Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for each calendar year.

Federal Register, Volume 81 Issue 34 (Monday, February 22, 2016)
[Federal Register Volume 81, Number 34 (Monday, February 22, 2016)]
[Rules and Regulations]
[Pages 8644-8645]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-03507]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

18 CFR Part 157

[Docket No. RM81-19-000]


Natural Gas Pipelines; Project Cost and Annual Limits

AGENCY: Federal Energy Regulatory Commission, Energy.

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), 
the Director of the Office of Energy Projects (OEP) computes and 
publishes the project cost and annual limits for natural gas pipelines 
blanket construction certificates for each calendar year.

DATES: This final rule is effective February 22, 2016 and establishes 
cost limits applicable from January 1, 2016 through December 31, 2016.

FOR FURTHER INFORMATION CONTACT: Marsha K. Palazzi, Chief, Certificates 
Branch 2, Division of Pipeline Certificates, (202) 502-6785.
    Section 157.208(d) of the Commission's Regulations provides for 
project cost limits applicable to construction, acquisition, operation 
and miscellaneous rearrangement of facilities (Table I) authorized 
under the blanket certificate procedure (Order No. 234, 19 FERC ] 
61,216). Section 157.215(a) specifies the calendar year dollar limit 
which may be expended on underground storage testing and development 
(Table II) authorized under the blanket certificate. Section 157.208(d) 
requires that the ``limits specified in Tables I and II shall be 
adjusted each calendar year to reflect the `GDP implicit price 
deflator' published by the Department of Commerce for the previous 
calendar year.''
    Pursuant to 375.308(x)(1) of the Commission's Regulations, the 
authority for the publication of such cost limits, as adjusted for 
inflation, is delegated to the Director of the Office of Energy 
Projects. The cost limits for calendar year 2014, as published in Table 
I of 157.208(d) and Table II of Sec.  157.215(a), are hereby issued.

Effective Date

    This final rule is effective February 22, 2016. The provisions of 5 
U.S.C. 804 regarding Congressional review of Final Rules does not apply 
to the Final Rule because the rule concerns agency procedure and 
practice and will not substantially affect the rights or obligations of 
non-agency parties. The Final Rule merely updates amounts published in 
the Code of Federal Regulations to reflect the Department of Commerce's 
latest annual determination of the Gross Domestic Product (GDP) 
implicit price deflator, a mathematical updating required by the 
Commission's existing regulations.

List of Subjects in 18 CFR Part 157

    Administrative practice and procedure, Natural gas, Reporting and 
recordkeeping requirements.

    Issued: February 11, 2016.
Ann Miles,
Director, Office of Energy Projects.
    Accordingly, 18 CFR part 157 is amended as follows:

PART 157--[AMENDED]

0
1. The authority citation for Part 157 continues to read as follows:

    Authority:  15 U.S.C. 717-717w, 3301-3432; 42 U.S.C. 7101-7352.


0
2. Table I in Sec.  157.208(d) is revised to read as follows:


Sec.  157.208  Construction, acquisition, operation, replacement, and 
miscellaneous rearrangement of facilities.

* * * * *
    (d) * * *

                                 Table I
------------------------------------------------------------------------
                                                       Limit
                                         -------------------------------
                  Year                      Auto. proj.    Prior notice
                                            cost limit      proj. cost
                                              (Col.1)      limit (Col.2)
------------------------------------------------------------------------
1982                                          $4,200,000     $12,000,000

[[Page 8645]]

 
1983                                           4,500,000      12,800,000
1984                                           4,700,000      13,300,000
1985                                           4,900,000      13,800,000
1986                                           5,100,000      14,300,000
1987                                           5,200,000      14,700,000
1988                                           5,400,000      15,100,000
1989                                           5,600,000      15,600,000
1990                                           5,800,000      16,000,000
1991                                           6,000,000      16,700,000
1992                                           6,200,000      17,300,000
1993                                           6,400,000      17,700,000
1994                                           6,600,000      18,100,000
1995                                           6,700,000      18,400,000
1996                                           6,900,000      18,800,000
1997                                           7,000,000      19,200,000
1998                                           7,100,000      19,600,000
1999                                           7,200,000      19,800,000
2000                                           7,300,000      20,200,000
2001                                           7,400,000      20,600,000
2002                                           7,500,000      21,000,000
2003                                           7,600,000      21,200,000
2004                                           7,800,000      21,600,000
2005                                           8,000,000      22,000,000
2006                                           9,600,000      27,400,000
2007                                           9,900,000      28,200,000
2008                                          10,200,000      29,000,000
2009                                          10,400,000      29,600,000
2010                                          10,500,000      29,900,000
2011                                          10,600,000      30,200,000
2012                                          10,800,000      30,800,000
2013                                          11,000,000      31,400,000
2014                                          11,200,000      31,900,000
2015                                          11,400,000      32,300,000
2016                                          11,600,000      32,800,000
------------------------------------------------------------------------

* * * * *

0
3. Table II in Sec.  157.215(a)(5) is revised to read as follows:


Sec.  157.215  Underground storage testing and development.

    (a) * * *
    (5) * * *

                                Table II
------------------------------------------------------------------------
                          Year                                 Limit
------------------------------------------------------------------------
1982....................................................      $2,700,000
1983....................................................       2,900,000
1984....................................................       3,000,000
1985....................................................       3,100,000
1986....................................................       3,200,000
1987....................................................       3,300,000
1988....................................................       3,400,000
1989....................................................       3,500,000
1990....................................................       3,600,000
1991....................................................       3,800,000
1992....................................................       3,900,000
1993....................................................       4,000,000
1994....................................................       4,100,000
1995....................................................       4,200,000
1996....................................................       4,300,000
1997....................................................       4,400,000
1998....................................................       4,500,000
1999....................................................       4,550,000
2000....................................................       4,650,000
2001....................................................       4,750,000
2002....................................................       4,850,000
2003....................................................       4,900,000
2004....................................................       5,000,000
2005....................................................       5,100,000
2006....................................................       5,250,000
2007....................................................       5,400,000
2008....................................................       5,550,000
2009....................................................       5,600,000
2010....................................................       5,700,000
2011....................................................       5,750,000
2012....................................................       5,850,000
2013....................................................       6,000,000
2014....................................................       6,100,000
2015....................................................       6,200,000
2016....................................................       6,300,000
------------------------------------------------------------------------

* * * * *
[FR Doc. 2016-03507 Filed 2-19-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                8644             Federal Register / Vol. 81, No. 34 / Monday, February 22, 2016 / Rules and Regulations

                                                of this Service Bulletin,’’ this AD requires               (3) For service information identified in          development (Table II) authorized under
                                                compliance within the specified compliance              this AD, contact Boeing Commercial                    the blanket certificate. Section
                                                time after the effective date of this AD.               Airplanes, Attention: Data & Services                 157.208(d) requires that the ‘‘limits
                                                                                                        Management, P.O. Box 3707, MC 2H–65,                  specified in Tables I and II shall be
                                                (i) Alternative Methods of Compliance                   Seattle, WA 98124–2207; telephone 206–
                                                (AMOCs)                                                 544–5000, extension 1; fax 206–766–5680;
                                                                                                                                                              adjusted each calendar year to reflect
                                                   (1) The Manager, Seattle Aircraft                    Internet https://www.myboeingfleet.com.               the ‘GDP implicit price deflator’
                                                Certification Office (ACO), FAA, has the                   (4) You may view this service information          published by the Department of
                                                authority to approve AMOCs for this AD, if              at FAA, Transport Airplane Directorate, 1601          Commerce for the previous calendar
                                                requested using the procedures found in 14              Lind Avenue SW., Renton, WA. For                      year.’’
                                                CFR 39.19. In accordance with 14 CFR 39.19,             information on the availability of this                 Pursuant to 375.308(x)(1) of the
                                                send your request to your principal inspector           material at the FAA, call 425–227–1221.               Commission’s Regulations, the authority
                                                or local Flight Standards District Office, as              (5) You may view this service information          for the publication of such cost limits,
                                                appropriate. If sending information directly            that is incorporated by reference at the              as adjusted for inflation, is delegated to
                                                to the manager of the ACO, send it to the               National Archives and Records                         the Director of the Office of Energy
                                                attention of the person identified in                   Administration (NARA). For information on             Projects. The cost limits for calendar
                                                paragraph (j) of this AD. Information may be            the availability of this material at NARA, call
                                                emailed to: 9-ANM-Seattle-ACO-AMOC-                     202–741–6030, or go to: http://www.archives.
                                                                                                                                                              year 2014, as published in Table I of
                                                Requests@faa.gov.                                       gov/federal-register/cfr/ibr-locations.html.          157.208(d) and Table II of § 157.215(a),
                                                   (2) Before using any approved AMOC,                                                                        are hereby issued.
                                                                                                          Issued in Renton, Washington on February
                                                notify your appropriate principal inspector,                                                                  Effective Date
                                                                                                        10, 2016.
                                                or lacking a principal inspector, the manager
                                                of the local flight standards district office/          Michael Kaszycki,                                       This final rule is effective February
                                                certificate holding district office.                    Acting Manager, Transport Airplane                    22, 2016. The provisions of 5 U.S.C. 804
                                                   (3) An AMOC that provides an acceptable              Directorate, Aircraft Certification Service.          regarding Congressional review of Final
                                                level of safety may be used for any repair,             [FR Doc. 2016–03456 Filed 2–19–16; 8:45 am]           Rules does not apply to the Final Rule
                                                modification, or alteration required by this            BILLING CODE 4910–13–P                                because the rule concerns agency
                                                AD if it is approved by the Boeing                                                                            procedure and practice and will not
                                                Commercial Airplanes Organization
                                                                                                                                                              substantially affect the rights or
                                                Designation Authorization (ODA) that has
                                                been authorized by the Manager, Seattle                 DEPARTMENT OF ENERGY                                  obligations of non-agency parties. The
                                                ACO, to make those findings. To be                                                                            Final Rule merely updates amounts
                                                approved, the repair method, modification               Federal Energy Regulatory                             published in the Code of Federal
                                                deviation, or alteration deviation must meet            Commission                                            Regulations to reflect the Department of
                                                the certification basis of the airplane, and the                                                              Commerce’s latest annual determination
                                                approval must specifically refer to this AD.            18 CFR Part 157                                       of the Gross Domestic Product (GDP)
                                                   (4) For service information that contains                                                                  implicit price deflator, a mathematical
                                                steps that are labeled as Required for                  [Docket No. RM81–19–000]
                                                                                                                                                              updating required by the Commission’s
                                                Compliance (RC), the provisions of                                                                            existing regulations.
                                                paragraphs (i)(4)(i) and (i)(4)(ii) of this AD          Natural Gas Pipelines; Project Cost
                                                apply.                                                  and Annual Limits                                     List of Subjects in 18 CFR Part 157
                                                   (i) The steps labeled as RC, including
                                                substeps under an RC step and any figures
                                                                                                        AGENCY:  Federal Energy Regulatory                      Administrative practice and
                                                identified in an RC step, must be done to               Commission, Energy.                                   procedure, Natural gas, Reporting and
                                                comply with the AD. An AMOC is required                 ACTION: Final rule.                                   recordkeeping requirements.
                                                for any deviations to RC steps, including                                                                       Issued: February 11, 2016.
                                                substeps and identified figures.                        SUMMARY:    Pursuant to the authority
                                                                                                        delegated by 18 CFR 375.308(x)(1), the                Ann Miles,
                                                   (ii) Steps not labeled as RC may be
                                                deviated from using accepted methods in                 Director of the Office of Energy Projects             Director, Office of Energy Projects.
                                                accordance with the operator’s maintenance              (OEP) computes and publishes the                        Accordingly, 18 CFR part 157 is
                                                or inspection program without obtaining                 project cost and annual limits for                    amended as follows:
                                                approval of an AMOC, provided the RC steps,             natural gas pipelines blanket
                                                including substeps and identified figures, can                                                                PART 157—[AMENDED]
                                                                                                        construction certificates for each
                                                still be done as specified, and the airplane
                                                                                                        calendar year.                                        ■ 1. The authority citation for Part 157
                                                can be put back in an airworthy condition.
                                                                                                        DATES: This final rule is effective                   continues to read as follows:
                                                (j) Related Information                                 February 22, 2016 and establishes cost                  Authority: 15 U.S.C. 717–717w, 3301–
                                                   For more information about this AD,                  limits applicable from January 1, 2016                3432; 42 U.S.C. 7101–7352.
                                                contact Wayne Lockett, Aerospace Engineer,              through December 31, 2016.
                                                Airframe Branch, ANM–120S, FAA, Seattle                                                                       ■ 2. Table I in § 157.208(d) is revised to
                                                                                                        FOR FURTHER INFORMATION CONTACT:
                                                ACO, 1601 Lind Avenue SW., Renton, WA                                                                         read as follows:
                                                98057–3356; phone: 425–917–6447; fax: 425–
                                                                                                        Marsha K. Palazzi, Chief, Certificates
                                                917–6590; email: wayne.lockett@faa.gov.                 Branch 2, Division of Pipeline                        § 157.208 Construction, acquisition,
                                                                                                        Certificates, (202) 502–6785.                         operation, replacement, and miscellaneous
                                                (k) Material Incorporated by Reference                    Section 157.208(d) of the                           rearrangement of facilities.
                                                   (1) The Director of the Federal Register             Commission’s Regulations provides for                 *       *    *      *      *
                                                approved the incorporation by reference                 project cost limits applicable to                         (d) * * *
                                                (IBR) of the service information listed in this         construction, acquisition, operation and
mstockstill on DSK4VPTVN1PROD with RULES




                                                paragraph under 5 U.S.C. 552(a) and 1 CFR               miscellaneous rearrangement of                                            TABLE I
                                                part 51.
                                                                                                        facilities (Table I) authorized under the
                                                   (2) You must use this service information                                                                                             Limit
                                                as applicable to do the actions required by             blanket certificate procedure (Order No.
                                                this AD, unless the AD specifies otherwise.             234, 19 FERC ¶ 61,216). Section                        Year       Auto. proj. cost   Prior notice proj.
                                                   (i) Boeing Alert Service Bulletin 767–               157.215(a) specifies the calendar year                             limit (Col.1)     cost limit (Col.2)
                                                53A0263, dated January 12, 2015.                        dollar limit which may be expended on
                                                   (ii) Reserved.                                       underground storage testing and                       1982              $4,200,000        $12,000,000



                                           VerDate Sep<11>2014   16:09 Feb 19, 2016   Jkt 238001   PO 00000   Frm 00006   Fmt 4700   Sfmt 4700   E:\FR\FM\22FER1.SGM   22FER1


                                                                       Federal Register / Vol. 81, No. 34 / Monday, February 22, 2016 / Rules and Regulations                                                               8645

                                                               TABLE I—Continued                                                   TABLE II—Continued                              telephone 206–220–7282, email d13-pf-
                                                                                                                                                                                   d13bridges@uscg.mil.
                                                                                      Limit                                           Year                             Limit
                                                                                                                                                                                   SUPPLEMENTARY INFORMATION:      The
                                                  Year        Auto. proj. cost                  Prior notice proj.   2002   ......................................     4,850,000   Washington State Department of
                                                               limit (Col.1)                    cost limit (Col.2)   2003   ......................................     4,900,000   Transportation (WSDOT) requested
                                                                                                                     2004   ......................................     5,000,000   permission for the SR 529 highway
                                                1983                    4,500,000                     12,800,000     2005   ......................................     5,100,000
                                                1984                    4,700,000                     13,300,000                                                                   bridges across the Snohomish River and
                                                                                                                     2006   ......................................     5,250,000
                                                1985                    4,900,000                     13,800,000                                                                   Steamboat Slough to remain in the
                                                                                                                     2007   ......................................     5,400,000
                                                1986                    5,100,000                     14,300,000     2008   ......................................     5,550,000   closed-to-navigation position to
                                                1987                    5,200,000                     14,700,000     2009   ......................................     5,600,000   facilitate the safe, uninterrupted
                                                1988                    5,400,000                     15,100,000     2010   ......................................     5,700,000   roadway passage of participants in the
                                                1989                    5,600,000                     15,600,000     2011   ......................................     5,750,000   Everett Marathon. The SR 529 highway
                                                1990                    5,800,000                     16,000,000     2012   ......................................     5,850,000
                                                1991                    6,000,000                     16,700,000                                                                   bridge over the Snohomish River at mile
                                                                                                                     2013   ......................................     6,000,000   3.6 provides 37 feet of vertical clearance
                                                1992                    6,200,000                     17,300,000     2014   ......................................     6,100,000
                                                1993                    6,400,000                     17,700,000     2015   ......................................     6,200,000   above mean high water elevation while
                                                1994                    6,600,000                     18,100,000     2016   ......................................     6,300,000   in the closed position. This bridge
                                                1995                    6,700,000                     18,400,000                                                                   operate in accordance with 33 CFR
                                                1996                    6,900,000                     18,800,000                                                                   117.1059(c). The SR 529 highway bridge
                                                1997                    7,000,000                     19,200,000     *      *         *          *         *
                                                1998                    7,100,000                     19,600,000     [FR Doc. 2016–03507 Filed 2–19–16; 8:45 am]                   over Steamboat Slough at mile 1.1 and
                                                1999                    7,200,000                     19,800,000     BILLING CODE 6717–01–P                                        1.2 provides 10 feet of vertical clearance
                                                2000                    7,300,000                     20,200,000                                                                   above mean high water elevation while
                                                2001                    7,400,000                     20,600,000                                                                   in the closed position. This bridge
                                                2002                    7,500,000                     21,000,000                                                                   operate in accordance with 33 CFR
                                                                                                                     DEPARTMENT OF HOMELAND
                                                2003                    7,600,000                     21,200,000                                                                   117.1059(g). This deviation allows the
                                                2004                    7,800,000                     21,600,000
                                                                                                                     SECURITY
                                                2005                    8,000,000                     22,000,000
                                                                                                                                                                                   SR 529 bridges crossing the Snohomish
                                                2006                    9,600,000                     27,400,000
                                                                                                                     Coast Guard                                                   River and Steamboat Slough to remain
                                                2007                    9,900,000                     28,200,000                                                                   in the closed-to-navigation position
                                                2008                   10,200,000                     29,000,000     33 CFR Part 117                                               from 7:30 a.m. to 11:00 a.m. on April 10,
                                                2009                   10,400,000                     29,600,000                                                                   2016. The bridges shall operate in
                                                2010                   10,500,000                     29,900,000     [Docket No. USCG–2016–0124]
                                                                                                                                                                                   accordance to 33 CFR 117.1059 at all
                                                2011                   10,600,000                     30,200,000
                                                                                                                     Drawbridge Operation Regulation;                              other times.
                                                2012                   10,800,000                     30,800,000
                                                2013                   11,000,000                     31,400,000     Snohomish River and Steamboat                                    Vessels able to pass through the
                                                2014                   11,200,000                     31,900,000     Slough, Everett and Marysville, WA                            bridges in the closed-to-navigation
                                                2015                   11,400,000                     32,300,000                                                                   position may do so at any time. The
                                                2016                   11,600,000                     32,800,000     AGENCY: Coast Guard, DHS.
                                                                                                                                                                                   bridges will be able to open for
                                                                                                                     ACTION:Notice of deviation from
                                                                                                                                                                                   emergencies and there is no immediate
                                                *     *     *      *    *                                            drawbridge regulation.
                                                                                                                                                                                   alternate route for vessels to pass.
                                                ■ 3. Table II in § 157.215(a)(5) is revised                                                                                        Waterway usage on this part of the
                                                                                                                     SUMMARY:   The Coast Guard has issued a
                                                to read as follows:                                                                                                                Snohomish River and Steamboat Slough
                                                                                                                     temporary deviation from the operating
                                                § 157.215 Underground storage testing                                schedule that governs the SR 529                              includes vessels ranging from
                                                and development.                                                     highway bridges across the Snohomish                          commercial tug and barge to small
                                                    (a) * * *                                                        River, mile 3.6 near Everett, WA, and                         pleasure craft. The Coast Guard will also
                                                    (5) * * *                                                        the SR 529 highway bridges across                             inform the users of the waterways
                                                                                                                     Steamboat Slough, mile 1.1 and 1.2,                           through our Local and Broadcast
                                                                           TABLE II                                  near Marysville, WA. The deviation is                         Notices to Mariners of the change in
                                                                                                                     necessary to accommodate the Everett                          operating schedule for the bridge so that
                                                                 Year                                  Limit         Marathon. The deviation allows the                            vessel operators can arrange their
                                                                                                                     bridges to remain in the closed-to-                           transits to minimize any impact caused
                                                1982   ......................................         $2,700,000     navigation position to allow for the safe
                                                1983   ......................................          2,900,000                                                                   by the temporary deviation.
                                                                                                                     movement of event participants.
                                                1984   ......................................          3,000,000                                                                      In accordance with 33 CFR 117.35(e),
                                                1985   ......................................          3,100,000     DATES: This deviation is effective from
                                                                                                                                                                                   the drawbridges must return to their
                                                1986   ......................................          3,200,000     7:30 a.m. to 11:00 a.m. on April 10,
                                                                                                                                                                                   regular operating schedule immediately
                                                1987   ......................................          3,300,000     2016.
                                                1988   ......................................          3,400,000                                                                   at the end of the effective period of this
                                                1989   ......................................          3,500,000     ADDRESSES:   The docket for this                              temporary deviation. This deviation
                                                1990   ......................................          3,600,000     deviation, [USCG–2016–0124] is                                from the operating regulations is
                                                1991   ......................................          3,800,000     available at http://www.regulations.gov.                      authorized under 33 CFR 117.35.
                                                1992   ......................................          3,900,000     Type the docket number in the
                                                1993   ......................................          4,000,000     ‘‘SEARCH’’ box and click ‘‘SEARCH.’’                            Dated: February 17, 2016.
mstockstill on DSK4VPTVN1PROD with RULES




                                                1994   ......................................          4,100,000     Click on Open Docket Folder on the line                       Steven M. Fischer,
                                                1995   ......................................          4,200,000     associated with this deviation.                               Bridge Administrator, Thirteenth Coast Guard
                                                1996   ......................................          4,300,000                                                                   District.
                                                1997   ......................................          4,400,000     FOR FURTHER INFORMATION CONTACT: If
                                                1998   ......................................          4,500,000     you have questions on this temporary                          [FR Doc. 2016–03547 Filed 2–19–16; 8:45 am]
                                                1999   ......................................          4,550,000     deviation, call or email Mr. Steven                           BILLING CODE 9110–04–P
                                                2000   ......................................          4,650,000     Fischer, Bridge Administrator,
                                                2001   ......................................          4,750,000     Thirteenth Coast Guard District;


                                           VerDate Sep<11>2014        16:09 Feb 19, 2016           Jkt 238001   PO 00000   Frm 00007       Fmt 4700       Sfmt 9990   E:\FR\FM\22FER1.SGM   22FER1



Document Created: 2016-02-19 23:56:51
Document Modified: 2016-02-19 23:56:51
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionRules and Regulations
ActionFinal rule.
DatesThis final rule is effective February 22, 2016 and establishes cost limits applicable from January 1, 2016 through December 31, 2016.
ContactMarsha K. Palazzi, Chief, Certificates Branch 2, Division of Pipeline Certificates, (202) 502-6785.
FR Citation81 FR 8644 
CFR AssociatedAdministrative Practice and Procedure; Natural Gas and Reporting and Recordkeeping Requirements

2025 Federal Register | Disclaimer | Privacy Policy