81_FR_67148 81 FR 66959 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Gulf Connector Expansion Project and Request for Comments on Environmental Issues

81 FR 66959 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Gulf Connector Expansion Project and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 189 (September 29, 2016)

Page Range66959-66960
FR Document2016-23516

Federal Register, Volume 81 Issue 189 (Thursday, September 29, 2016)
[Federal Register Volume 81, Number 189 (Thursday, September 29, 2016)]
[Notices]
[Pages 66959-66960]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-23516]



[[Page 66959]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-494-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To 
Prepare an Environmental Assessment for the Proposed Gulf Connector 
Expansion Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Gulf Connector Expansion 
Project involving construction and operation of facilities by 
Transcontinental Gas Pipe Line Company, LLC (Transco) in Wharton, San 
Patricio, Hardin, and Victoria Counties, Texas. The Commission will use 
this EA in its decision-making process to determine whether the project 
is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before October 24, 2016.
    If you sent comments on this project to the Commission before the 
opening of this docket on August 16, 2016, you will need to file those 
comments in Docket No. CP16-494-000 to ensure they are considered as 
part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a Transco 
representative may contact you about the acquisition of land to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, Transco could initiate condemnation proceedings 
where compensation would be determined in accordance with state law.
    Transco provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file with your submission. 
New eFiling users must first create an account by clicking on 
``eRegister.'' If you are filing a comment on a particular project, 
please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP16-494-000) with your submission: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Transco proposes to construct and operate new compressor stations 
and modify existing compressor stations in Texas. According to Transco, 
the Gulf Connector Expansion Project would provide about 475 million 
standard cubic feet of natural gas per day to liquefied natural gas 
terminals in Freeport Bay and Corpus Christi Bay, Texas.
    The Gulf Connector Expansion Project would consist of the following 
facilities:
     A new compressor station to be known as Compressor Station 
32 located in San Patricio County, Texas;
     piping and valve modifications at an existing compressor 
station known as Compressor Station 40 located in Hardin County, Texas;
     a new compressor station to be known as Compressor Station 
17 located in San Patricio County, Texas;
     a new compressor station to be known as Compressor Station 
23 located in Victoria County, Texas;
     piping and valve modifications at an existing compressor 
station known as Compressor Station 30 located in Wharton County, 
Texas;
     a new interconnection with Corpus Christi LNG located in 
San Patricio County, Texas; and
     use of a decommissioned compressor station known as 
Compressor Station 20 to be used as a construction storage yard.
    The general location of the project facilities is shown in appendix 
1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 197 
acres of land. Following construction, Transco would maintain about 46 
acres for permanent operation of the project's facilities; the 
remaining acreage would be restored and revert to former uses.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the

[[Page 66960]]

construction and operation of the proposed project under these general 
headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     air quality and noise;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may publish and 
distribute the EA to the public for an allotted comment period. We will 
consider all comments on the EA before making our recommendations to 
the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office (SHPO), and to 
solicit their views and those of other government agencies, interested 
Indian tribes, and the public on the project's potential effects on 
historic properties.\4\ We will define the project-specific Area of 
Potential Effects (APE) in consultation with the SHPO as the project 
develops. On natural gas facility projects, the APE at a minimum 
encompasses all areas subject to ground disturbance (examples include 
construction right-of-way, contractor/pipe storage yards, compressor 
stations, and access roads). Our EA for this project will document our 
findings on the impacts on historic properties and summarize the status 
of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies EA will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP16-
494). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: September 22, 2016.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2016-23516 Filed 9-28-16; 8:45 am]
BILLING CODE 6717-01-P



                                                                           Federal Register / Vol. 81, No. 189 / Thursday, September 29, 2016 / Notices                                                    66959

                                                  DEPARTMENT OF ENERGY                                    eminent domain. Therefore, if easement                  The Gulf Connector Expansion Project
                                                                                                          negotiations fail to produce an                       would consist of the following facilities:
                                                  Federal Energy Regulatory                               agreement, Transco could initiate                       • A new compressor station to be
                                                  Commission                                              condemnation proceedings where                        known as Compressor Station 32 located
                                                  [Docket No. CP16–494–000]                               compensation would be determined in                   in San Patricio County, Texas;
                                                                                                          accordance with state law.                              • piping and valve modifications at
                                                  Transcontinental Gas Pipe Line                             Transco provided landowners with a                 an existing compressor station known as
                                                  Company, LLC; Notice of Intent To                       fact sheet prepared by the FERC entitled              Compressor Station 40 located in
                                                  Prepare an Environmental Assessment                     ‘‘An Interstate Natural Gas Facility On               Hardin County, Texas;
                                                  for the Proposed Gulf Connector                         My Land? What Do I Need To Know?’’                      • a new compressor station to be
                                                  Expansion Project and Request for                       This fact sheet addresses a number of                 known as Compressor Station 17 located
                                                  Comments on Environmental Issues                        typically asked questions, including the              in San Patricio County, Texas;
                                                                                                                                                                  • a new compressor station to be
                                                                                                          use of eminent domain and how to
                                                     The staff of the Federal Energy                                                                            known as Compressor Station 23 located
                                                                                                          participate in the Commission’s
                                                  Regulatory Commission (FERC or                                                                                in Victoria County, Texas;
                                                                                                          proceedings. It is also available for                   • piping and valve modifications at
                                                  Commission) will prepare an                             viewing on the FERC Web site
                                                  environmental assessment (EA) that will                                                                       an existing compressor station known as
                                                                                                          (www.ferc.gov).                                       Compressor Station 30 located in
                                                  discuss the environmental impacts of
                                                  the Gulf Connector Expansion Project                    Public Participation                                  Wharton County, Texas;
                                                  involving construction and operation of                                                                         • a new interconnection with Corpus
                                                                                                            For your convenience, there are three               Christi LNG located in San Patricio
                                                  facilities by Transcontinental Gas Pipe                 methods you can use to submit your
                                                  Line Company, LLC (Transco) in                                                                                County, Texas; and
                                                                                                          comments to the Commission. The                         • use of a decommissioned
                                                  Wharton, San Patricio, Hardin, and                      Commission encourages electronic filing
                                                  Victoria Counties, Texas. The                                                                                 compressor station known as
                                                                                                          of comments and has expert staff                      Compressor Station 20 to be used as a
                                                  Commission will use this EA in its                      available to assist you at (202) 502–8258
                                                  decision-making process to determine                                                                          construction storage yard.
                                                                                                          or efiling@ferc.gov. Please carefully                   The general location of the project
                                                  whether the project is in the public                    follow these instructions so that your                facilities is shown in appendix 1.1
                                                  convenience and necessity.                              comments are properly recorded.
                                                     This notice announces the opening of                                                                       Land Requirements for Construction
                                                  the scoping process the Commission                         (1) You can file your comments
                                                                                                          electronically using the eComment                       Construction of the proposed facilities
                                                  will use to gather input from the public                                                                      would disturb about 197 acres of land.
                                                  and interested agencies on the project.                 feature on the Commission’s Web site
                                                                                                          (www.ferc.gov) under the link to                      Following construction, Transco would
                                                  You can make a difference by providing                                                                        maintain about 46 acres for permanent
                                                  us with your specific comments or                       Documents and Filings. This is an easy
                                                                                                          method for submitting brief, text-only                operation of the project’s facilities; the
                                                  concerns about the project. Your                                                                              remaining acreage would be restored
                                                  comments should focus on the potential                  comments on a project;
                                                                                                             (2) You can file your comments                     and revert to former uses.
                                                  environmental effects, reasonable
                                                  alternatives, and measures to avoid or                  electronically by using the eFiling                   The EA Process
                                                  lessen environmental impacts. Your                      feature on the Commission’s Web site
                                                                                                                                                                   The National Environmental Policy
                                                  input will help the Commission staff                    (www.ferc.gov) under the link to
                                                                                                                                                                Act (NEPA) requires the Commission to
                                                  determine what issues they need to                      Documents and Filings. With eFiling,
                                                                                                                                                                take into account the environmental
                                                  evaluate in the EA. To ensure that your                 you can provide comments in a variety
                                                                                                                                                                impacts that could result from an action
                                                  comments are timely and properly                        of formats by attaching them as a file
                                                                                                                                                                whenever it considers the issuance of a
                                                  recorded, please send your comments so                  with your submission. New eFiling
                                                                                                                                                                Certificate of Public Convenience and
                                                  that the Commission receives them in                    users must first create an account by
                                                                                                                                                                Necessity. NEPA also requires us 2 to
                                                  Washington, DC on or before October                     clicking on ‘‘eRegister.’’ If you are filing
                                                                                                                                                                discover and address concerns the
                                                  24, 2016.                                               a comment on a particular project,
                                                                                                                                                                public may have about proposals. This
                                                     If you sent comments on this project                 please select ‘‘Comment on a Filing’’ as              process is referred to as ‘‘scoping.’’ The
                                                  to the Commission before the opening of                 the filing type; or                                   main goal of the scoping process is to
                                                  this docket on August 16, 2016, you will                   (3) You can file a paper copy of your              focus the analysis in the EA on the
                                                  need to file those comments in Docket                   comments by mailing them to the                       important environmental issues. By this
                                                  No. CP16–494–000 to ensure they are                     following address. Be sure to reference               notice, the Commission requests public
                                                  considered as part of this proceeding.                  the project docket number (CP16–494–                  comments on the scope of the issues to
                                                     This notice is being sent to the                     000) with your submission: Kimberly D.                address in the EA. We will consider all
                                                  Commission’s current environmental                      Bose, Secretary, Federal Energy                       filed comments during the preparation
                                                  mailing list for this project. State and                Regulatory Commission, 888 First Street               of the EA.
                                                  local government representatives should                 NE., Room 1A, Washington, DC 20426.                      In the EA we will discuss impacts that
                                                  notify their constituents of this                                                                             could occur as a result of the
                                                                                                          Summary of the Proposed Project
                                                  proposed project and encourage them to
                                                  comment on their areas of concern.                         Transco proposes to construct and                    1 The appendices referenced in this notice will

                                                     If you are a landowner receiving this                operate new compressor stations and                   not appear in the Federal Register. Copies of
                                                  notice, a Transco representative may                    modify existing compressor stations in                appendices were sent to all those receiving this
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                notice in the mail and are available at www.ferc.gov
                                                  contact you about the acquisition of                    Texas. According to Transco, the Gulf                 using the link called ‘‘eLibrary’’ or from the
                                                  land to construct, operate, and maintain                Connector Expansion Project would                     Commission’s Public Reference Room, 888 First
                                                  the proposed facilities. The company                    provide about 475 million standard                    Street NE., Washington, DC 20426, or call (202)
                                                  would seek to negotiate a mutually                      cubic feet of natural gas per day to                  502–8371. For instructions on connecting to
                                                                                                                                                                eLibrary, refer to the last page of this notice.
                                                  acceptable agreement. However, if the                   liquefied natural gas terminals in                      2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
                                                  Commission approves the project, that                   Freeport Bay and Corpus Christi Bay,                  environmental staff of the Commission’s Office of
                                                  approval conveys with it the right of                   Texas.                                                Energy Projects.



                                             VerDate Sep<11>2014   18:51 Sep 28, 2016   Jkt 238001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\29SEN1.SGM   29SEN1


                                                  66960                      Federal Register / Vol. 81, No. 189 / Thursday, September 29, 2016 / Notices

                                                  construction and operation of the                         project-specific Area of Potential Effects              described at http://www.ferc.gov/
                                                  proposed project under these general                      (APE) in consultation with the SHPO as                  resources/guides/how-to/intervene.asp.
                                                  headings:                                                 the project develops. On natural gas
                                                                                                                                                                    Additional Information
                                                     • Geology and soils;                                   facility projects, the APE at a minimum
                                                     • land use;                                            encompasses all areas subject to ground                    Additional information about the
                                                     • water resources, fisheries, and                      disturbance (examples include                           project is available from the
                                                  wetlands;                                                 construction right-of-way, contractor/                  Commission’s Office of External Affairs,
                                                     • cultural resources;                                  pipe storage yards, compressor stations,                at (866) 208–FERC, or on the FERC Web
                                                     • vegetation and wildlife;                             and access roads). Our EA for this                      site at www.ferc.gov using the
                                                     • air quality and noise;                               project will document our findings on                   ‘‘eLibrary’’ link. Click on the eLibrary
                                                     • endangered and threatened species;                   the impacts on historic properties and                  link, click on ‘‘General Search’’ and
                                                     • public safety; and                                   summarize the status of consultations                   enter the docket number, excluding the
                                                     • cumulative impacts.                                  under section 106.                                      last three digits in the Docket Number
                                                     We will also evaluate reasonable                                                                               field (i.e., CP16–494). Be sure you have
                                                                                                            Environmental Mailing List
                                                  alternatives to the proposed project or                                                                           selected an appropriate date range. For
                                                  portions of the project, and make                            The environmental mailing list                       assistance, please contact FERC Online
                                                  recommendations on how to lessen or                       includes federal, state, and local                      Support at FercOnlineSupport@ferc.gov
                                                  avoid impacts on the various resource                     government representatives and                          or toll free at (866) 208–3676, or for
                                                  areas.                                                    agencies; elected officials;                            TTY, contact (202) 502–8659. The
                                                     The EA will present our independent                    environmental and public interest                       eLibrary link also provides access to the
                                                  analysis of the issues. The EA will be                    groups; Native American Tribes; other                   texts of formal documents issued by the
                                                  available in the public record through                    interested parties; and local libraries                 Commission, such as orders, notices,
                                                  eLibrary. Depending on the comments                       and newspapers. This list also includes                 and rulemakings.
                                                  received during the scoping process, we                   all affected landowners (as defined in                     In addition, the Commission offers a
                                                  may publish and distribute the EA to                      the Commission’s regulations) who are                   free service called eSubscription which
                                                  the public for an allotted comment                        potential right-of-way grantors, whose                  allows you to keep track of all formal
                                                  period. We will consider all comments                     property may be used temporarily for                    issuances and submittals in specific
                                                  on the EA before making our                               project purposes, or who own homes                      dockets. This can reduce the amount of
                                                  recommendations to the Commission.                        within certain distances of aboveground                 time you spend researching proceedings
                                                  To ensure we have the opportunity to                      facilities, and anyone who submits                      by automatically providing you with
                                                  consider and address your comments,                       comments on the project. We will                        notification of these filings, document
                                                  please carefully follow the instructions                  update the environmental mailing list as                summaries, and direct links to the
                                                  in the Public Participation section,                      the analysis proceeds to ensure that we                 documents. Go to www.ferc.gov/docs-
                                                  beginning on page 2.                                      send the information related to this                    filing/esubscription.asp.
                                                     With this notice, we are asking                        environmental review to all individuals,                   Finally, public meetings or site visits
                                                  agencies with jurisdiction by law and/                    organizations, and government entities                  will be posted on the Commission’s
                                                  or special expertise with respect to the                  interested in and/or potentially affected               calendar located at www.ferc.gov/
                                                  environmental issues of this project to                   by the proposed project.                                EventCalendar/EventsList.aspx along
                                                  formally cooperate with us in the                            If we publish and distribute the EA,                 with other related information.
                                                  preparation of the EA.3 Agencies that                     copies EA will be sent to the
                                                                                                                                                                      Dated: September 22, 2016.
                                                  would like to request cooperating                         environmental mailing list for public
                                                                                                            review and comment. If you would                        Kimberly D. Bose,
                                                  agency status should follow the
                                                                                                            prefer to receive a paper copy of the                   Secretary.
                                                  instructions for filing comments
                                                  provided under the Public Participation                   document instead of the CD version or                   [FR Doc. 2016–23516 Filed 9–28–16; 8:45 am]
                                                  section of this notice.                                   would like to remove your name from                     BILLING CODE 6717–01–P
                                                                                                            the mailing list, please return the
                                                  Consultations Under Section 106 of the                    attached Information Request (appendix
                                                  National Historic Preservation Act                        2).                                                     DEPARTMENT OF ENERGY
                                                    In accordance with the Advisory                         Becoming an Intervenor                                  Federal Energy Regulatory
                                                  Council on Historic Preservation’s                                                                                Commission
                                                  implementing regulations for section                         In addition to involvement in the EA
                                                  106 of the National Historic                              scoping process, you may want to                        [Docket No. EL16–117–000]
                                                  Preservation Act, we are using this                       become an ‘‘intervenor’’ which is an
                                                  notice to initiate consultation with the                  official party to the Commission’s                      Vote Solar Initiative, Montana
                                                  applicable State Historic Preservation                    proceeding. Intervenors play a more                     Environmental Information Center v.
                                                  Office (SHPO), and to solicit their views                 formal role in the process and are able                 Montana Public Service Commission;
                                                  and those of other government agencies,                   to file briefs, appear at hearings, and be              Notice of Complaint
                                                  interested Indian tribes, and the public                  heard by the courts if they choose to
                                                                                                            appeal the Commission’s final ruling.                      Take notice that on September 19,
                                                  on the project’s potential effects on                                                                             2016, pursuant to Rule 206 of the
                                                  historic properties.4 We will define the                  An intervenor formally participates in
                                                                                                            the proceeding by filing a request to                   Federal Energy Regulatory
                                                                                                                                                                    Commission’s (Commission) Rules of
mstockstill on DSK3G9T082PROD with NOTICES




                                                    3 The Council on Environmental Quality                  intervene. Instructions for becoming an
                                                  regulations addressing cooperating agency                 intervenor are in the ‘‘Document-less                   Practice and Procedure, 18 CFR 385.206,
                                                  responsibilities are at Title 40, Code of Federal         Intervention Guide’’ under the ‘‘e-filing’’             Vote Solar Initiative and Montana
                                                  Regulations, Part 1501.6.
                                                                                                            link on the Commission’s Web site.                      Environmental Information Center
                                                    4 The Advisory Council on Historic Preservation’s
                                                                                                            Motions to intervene are more fully                     (collectively, Vote Solar) filed a formal
                                                  regulations are at Title 36, Code of Federal
                                                  Regulations, Part 800. Those regulations define
                                                                                                                                                                    complaint against Montana Public
                                                  historic properties as any prehistoric or historic        in or eligible for inclusion in the National Register   Service Commission (Respondent)
                                                  district, site, building, structure, or object included   of Historic Places.                                     alleging that Respondent violated


                                             VerDate Sep<11>2014    18:51 Sep 28, 2016   Jkt 238001   PO 00000   Frm 00042    Fmt 4703   Sfmt 4703   E:\FR\FM\29SEN1.SGM   29SEN1



Document Created: 2016-09-29 04:14:58
Document Modified: 2016-09-29 04:14:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 66959 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR