81_FR_91396 81 FR 91154 - Notice of Availability-Final Environmental Impact Statement for the Update of the Water Control Manuals and Water Supply Storage Assessment for the Apalachicola-Chattahoochee-Flint River Basin

81 FR 91154 - Notice of Availability-Final Environmental Impact Statement for the Update of the Water Control Manuals and Water Supply Storage Assessment for the Apalachicola-Chattahoochee-Flint River Basin

DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers

Federal Register Volume 81, Issue 242 (December 16, 2016)

Page Range91154-91155
FR Document2016-30295

Notice is hereby given that the U.S. Army Corps of Engineers, Mobile District (USACE), has released the Final Environmental Impact Statement (FEIS) for the update of the Apalachicola-Chattahoochee-Flint (ACF) Water Control Master Manual (Master Manual) Alabama, Florida, and Georgia including a water supply storage assessment addressing reallocation of storage in Lake Sidney Lanier (Lake Lanier). A Notice of Availability was published by the Environmental Protection Agency on December 16, 2016. The review period will end 30 days after that date.

Federal Register, Volume 81 Issue 242 (Friday, December 16, 2016)
[Federal Register Volume 81, Number 242 (Friday, December 16, 2016)]
[Notices]
[Pages 91154-91155]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-30295]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Army; Corps of Engineers


Notice of Availability--Final Environmental Impact Statement for 
the Update of the Water Control Manuals and Water Supply Storage 
Assessment for the Apalachicola-Chattahoochee-Flint River Basin

AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the U.S. Army Corps of Engineers, 
Mobile District (USACE), has released the Final Environmental Impact 
Statement (FEIS) for the update of the Apalachicola-Chattahoochee-Flint 
(ACF) Water Control Master Manual (Master Manual) Alabama, Florida, and 
Georgia including a water supply storage assessment addressing 
reallocation of storage in Lake Sidney Lanier (Lake Lanier).
    A Notice of Availability was published by the Environmental 
Protection Agency on December 16, 2016. The review period will end 30 
days after that date.

DATES: The review period of the FEIS ends on January 14, 2017.

FOR FURTHER INFORMATION CONTACT: Mr. Lewis Sumner at telephone (251) 
694-3857.

SUPPLEMENTARY INFORMATION: The Master Manual includes appendices 
prepared for individual projects in the ACF Basin and is the guide used 
by USACE to operate a system of five federal reservoir projects in the 
basin--Buford Dam and Lake Lanier, West Point Dam and Lake, Walter F. 
George Lock and Dam and Lake, George W. Andrews Lock and Dam and Lake, 
and Jim Woodruff Lock and Dam and Lake Seminole.
    The purpose and need for the federal action is to determine how 
federal projects in the ACF Basin should be operated for their 
authorized purposes, in light of current conditions and applicable law, 
and to implement those operations through updated water control plans 
and manuals. The proposed action will result in an updated Master 
Manual and individual project water control manuals (WCMs) that comply 
with existing USACE regulations and reflect operations under existing 
congressional authorizations, taking into account changes in basin 
hydrology and demands from years of growth and development, new/
rehabilitated structural features, legal developments, and 
environmental issues. The action includes updates to account for a June 
28, 2011, decision of the 11th Circuit Court of Appeals.
    On May 16, 2000, the Governor of the State of Georgia submitted a 
formal request to the Assistant Secretary of the Army (Civil Works) to 
adjust the operation of Lake Lanier, and to enter into agreements with 
the state or water supply providers to accommodate increases in water 
supply withdrawals from Lake Lanier and downstream at Atlanta over the 
next 30 years, culminating in total gross withdrawals of 705 million 
gallons per day (mgd)--297 mgd from Lake Lanier and 408 mgd 
downstream--by the year 2030. The Assistant Secretary of the Army 
(Civil Works) in 2002 denied Georgia's request. The 2011 decision of 
the 11th Circuit Court of Appeals ordered USACE to reconsider whether 
it has the legal authority to operate the Buford project to accommodate 
Georgia's request. USACE provided a legal opinion concluding that it 
has sufficient authority under applicable law to accommodate that 
request, but noted that any decision to take action on Georgia's 
request would require a separate analysis. On January 11, 2013, the 
Governor of the state of Georgia provided updated demographic and water 
demand data to confirm the continued need for 705 mgd to meet Georgia's 
water needs from Lake Lanier and the Chattahoochee River to 
approximately the year 2040 rather than 2030 as specified in the 2000 
request. On December 4, 2015, after the Draft Environmental Impact 
Statement (DEIS) had been published, the Georgia Environmental 
Protection Division (GAEPD), on behalf of the State of Georgia, 
provided additional updated demographic and water demand data (referred 
to as Georgia's 2015 request) that reduced the state's needs from a 
total of 705 mgd to a range of 597-621 mgd--242 mgd from Lake Lanier 
(instead of 297 mgd) and 355-379 mgd downstream (instead of 408 mgd)--
through the year 2050 rather than 2040 as specified in the 2013 
request.
    USACE's objectives for the Master Manual are to develop a water 
control plan that meets the existing water resource needs of the basin, 
fulfills its responsibilities in operating for the authorized project 
purposes, and complies with all pertinent laws. The FEIS presents the 
results of USACE's analysis of the environmental effects of the 
Proposed Action Alternative (PAA) that the USACE believes accomplishes 
these objectives.
    USACE evaluated an array of potential water management alternatives 
and optional water supply amounts during the Master Manual update 
process, resulting in the selection of the PAA. Additional information 
on the components of the PAA can be found at http://www.sam.usace.army.mil/Missions/PlanningEnvironmental/ACFMasterWaterControlManualUpdate/ACFDocumentLibrary.aspx.
    One alternative available to USACE is to continue with current 
operations. This approach is termed the No Action Alternative (NAA). 
The PAA would update the water control plans and manuals for the ACF 
Basin as directed by Secretary of the Army Pete Geren on January 30, 
2008. Additionally, the PAA would provide for releases from Buford Dam 
to satisfy Georgia's 2015 request of 379 mgd from the Chattahoochee 
River for Metro Atlanta and would reallocate storage in Lake Lanier of 
252,950 acre-feet to satisfy Georgia's 2015 request and support average 
annual water supply withdrawals of up to 222 mgd.
    The FEIS responds to, and incorporates agency and public comments 
received on the DEIS, which was available for public review from 
October 2, 2015, through January 15, 2016. Five open house style public 
meetings were held on October 26th through November 9th, 2015, and more 
than 300 persons attended these workshops, either representing various 
agencies and organizations or as interested individual citizens. Two 
hundred seventy (270) comments on the DEIS were submitted by agencies 
(Federal, state, and local), private organizations, and individuals. 
The USACE responses to substantive agency and public comments are 
provided in appendix C of the FEIS.
    USACE incorporated pertinent revisions and updates to the EIS and 
the WCM based on input received during the public review process. The 
key revisions and updates to the documents

[[Page 91155]]

included in the FEIS for the WCM update include:
     Sections 1 through 12 were revised to make minor technical 
and administrative corrections and updates based on agency and public 
comments, independent external peer review comments, and relevant 
additional information obtained since the DEIS was published.
     Section 4 was also updated to more fully describe and 
clarify (1) the two-phased plan formulation process (water management 
alternatives/water supply options) to determine the alternatives 
evaluated in detail in section 6 (see the introduction to section 4); 
(2) how modeling was used in both phases of the plan formulation 
process to assess and narrow the array of alternatives considered in 
detail in section 6 and to provide a technical foundation for 
environmental impact assessment of the alternatives considered in 
detail in section 6; (3) the screening process for water management 
measures; and (4) consideration of an alternative offered by the ACF 
Stakeholders (ACFS) organization in comments on the DEIS.
     Section 5 was also updated to incorporate additional 
information provided by the State of Georgia in 2015 regarding (1) 
future water supply needs for communities withdrawing or expected to 
withdraw from Lake Lanier; (2) future water supply needs for 
communities withdrawing from the Chattahoochee River downstream of 
Buford Dam; and (3) expected return rates associated with lake and 
river withdrawals. The water supply needs considered in the FEIS were 
generally revised downward and extend over a longer planning horizon 
(from 2040 to 2050) than included in the previous 2013 request from 
Georgia, which was used in the formulation of alternatives presented in 
the DEIS. Further, the FEIS eliminated Glades Reservoir as a reasonably 
foreseeable source of future water supply when the GAEPD rescinded the 
need certification for the reservoir in early 2016. This additional 
information resulted in several new alternatives (including a new PAA), 
all of which are within the range of the alternatives evaluated in the 
DEIS.
     Section 6 was further updated to address additional 
alternatives (including the new PAA) that were developed in accordance 
with the additional water supply information from Georgia as presented 
in the updated section 5 of the FEIS. The updated analysis that 
includes the new alternatives was based on additional Hydrologic 
Engineering Center Reservoir Simulation and Water Quality models (HEC-
ResSim) (HEC-5Q) that incorporated the revised water supply 
information. All pertinent subsections within section 6 have been 
updated accordingly.
     Appendix A (Master WCM and Individual Project WCMs) was 
updated to include pertinent technical corrections and administrative 
updates based on agency and public comments, independent external peer 
review comments, and relevant additional information obtained since the 
DEIS was published.
     Appendix B (Water Supply Storage Assessment Report) was 
updated to include the analysis of the new alternatives that 
incorporate additional population projections and water supply demand 
projections provided by Georgia in December 2015.
     Appendix C (Pertinent Correspondence) was updated to 
incorporate agency and public comments on the DEIS (with USACE 
responses) as well as relevant new correspondence.
     Appendix E (HEC-ResSim Modeling Report) was updated to 
reflect analysis of the additional alternatives based on changes 
presented in section 5 of the FEIS and to incorporate technical and 
administrative corrections and updates based on comments from agencies, 
the public, and independent external peer review.
     Appendix J (USFWS Coordination) was updated to incorporate 
documentation of Endangered Species Act Section 7 consultation that 
occurred following agency and public review of the DEIS as well as the 
final Fish and Wildlife Coordination Act Report for the Master Manual 
update.
     Appendix K (HEC-5Q Water Quality Modeling Report) was 
updated to reflect analysis of the additional alternatives based on 
changes presented in section 5 of the FEIS and to incorporate technical 
and administrative corrections and updates based on comments from 
agencies, the public, and independent external peer review.
     Appendix L (Coastal Zone Management Statement of 
Consistency) was updated to include administrative changes to the 
Florida Coastal Management Program reference, and to address Florida's 
comments on the Statement of Consistency in the DEIS.
     Appendix M (Recreation Benefit Analysis) was updated to 
reflect analysis of the additional alternatives based on changes 
presented in section 5 of the FEIS.
     Appendix N (USACE Institute for Water Resources ACF 
Climate Change Support Analysis) was updated to reflect the additional 
information available following coordination of the DEIS and in 
response to comments on the DEIS from agencies, the public, and 
independent external peer review.
     Appendix O (Unimpaired Flow Dataset) was added to describe 
the development of the unimpaired flow dataset.

Document Availability

    The FEIS and appendices are available for review in the following 
formats:
     Online as PDF documents at www.sam.usace.army.mil/Missions/PlanningEnvironmental/ACF-Master-Water-Control-Manual-Update/ACF-Document-Library.aspx
     As a CD when requested in writing to: Commander, U.S. Army 
Corps of Engineers, Mobile District, Attn: PD-EI (ACF-FEIS), P.O. Box 
2288, Mobile, AL 36628.

Next Steps

    No sooner than 30 days after filing the final EIS with USEPA and 
publication of the EPA Notice of Availability for the FEIS in the 
Federal Register, USACE will prepare a Record of Decision (ROD) which 
documents the final decision on the proposed action. USACE will 
announce availability of the ROD in a newsletter, distribution to the 
project mailing list, press releases to local newspapers, radio and 
television news, and on the project Web site.

