81_FR_8989 81 FR 8954 - Pyramid Lake Paiute Tribe; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

81 FR 8954 - Pyramid Lake Paiute Tribe; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 35 (February 23, 2016)

Page Range8954-8954
FR Document2016-03621

Federal Register, Volume 81 Issue 35 (Tuesday, February 23, 2016)
[Federal Register Volume 81, Number 35 (Tuesday, February 23, 2016)]
[Notices]
[Page 8954]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-03621]



[[Page 8954]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14728-000]


Pyramid Lake Paiute Tribe; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On November 3, 2015, the Pyramid Lake Paiute Tribe filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the Boca 
Hydroelectric Project (Boca Hydroelectric Project or project) to be 
located on the Bureau of Reclamation's Boca Dam on the Little Truckee 
River, near the town of Truckee, Nevada County, California. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.
    Boca Reservoir has a usable storage capacity of 40,900 acre-feet at 
the normal maximum elevation of 5,601 feet. The proposed project would 
utilize the existing intake structure in Boca Reservoir and the two 
375-foot long, 50-inch steel conduits. The existing 50-inch primary 
outlet pipes would be modified to remove the existing 42-inch hollow 
jet valves and to add bifurcations that would connect to the proposed 
new penstocks.
    The proposed project would also consist of the following new 
facilities: (1) Two new penstocks that connect the existing 50-inch 
primary outlet pipes to a new 60-inch-diameter penstock via isolation 
valves to allow flow to be conveyed to the powerhouse from either or 
both outlet pipes; (2) a 45-foot-long by 45-foot-wide by 40-foot-high 
powerhouse containing a single Kaplan generating unit rated for 1.6 
megawatts at 60 feet of head; (3) a 20 to 40-foot-long tailrace channel 
that discharges water downstream of the existing outlet channel walls 
approximately 140 feet from the existing hollow jet valves; (4) a 
channel training wall consisting of either a sheet pile tied-back 
channel wall or a concrete cantilever type wall leaving the powerhouse 
on the landside of the tailrace channel; (5) a step-up transformer 
installed at the powerhouse generator in order to wheel power onto the 
grid; (6) a new 700-foot long 12-kilovolt (kV) transmission line to 
interconnect to an existing 12-kV transmission line owned by Liberty 
Utilities (the point of interconnection); and (7) appurtenant 
facilities.
    The Pyramid Lake Paiute Tribe proposes to develop the proposed 
project in conformance with the operation of Boca Dam by the Bureau of 
Reclamation under the terms of the Truckee River Operating Agreement 
(TROA) and would generate electricity using the existing flow releases 
under the terms of the TROA. The Pyramid Lake Paiute Tribe does not 
propose to alter the timing, condition or the amount of releases from 
Boca Reservoir or impair any of the current functions supported by 
operation of this existing multi-purpose water resources project. The 
estimated annual generation of the Boca Hydroelectric Project would be 
3.5 gigawatt-hours.
    Applicant Contact: Ms. Donna Noel, Director of Natural Resources, 
Pyramid Lake Paiute Tribe, P.O. Box 256, Nixon, Nevada 89424; phone: 
(775) 574-1000.
    FERC Contact: Kyle Olcott; phone: (202) 502-8963.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14728-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14728) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: February 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-03621 Filed 2-22-16; 8:45 am]
BILLING CODE 6717-01-P



                                                  8954                        Federal Register / Vol. 81, No. 35 / Tuesday, February 23, 2016 / Notices

                                                  DEPARTMENT OF ENERGY                                    interconnect to an existing 12-kV                       Dated: February 12, 2016.
                                                                                                          transmission line owned by Liberty                    Nathaniel J. Davis, Sr.,
                                                  Federal Energy Regulatory                               Utilities (the point of interconnection);             Deputy Secretary.
                                                  Commission                                              and (7) appurtenant facilities.                       [FR Doc. 2016–03621 Filed 2–22–16; 8:45 am]
                                                  [Project No. 14728–000]                                    The Pyramid Lake Paiute Tribe                      BILLING CODE 6717–01–P
                                                                                                          proposes to develop the proposed
                                                  Pyramid Lake Paiute Tribe; Notice of                    project in conformance with the
                                                  Preliminary Permit Application                          operation of Boca Dam by the Bureau of                DEPARTMENT OF ENERGY
                                                  Accepted for Filing and Soliciting                      Reclamation under the terms of the
                                                  Comments, Motions To Intervene, and                     Truckee River Operating Agreement                     Federal Energy Regulatory
                                                  Competing Applications                                  (TROA) and would generate electricity                 Commission
                                                     On November 3, 2015, the Pyramid                     using the existing flow releases under
                                                                                                                                                                Combined Notice of Filings #1
                                                  Lake Paiute Tribe filed an application                  the terms of the TROA. The Pyramid
                                                  for a preliminary permit, pursuant to                   Lake Paiute Tribe does not propose to                    Take notice that the Commission
                                                  section 4(f) of the Federal Power Act                   alter the timing, condition or the                    received the following electric corporate
                                                  (FPA), proposing to study the feasibility               amount of releases from Boca Reservoir                filings:
                                                  of the Boca Hydroelectric Project (Boca                 or impair any of the current functions                   Docket Numbers: EC16–52–000.
                                                  Hydroelectric Project or project) to be                 supported by operation of this existing                  Applicants: Twin Eagle Resource
                                                  located on the Bureau of Reclamation’s                  multi-purpose water resources project.                Management, LLC, TERM Holdings,
                                                  Boca Dam on the Little Truckee River,                   The estimated annual generation of the                LLC.
                                                  near the town of Truckee, Nevada                        Boca Hydroelectric Project would be 3.5                  Description: Amendment to December
                                                  County, California. The sole purpose of                 gigawatt-hours.                                       14, 2015 Application under FPA Section
                                                  a preliminary permit, if issued, is to                     Applicant Contact: Ms. Donna Noel,                 203 of Twin Eagle Resource
                                                  grant the permit holder priority to file                Director of Natural Resources, Pyramid                Management, LLC, et al.
                                                  a license application during the permit                 Lake Paiute Tribe, P.O. Box 256, Nixon,                  Filed Date: 2/12/16.
                                                  term. A preliminary permit does not                     Nevada 89424; phone: (775) 574–1000.                     Accession Number: 20160212–5170.
                                                  authorize the permit holder to perform                     FERC Contact: Kyle Olcott; phone:                     Comments Due: 5 p.m. ET 2/22/16.
                                                  any land-disturbing activities or                       (202) 502–8963.                                          Docket Numbers: EC16–70–000.
                                                  otherwise enter upon lands or waters                                                                             Applicants: Portsmouth Genco, LLC,
                                                                                                             Deadline for filing comments, motions
                                                  owned by others without the owners’                                                                           Virginia Renewable Power—
                                                                                                          to intervene, competing applications
                                                  express permission.                                                                                           Portsmouth, LLC.
                                                                                                          (without notices of intent), or notices of               Description: Application for
                                                     Boca Reservoir has a usable storage
                                                                                                          intent to file competing applications: 60             Authorization for Disposition of
                                                  capacity of 40,900 acre-feet at the
                                                                                                          days from the issuance of this notice.                Jurisdictional Facilities and Request for
                                                  normal maximum elevation of 5,601
                                                                                                          Competing applications and notices of                 Expedited Action of Portsmouth Genco,
                                                  feet. The proposed project would utilize
                                                                                                          intent must meet the requirements of 18               LLC, et al.
                                                  the existing intake structure in Boca
                                                                                                          CFR 4.36.                                                Filed Date: 2/12/16.
                                                  Reservoir and the two 375-foot long, 50-
                                                  inch steel conduits. The existing 50-                      The Commission strongly encourages                    Accession Number: 20160212–5166.
                                                  inch primary outlet pipes would be                      electronic filing. Please file comments,                 Comments Due: 5 p.m. ET 3/4/16.
                                                  modified to remove the existing 42-inch                 motions to intervene, notices of intent,                 Docket Numbers: EC16–71–000.
                                                  hollow jet valves and to add                            and competing applications using the                     Applicants: Prairie Breeze Wind
                                                  bifurcations that would connect to the                  Commission’s eFiling system at http://                Energy III LLC.
                                                  proposed new penstocks.                                 www.ferc.gov/docs-filing/efiling.asp.                    Description: Application for
                                                     The proposed project would also                      Commenters can submit brief comments                  Authorization Under Section 203 of the
                                                  consist of the following new facilities:                up to 6,000 characters, without prior                 Federal Power Act and Request for
                                                  (1) Two new penstocks that connect the                  registration, using the eComment system               Waivers and Expedited Action of Prairie
                                                  existing 50-inch primary outlet pipes to                at http://www.ferc.gov/docs-filing/                   Breeze Wind Energy III LLC.
                                                  a new 60-inch-diameter penstock via                     ecomment.asp. You must include your                      Filed Date: 2/12/16.
                                                  isolation valves to allow flow to be                    name and contact information at the end                  Accession Number: 20160212–5168.
                                                  conveyed to the powerhouse from either                  of your comments. For assistance,                        Comments Due: 5 p.m. ET 3/4/16.
                                                  or both outlet pipes; (2) a 45-foot-long                please contact FERC Online Support at                    Take notice that the Commission
                                                  by 45-foot-wide by 40-foot-high                         FERCOnlineSupport@ferc.gov, (866)                     received the following electric rate
                                                  powerhouse containing a single Kaplan                   208–3676 (toll free), or (202) 502–8659               filings:
                                                  generating unit rated for 1.6 megawatts                 (TTY). In lieu of electronic filing, please              Docket Numbers: ER10–2984–025.
                                                  at 60 feet of head; (3) a 20 to 40-foot-                send a paper copy to: Secretary, Federal                 Applicants: Merrill Lynch
                                                  long tailrace channel that discharges                   Energy Regulatory Commission, 888                     Commodities, Inc.
                                                  water downstream of the existing outlet                 First Street NE., Washington, DC 20426.                  Description: Notice of Non-Material
                                                  channel walls approximately 140 feet                    The first page of any filing should                   Change in Status of Merrill Lynch
                                                  from the existing hollow jet valves; (4)                include docket number P–14728–000.                    Commodities, Inc.
                                                  a channel training wall consisting of                      More information about this project,                  Filed Date: 2/11/16.
mstockstill on DSK4VPTVN1PROD with NOTICES




                                                  either a sheet pile tied-back channel                   including a copy of the application, can                 Accession Number: 20160211–5242.
                                                  wall or a concrete cantilever type wall                 be viewed or printed on the ‘‘eLibrary’’                 Comments Due: 5 p.m. ET 3/3/16.
                                                  leaving the powerhouse on the landside                  link of Commission’s Web site at                         Docket Numbers: ER14–543–003.
                                                  of the tailrace channel; (5) a step-up                  http://www.ferc.gov/docs-filing/                         Applicants: Niagara Mohawk Power
                                                  transformer installed at the powerhouse                 elibrary.asp. Enter the docket number                 Corporation, New York Independent
                                                  generator in order to wheel power onto                  (P–14728) in the docket number field to               System Operator, Inc.
                                                  the grid; (6) a new 700-foot long 12-                   access the document. For assistance,                     Description: Compliance filing: NMPC
                                                  kilovolt (kV) transmission line to                      contact FERC Online Support.                          TSC formula compliance revisions to


                                             VerDate Sep<11>2014   17:06 Feb 22, 2016   Jkt 238001   PO 00000   Frm 00060   Fmt 4703   Sfmt 4703   E:\FR\FM\23FEN1.SGM   23FEN1



Document Created: 2018-02-02 14:33:11
Document Modified: 2018-02-02 14:33:11
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 8954 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR