81_FR_88156 81 FR 87922 - Brookfield White Pine Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

81 FR 87922 - Brookfield White Pine Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 234 (December 6, 2016)

Page Range87922-87922
FR Document2016-29226

Federal Register, Volume 81 Issue 234 (Tuesday, December 6, 2016)
[Federal Register Volume 81, Number 234 (Tuesday, December 6, 2016)]
[Notices]
[Page 87922]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-29226]



[[Page 87922]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 11834-065]


Brookfield White Pine Hydro, LLC; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Temporary Variance of 
Minimum Flow Requirements.
    b. Project No.: 11834-065.
    c. Date Filed: November 23, 2016.
    d. Applicant: Brookfield White Pine Hydro, LLC (licensee).
    e. Name of Project: Upper and Middle Dams Storage Hydroelectric 
Project.
    f. Location: Rapid River in Oxford and Franklin counties, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Kelly Maloney, Manager, Licensing and 
Compliance, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, 
ME 04240, Phone: (207) 755-5605.
    i. FERC Contact: Robert Ballantine, (202) 502-6289, or 
[email protected].
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice 
(by December 29, 2016). The Commission strongly encourages electronic 
filing. Please file motions to intervene, protests, comments, or 
recommendations using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-11834-065) 
on any comments, motions to intervene, protests, or recommendations 
filed.
    k. Description of Request: The licensee requests a temporary 
variance of the minimum flow requirements in the Rapid River below the 
Middle Dam development due to drought conditions. License Article 402, 
in part, requires the licensee to release from September 16 through the 
start of the spring refill of Richardson Lake, a minimum flow of 472 
cubic feet per second (cfs). The licensee explains that due to drought 
conditions, Richardson Lake is below its long term average. Considering 
a dry long term precipitation forecast and the impending winter freeze 
up, the licensee is concerned that the reservoir may not refill by 
spring as intended, which could cause additional water level and 
minimum flow issues in the spring of 2017. Therefore in order to 
conserve as much fall runoff as possible, the licensee is requesting to 
reduce the minimum flow to 200 cfs until April 23, 2017, at which time 
a minimum flow of 382 cfs would be released in accordance with the 
requirements of Article 402.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at http://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of proposed action. Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-29226 Filed 12-5-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                  87922                       Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices

                                                  DEPARTMENT OF ENERGY                                    development due to drought conditions.                ‘‘COMMENTS’’, ‘‘PROTEST’’, or
                                                                                                          License Article 402, in part, requires the            ‘‘MOTION TO INTERVENE’’ as
                                                  Federal Energy Regulatory                               licensee to release from September 16                 applicable; (2) set forth in the heading
                                                  Commission                                              through the start of the spring refill of             the name of the applicant and the
                                                  [Project No. 11834–065]                                 Richardson Lake, a minimum flow of                    project number of the application to
                                                                                                          472 cubic feet per second (cfs). The                  which the filing responds; (3) furnish
                                                  Brookfield White Pine Hydro, LLC;                       licensee explains that due to drought                 the name, address, and telephone
                                                  Notice of Application Accepted for                      conditions, Richardson Lake is below its              number of the person protesting or
                                                  Filing, Soliciting Comments, Motions                    long term average. Considering a dry                  intervening; and (4) otherwise comply
                                                  To Intervene, and Protests                              long term precipitation forecast and the              with the requirements of 18 CFR
                                                                                                          impending winter freeze up, the                       385.2001 through 385.2005. All
                                                     Take notice that the following                       licensee is concerned that the reservoir              comments, motions to intervene, or
                                                  hydroelectric application has been filed                may not refill by spring as intended,                 protests must set forth their evidentiary
                                                  with the Commission and is available                    which could cause additional water                    basis and otherwise comply with the
                                                  for public inspection:                                  level and minimum flow issues in the                  requirements of 18 CFR 4.34(b). All
                                                     a. Type of Application: Application                  spring of 2017. Therefore in order to                 comments, motions to intervene, or
                                                  for Temporary Variance of Minimum                       conserve as much fall runoff as possible,             protests should relate to project works
                                                  Flow Requirements.                                      the licensee is requesting to reduce the              which are the subject of proposed
                                                     b. Project No.: 11834–065.                           minimum flow to 200 cfs until April 23,               action. Agencies may obtain copies of
                                                     c. Date Filed: November 23, 2016.                    2017, at which time a minimum flow of                 the application directly from the
                                                     d. Applicant: Brookfield White Pine                  382 cfs would be released in accordance               applicant. A copy of any protest or
                                                  Hydro, LLC (licensee).                                  with the requirements of Article 402.
                                                     e. Name of Project: Upper and Middle                                                                       motion to intervene must be served
                                                                                                             l. Locations of the Application: A                 upon each representative of the
                                                  Dams Storage Hydroelectric Project.                     copy of the application is available for
                                                     f. Location: Rapid River in Oxford and                                                                     applicant specified in the particular
                                                                                                          inspection and reproduction at the                    application. If an intervener files
                                                  Franklin counties, Maine.                               Commission’s Public Reference Room,
                                                     g. Filed Pursuant to: Federal Power                                                                        comments or documents with the
                                                                                                          located at 888 First Street NE., Room                 Commission relating to the merits of an
                                                  Act, 16 U.S.C. 791(a)–825(r).                           2A, Washington, DC 20426, or by calling
                                                     h. Applicant Contact: Kelly Maloney,                                                                       issue that may affect the responsibilities
                                                                                                          (202) 502–8371. This filing may also be               of a particular resource agency, they
                                                  Manager, Licensing and Compliance,                      viewed on the Commission’s Web site at
                                                  Brookfield White Pine Hydro LLC, 150                                                                          must also serve a copy of the document
                                                                                                          http://www.ferc.gov/docs-filing/                      on that resource agency. A copy of all
                                                  Main Street, Lewiston, ME 04240,                        elibrary.asp. Enter the docket number
                                                  Phone: (207) 755–5605.                                                                                        other filings in reference to this
                                                                                                          excluding the last three digits in the                application must be accompanied by
                                                     i. FERC Contact: Robert Ballantine,                  docket number field to access the
                                                  (202) 502–6289, or robert.ballantine@                                                                         proof of service on all persons listed in
                                                                                                          document. You may also register online                the service list prepared by the
                                                  ferc.gov.                                               at http://www.ferc.gov/docs-filing/
                                                     j. Deadline for filing comments,                                                                           Commission in this proceeding, in
                                                                                                          esubscription.asp to be notified via                  accordance with 18 CFR 4.34(b) and
                                                  motions to intervene, protests, and                     email of new filings and issuances
                                                  recommendations is 30 days from the                                                                           385.2010.
                                                                                                          related to this or other pending projects.
                                                  issuance date of this notice (by                        For assistance, call 1–866–208–3676 or                  Dated: November 29, 2016.
                                                  December 29, 2016). The Commission                      email FERCOnlineSupport@ferc.gov, for                 Kimberly D. Bose,
                                                  strongly encourages electronic filing.                  TTY, call (202) 502–8659. A copy is also              Secretary.
                                                  Please file motions to intervene,                       available for inspection and                          [FR Doc. 2016–29226 Filed 12–5–16; 8:45 am]
                                                  protests, comments, or                                  reproduction at the address in item (h)               BILLING CODE 6717–01–P
                                                  recommendations using the                               above.
                                                  Commission’s eFiling system at http://                     m. Individuals desiring to be included
                                                  www.ferc.gov/docs-filing/efiling.asp.                   on the Commission’s mailing list should               DEPARTMENT OF ENERGY
                                                  Commenters can submit brief comments                    so indicate by writing to the Secretary
                                                  up to 6,000 characters, without prior                   of the Commission.                                    Federal Energy Regulatory
                                                  registration, using the eComment system                    n. Comments, Protests, or Motions to               Commission
                                                  at http://www.ferc.gov/docs-filing/                     Intervene: Anyone may submit
                                                                                                                                                                [Docket No. CP17–9–000]
                                                  ecomment.asp. You must include your                     comments, a protest, or a motion to
                                                  name and contact information at the end                 intervene in accordance with the                      ANR Pipeline Company; Notice of
                                                  of your comments. For assistance,                       requirements of Rules of Practice and                 Intent To Prepare an Environmental
                                                  please contact FERC Online Support at                   Procedure, 18 CFR 385.210, .211, .214.                Assessment for the Proposed
                                                  FERCOnlineSupport@ferc.gov, (866)                       In determining the appropriate action to              Wisconsin South Expansion Project,
                                                  208–3676 (toll free), or (202) 502–8659                 take, the Commission will consider all                and Request for Comments on
                                                  (TTY). In lieu of electronic filing, please             protests or other comments filed, but                 Environmental Issues
                                                  send a paper copy to: Secretary, Federal                only those who file a motion to
                                                  Energy Regulatory Commission, 888                       intervene in accordance with the                        The staff of the Federal Energy
                                                  First Street NE., Washington, DC 20426.                 Commission’s Rules may become a                       Regulatory Commission (FERC or
                                                  Please include the project number (P–                   party to the proceeding. Any comments,                Commission) will prepare an
mstockstill on DSK3G9T082PROD with NOTICES




                                                  11834–065) on any comments, motions                     protests, or motions to intervene must                environmental assessment (EA) that will
                                                  to intervene, protests, or                              be received on or before the specified                discuss the environmental impacts of
                                                  recommendations filed.                                  comment date for the particular                       the Wisconsin South Expansion Project
                                                     k. Description of Request: The                       application.                                          (Project) involving replacement and
                                                  licensee requests a temporary variance                     o. Filing and Service of Responsive                expansion of existing aboveground
                                                  of the minimum flow requirements in                     Documents: Any filing must (1) bear in                facilities by ANR Pipeline Company
                                                  the Rapid River below the Middle Dam                    all capital letters the title                         (ANR) in the area west and southwest of


                                             VerDate Sep<11>2014   17:39 Dec 05, 2016   Jkt 241001   PO 00000   Frm 00021   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1



Document Created: 2016-12-06 02:18:49
Document Modified: 2016-12-06 02:18:49
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 87922 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR