81_FR_88154 81 FR 87920 - UGI LNG, Inc.; Notice of Application

81 FR 87920 - UGI LNG, Inc.; Notice of Application

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 234 (December 6, 2016)

Page Range87920-87921
FR Document2016-29220

Federal Register, Volume 81 Issue 234 (Tuesday, December 6, 2016)
[Federal Register Volume 81, Number 234 (Tuesday, December 6, 2016)]
[Notices]
[Pages 87920-87921]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-29220]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-14-000]


UGI LNG, Inc.; Notice of Application

    Take notice that on November 14, 2016, UGI LNG, INC. (UGI LNG) One 
Meridian Boulevard, Suite 2C01, Wyomissing, Pennsylvania 19610, filed 
in Docket No. CP17-14-000, an application pursuant to section 7(c) of 
the Natural Gas Act and Part 157 of the Commission's regulations, for a 
certificate of public convenience and necessity to construct and 
operate its Temple Truck Rack Expansion Project at UGI LNG's Temple 
liquefied natural gas (LNG) storage facility located in Berks County, 
Pennsylvania. Specifically, UGI LNG requests to operate two new trailer 
loading and unloading racks at UGI LNG's Temple LNG storage facility. 
The project will be installed within the Temple Facility's existing 
footprint, and will consist of two racks with scales, trailer loading 
skid, pump skid, transfer piping and associated equipment. In addition, 
UGI LNG will also construct a new, approximately 1,500-foot driveway 
connecting the expansion to Willow Creek Road. The project will enable 
UGI LNG to provide more reliable service to its customers by allowing 
increased flexibility, coordination, and throughput of intra-tank 
transfers, all as more fully set forth in the application, which is on 
file with the Commission and open to public inspection. The filing may 
also be viewed on the web at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC at [email protected] or call toll-free, (866) 208-3676 or 
TTY, (202) 502-8659.
    Any questions regarding this application should be directed to 
Frank H. Markle, 460 N. Gulph Road, King of Prussia, PA 19406, or phone 
by: (610) 768-3625, or by email: [email protected].
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.

[[Page 87921]]

    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at http://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    There is an ``eSubscription'' link on the Web site that enables 
subscribers to receive email notification when a document is added to a 
subscribed docket(s). For assistance with any FERC Online service, 
please email [email protected], or call (866) 208-3676 (toll 
free). For TTY, call (202) 502-8659.
    Comment Date: December 20, 2016.

    Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-29220 Filed 12-5-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  87920                       Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices

                                                  response to information requests sent by                Wyomissing, Pennsylvania 19610, filed                 the date of issuance of the Commission
                                                  PJM’s Market Monitor Unit and request                   in Docket No. CP17–14–000, an                         staff’s FEIS or EA.
                                                  that the Commission issue an order                      application pursuant to section 7(c) of                  There are two ways to become
                                                  directing AEP to provide the                            the Natural Gas Act and Part 157 of the               involved in the Commission’s review of
                                                  information, all as more fully explained                Commission’s regulations, for a                       this project. First, any person wishing to
                                                  in the complaint.                                       certificate of public convenience and                 obtain legal status by becoming a party
                                                     Any person desiring to intervene or to               necessity to construct and operate its                to the proceedings for this project
                                                  protest this filing must file in                        Temple Truck Rack Expansion Project at                should, on or before the comment date
                                                  accordance with Rules 211 and 214 of                    UGI LNG’s Temple liquefied natural gas                stated below, file with the Federal
                                                  the Commission’s Rules of Practice and                  (LNG) storage facility located in Berks               Energy Regulatory Commission, 888
                                                  Procedure (18 CFR 385.211, 385.214).                    County, Pennsylvania. Specifically, UGI               First Street NE., Washington, DC 20426,
                                                  Protests will be considered by the                      LNG requests to operate two new trailer               a motion to intervene in accordance
                                                  Commission in determining the                           loading and unloading racks at UGI                    with the requirements of the
                                                  appropriate action to be taken, but will                LNG’s Temple LNG storage facility. The                Commission’s Rules of Practice and
                                                  not serve to make protestants parties to                project will be installed within the                  Procedure (18 CFR 385.214 or 385.211)
                                                  the proceeding. Any person wishing to                   Temple Facility’s existing footprint, and             and the Regulations under the NGA (18
                                                  become a party must file a notice of                    will consist of two racks with scales,                CFR 157.10). A person obtaining party
                                                  intervention or motion to intervene, as                 trailer loading skid, pump skid, transfer             status will be placed on the service list
                                                  appropriate. The Respondent’s answer                    piping and associated equipment. In                   maintained by the Secretary of the
                                                  and all interventions, or protests must                 addition, UGI LNG will also construct a               Commission and will receive copies of
                                                  be filed on or before the comment date.                 new, approximately 1,500-foot driveway                all documents filed by the applicant and
                                                  The Respondent’s answer, motions to                     connecting the expansion to Willow                    by all other parties. A party must submit
                                                  intervene, and protests must be served                  Creek Road. The project will enable UGI               7 copies of filings made with the
                                                  on the Complainants.                                    LNG to provide more reliable service to               Commission and must mail a copy to
                                                     The Commission encourages                            its customers by allowing increased                   the applicant and to every other party in
                                                  electronic submission of protests and                   flexibility, coordination, and throughput             the proceeding. Only parties to the
                                                  interventions in lieu of paper using the                of intra-tank transfers, all as more fully            proceeding can ask for court review of
                                                  ‘‘eFiling’’ link at http://www.ferc.gov.                set forth in the application, which is on             Commission orders in the proceeding.
                                                  Persons unable to file electronically                   file with the Commission and open to                     However, a person does not have to
                                                  should submit an original and 5 copies                  public inspection. The filing may also                intervene in order to have comments
                                                  of the protest or intervention to the                   be viewed on the web at http://                       considered. The second way to
                                                                                                                                                                participate is by filing with the
                                                  Federal Energy Regulatory Commission,                   www.ferc.gov using the ‘‘eLibrary’’ link.
                                                                                                                                                                Secretary of the Commission, as soon as
                                                  888 First Street NE., Washington, DC                    Enter the docket number excluding the
                                                                                                                                                                possible, an original and two copies of
                                                  20426.                                                  last three digits in the docket number
                                                                                                                                                                comments in support of or in opposition
                                                     This filing is accessible on-line at                 field to access the document. For
                                                                                                                                                                to this project. The Commission will
                                                  http://www.ferc.gov, using the                          assistance, contact FERC at
                                                                                                                                                                consider these comments in
                                                  ‘‘eLibrary’’ link and is available for                  FERCOnlineSupport@ferc.gov or call
                                                                                                                                                                determining the appropriate action to be
                                                  electronic review in the Commission’s                   toll-free, (866) 208–3676 or TTY, (202)
                                                                                                                                                                taken, but the filing of a comment alone
                                                  Public Reference Room in Washington,                    502–8659.
                                                                                                                                                                will not serve to make the filer a party
                                                  DC. There is an ‘‘eSubscription’’ link on                  Any questions regarding this                       to the proceeding. The Commission’s
                                                  the Web site that enables subscribers to                application should be directed to Frank               rules require that persons filing
                                                  receive email notification when a                       H. Markle, 460 N. Gulph Road, King of                 comments in opposition to the project
                                                  document is added to a subscribed                       Prussia, PA 19406, or phone by: (610)                 provide copies of their protests only to
                                                  docket(s). For assistance with any FERC                 768–3625, or by email: marklef@                       the party or parties directly involved in
                                                  Online service, please email                            ugicorp.com.                                          the protest.
                                                  FERCOnlineSupport@ferc.gov, or call                        Pursuant to section 157.9 of the                      Persons who wish to comment only
                                                  (866) 208–3676 (toll free). For TTY, call               Commission’s rules, 18 CFR 157.9,                     on the environmental review of this
                                                  (202) 502–8659.                                         within 90 days of this Notice the                     project should submit an original and
                                                     Comment Date: 5:00 p.m. Eastern                      Commission staff will either: Complete                two copies of their comments to the
                                                  Time on December 20, 2016.                              its environmental assessment (EA) and                 Secretary of the Commission.
                                                    Dated: November 30, 2016.                             place it into the Commission’s public                 Environmental commentors will be
                                                  Kimberly D. Bose,                                       record (eLibrary) for this proceeding; or             placed on the Commission’s
                                                  Secretary.                                              issue a Notice of Schedule for                        environmental mailing list, will receive
                                                  [FR Doc. 2016–29224 Filed 12–5–16; 8:45 am]
                                                                                                          Environmental Review. If a Notice of                  copies of the environmental documents,
                                                                                                          Schedule for Environmental Review is                  and will be notified of meetings
                                                  BILLING CODE 6717–01–P
                                                                                                          issued, it will indicate, among other                 associated with the Commission’s
                                                                                                          milestones, the anticipated date for the              environmental review process.
                                                  DEPARTMENT OF ENERGY                                    Commission staff’s issuance of the final              Environmental commentors will not be
                                                                                                          environmental impact statement (FEIS)                 required to serve copies of filed
                                                  Federal Energy Regulatory                               or EA for this proposal. The filing of the            documents on all other parties.
                                                                                                          EA in the Commission’s public record                  However, the non-party commentors
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Commission
                                                                                                          for this proceeding or the issuance of a              will not receive copies of all documents
                                                  [Docket No. CP17–14–000]                                Notice of Schedule for Environmental                  filed by other parties or issued by the
                                                  UGI LNG, Inc.; Notice of Application                    Review will serve to notify federal and               Commission (except for the mailing of
                                                                                                          state agencies of the timing for the                  environmental documents issued by the
                                                    Take notice that on November 14,                      completion of all necessary reviews, and              Commission) and will not have the right
                                                  2016, UGI LNG, INC. (UGI LNG) One                       the subsequent need to complete all                   to seek court review of the
                                                  Meridian Boulevard, Suite 2C01,                         federal authorizations within 90 days of              Commission’s final order.


                                             VerDate Sep<11>2014   17:39 Dec 05, 2016   Jkt 241001   PO 00000   Frm 00019   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1


                                                                              Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices                                                 87921

                                                    The Commission strongly encourages                    the docket number field to access the                 to this project. The Commission will
                                                  electronic filings of comments, protests                document. For assistance, please contact              consider these comments in
                                                  and interventions in lieu of paper using                FERC at FERCOnlineSupport@ferc.gov                    determining the appropriate action to be
                                                  the ‘‘eFiling’’ link at http://                         or call toll-free, (886) 208–3676 or TYY,             taken, but the filing of a comment alone
                                                  www.ferc.gov. Persons unable to file                    (202) 502–8659.                                       will not serve to make the filer a party
                                                  electronically should submit an original                   Any questions regarding this                       to the proceeding. The Commission’s
                                                  and 5 copies of the protest or                          Application should be directed to Salud               rules require that persons filing
                                                  intervention to the Federal Energy                      Astruc, Gas Transmission Certificates,                comments in opposition to the project
                                                  Regulatory Commission, 888 First Street                 Dominion Cove Point LNG, LP, 707 East
                                                                                                                                                                provide copies of their protests only to
                                                  NE., Washington, DC 20426.                              Main Street, Richmond, Virginia 23219,
                                                                                                                                                                the party or parties directly involved in
                                                    There is an ‘‘eSubscription’’ link on                 or by telephone at (866) 319–3382.
                                                                                                             Pursuant to section 157.9 of the                   the protest.
                                                  the Web site that enables subscribers to
                                                  receive email notification when a                       Commission’s rules, 18 CFR 157.9,                        Persons who wish to comment only
                                                  document is added to a subscribed                       within 90 days of this Notice the                     on the environmental review of this
                                                  docket(s). For assistance with any FERC                 Commission staff will either: Complete                project should submit an original and
                                                  Online service, please email                            its environmental assessment (EA) and                 two copies of their comments to the
                                                  FERCOnlineSupport@ferc.gov, or call                     place it into the Commission’s public                 Secretary of the Commission.
                                                  (866) 208–3676 (toll free). For TTY, call               record (eLibrary) for this proceeding; or             Environmental commenter’s will be
                                                  (202) 502–8659.                                         issue a Notice of Schedule for                        placed on the Commission’s
                                                    Comment Date: December 20, 2016.                      Environmental Review. If a Notice of                  environmental mailing list, will receive
                                                                                                          Schedule for Environmental Review is                  copies of the environmental documents,
                                                    Dated: November 29, 2016.                             issued, it will indicate, among other
                                                  Kimberly D. Bose,                                                                                             and will be notified of meetings
                                                                                                          milestones, the anticipated date for the
                                                  Secretary.                                                                                                    associated with the Commission’s
                                                                                                          Commission staff’s issuance of the final
                                                                                                                                                                environmental review process.
                                                  [FR Doc. 2016–29220 Filed 12–5–16; 8:45 am]             environmental impact statement (FEIS)
                                                                                                          or EA for this proposal. The filing of the            Environmental commenter’s will not be
                                                  BILLING CODE 6717–01–P
                                                                                                          EA in the Commission’s public record                  required to serve copies of filed
                                                                                                          for this proceeding or the issuance of a              documents on all other parties.
                                                  DEPARTMENT OF ENERGY                                    Notice of Schedule for Environmental                  However, the non-party commentary,
                                                                                                          Review will serve to notify federal and               will not receive copies of all documents
                                                  Federal Energy Regulatory                               state agencies of the timing for the                  filed by other parties or issued by the
                                                  Commission                                              completion of all necessary reviews, and              Commission (except for the mailing of
                                                  [Docket No. CP17–15–000]                                the subsequent need to complete all                   environmental documents issued by the
                                                                                                          federal authorizations within 90 days of              Commission) and will not have the right
                                                  Dominion Cove Point LNG, LP; Notice                     the date of issuance of the Commission                to seek court review of the
                                                  of Application                                          staff’s FEIS or EA.                                   Commission’s final order.
                                                                                                             There are two ways to become
                                                     Take notice that on November 15,                                                                              The Commission strongly encourages
                                                                                                          involved in the Commission’s review of
                                                  2016, Dominion Cove Point LNG, LP                                                                             electronic filings of comments, protests
                                                                                                          this project. First, any person wishing to
                                                  (Cove Point), 707 East Main Street,                     obtain legal status by becoming a party               and interventions in lieu of paper using
                                                  Richmond, Virginia, filed in Docket No.                 to the proceedings for this project                   the ‘‘eFiling’’ link at http://
                                                  CP17–15–000, an application pursuant                    should, on or before the comment date                 www.ferc.gov. Persons unable to file
                                                  to section 7(c) of the Natural Gas Act                  stated below, file with the Federal                   electronically should submit an original
                                                  and Part 157 of the Commission’s                        Energy Regulatory Commission, 888                     and 5 copies of the protest or
                                                  regulations requesting authorization of                 First Street NE., Washington, DC 20426,               intervention to the Federal Energy
                                                  its Eastern Market Access Project                       a motion to intervene in accordance                   Regulatory Commission, 888 First Street
                                                  (Project) consisting of one new                         with the requirements of the                          NE., Washington, DC 20426. See, 18
                                                  compressor station, additional                          Commission’s Rules of Practice and                    CFR 385.2001(a) (1) (iii) and the
                                                  compression at an existing station, and                 Procedure (18 CFR 385.214 or 385.211)                 instructions on the Commission’s Web
                                                  re-wheeling of a compressor unit at an                  and the Regulations under the NGA (18                 site under the ‘‘e-Filing’’ link.
                                                  existing compressor station for an                      CFR 157.10). A person obtaining party                    Comment Date: 5:00 p.m. Eastern
                                                  increase of 31,370 horsepower in                        status will be placed on the service list
                                                  Charles County, Maryland and Loudon                                                                           Time on December 21, 2016.
                                                                                                          maintained by the Secretary of the
                                                  and Fairfax Counties, Virginia. The                     Commission and will receive copies of                   Dated: November 30, 2016.
                                                  Project would also construct two new                    all documents filed by the applicant and              Kimberly D. Bose,
                                                  delivery taps in Charles County,                        by all other parties. A party must submit             Secretary.
                                                  Maryland. The Project would cost                        7 copies of filings made with the                     [FR Doc. 2016–29221 Filed 12–5–16; 8:45 am]
                                                  approximately $147.3 million and                        Commission and must mail a copy to
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  would enable 294,000 dekatherms per                     the applicant and to every other party in
                                                  day of firm natural gas transportation                  the proceeding. Only parties to the
                                                  service to Washington Gas Light                         proceeding can ask for court review of
                                                  Company and Mattawoman Energy,                          Commission orders in the proceeding.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  LLC, all as more fully set forth in the                    However, a person does not have to
                                                  application which is on file with the                   intervene in order to have comments
                                                  Commission and open to public                           considered. The second way to
                                                  inspection. This filing may be viewed                   participate is by filing with the
                                                  on the web at http://www.ferc.gov using                 Secretary of the Commission, as soon as
                                                  the ‘‘eLibrary’’ link. Enter the docket                 possible, an original and two copies of
                                                  number excluding the last three digits in               comments in support of or in opposition


                                             VerDate Sep<11>2014   17:39 Dec 05, 2016   Jkt 241001   PO 00000   Frm 00020   Fmt 4703   Sfmt 9990   E:\FR\FM\06DEN1.SGM   06DEN1



Document Created: 2016-12-06 02:19:05
Document Modified: 2016-12-06 02:19:05
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
DatesDecember 20, 2016.
FR Citation81 FR 87920 