    Dated: December 6, 2016.
James A. Delapp,
Colonel, District Commander, Mobile District, U.S. Army Corps of 
Engineers.
[FR Doc. 2016-30295 Filed 12-15-16; 8:45 am]
BILLING CODE 3720-58-P



                                                  91154                       Federal Register / Vol. 81, No. 242 / Friday, December 16, 2016 / Notices

                                                  ADDRESSES section of this notice. Before                Jim Woodruff Lock and Dam and Lake                    total of 705 mgd to a range of 597–621
                                                  including your address, phone number,                   Seminole.                                             mgd—242 mgd from Lake Lanier
                                                  email address, or any other personal                       The purpose and need for the federal               (instead of 297 mgd) and 355–379 mgd
                                                  identifying information in your                         action is to determine how federal                    downstream (instead of 408 mgd)—
                                                  comment, you should be aware that                       projects in the ACF Basin should be                   through the year 2050 rather than 2040
                                                  your entire comment—including your                      operated for their authorized purposes,               as specified in the 2013 request.
                                                  personal identifying information—may                    in light of current conditions and                       USACE’s objectives for the Master
                                                  be made available to the public at any                  applicable law, and to implement those                Manual are to develop a water control
                                                  time. While you can request us to                       operations through updated water                      plan that meets the existing water
                                                  withhold your personal identifying                      control plans and manuals. The                        resource needs of the basin, fulfills its
                                                  information from public review, we                      proposed action will result in an                     responsibilities in operating for the
                                                  cannot guarantee that we will be able to                updated Master Manual and individual                  authorized project purposes, and
                                                  do so.                                                  project water control manuals (WCMs)                  complies with all pertinent laws. The
                                                    Dated: December 8, 2016.                              that comply with existing USACE                       FEIS presents the results of USACE’s
                                                                                                          regulations and reflect operations under              analysis of the environmental effects of
                                                  Mark Harberg,
                                                                                                          existing congressional authorizations,                the Proposed Action Alternative (PAA)
                                                  Missouri River Recovery Program Manager,
                                                  U.S. Army Corps of Engineers.
                                                                                                          taking into account changes in basin                  that the USACE believes accomplishes
                                                                                                          hydrology and demands from years of                   these objectives.
                                                  [FR Doc. 2016–30294 Filed 12–15–16; 8:45 am]
                                                                                                          growth and development, new/                             USACE evaluated an array of
                                                  BILLING CODE 3720–58–P                                                                                        potential water management alternatives
                                                                                                          rehabilitated structural features, legal
                                                                                                          developments, and environmental                       and optional water supply amounts
                                                                                                          issues. The action includes updates to                during the Master Manual update
                                                  DEPARTMENT OF DEFENSE                                                                                         process, resulting in the selection of the
                                                                                                          account for a June 28, 2011, decision of
                                                  Department of the Army; Corps of                        the 11th Circuit Court of Appeals.                    PAA. Additional information on the
                                                  Engineers                                                  On May 16, 2000, the Governor of the               components of the PAA can be found at
                                                                                                          State of Georgia submitted a formal                   http://www.sam.usace.army.mil/
                                                  Notice of Availability—Final                            request to the Assistant Secretary of the             Missions/PlanningEnvironmental/
                                                  Environmental Impact Statement for                      Army (Civil Works) to adjust the                      ACFMasterWaterControlManualUpdate/
                                                  the Update of the Water Control                         operation of Lake Lanier, and to enter                ACFDocumentLibrary.aspx.
                                                  Manuals and Water Supply Storage                        into agreements with the state or water                  One alternative available to USACE is
                                                  Assessment for the Apalachicola-                        supply providers to accommodate                       to continue with current operations.
                                                  Chattahoochee-Flint River Basin                         increases in water supply withdrawals                 This approach is termed the No Action
                                                                                                          from Lake Lanier and downstream at                    Alternative (NAA). The PAA would
                                                  AGENCY: Department of the Army, U.S.                    Atlanta over the next 30 years,                       update the water control plans and
                                                  Army Corps of Engineers, DoD.                           culminating in total gross withdrawals                manuals for the ACF Basin as directed
                                                  ACTION: Notice of availability.                         of 705 million gallons per day (mgd)—                 by Secretary of the Army Pete Geren on
                                                                                                          297 mgd from Lake Lanier and 408 mgd                  January 30, 2008. Additionally, the PAA
                                                  SUMMARY:   Notice is hereby given that
                                                                                                          downstream—by the year 2030. The                      would provide for releases from Buford
                                                  the U.S. Army Corps of Engineers,
                                                                                                          Assistant Secretary of the Army (Civil                Dam to satisfy Georgia’s 2015 request of
                                                  Mobile District (USACE), has released
                                                                                                          Works) in 2002 denied Georgia’s                       379 mgd from the Chattahoochee River
                                                  the Final Environmental Impact
                                                                                                          request. The 2011 decision of the 11th                for Metro Atlanta and would reallocate
                                                  Statement (FEIS) for the update of the
                                                                                                          Circuit Court of Appeals ordered                      storage in Lake Lanier of 252,950 acre-
                                                  Apalachicola-Chattahoochee-Flint                                                                              feet to satisfy Georgia’s 2015 request and
                                                                                                          USACE to reconsider whether it has the
                                                  (ACF) Water Control Master Manual                                                                             support average annual water supply
                                                                                                          legal authority to operate the Buford
                                                  (Master Manual) Alabama, Florida, and                                                                         withdrawals of up to 222 mgd.
                                                                                                          project to accommodate Georgia’s
                                                  Georgia including a water supply                                                                                 The FEIS responds to, and
                                                                                                          request. USACE provided a legal
                                                  storage assessment addressing                                                                                 incorporates agency and public
                                                                                                          opinion concluding that it has sufficient
                                                  reallocation of storage in Lake Sidney                                                                        comments received on the DEIS, which
                                                                                                          authority under applicable law to
                                                  Lanier (Lake Lanier).                                                                                         was available for public review from
                                                                                                          accommodate that request, but noted
                                                    A Notice of Availability was                                                                                October 2, 2015, through January 15,
                                                                                                          that any decision to take action on
                                                  published by the Environmental                                                                                2016. Five open house style public
                                                                                                          Georgia’s request would require a
                                                  Protection Agency on December 16,                                                                             meetings were held on October 26th
                                                                                                          separate analysis. On January 11, 2013,
                                                  2016. The review period will end 30                                                                           through November 9th, 2015, and more
                                                                                                          the Governor of the state of Georgia
                                                  days after that date.                                                                                         than 300 persons attended these
                                                                                                          provided updated demographic and
                                                  DATES: The review period of the FEIS                    water demand data to confirm the                      workshops, either representing various
                                                  ends on January 14, 2017.                               continued need for 705 mgd to meet                    agencies and organizations or as
                                                  FOR FURTHER INFORMATION CONTACT: Mr.                    Georgia’s water needs from Lake Lanier                interested individual citizens. Two
                                                  Lewis Sumner at telephone (251) 694–                    and the Chattahoochee River to                        hundred seventy (270) comments on the
                                                  3857.                                                   approximately the year 2040 rather than               DEIS were submitted by agencies
                                                  SUPPLEMENTARY INFORMATION: The                          2030 as specified in the 2000 request.                (Federal, state, and local), private
                                                  Master Manual includes appendices                       On December 4, 2015, after the Draft                  organizations, and individuals. The
                                                  prepared for individual projects in the                 Environmental Impact Statement (DEIS)                 USACE responses to substantive agency
mstockstill on DSK3G9T082PROD with NOTICES




                                                  ACF Basin and is the guide used by                      had been published, the Georgia                       and public comments are provided in
                                                  USACE to operate a system of five                       Environmental Protection Division                     appendix C of the FEIS.
                                                  federal reservoir projects in the basin—                (GAEPD), on behalf of the State of                       USACE incorporated pertinent
                                                  Buford Dam and Lake Lanier, West                        Georgia, provided additional updated                  revisions and updates to the EIS and the
                                                  Point Dam and Lake, Walter F. George                    demographic and water demand data                     WCM based on input received during
                                                  Lock and Dam and Lake, George W.                        (referred to as Georgia’s 2015 request)               the public review process. The key
                                                  Andrews Lock and Dam and Lake, and                      that reduced the state’s needs from a                 revisions and updates to the documents


                                             VerDate Sep<11>2014   18:42 Dec 15, 2016   Jkt 241001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\16DEN1.SGM   16DEN1


                                                                              Federal Register / Vol. 81, No. 242 / Friday, December 16, 2016 / Notices                                                91155

                                                  included in the FEIS for the WCM                        incorporated the revised water supply                 available following coordination of the
                                                  update include:                                         information. All pertinent subsections                DEIS and in response to comments on
                                                     • Sections 1 through 12 were revised                 within section 6 have been updated                    the DEIS from agencies, the public, and
                                                  to make minor technical and                             accordingly.                                          independent external peer review.
                                                  administrative corrections and updates                     • Appendix A (Master WCM and                         • Appendix O (Unimpaired Flow
                                                  based on agency and public comments,                    Individual Project WCMs) was updated                  Dataset) was added to describe the
                                                  independent external peer review                        to include pertinent technical                        development of the unimpaired flow
                                                  comments, and relevant additional                       corrections and administrative updates                dataset.
                                                  information obtained since the DEIS                     based on agency and public comments,
                                                  was published.                                          independent external peer review                      Document Availability
                                                     • Section 4 was also updated to more                 comments, and relevant additional                       The FEIS and appendices are
                                                  fully describe and clarify (1) the two-                 information obtained since the DEIS                   available for review in the following
                                                  phased plan formulation process (water                  was published.                                        formats:
                                                  management alternatives/water supply                       • Appendix B (Water Supply Storage                   • Online as PDF documents at
                                                  options) to determine the alternatives                  Assessment Report) was updated to                     www.sam.usace.army.mil/Missions/
                                                  evaluated in detail in section 6 (see the               include the analysis of the new                       PlanningEnvironmental/ACF-Master-
                                                  introduction to section 4); (2) how                     alternatives that incorporate additional              Water-Control-Manual-Update/ACF-
                                                  modeling was used in both phases of the                 population projections and water                      Document-Library.aspx
                                                  plan formulation process to assess and                  supply demand projections provided by                   • As a CD when requested in writing
                                                  narrow the array of alternatives                        Georgia in December 2015.                             to: Commander, U.S. Army Corps of
                                                  considered in detail in section 6 and to                   • Appendix C (Pertinent                            Engineers, Mobile District, Attn: PD–EI
                                                  provide a technical foundation for                      Correspondence) was updated to                        (ACF–FEIS), P.O. Box 2288, Mobile, AL
                                                  environmental impact assessment of the                  incorporate agency and public                         36628.
                                                  alternatives considered in detail in                    comments on the DEIS (with USACE
                                                  section 6; (3) the screening process for                                                                      Next Steps
                                                                                                          responses) as well as relevant new
                                                  water management measures; and (4)                      correspondence.                                          No sooner than 30 days after filing the
                                                  consideration of an alternative offered                    • Appendix E (HEC-ResSim Modeling                  final EIS with USEPA and publication
                                                  by the ACF Stakeholders (ACFS)                          Report) was updated to reflect analysis               of the EPA Notice of Availability for the
                                                  organization in comments on the DEIS.                   of the additional alternatives based on               FEIS in the Federal Register, USACE
                                                     • Section 5 was also updated to                      changes presented in section 5 of the                 will prepare a Record of Decision (ROD)
                                                  incorporate additional information                      FEIS and to incorporate technical and                 which documents the final decision on
                                                  provided by the State of Georgia in 2015                administrative corrections and updates                the proposed action. USACE will
                                                  regarding (1) future water supply needs                 based on comments from agencies, the                  announce availability of the ROD in a
                                                  for communities withdrawing or                          public, and independent external peer                 newsletter, distribution to the project
                                                  expected to withdraw from Lake Lanier;                  review.                                               mailing list, press releases to local
                                                  (2) future water supply needs for                          • Appendix J (USFWS Coordination)                  newspapers, radio and television news,
                                                  communities withdrawing from the                        was updated to incorporate                            and on the project Web site.
                                                  Chattahoochee River downstream of                       documentation of Endangered Species                     Dated: December 6, 2016.
                                                  Buford Dam; and (3) expected return                     Act Section 7 consultation that occurred              James A. Delapp,
                                                  rates associated with lake and river                    following agency and public review of
                                                  withdrawals. The water supply needs                                                                           Colonel, District Commander, Mobile District,
                                                                                                          the DEIS as well as the final Fish and                U.S. Army Corps of Engineers.
                                                  considered in the FEIS were generally                   Wildlife Coordination Act Report for the
                                                  revised downward and extend over a                                                                            [FR Doc. 2016–30295 Filed 12–15–16; 8:45 am]
                                                                                                          Master Manual update.
                                                  longer planning horizon (from 2040 to                      • Appendix K (HEC–5Q Water                         BILLING CODE 3720–58–P
                                                  2050) than included in the previous                     Quality Modeling Report) was updated
                                                  2013 request from Georgia, which was                    to reflect analysis of the additional
                                                  used in the formulation of alternatives                 alternatives based on changes presented               DEPARTMENT OF EDUCATION
                                                  presented in the DEIS. Further, the FEIS                in section 5 of the FEIS and to                       [Docket No. ED–2016–ICCD–0142]
                                                  eliminated Glades Reservoir as a                        incorporate technical and
                                                  reasonably foreseeable source of future                 administrative corrections and updates                Agency Information Collection
                                                  water supply when the GAEPD                             based on comments from agencies, the                  Activities; Comment Request;
                                                  rescinded the need certification for the                public, and independent external peer                 Rehabilitation Services Administration
                                                  reservoir in early 2016. This additional                review.                                               Grant Re-Allotment Form
                                                  information resulted in several new                        • Appendix L (Coastal Zone
                                                  alternatives (including a new PAA), all                 Management Statement of Consistency)                  AGENCY:  Office of Special Education and
                                                  of which are within the range of the                    was updated to include administrative                 Rehabilitative Services (OSERS),
                                                  alternatives evaluated in the DEIS.                     changes to the Florida Coastal                        Department of Education (ED).
                                                     • Section 6 was further updated to                   Management Program reference, and to                  ACTION: Notice.
                                                  address additional alternatives                         address Florida’s comments on the
                                                  (including the new PAA) that were                                                                             SUMMARY:  In accordance with the
                                                                                                          Statement of Consistency in the DEIS.
                                                  developed in accordance with the                           • Appendix M (Recreation Benefit                   Paperwork Reduction Act of 1995 (44
                                                  additional water supply information                     Analysis) was updated to reflect                      U.S.C. chapter 3501 et seq.), ED is
mstockstill on DSK3G9T082PROD with NOTICES




                                                  from Georgia as presented in the                        analysis of the additional alternatives               proposing an extension of an existing
                                                  updated section 5 of the FEIS. The                      based on changes presented in section 5               information collection.
                                                  updated analysis that includes the new                  of the FEIS.                                          DATES: Interested persons are invited to
                                                  alternatives was based on additional                       • Appendix N (USACE Institute for                  submit comments on or before February
                                                  Hydrologic Engineering Center                           Water Resources ACF Climate Change                    14, 2017.
                                                  Reservoir Simulation and Water Quality                  Support Analysis) was updated to                      ADDRESSES: To access and review all the
                                                  models (HEC-ResSim) (HEC–5Q) that                       reflect the additional information                    documents related to the information


                                             VerDate Sep<11>2014   18:42 Dec 15, 2016   Jkt 241001   PO 00000   Frm 00041   Fmt 4703   Sfmt 4703   E:\FR\FM\16DEN1.SGM   16DEN1



Document Created: 2018-02-14 09:07:42
Document Modified: 2018-02-14 09:07:42
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of availability.
DatesThe review period of the FEIS ends on January 14, 2017.
ContactMr. Lewis Sumner at telephone (251) 694-3857.
FR Citation81 FR 91154 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR