FERCOnlineSupport@ferc.gov. For TTY,                   project would consist of: (1) A drywell,
                                                    person filing; and (4) otherwise comply                  call (202) 502–8659.                                   approximately 23 feet by 13 feet, within
                                                    with the requirements of sections                          Dated: July 28, 2016.                                the canal’s right bank; (2) two new
                                                    385.2001 through 385.2005 of the                         Kimberly D. Bose,                                      turbine/generating units with a total
                                                    Commission’s regulations.1 All                           Secretary.                                             installed capacity of 40 kW; (3) two 24-
                                                    comments contesting Commission staff’s                                                                          inch-diameter, 9-foot-long intake pipes;
                                                                                                             [FR Doc. 2016–18361 Filed 8–2–16; 8:45 am]
                                                    preliminary determination that the                                                                              (4) one 48-inch-diameter, 120-foot-long
                                                                                                             BILLING CODE 6717–01–P
                                                    facility meets the qualifying criteria                                                                          raceway returning water to the Westside
                                                    must set forth their evidentiary basis.                                                                         Irrigation Canal; and (5) appurtenant
                                                       The Commission strongly encourages
                                                                                                             DEPARTMENT OF ENERGY                                   facilities. The proposed project would
                                                    electronic filing. Please file motions to
                                                    intervene and comments using the                                                                                have an estimated annual generating
                                                                                                             Federal Energy Regulatory                              capacity of 230 megawatt-hours.
                                                    Commission’s eFiling system at http://                   Commission
                                                    www.ferc.gov/docs-filing/efiling.asp.                                                                              A qualifying conduit hydropower
                                                    Commenters can submit brief comments                     [Docket No. CD16–17–000]                               facility is one that is determined or
                                                    up to 6,000 characters, without prior                                                                           deemed to meet all of the criteria shown
                                                                                                             Elephant Butte Irrigation District;
                                                    registration, using the eComment system                                                                         in the table below.
                                                                                                             Notice of Preliminary Determination of
                                                    at http://www.ferc.gov/docs-filing/
                                                                                                             a Qualifying Conduit Hydropower
                                                    ecomment.asp. You must include your
                                                                                                             Facility and Soliciting Comments and
                                                    name and contact information at the end
                                                                                                             Motions To Intervene
                                                    of your comments. For assistance,
                                                    please contact FERC Online Support at                       On July 26, 2016, Elephant Butte
                                                    FERCOnlineSupport@ferc.gov, (866)                        Irrigation District filed a notice of intent

                                                                                         TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                         Satisfies
                                                             Statutory Provision                                                           Description                                                    (Y/N)

                                                    FPA 30(a)(3)(A), as amended             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar                  Y
                                                      by HREA.                                manmade water conveyance that is operated for the distribution of water for agricultural,
                                                                                              municipal, or industrial consumption and not primarily for the generation of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended          The facility is constructed, operated, or maintained for the generation of electric power and                   Y
                                                      by HREA.                                uses for such generation only the hydroelectric potential of a non-federally owned conduit.
                                                    FPA 30(a)(3)(C)(ii), as amend-          The facility has an installed capacity that does not exceed 5 megawatts ..................................      Y
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                      ed by HREA.
                                                    FPA 30(a)(3)(C)(iii), as amend-         On or before August 9, 2013, the facility is not licensed, or exempted from the licensing re-                   Y
                                                      ed by HREA.                            quirements of Part I of the FPA.




                                                      1 18   CFR 385.2001–2005 (2015).



                                               VerDate Sep<11>2014    18:21 Aug 02, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\03AUN1.SGM    03AUN1



Document Created: 2016-08-02 23:44:03
Document Modified: 2016-08-02 23:44:03
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 51196 