81_FR_88159 81 FR 87925 - BMB Enterprises, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

81 FR 87925 - BMB Enterprises, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 234 (December 6, 2016)

Page Range87925-87926
FR Document2016-29225

Federal Register, Volume 81 Issue 234 (Tuesday, December 6, 2016)
[Federal Register Volume 81, Number 234 (Tuesday, December 6, 2016)]
[Notices]
[Pages 87925-87926]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-29225]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[P-6764-038]


BMB Enterprises, Inc.; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of License.
    b. Project No.: 6764-038.
    c. Date Filed: July 18, 2016.
    d. Applicant: BMB Enterprises, Inc.
    e. Name of Project: Sixmile Creek Hydroelectric Project.
    f. Location: The project is located on the Sixmile Creek in Sanpete 
County, Utah.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Brad F. Hutchings, BMB Enterprises, Inc., 
282 North 1350 East, Bountiful, Utah 84010, (801) 298-7383.
    i. FERC Contact: Anumzziatta Purchiaroni, (202) 502-6191, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file comments, 
motions to intervene, and protests using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-6764-038.
    k. Description of Request: The licensee is proposing to delete a 
portion of the project transmission line that is no longer needed for 
interconnection of the project and change the point of interconnection 
with Manti City. The proposed changes are within the project boundary 
and will have no impact on federal lands.
    l. Locations of the Applications: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. The filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document (i.e., P-6764). You 
may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, call 1-866-
208-3676 or email [email protected], for TTY, call (202) 502-
8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to

[[Page 87926]]

take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, motions to intervene, or protests must be received on or 
before the specified comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``MOTION TO 
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the amendment request. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: November 29, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-29225 Filed 12-5-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                              Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices                                            87925

                                                  million, all as more fully set forth in the             project should submit an original and                    i. FERC Contact: Anumzziatta
                                                  application which is on file with the                   two copies of their comments to the                   Purchiaroni, (202) 502–6191,
                                                  Commission and open to public                           Secretary of the Commission.                          anumzziatta.purchiaroni@ferc.gov.
                                                  inspection. The filing may also be                      Environmental commenters will be                         j. Deadline for filing comments,
                                                  viewed on the web at http://                            placed on the Commission’s                            motions to intervene, and protests is 30
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.               environmental mailing list, will receive              days from the issuance of this notice by
                                                  Enter the docket number excluding the                   copies of the environmental documents,                the Commission. The Commission
                                                  last three digits in the docket number                  and will be notified of meetings                      strongly encourages electronic filing.
                                                  field to access the document. For                       associated with the Commission’s                      Please file comments, motions to
                                                  assistance, please contact FERC Online                  environmental review process.                         intervene, and protests using the
                                                  Support at FERCOnlineSupport@                           Environmental commenters will not be                  Commission’s eFiling system at http://
                                                  ferc.gov or toll free at (866) 208–3676, or             required to serve copies of filed                     www.ferc.gov/docs-filing/efiling.asp.
                                                  TTY, contact (202) 502–8659.                            documents on all other parties.                       Commenters can submit brief comments
                                                     Any questions concerning this                        However, the non-party commenters,                    up to 6,000 characters, without prior
                                                  application may be directed to Robert D.                will not receive copies of all documents              registration, using the eComment system
                                                  Jackson, Manager, Certificates &                        filed by other parties or issued by the               at http://www.ferc.gov/docs-filing/
                                                  Regulatory Administration, Columbia                     Commission (except for the mailing of                 ecomment.asp. You must include your
                                                  Gas Transmission, LLC, 700 Louisiana                    environmental documents issued by the                 name and contact information at the end
                                                  Street, Suite 700, Houston, TX 77002–                   Commission) and will not have the right               of your comments. For assistance,
                                                  2700, by telephone at (832) 320–5487, or                to seek court review of the                           please contact FERC Online Support at
                                                  by email at robert_jackson@                             Commission’s final order.                             FERCOnlineSupport@ferc.gov, (866)
                                                  transcanada.com.                                           The Commission strongly encourages                 208–3676 (toll free), or (202) 502–8659
                                                     Any person or the Commission’s staff                 electronic filings of comments, protests              (TTY). In lieu of electronic filing, please
                                                  may, within 60 days after issuance of                   and interventions in lieu of paper using              send a paper copy to: Secretary, Federal
                                                  the instant notice by the Commission,                   the ‘‘eFiling’’ link at http://                       Energy Regulatory Commission, 888
                                                  file pursuant to Rule 214 of the                        www.ferc.gov. Persons unable to file                  First Street NE., Washington, DC 20426.
                                                  Commission’s Procedural Rules (18 CFR                   electronically should submit an original              The first page of any filing should
                                                  385.214) a motion to intervene or notice                and seven copies of the protest or                    include docket number P–6764–038.
                                                  of intervention and pursuant to section                 intervention to the Federal Energy                       k. Description of Request: The
                                                  157.205 of the regulations under the                    Regulatory Commission, 888 First Street               licensee is proposing to delete a portion
                                                  NGA (18 CFR 157.205), a protest to the                  NE., Washington, DC 20426.                            of the project transmission line that is
                                                  request. If no protest is filed within the                                                                    no longer needed for interconnection of
                                                  time allowed therefore, the proposed                      Dated: November 28, 2016.                           the project and change the point of
                                                  activity shall be deemed to be                          Kimberly D. Bose,                                     interconnection with Manti City. The
                                                  authorized effective the day after the                  Secretary.                                            proposed changes are within the project
                                                  time allowed for filing a protest. If a                 [FR Doc. 2016–29227 Filed 12–5–16; 8:45 am]           boundary and will have no impact on
                                                  protest is filed and not withdrawn                      BILLING CODE 6717–01–P                                federal lands.
                                                  within 30 days after the allowed time                                                                            l. Locations of the Applications: A
                                                  for filing a protest, the instant request                                                                     copy of the application is available for
                                                  shall be treated as an application for                  DEPARTMENT OF ENERGY                                  inspection and reproduction at the
                                                  authorization pursuant to section 7 of                                                                        Commission’s Public Reference Room,
                                                  the NGA.                                                Federal Energy Regulatory                             located at 888 First Street NE., Room
                                                     Pursuant to section 157.9 of the                     Commission                                            2A, Washington, DC 20426, or by calling
                                                  Commission’s rules, 18 CFR 157.9,                       [P–6764–038]                                          (202) 502–8371. The filing may also be
                                                  within 90 days of this Notice the                                                                             viewed on the Commission’s Web site at
                                                  Commission staff will either: Complete                  BMB Enterprises, Inc.; Notice of                      http://www.ferc.gov/docs-filing/
                                                  its environmental assessment (EA) and                   Application Accepted for Filing and                   elibrary.asp. Enter the docket number
                                                  place it into the Commission’s public                   Soliciting Comments, Motions To                       excluding the last three digits in the
                                                  record (eLibrary) for this proceeding, or               Intervene, and Protests                               docket number field to access the
                                                  issue a Notice of Schedule for                                                                                document (i.e., P–6764). You may also
                                                  Environmental Review. If a Notice of                      Take notice that the following
                                                                                                                                                                register online at http://www.ferc.gov/
                                                  Schedule for Environmental Review is                    hydroelectric application has been filed
                                                                                                                                                                docs-filing/esubscription.asp to be
                                                  issued, it will indicate, among other                   with the Commission and is available
                                                                                                                                                                notified via email of new filings and
                                                  milestones, the anticipated date for the                for public inspection:
                                                                                                            a. Type of Application: Amendment                   issuances related to this or other
                                                  Commission staff’s issuance of the final                                                                      pending projects. For assistance, call
                                                                                                          of License.
                                                  environmental impact statement (FEIS)                     b. Project No.: 6764–038.                           1–866–208–3676 or email
                                                  or EA for this proposal. The filing of the                c. Date Filed: July 18, 2016.                       FERCOnlineSupport@ferc.gov, for TTY,
                                                  EA in the Commission’s public record                      d. Applicant: BMB Enterprises, Inc.                 call (202) 502–8659.
                                                  for this proceeding or the issuance of a                  e. Name of Project: Sixmile Creek                      m. Individuals desiring to be included
                                                  Notice of Schedule for Environmental                    Hydroelectric Project.                                on the Commission’s mailing list should
                                                  Review will serve to notify federal and                   f. Location: The project is located on              so indicate by writing to the Secretary
                                                  state agencies of the timing for the                                                                          of the Commission.
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                          the Sixmile Creek in Sanpete County,
                                                  completion of all necessary reviews, and                Utah.                                                    n. Comments, Motions to Intervene or
                                                  the subsequent need to complete all                       g. Filed Pursuant to: Federal Power                 Protests: Anyone may submit
                                                  federal authorizations within 90 days of                Act, 16 U.S.C. 791 (a)–825(r).                        comments, a motion to intervene, or a
                                                  the date of issuance of the Commission                    h. Applicant Contact: Mr. Brad F.                   protest in accordance with the
                                                  staff’s FEIS or EA.                                     Hutchings, BMB Enterprises, Inc., 282                 requirements of Rules of Practice and
                                                     Persons who wish to comment only                     North 1350 East, Bountiful, Utah 84010,               Procedure, 18 CFR 385.210, .211, .214.
                                                  on the environmental review of this                     (801) 298–7383.                                       In determining the appropriate action to


                                             VerDate Sep<11>2014   17:39 Dec 05, 2016   Jkt 241001   PO 00000   Frm 00024   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1


                                                  87926                       Federal Register / Vol. 81, No. 234 / Tuesday, December 6, 2016 / Notices

                                                  take, the Commission will consider all                  Commission in this proceeding, in                       90-day Federal Authorization
                                                  protests or other comments filed, but                   accordance with 18 CFR 4.34(b) and                    Decision Deadline: October 26, 2017.
                                                  only those who file a motion to                         385.2010.                                               If another schedule change becomes
                                                  intervene in accordance with the                          Dated: November 29, 2016.                           necessary, an additional notice will be
                                                  Commission’s Rules may become a                         Kimberly D. Bose,                                     provided so that the relevant agencies
                                                  party to the proceeding. Any comments,                  Secretary.
                                                                                                                                                                are kept informed of the projects’
                                                  motions to intervene, or protests must                                                                        progress.
                                                                                                          [FR Doc. 2016–29225 Filed 12–5–16; 8:45 am]
                                                  be received on or before the specified                                                                        Additional Information
                                                                                                          BILLING CODE 6717–01–P
                                                  comment date for the particular
                                                  application.                                                                                                     In order to receive notification of the
                                                                                                                                                                issuance of the EIS and to keep track of
                                                     o. Filing and Service of Responsive                  DEPARTMENT OF ENERGY
                                                                                                                                                                all formal issuances and submittals in
                                                  Documents: Any filing must (1) bear in
                                                                                                          Federal Energy Regulatory                             specific dockets, the Commission offers
                                                  all capital letters the title
                                                                                                          Commission                                            a free service called eSubscription
                                                  ‘‘COMMENTS’’, ‘‘MOTION TO
                                                                                                                                                                (http://www.ferc.gov/docs-filing/
                                                  INTERVENE’’, or ‘‘PROTEST’’ as                          [Docket No. CP16–357–000; Docket No.                  esubscription.asp).
                                                  applicable; (2) set forth in the heading                CP16–361–000]
                                                  the name of the applicant and the                                                                               Dated: November 29, 2016.
                                                  project number of the application to                    Columbia Gas Transmission, LLC,                       Kimberly D. Bose,
                                                  which the filing responds; (3) furnish                  Columbia Gulf Transmission, LLC;                      Secretary.
                                                  the name, address, and telephone                        Notice of Revised Schedule for                        [FR Doc. 2016–29217 Filed 12–5–16; 8:45 am]
                                                  number of the person protesting or                      Environmental Review of the                           BILLING CODE 6717–01–P
                                                  intervening; and (4) otherwise comply                   Mountaineer Xpress Project and the
                                                  with the requirements of 18 CFR                         Gulf Xpress Project
                                                  385.2001 through 385.2005. All                             This notice identifies the Federal                 DEPARTMENT OF ENERGY
                                                  comments, motions to intervene, or                      Energy Regulatory Commission staff’s
                                                  protests must set forth their evidentiary                                                                     Federal Energy Regulatory
                                                                                                          revised schedule for the completion of
                                                  basis and otherwise comply with the                                                                           Commission
                                                                                                          the environmental impact statement
                                                  requirements of 18 CFR 4.34(b). All                     (EIS) for Columbia Gas Transmission,
                                                  comments, motions to intervene, or                                                                            [Docket No. CP16–496–000]
                                                                                                          LLC’s Mountaineer XPress Project and
                                                  protests should relate to project works                 Columbia Gulf Transmission, LLC’s Gulf                Tennessee Gas Pipeline Company,
                                                  which are the subject of the amendment                  XPress Project. The first notice of                   L.L.C.; Notice of Public Scoping
                                                  request. Agencies may obtain copies of                  schedule, issued on September 14, 2016,               Session for the Proposed Lone Star
                                                  the application directly from the                       identified April 28, 2017 as the final EIS            Project and Request for Comments on
                                                  applicant. A copy of any protest or                     issuance date. However, due to recently               Environmental Issues
                                                  motion to intervene must be served                      filed re-routes and additional
                                                  upon each representative of the                         environmental information that required                 The staff of the Federal Energy
                                                  applicant specified in the particular                   re-opening a scoping period, it was                   Regulatory Commission (FERC or
                                                  application. If an intervener files                     necessary for us to revise the published              Commission) will hold a public scoping
                                                  comments or documents with the                          EIS schedule. Staff has now received all              session as part of their preparation of an
                                                  Commission relating to the merits of an                 the information necessary to complete                 environmental assessment (EA) in Edna,
                                                  issue that may affect the responsibilities              our review. As a result, staff has revised            Texas to receive comments on the Lone
                                                  of a particular resource agency, they                   the schedule for issuance of the final                Star Project involving construction and
                                                  must also serve a copy of the document                  EIS, based on a revised issuance of the               operation of facilities by Tennessee Gas
                                                  on that resource agency. A copy of all                  draft EIS in February 2017.                           Pipeline Company, L.L.C. (Tennessee)
                                                  other filings in reference to this                                                                            in San Patricio and Jackson Counties,
                                                  application must be accompanied by                      Schedule for Environmental Review                     Texas. The date, time, and location of
                                                  proof of service on all persons listed in                 Issuance of Notice of Availability of               the meeting is detailed in the table
                                                  the service list prepared by the                        the final EIS: July 28, 2017.                         below.

                                                                                              FERC PUBLIC SCOPING SESSION, LONE STAR PROJECT
                                                                                  Date and time                                                                          Location

                                                  Tuesday, December 13, 2016, 5:00 p.m. to 10:00 p.m. a ........................       Edna Elementary School, 400 Apollo Drive, Edna, TX 77957.
                                                     a FERC   staff may conclude the session at 8:00 p.m. if all comments have been received. See session format below.


                                                    This notice is being sent to the                      Assessment for the Proposed Lone Star                 from the public and interested agencies
                                                  Commission’s current environmental                      Project and Request for Comments on                   on the project. The scoping period has
                                                  mailing list for this project. State and                Environmental Issues (NOI) issued on                  been extended until December 21, 2016.
                                                  local government representatives should                 October 12, 2016. The NOI describes the               The Commission invites you to attend
mstockstill on DSK3G9T082PROD with NOTICES




                                                  notify their constituents of this                       scoping process that is under way                     the public scoping session.
                                                  proposed project and encourage them to                  seeking public participation in the                      The primary goal of the scoping
                                                  comment on their areas of concern.                      environmental review of this project.                 session is to identify the specific
                                                  More information about the                              Based on public concerns, this notice                 environmental issues and concerns that
                                                  Commission’s EA and Tennessee’s                         announces the continuation of the                     should be considered and addressed in
                                                  project is available in the Notice of                   scoping process, initiated by the NOI,                the EA. Commission staff will accept
                                                  Intent to Prepare an Environmental                      the Commission will use to gather input               verbal comments between 5:00 p.m. and


                                             VerDate Sep<11>2014   17:39 Dec 05, 2016   Jkt 241001   PO 00000   Frm 00025   Fmt 4703   Sfmt 4703   E:\FR\FM\06DEN1.SGM   06DEN1



Document Created: 2016-12-06 02:19:09
Document Modified: 2016-12-06 02:19:09
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 87925 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR