81_FR_64632 81 FR 64450 - Columbia Gas Transmission, LLC, Columbia Gulf Transmission, LLC; Notice of Schedule for Environmental Review of the Mountaineer XPress Project and the Gulf XPress Project

81 FR 64450 - Columbia Gas Transmission, LLC, Columbia Gulf Transmission, LLC; Notice of Schedule for Environmental Review of the Mountaineer XPress Project and the Gulf XPress Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 182 (September 20, 2016)

Page Range64450-64451
FR Document2016-22604

Federal Register, Volume 81 Issue 182 (Tuesday, September 20, 2016)
[Federal Register Volume 81, Number 182 (Tuesday, September 20, 2016)]
[Notices]
[Pages 64450-64451]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-22604]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-357-000; Docket No. CP16-361-000]


Columbia Gas Transmission, LLC, Columbia Gulf Transmission, LLC; 
Notice of Schedule for Environmental Review of the Mountaineer XPress 
Project and the Gulf XPress Project

    On April 29, 2016, Columbia Gas Transmission, LLC (Columbia Gas) 
and Columbia Gulf Transmission, LLC (Columbia Gulf) filed applications 
in Docket Nos. CP16-357-000 and CP16-361-000, respectively, requesting 
Certificates of Public Convenience and Necessity pursuant to Sections 
7(b) and 7(c) of the Natural Gas Act to construct, operate, and 
maintain certain natural gas pipeline facilities. Columbia Gas' 
proposed Mountaineer XPress Project in West Virginia would transport up 
to 2,700,000 dekatherms per day (Dth/d) of natural gas from receipt 
points in West Virginia, Ohio, and Pennsylvania, to markets on the 
Columbia Pipeline Group system. Columbia Gulf's proposed Gulf XPress 
Project in Kentucky, Tennessee, and Mississippi would expand the 
capacity of Columbia Gulf's existing system to allow for an additional 
860,000 Dth/d of natural gas delivery to high-demand markets in the 
Gulf Coast region. Because these are interrelated projects, the Federal 
Energy Regulatory Commission (FERC or Commission) deemed it was 
appropriate to analyze them in a single environmental impact statement 
(EIS).
    FERC issued respective Notices of Application for the Mountaineer 
XPress and Gulf XPress Projects on May 13, 2016. Among other things, 
those notices alerted other agencies issuing federal authorizations of 
the requirement to complete all necessary reviews and to reach a final 
decision on the request for a federal authorization within 90 days of 
the date of issuance of the Commission staff's final EIS for the two 
projects. This instant notice identifies the FERC staff's planned 
schedule for completion of the final EIS for the projects, which is 
based on an issuance of the draft EIS in November 2016.

[[Page 64451]]

Schedule for Environmental Review

Issuance of Notice of Availability of the final EIS--April 28, 2017
90-day Federal Authorization Decision Deadline--July 27, 2017

    If a schedule change becomes necessary for the final EIS, an 
additional notice will be provided so that the relevant agencies are 
kept informed of the projects' progress.

Project Description

    The Mountaineer XPress Project consists of new pipeline and 
compression facilities, all in the state of West Virginia. The major 
proposed facilities include 163.9 miles of new 36-inch-diameter 
pipeline in Marshall and Cabell Counties; 5.8 miles of new 24-inch-
diameter pipeline in Doddridge County; 0.4 mile of replacement 30-inch-
diameter pipeline on segments of Columbia Gas' SM80 and SM80 loop 
pipelines in Cabell County; three new compressor stations (totaling 
106,300 horsepower) in Doddridge, Calhoun, and Jackson Counties; two 
new regulating stations in Ripley and Cabell Counties; and added 
compression at three existing compressor stations in Marshall, Wayne, 
and Kanawha Counties.
    The Gulf XPress Project consists of construction and operation of 
seven new compressor stations, and upgrades at one existing meter 
station and one pending compressor station (under Docket No. CP15-539) 
on Columbia Gulf's existing system, spread across Kentucky (Carter, 
Boyd, Rowan, Garrard, and Metcalfe Counties), Tennessee (Davidson and 
Wayne Counties), and Mississippi (Union and Grenada Counties).

Background

    On September 16, 2015, the Commission staff granted Columbia Gas' 
request to use the FERC's Pre-filing environmental review process and 
assigned the Mountaineer XPress Project temporary Docket No. PF15-31-
000. On November 18, 2015, the Commission issued a Notice of Intent to 
Prepare an Environmental Impact Statement for the Planned Mountaineer 
XPress Project, Request for Comments on Environmental Issues, and 
Notice of Public Scoping Meetings. The Gulf XPress Project did not 
utilize the FERC's Pre-filing environmental process, and on June 2, 
2016, the Commission issued a Notice of Intent to Prepare an 
Environmental Impact Statement for the Proposed Gulf XPress Project, 
Request for Comments on Environmental Issues, and Notice of Public 
Scoping Meeting.
    The Notices of Intent were sent to our environmental mailing list 
that include federal, state, and local government agencies; elected 
officials; affected landowners; regional environmental groups and 
nongovernmental organizations; Native Americans and Indian tribes; 
local libraries and newspapers; and other interested parties. Major 
environmental issues raised during scoping included karst terrain; 
impacts on groundwater and surface waterbodies; impacts on forests; 
impacts on special status species; impacts on property values and the 
use of eminent domain; impacts on the local economy; impacts on 
historic properties and districts; visual impacts from compressor 
stations; impacts on land use; impacts on air quality and noise from 
construction and operation of pipeline facilities; and public health 
and safety.
    The U.S. Army Corps of Engineers; U.S. Environmental Protection 
Agency; West Virginia Department of Environmental Protection; and West 
Virginia Division of Natural Resources are cooperating agencies in the 
preparation of the EIS.

Additional Information

    In order to receive notification of the issuance of the EIS and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription (http://www.ferc.gov/docs-filing/esubscription.asp). Additional data about the 
projects can be obtained electronically through the Commission's 
Internet Web site (www.ferc.gov). Under ``Dockets & Filings,'' use the 
``eLibrary'' link, select ``General Search'' from the menu, enter the 
docket numbers excluding the last three digits (i.e., CP16-357 or CP16-
361), and the search dates. Questions about the projects can be 
directed to the Commission's Office of External Affairs at (866) 208-
FERC.

    Dated: September 14, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-22604 Filed 9-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                64450                     Federal Register / Vol. 81, No. 182 / Tuesday, September 20, 2016 / Notices

                                                briefing will be held in the Commission                 remove the micro-turbine units for                      Dated: September 12, 2016.
                                                Meeting Room. Members of the public                     maintenance and lower them in place                   Kimberly D. Bose,
                                                may view this briefing in the designated                for generation; (6) a tailrace made of                Secretary.
                                                overflow room. This statement is                        steel draft tubes discharging directly                [FR Doc. 2016–22603 Filed 9–19–16; 8:45 am]
                                                intended to notify the public that the                  into the Mississippi River; (7) a third               BILLING CODE 6717–01–P
                                                press briefings that follow Commission                  powerhouse 60-foot-wide by 80-foot-
                                                meetings may now be viewed remotely                     long containing the controls for the
                                                at Commission headquarters, but will                    dam’s crest gates and necessary                       DEPARTMENT OF ENERGY
                                                not be telecast through the Capitol                     electrical and mechanical equipment to
                                                Connection service.                                                                                           Federal Energy Regulatory
                                                                                                        support the micro-turbines; (8) a 550-
                                                [FR Doc. 2016–22686 Filed 9–16–16; 11:15 am]            foot-long, 13.8 kilo-volt underground                 Commission
                                                BILLING CODE 6717–01–P                                  transmission line connecting to an Xcel
                                                                                                        Energy substation; and (9) appurtenant                [Docket No. CP16–357–000; Docket No.
                                                                                                        facilities. The estimated annual                      CP16–361–000]
                                                DEPARTMENT OF ENERGY
                                                                                                        generation of the proposed Coon Rapids
                                                Federal Energy Regulatory                               Project would be 62,790 megwatt-hours.                Columbia Gas Transmission, LLC,
                                                Commission                                                                                                    Columbia Gulf Transmission, LLC;
                                                                                                           Applicant Contact: Raymond J.
                                                                                                                                                              Notice of Schedule for Environmental
                                                [Project No. 14798–000]                                 Wahle, P.E., Missouri River Energy
                                                                                                                                                              Review of the Mountaineer XPress
                                                                                                        Services, 3724 W. Avera Drive, P.O. Box
                                                                                                                                                              Project and the Gulf XPress Project
                                                Western Minnesota Municipal Power                       88920, Sioux Falls, SD 57109; phone:
                                                Agency; Notice of Preliminary Permit                    (605) 330–6963; fax: (605) 978–3960;                     On April 29, 2016, Columbia Gas
                                                Application Accepted for Filing and                     email: rwahle@mrenergy.com.                           Transmission, LLC (Columbia Gas) and
                                                Soliciting Comments, Motions To
                                                                                                           FERC Contact: Sergiu Serban; phone:                Columbia Gulf Transmission, LLC
                                                Intervene, and Competing Applications
                                                                                                        (202) 502–6211; email: sergiu.serban@                 (Columbia Gulf) filed applications in
                                                   On August 15, 2016, Western                          ferc.gov.                                             Docket Nos. CP16–357–000 and CP16–
                                                Minnesota Municipal Power Agency                           Deadline for filing comments, motions              361–000, respectively, requesting
                                                filed an application for a preliminary                  to intervene, competing applications                  Certificates of Public Convenience and
                                                permit, pursuant to section 4(f) of the                                                                       Necessity pursuant to Sections 7(b) and
                                                                                                        (without notices of intent), or notices of
                                                Federal Power Act (FPA), proposing to                                                                         7(c) of the Natural Gas Act to construct,
                                                                                                        intent to file competing applications: 60
                                                study the feasibility of the Coon Rapids                                                                      operate, and maintain certain natural
                                                Hydroelectric Project (Coon Rapids                      days from the issuance of this notice.
                                                                                                                                                              gas pipeline facilities. Columbia Gas’
                                                Project or project) located on the                      Competing applications and notices of
                                                                                                                                                              proposed Mountaineer XPress Project in
                                                Mississippi River at River Mile 866.2,                  intent must meet the requirements of 18
                                                                                                                                                              West Virginia would transport up to
                                                about 11.5 miles north of downtown                      CFR 4.36.                                             2,700,000 dekatherms per day (Dth/d) of
                                                Minneapolis, Minnesota. The sole                           The Commission strongly encourages                 natural gas from receipt points in West
                                                purpose of a preliminary permit, if                     electronic filing. Please file comments,              Virginia, Ohio, and Pennsylvania, to
                                                issued, is to grant the permit holder                   motions to intervene, notices of intent,              markets on the Columbia Pipeline
                                                priority to file a license application                  and competing applications using the                  Group system. Columbia Gulf’s
                                                during the permit term. A preliminary                   Commission’s eFiling system at http://                proposed Gulf XPress Project in
                                                permit does not authorize the permit                    www.ferc.gov/docs-filing/efiling.asp.                 Kentucky, Tennessee, and Mississippi
                                                holder to perform any land-disturbing                   Commenters can submit brief comments                  would expand the capacity of Columbia
                                                activities or otherwise enter upon lands                up to 6,000 characters, without prior                 Gulf’s existing system to allow for an
                                                or waters owned by others without the                                                                         additional 860,000 Dth/d of natural gas
                                                                                                        registration, using the eComment system
                                                owners’ express permission.                                                                                   delivery to high-demand markets in the
                                                   The proposed project would consist of                at http://www.ferc.gov/docs-filing/
                                                                                                        ecomment.asp. You must include your                   Gulf Coast region. Because these are
                                                the following facilities: (1) An existing
                                                                                                        name and contact information at the end               interrelated projects, the Federal Energy
                                                reservoir with a surface area of 600
                                                                                                        of your comments. For assistance,                     Regulatory Commission (FERC or
                                                square miles at normal pool elevation of
                                                                                                        please contact FERC Online Support at                 Commission) deemed it was appropriate
                                                830.1 National Geodetic Vertical Datum
                                                                                                        FERCOnlineSupport@ferc.gov, (866)                     to analyze them in a single
                                                with no storage capacity; (2) the existing
                                                                                                        208–3676 (toll free), or (202) 502–8659               environmental impact statement (EIS).
                                                1,455-foot-long, 30.8-foot-high Coon
                                                Rapids Dam with nine intermediate                       (TTY). In lieu of electronic filing, please              FERC issued respective Notices of
                                                piers and ten spans with crest gates; (3)               send a paper copy to: Secretary, Federal              Application for the Mountaineer XPress
                                                an array of micro-turbines placed in                    Energy Regulatory Commission, 888                     and Gulf XPress Projects on May 13,
                                                front of two cast in place powerhouses;                 First Street NE., Washington, DC 20426.               2016. Among other things, those notices
                                                (4) a 97-foot-long, 18-foot-wide, 19-foot-              The first page of any filing should                   alerted other agencies issuing federal
                                                high reinforced concrete powerhouse                     include docket number P–14798–000.                    authorizations of the requirement to
                                                located immediately downstream of the                                                                         complete all necessary reviews and to
                                                                                                           More information about this project,
                                                span 9 spillway section and a 103-foot-                                                                       reach a final decision on the request for
                                                                                                        including a copy of the application, can
                                                long, 18-foot-wide, 19-foot-high                                                                              a federal authorization within 90 days of
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        be viewed or printed on the ‘‘eLibrary’’              the date of issuance of the Commission
                                                reinforced concrete powerhouse located
                                                                                                        link of Commission’s Web site at http://              staff’s final EIS for the two projects. This
                                                immediately downstream of the span 10
                                                spillway section with each powerhouse                   www.ferc.gov/docs-filing/                             instant notice identifies the FERC staff’s
                                                divided in half resulting in four bays in               ecomment.asp. Enter the docket number                 planned schedule for completion of the
                                                which the micro-turbines would be                       (P–14798) in the docket number field to               final EIS for the projects, which is based
                                                installed; (5) two crane rails spanning                 access the document. For assistance,                  on an issuance of the draft EIS in
                                                the length of each powerhouse to                        contact FERC Online Support.                          November 2016.


                                           VerDate Sep<11>2014   17:13 Sep 19, 2016   Jkt 238001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\20SEN1.SGM   20SEN1


                                                                          Federal Register / Vol. 81, No. 182 / Tuesday, September 20, 2016 / Notices                                                 64451

                                                Schedule for Environmental Review                       Public Scoping Meetings. The Gulf                       Dated: September 14, 2016.
                                                Issuance of Notice of Availability of the               XPress Project did not utilize the FERC’s             Kimberly D. Bose,
                                                   final EIS—April 28, 2017                             Pre-filing environmental process, and                 Secretary.
                                                90-day Federal Authorization Decision                   on June 2, 2016, the Commission issued                [FR Doc. 2016–22604 Filed 9–19–16; 8:45 am]
                                                   Deadline—July 27, 2017                               a Notice of Intent to Prepare an                      BILLING CODE 6717–01–P
                                                                                                        Environmental Impact Statement for the
                                                   If a schedule change becomes
                                                                                                        Proposed Gulf XPress Project, Request
                                                necessary for the final EIS, an additional              for Comments on Environmental Issues,
                                                notice will be provided so that the                                                                           DEPARTMENT OF ENERGY
                                                                                                        and Notice of Public Scoping Meeting.
                                                relevant agencies are kept informed of                    The Notices of Intent were sent to our              Federal Energy Regulatory
                                                the projects’ progress.                                 environmental mailing list that include               Commission
                                                Project Description                                     federal, state, and local government
                                                                                                        agencies; elected officials; affected                 [Docket No. CD16–21–000]
                                                   The Mountaineer XPress Project
                                                                                                        landowners; regional environmental
                                                consists of new pipeline and                            groups and nongovernmental                            Mary Ann Gaston; Notice of
                                                compression facilities, all in the state of             organizations; Native Americans and                   Preliminary Determination of a
                                                West Virginia. The major proposed                       Indian tribes; local libraries and                    Qualifying Conduit Hydropower
                                                facilities include 163.9 miles of new 36-               newspapers; and other interested                      Facility and Soliciting Comments and
                                                inch-diameter pipeline in Marshall and                  parties. Major environmental issues                   Motions To Intervene
                                                Cabell Counties; 5.8 miles of new 24-                   raised during scoping included karst
                                                inch-diameter pipeline in Doddridge                                                                              On September 1, 2016, as
                                                                                                        terrain; impacts on groundwater and                   supplemented on September 13, 2016,
                                                County; 0.4 mile of replacement 30-                     surface waterbodies; impacts on forests;
                                                inch-diameter pipeline on segments of                                                                         Mary Ann Gaston filed a notice of intent
                                                                                                        impacts on special status species;
                                                Columbia Gas’ SM80 and SM80 loop                                                                              to construct a qualifying conduit
                                                                                                        impacts on property values and the use
                                                pipelines in Cabell County; three new                                                                         hydropower facility, pursuant to section
                                                                                                        of eminent domain; impacts on the local
                                                compressor stations (totaling 106,300                                                                         30 of the Federal Power Act (FPA), as
                                                                                                        economy; impacts on historic properties
                                                horsepower) in Doddridge, Calhoun,                                                                            amended by section 4 of the
                                                                                                        and districts; visual impacts from
                                                and Jackson Counties; two new                                                                                 Hydropower Regulatory Efficiency Act
                                                                                                        compressor stations; impacts on land
                                                regulating stations in Ripley and Cabell                                                                      of 2013 (HREA). The proposed Gaston
                                                                                                        use; impacts on air quality and noise
                                                Counties; and added compression at                                                                            Hydro Facility would have an installed
                                                                                                        from construction and operation of
                                                three existing compressor stations in                                                                         capacity of 4 kilowatts (kW), and would
                                                                                                        pipeline facilities; and public health
                                                Marshall, Wayne, and Kanawha                                                                                  be located near the end of an existing
                                                                                                        and safety.
                                                Counties.                                                 The U.S. Army Corps of Engineers;                   irrigation pipeline on the applicant’s
                                                   The Gulf XPress Project consists of                  U.S. Environmental Protection Agency;                 land. The project would be located near
                                                construction and operation of seven                     West Virginia Department of                           the Town of Norwood in San Miguel
                                                new compressor stations, and upgrades                   Environmental Protection; and West                    County, Colorado.
                                                at one existing meter station and one                   Virginia Division of Natural Resources                   Applicant Contact: Mary Ann Gaston,
                                                pending compressor station (under                       are cooperating agencies in the                       1280 CR44ZN, Norwood, CO 81423
                                                Docket No. CP15–539) on Columbia                        preparation of the EIS.                               Phone No. (970) 327–0333.
                                                Gulf’s existing system, spread across                                                                            FERC Contact: Christopher Chaney,
                                                Kentucky (Carter, Boyd, Rowan,                          Additional Information                                Phone No. (202) 502–6778, email:
                                                Garrard, and Metcalfe Counties),                           In order to receive notification of the            Christopher.Chaney@ferc.gov.
                                                Tennessee (Davidson and Wayne                           issuance of the EIS and to keep track of                 Qualifying Conduit Hydropower
                                                Counties), and Mississippi (Union and                   all formal issuances and submittals in                Facility Description: The proposed
                                                Grenada Counties).                                      specific dockets, the Commission offers               project would consist of: (1) A barrel
                                                                                                        a free service called eSubscription                   housing containing one 4-jet Turgo
                                                Background                                              (http://www.ferc.gov/docs-filing/                     turbine/generating unit with an
                                                   On September 16, 2015, the                           esubscription.asp). Additional data                   installed capacity of 4 kW; (2) 4 short,
                                                Commission staff granted Columbia Gas’                  about the projects can be obtained                    2-inch-diameter intake manifold pipes;
                                                request to use the FERC’s Pre-filing                    electronically through the Commission’s               (3) one 8-inch-diameter tailrace pipe
                                                environmental review process and                        Internet Web site (www.ferc.gov). Under               discharging water to an existing
                                                assigned the Mountaineer XPress Project                 ‘‘Dockets & Filings,’’ use the ‘‘eLibrary’’           irrigation pond; and (4) appurtenant
                                                temporary Docket No. PF15–31–000. On                    link, select ‘‘General Search’’ from the              facilities. The proposed project would
                                                November 18, 2015, the Commission                       menu, enter the docket numbers                        have an estimated annual generating
                                                issued a Notice of Intent to Prepare an                 excluding the last three digits (i.e.,                capacity of 6,382 kilowatt-hours.
                                                Environmental Impact Statement for the                  CP16–357 or CP16–361), and the search                    A qualifying conduit hydropower
                                                Planned Mountaineer XPress Project,                     dates. Questions about the projects can               facility is one that is determined or
                                                Request for Comments on                                 be directed to the Commission’s Office                deemed to meet all of the criteria shown
                                                Environmental Issues, and Notice of                     of External Affairs at (866) 208–FERC.                in the table below.

                                                                                  TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                                                                  Satisfies
                                                            Statutory provision                                                            Description                                             (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or             Y
                                                                                                     similar manmade water conveyance that is operated for the distribution of water
                                                                                                     for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                     eration of electricity.




                                           VerDate Sep<11>2014   17:13 Sep 19, 2016   Jkt 238001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\20SEN1.SGM   20SEN1



Document Created: 2018-02-09 13:20:31
Document Modified: 2018-02-09 13:20:31
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 64450 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR