81_FR_53005 81 FR 52851 - Notice of Availability of Draft NPDES General Permits for Discharges From Potable Water Treatment Facilities in Massachusetts and New Hampshire: The Potable Water Treatment Facility General Permit

81 FR 52851 - Notice of Availability of Draft NPDES General Permits for Discharges From Potable Water Treatment Facilities in Massachusetts and New Hampshire: The Potable Water Treatment Facility General Permit

ENVIRONMENTAL PROTECTION AGENCY

Federal Register Volume 81, Issue 154 (August 10, 2016)

Page Range52851-52852
FR Document2016-19028

The Director of the Office of Ecosystem Protection, U.S. Environmental Protection Agency--Region 1 (EPA), is providing a notice of availability of the draft National Pollutant Discharge Elimination System (NPDES) General Permits (GP) for discharges from potable water treatment facilities (PWTF) to certain waters of the Commonwealth of Massachusetts and the State of New Hampshire. The draft General Permits establish Notice of Intent (NOI) requirements, effluent limitations, standard and special conditions, prohibitions, and best management practices (BMPs) for sites with discharges from potable water treatment facilities. These General Permits replace the previous PWTF GP that expired on October 2, 2014.

Federal Register, Volume 81 Issue 154 (Wednesday, August 10, 2016)
[Federal Register Volume 81, Number 154 (Wednesday, August 10, 2016)]
[Notices]
[Pages 52851-52852]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-19028]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-9950-56-Region 1]


Notice of Availability of Draft NPDES General Permits for 
Discharges From Potable Water Treatment Facilities in Massachusetts and 
New Hampshire: The Potable Water Treatment Facility General Permit

AGENCY: Environmental Protection Agency.

ACTION: Notice of availability of draft NPDES general permits MAG640000 
and NHG640000.

-----------------------------------------------------------------------

SUMMARY: The Director of the Office of Ecosystem Protection, U.S. 
Environmental Protection Agency--Region 1 (EPA), is providing a notice 
of availability of the draft National Pollutant Discharge Elimination 
System (NPDES) General Permits (GP) for discharges from potable water 
treatment facilities (PWTF) to certain waters of the Commonwealth of 
Massachusetts and the State of New Hampshire. The draft General Permits 
establish Notice of Intent (NOI) requirements, effluent limitations, 
standard and special conditions, prohibitions, and best management 
practices (BMPs) for sites with discharges from potable water treatment 
facilities. These General Permits replace the previous PWTF GP that 
expired on October 2, 2014.

DATES: Comments on the draft General Permits must be received on or 
before September 9, 2016.

ADDRESSES: Written comments on the draft General Permits may be mailed 
to U.S. EPA Region 1, Office of Ecosystem Protection, Attn: Glenda 
Velez, 5 Post Office Square, Suite 100, Mail Code: OEP06-1, Boston, 
Massachusetts 02109-3912, or sent via email to [email protected]. No 
facsimiles (faxes) will be accepted.
    The draft PWTF GP is based on an administrative record available 
for public review at EPA-Region 1, Office of Ecosystem Protection, 5 
Post Office Square, Suite 100, Boston, Massachusetts 02109-3912. A 
reasonable fee may be charged for copying requests. The fact sheet for 
the draft PWTF GP sets forth principal facts and the significant 
factual, legal, methodological and policy questions considered in the 
development of the draft General Permit and is available upon request.

FOR FURTHER INFORMATION CONTACT: Additional information concerning the 
draft General Permits may be obtained between the hours of 9 a.m. and 5 
p.m. Monday through Friday, excluding holidays, from Glenda Velez, U.S. 
EPA Region 1, 5 Post Office Square, Suite 100, Mail Code OEP06-1, 
Boston, MA 02109-3912; telephone: 617-918-1677; email: 
[email protected].

SUPPLEMENTARY INFORMATION: 
    Public Comment Information: Interested persons may submit written 
comments on the draft General Permits to the EPA-Region I at the 
address listed above. Within the comment period, interested persons may 
also request, in writing, that EPA hold a public hearing pursuant to 40 
CFR 124.12, concerning the draft General Permits. Such requests shall 
state the nature of the issues proposed to be raised at the hearing. A 
public hearing may be held at least thirty days after public notice 
whenever the Regional Administrator finds that response to this notice 
indicates significant public interest. In reaching a final decision on 
this draft permit, the Regional Administrator will respond to all 
significant comments and make responses available to the public at 
EPA's Boston office. All comments and requests for public hearings must 
be postmarked or delivered by the close of the public comment period.
    General Information: EPA is proposing to reissue two general 
permits for wastewater discharges from potable water treatment 
facilities in Massachusetts and New Hampshire, that are generally less 
than or equal to 1.0 million gallons per day (MGD) and that use one or 
more of the following treatment processes: Clarification, Coagulation, 
Media Filtration, Membrane filtration (not including reverse osmosis), 
and Disinfection. While the draft General Permits are two distinct 
permits, for convenience, EPA has grouped them together in a single 
document and has provided a single fact sheet. This document refers to 
the draft General ``Permit'' in the singular. The draft General Permit, 
fact sheet, and

[[Page 52852]]

appendices are available at: http://www.epa.gov/region1/npdes/pwtfgp.html.
    The draft general permit includes effluent limitations and 
requirements based on technology-based considerations, best 
professional judgment (BPJ), and water quality considerations. The 
effluent limits established in the draft General Permit assure that the 
surface water quality standards of the receiving water(s) are attained 
and/or maintained. The permit also contains BMP requirements in order 
to ensure EPA has the information necessary to ensure compliance and to 
ensure discharges meet water quality standards.
    Obtaining Authorization: In order to obtain authorization to 
discharge, operators must submit a complete and accurate NOI containing 
the information in Appendix IV of the draft General Permit. Facilities 
currently authorized to discharge under the Expired PWTF GP must submit 
a NOI within 90 days of the effective date of the final General Permit. 
Operators with new discharges must submit a NOI at least 60 days prior 
to initiating discharges and following the effective date of the final 
General Permit. Facilities with existing discharges that were not 
authorized under the Expired PWTF GP and which use aluminum in their 
treatment process must conduct more extensive water quality sampling 
data and submit this information with the NOI within 6 months of the 
effective date of the final General Permit.
    Operators must meet the eligibility requirements of the General 
Permit prior to submission of a NOI. An operator will be authorized to 
discharge under the General Permit upon receipt of written notice from 
EPA following EPA's web posting of the submitted NOI. EPA will 
authorize the discharge, request additional information, or require the 
operator to apply for an alternative permit or an individual permit. 
The effective date of the final General Permit will be specified in the 
Federal Register publication of the Notice of Availability of the final 
permit.
    Other Legal Requirements: Endangered Species Act (ESA): EPA has 
updated the provisions and necessary actions and documentation related 
to potential impacts to endangered species from facilities seeking 
coverage under the PWTF GP. EPA has requested concurrence from the 
appropriate federal services (U.S. Fish and Wildlife Service and 
National Marine Fisheries Service) in connection with this draft 
General Permit.
    National Historic Preservation Act (NHPA): In accordance with NHPA, 
EPA has established provisions and documentation requirements for sites 
seeking coverage under the PWTF GP to ensure that discharges or actions 
taken under this General Permit will not adversely affect historic 
properties and places.

    Authority:  This action is being taken under the Clean Water 
Act, 33 U.S.C. 1251 et seq.

    Dated: August 1, 2016.
H. Curtis Spalding,
Regional Administrator, Region 1.
[FR Doc. 2016-19028 Filed 8-9-16; 8:45 am]
 BILLING CODE 6560-50-P



                                                                             Federal Register / Vol. 81, No. 154 / Wednesday, August 10, 2016 / Notices                                           52851

                                                  a petition from Philip Nolan asking EPA                 industry, (3) the EPA should conduct a                   The draft PWTF GP is based on an
                                                  to object to a Title V operating permit                 residual risk and technology review, (4)              administrative record available for
                                                  issued by the Wisconsin Department of                   the permit limits are insufficient to                 public review at EPA–Region 1, Office
                                                  Natural Resources (WDNR) to Waupaca                     protect public health, (5) the modeling               of Ecosystem Protection, 5 Post Office
                                                  Foundry Plant 1 (Waupaca). Sections                     procedures used to determine public                   Square, Suite 100, Boston,
                                                  307(b) and 505(b)(2) of the Clean Air                   health risk were not correct, and (6)                 Massachusetts 02109–3912. A
                                                  Act (Act) provide that a petitioner may                 additional emissions control technology               reasonable fee may be charged for
                                                  ask for judicial review of those portions               should be used.                                       copying requests. The fact sheet for the
                                                  of the petition that EPA denies in the                     On July 14, 2016, the Administrator                draft PWTF GP sets forth principal facts
                                                  United States Court of Appeals for the                  issued an Order denying the petition.                 and the significant factual, legal,
                                                  appropriate circuit. Any petition for                   The Order explains the reasons behind                 methodological and policy questions
                                                  review shall be filed within 60 days                    EPA’s conclusion.                                     considered in the development of the
                                                  from the date this notice appears in the                  Dated: August 1, 2016.                              draft General Permit and is available
                                                  Federal Register, pursuant to section                   Robert A. Kaplan,                                     upon request.
                                                  307 of the Act.                                                                                               FOR FURTHER INFORMATION CONTACT:
                                                                                                          Acting Regional Administrator, Region 5.
                                                  ADDRESSES: You may review copies of                                                                           Additional information concerning the
                                                                                                          [FR Doc. 2016–19027 Filed 8–9–16; 8:45 am]
                                                  the final Order, the petition, and other                                                                      draft General Permits may be obtained
                                                                                                          BILLING CODE 6560–50–P
                                                  supporting information at the EPA                                                                             between the hours of 9 a.m. and 5 p.m.
                                                  Region 5 Office, 77 West Jackson                                                                              Monday through Friday, excluding
                                                  Boulevard, Chicago, Illinois 60604. If                  ENVIRONMENTAL PROTECTION                              holidays, from Glenda Velez, U.S. EPA
                                                  you wish to examine these documents,                    AGENCY                                                Region 1, 5 Post Office Square, Suite
                                                  you should make an appointment at                                                                             100, Mail Code OEP06–1, Boston, MA
                                                  least 24 hours before the day you would                 [FRL–9950–56–Region 1]                                02109–3912; telephone: 617–918–1677;
                                                  like to visit. Additionally, the final                                                                        email: velez.glenda@epa.gov.
                                                  Order for the Waupaca petition is                       Notice of Availability of Draft NPDES
                                                                                                          General Permits for Discharges From                   SUPPLEMENTARY INFORMATION:
                                                  available electronically at: https://                                                                            Public Comment Information:
                                                  www.epa.gov/title-v-operating-permits/                  Potable Water Treatment Facilities in
                                                                                                          Massachusetts and New Hampshire:                      Interested persons may submit written
                                                  title-v-petition-database.                                                                                    comments on the draft General Permits
                                                                                                          The Potable Water Treatment Facility
                                                  FOR FURTHER INFORMATION CONTACT:                                                                              to the EPA-Region I at the address listed
                                                                                                          General Permit
                                                  Genevieve Damico, Chief, Air Permits                                                                          above. Within the comment period,
                                                  Section, Air Programs Branch, Air and                   AGENCY: Environmental Protection                      interested persons may also request, in
                                                  Radiation Division, EPA, Region 5, 77                   Agency.                                               writing, that EPA hold a public hearing
                                                  West Jackson Boulevard AR–18J,                          ACTION: Notice of availability of draft               pursuant to 40 CFR 124.12, concerning
                                                  Chicago, Illinois 60604, telephone (312)                NPDES general permits MAG640000                       the draft General Permits. Such requests
                                                  353–4761.                                               and NHG640000.                                        shall state the nature of the issues
                                                  SUPPLEMENTARY INFORMATION: The Act                                                                            proposed to be raised at the hearing. A
                                                  affords EPA a 45-day period to review                   SUMMARY:    The Director of the Office of             public hearing may be held at least
                                                  and object, as appropriate, to Title V                  Ecosystem Protection, U.S.                            thirty days after public notice whenever
                                                  operating permits proposed by state                     Environmental Protection Agency—                      the Regional Administrator finds that
                                                  permitting authorities. Section 505(b)(2)               Region 1 (EPA), is providing a notice of              response to this notice indicates
                                                  of the Act authorizes any person to                     availability of the draft National                    significant public interest. In reaching a
                                                  petition the EPA Administrator within                   Pollutant Discharge Elimination System                final decision on this draft permit, the
                                                  60 days after the expiration of the EPA                 (NPDES) General Permits (GP) for                      Regional Administrator will respond to
                                                  review period to object to a Title V                    discharges from potable water treatment               all significant comments and make
                                                  operating permit if EPA has not done so.                facilities (PWTF) to certain waters of the            responses available to the public at
                                                  A petition must be based only on                        Commonwealth of Massachusetts and                     EPA’s Boston office. All comments and
                                                  objections to the permit that were raised               the State of New Hampshire. The draft                 requests for public hearings must be
                                                  with reasonable specificity during the                  General Permits establish Notice of                   postmarked or delivered by the close of
                                                  public comment period provided by the                   Intent (NOI) requirements, effluent                   the public comment period.
                                                  state, unless the petitioner demonstrates               limitations, standard and special                        General Information: EPA is
                                                  that it was impracticable to raise issues               conditions, prohibitions, and best                    proposing to reissue two general permits
                                                  during the comment period, or the                       management practices (BMPs) for sites                 for wastewater discharges from potable
                                                  grounds for the issues arose after this                 with discharges from potable water                    water treatment facilities in
                                                  period.                                                 treatment facilities. These General                   Massachusetts and New Hampshire, that
                                                     On July 1, 2015, EPA received a                      Permits replace the previous PWTF GP                  are generally less than or equal to 1.0
                                                  petition from Philip Nolan (Petitioner)                 that expired on October 2, 2014.                      million gallons per day (MGD) and that
                                                  requesting that EPA object to the Title                 DATES: Comments on the draft General                  use one or more of the following
                                                  V operating permit for Waupaca. The                     Permits must be received on or before                 treatment processes: Clarification,
                                                  Petitioner alleged that the permit is not               September 9, 2016.                                    Coagulation, Media Filtration,
                                                  in compliance with the requirements of                  ADDRESSES: Written comments on the                    Membrane filtration (not including
                                                  the Act. Specifically, the Petitioner                   draft General Permits may be mailed to                reverse osmosis), and Disinfection.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  alleged that: (1) The permit does not                   U.S. EPA Region 1, Office of Ecosystem                While the draft General Permits are two
                                                  limit Hazardous Air Pollutant emissions                 Protection, Attn: Glenda Velez, 5 Post                distinct permits, for convenience, EPA
                                                  to a concentration of 4.59 mg/m3, (2) the               Office Square, Suite 100, Mail Code:                  has grouped them together in a single
                                                  permit does not comply with Section                     OEP06–1, Boston, Massachusetts                        document and has provided a single fact
                                                  112 of the Act and the National                         02109–3912, or sent via email to                      sheet. This document refers to the draft
                                                  Emission Standard for Hazardous Air                     velez.glenda@epa.gov. No facsimiles                   General ‘‘Permit’’ in the singular. The
                                                  Pollutants for the iron and steel foundry               (faxes) will be accepted.                             draft General Permit, fact sheet, and


                                             VerDate Sep<11>2014   17:34 Aug 09, 2016   Jkt 238001   PO 00000   Frm 00042   Fmt 4703   Sfmt 4703   E:\FR\FM\10AUN1.SGM   10AUN1


                                                  52852                      Federal Register / Vol. 81, No. 154 / Wednesday, August 10, 2016 / Notices

                                                  appendices are available at: http://                    EPA has established provisions and                    I. General Information
                                                  www.epa.gov/region1/npdes/                              documentation requirements for sites
                                                                                                                                                                A. Does this action apply to me?
                                                  pwtfgp.html.                                            seeking coverage under the PWTF GP to
                                                     The draft general permit includes                    ensure that discharges or actions taken                  This action applies to the public in
                                                  effluent limitations and requirements                   under this General Permit will not                    general. As such, the Agency has not
                                                  based on technology-based                               adversely affect historic properties and              attempted to describe all the specific
                                                  considerations, best professional                       places.                                               entities that may be affected by this
                                                  judgment (BPJ), and water quality                          Authority: This action is being taken              action.
                                                  considerations. The effluent limits                     under the Clean Water Act, 33 U.S.C. 1251
                                                  established in the draft General Permit                                                                       B. How can I get copies of this document
                                                                                                          et seq.
                                                  assure that the surface water quality                                                                         and other related information?
                                                                                                            Dated: August 1, 2016.
                                                  standards of the receiving water(s) are
                                                                                                          H. Curtis Spalding,                                      The docket for this action, identified
                                                  attained and/or maintained. The permit
                                                                                                          Regional Administrator, Region 1.                     by docket identification (ID) number
                                                  also contains BMP requirements in
                                                                                                                                                                EPA–HQ–OPP–2016–0445, is available
                                                  order to ensure EPA has the information                 [FR Doc. 2016–19028 Filed 8–9–16; 8:45 am]
                                                                                                                                                                at http://www.regulations.gov or at the
                                                  necessary to ensure compliance and to                   BILLING CODE 6560–50–P
                                                                                                                                                                Office of Pesticide Programs Regulatory
                                                  ensure discharges meet water quality
                                                                                                                                                                Public Docket (OPP Docket) in the
                                                  standards.
                                                     Obtaining Authorization: In order to                 ENVIRONMENTAL PROTECTION                              Environmental Protection Agency
                                                  obtain authorization to discharge,                      AGENCY                                                Docket Center (EPA/DC), West William
                                                  operators must submit a complete and                                                                          Jefferson Clinton Bldg., Rm. 3334, 1301
                                                  accurate NOI containing the information                 [EPA–HQ–OPP–2016–0445; FRL–9950–09]                   Constitution Ave. NW., Washington, DC
                                                  in Appendix IV of the draft General                                                                           20460–0001. The Public Reading Room
                                                                                                          Summitec Corporation, Versar, Inc.,                   is open from 8:30 a.m. to 4:30 p.m.,
                                                  Permit. Facilities currently authorized                 and CDM/CSS-Dynamac Joint Venture;
                                                  to discharge under the Expired PWTF                                                                           Monday through Friday, excluding legal
                                                                                                          Transfer of Data                                      holidays. The telephone number for the
                                                  GP must submit a NOI within 90 days
                                                  of the effective date of the final General              AGENCY: Environmental Protection                      Public Reading Room is (202) 566–1744,
                                                  Permit. Operators with new discharges                   Agency (EPA).                                         and the telephone number for the OPP
                                                  must submit a NOI at least 60 days prior                                                                      Docket is (703) 305–5805. Please review
                                                                                                          ACTION: Notice.
                                                  to initiating discharges and following                                                                        the visitor instructions and additional
                                                  the effective date of the final General                 SUMMARY:   This notice announces that                 information about the docket available
                                                  Permit. Facilities with existing                        pesticide related information submitted               at http://www.epa.gov/dockets.
                                                  discharges that were not authorized                     to EPA’s Office of Pesticide Programs                 II. Contractor Requirements
                                                  under the Expired PWTF GP and which                     (OPP) pursuant to the Federal
                                                  use aluminum in their treatment process                 Insecticide, Fungicide, and Rodenticide                  Under Contract No. EP–W–16–019,
                                                  must conduct more extensive water                       Act (FIFRA) and the Federal Food, Drug,               Summitec Corporation and its
                                                  quality sampling data and submit this                   and Cosmetic Act (FFDCA), including                   subcontractors, Versar, Inc., and CDM/
                                                  information with the NOI within 6                       information that may have been claimed                CSS-Dynamac Joint Venture, will
                                                  months of the effective date of the final               as Confidential Business Information                  perform critical reviews of EPA
                                                  General Permit.                                         (CBI) by the submitter, will be                       designated studies submitted by the
                                                     Operators must meet the eligibility                  transferred to Summitec Corporation                   registrants and/or from the open
                                                  requirements of the General Permit prior                and its subcontractors, Versar, Inc., and             literature. These reviews will be
                                                  to submission of a NOI. An operator will                CDM/CSS-Dynamac Joint Venture in                      provided to the contract officer’s
                                                  be authorized to discharge under the                    accordance with the CBI regulations.                  representative in data evaluation
                                                  General Permit upon receipt of written                  Summitec Corporation and its                          records or other similar study data
                                                  notice from EPA following EPA’s web                     subcontractors, Versar, Inc., and CDM/                evaluation records or systems, as
                                                  posting of the submitted NOI. EPA will                  CSS-Dynamac Joint Venture have been                   applicable. A template of the data
                                                  authorize the discharge, request                        awarded a contract to perform work for                evaluation records format provided to
                                                  additional information, or require the                  OPP, and access to this information will              the contractor will be followed in the
                                                  operator to apply for an alternative                    enable Summitec Corporation and its                   preparation of data evaluation records.
                                                  permit or an individual permit. The                     subcontractors Versar, Inc., and CDM/                 See the data evaluation records
                                                  effective date of the final General Permit              CSS-Dynamac Joint Venture to fulfill the              templates for test guidelines at http://
                                                  will be specified in the Federal Register               obligations of the contract.                          www.epa.gov/pesticide-registration/
                                                  publication of the Notice of Availability               DATES: Summitec Corporation and its                   study-profile-templates. Specific
                                                  of the final permit.                                    subcontractors Versar, Inc., and CDM/                 guidance for completing each section is
                                                     Other Legal Requirements:                                                                                  provided in the data evaluation records
                                                                                                          CSS-Dynamac Joint Venture will be
                                                  Endangered Species Act (ESA): EPA has                                                                         templates. Each review will encompass
                                                                                                          given access to this information on or
                                                  updated the provisions and necessary                                                                          all items in the study that contribute to
                                                                                                          before August 15, 2016.
                                                  actions and documentation related to                                                                          the overall knowledge of the pesticide,
                                                  potential impacts to endangered species                 FOR FURTHER INFORMATION CONTACT:
                                                                                                                                                                and will include the following:
                                                  from facilities seeking coverage under                  Mario Steadman, Information
                                                                                                          Technology and Resources Management                      • An evaluation of the accuracy,
                                                  the PWTF GP. EPA has requested
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                          Division (7502P), Office of Pesticide                 credibility and scientific validity of that
                                                  concurrence from the appropriate                                                                              study;
                                                  federal services (U.S. Fish and Wildlife                Programs, Environmental Protection
                                                  Service and National Marine Fisheries                   Agency, 1200 Pennsylvania Ave. NW.,                      • its suitability for meeting specific
                                                  Service) in connection with this draft                  Washington, DC 20460–0001; telephone                  data requirements;
                                                  General Permit.                                         number: (703) 305–8338, email:                           • any necessary graphic displays of
                                                     National Historic Preservation Act                   steadman.mario@epa.gov.                               data, and/or summary tables illustrating
                                                  (NHPA): In accordance with NHPA,                        SUPPLEMENTARY INFORMATION:                            results of the study;


                                             VerDate Sep<11>2014   17:34 Aug 09, 2016   Jkt 238001   PO 00000   Frm 00043   Fmt 4703   Sfmt 4703   E:\FR\FM\10AUN1.SGM   10AUN1



Document Created: 2016-08-10 01:59:49
Document Modified: 2016-08-10 01:59:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability of draft NPDES general permits MAG640000 and NHG640000.
DatesComments on the draft General Permits must be received on or before September 9, 2016.
ContactAdditional information concerning the draft General Permits may be obtained between the hours of 9 a.m. and 5 p.m. Monday through Friday, excluding holidays, from Glenda Velez, U.S. EPA Region 1, 5 Post Office Square, Suite 100, Mail Code OEP06-1, Boston, MA 02109-3912; telephone: 617-918-1677; email: [email protected]
FR Citation81 FR 52851 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR