81 FR 95575 - Texas Eastern Transmission, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Idle Line 1 Abandonment Project, and Request for Comments on Environmental Issues

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 249 (December 28, 2016)

Page Range95575-95577
FR Document2016-31341

Federal Register, Volume 81 Issue 249 (Wednesday, December 28, 2016)
[Federal Register Volume 81, Number 249 (Wednesday, December 28, 2016)]
[Notices]
[Pages 95575-95577]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31341]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP17-6-000]


Texas Eastern Transmission, LP; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Idle Line 1 Abandonment 
Project, and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the Idle Line 1 Abandonment 
Project involving the abandonment of pipeline facilities by Texas 
Eastern Transmission, LP (Texas Eastern) in Fayette, Pickaway, 
Fairfield, Perry, Muskingum, Noble, and Monroe Counties, Ohio; Marshall 
County, West Virginia; and Greene County, Pennsylvania. The Commission 
will use this EA in its decision-making process to determine whether 
the project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. You can make a difference by providing us with 
your specific comments or concerns about the project. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
Your input will help the Commission staff determine what issues they 
need to evaluate in the EA. To ensure that your comments are timely and 
properly recorded, please send your comments so that the Commission 
receives them in Washington, DC on or before January 20, 2017.
    If you sent comments on this project to the Commission before the 
opening of this docket on October 28, 2016, you will need to file those 
comments in Docket No. CP17-6-000 to ensure they are considered as part 
of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an agreement to 
conduct the abandonment activities. Texas Eastern provided landowners 
with a fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' This fact sheet 
addresses a number of typically asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings. 
It is also available for viewing on the FERC Web site (www.ferc.gov).

Public Participation

    For your convenience, there are three methods you can use to submit 
your comments to the Commission. The Commission encourages electronic 
filing of comments and has expert staff available to assist you at 
(202) 502-8258 or [email protected]. Please carefully follow these 
instructions so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. With eFiling, you can provide comments in a 
variety of formats by attaching them as a file

[[Page 95576]]

with your submission. New eFiling users must first create an account by 
clicking on ``eRegister.'' If you are filing a comment on a particular 
project, please select ``Comment on a Filing'' as the filing type; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address. Be sure to reference the project docket number 
(CP17-6-000) with your submission: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Room 1A, 
Washington, DC 20426.

Summary of the Proposed Project

    Texas Eastern proposes to abandon in place and by removal 
approximately 165 miles of existing, idle Line 1 pipeline that runs 
from Fayette County, Ohio, to Greene County, Pennsylvania. 
Specifically, Texas Eastern is proposing to abandon portions of the 
Line 1 pipeline that were placed into idle service in 1989 including 
three segments of 24-inch pipeline, associated lateral lines 10-L and 
10-M, metering and regulating facilities 70054 and 70005, and other 
related aboveground facilities.
    The project would eliminate the need for future operating and 
maintenance expenditures on facilities that have been removed from 
service for many years. Texas Eastern has stated that abandonment of 
these idle facilities would not impact certificated parameters on Texas 
Eastern's system or affect service to existing customers of Texas 
Eastern. Texas Eastern has also stated that it has no current or 
reasonably foreseeable plans to use the Line 1 pipeline within the 
project areas following abandonment.
    Texas Eastern would abandon in place the following facilities:
     5.03 miles of Texas Eastern's 24-inch-diameter Line 1 from 
milepost 837.05 in Fayette County, OH to milepost 842.08 in Pickaway 
County, OH (Segment 1);
     155.37 miles of Texas Eastern's 24-inch-diameter Line 1 
from milepost 848.33 in Pickaway County, OH to milepost 1003.7 in Green 
County, PA (Segment 2);
     5.48 miles of Texas Eastern's 24-inch-diameter Line 1 from 
milepost 1004.35 to 1009.83 in Greene County, PA (Segment 3);
     0.5 miles of Texas Eastern's 8-inch Line 10-M in Marshall 
County, WV;
     0.07 miles of Texas Eastern's 4.5-inch Line 10-L in Greene 
County, PA; and
     Metering and Regulation facilities 70054 and 70005, and 
related launcher/receiver barrels, mainline valves, and other 
appurtenances would also be removed.
    The general location of the Project is shown in appendix 1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of appendices were sent to all those 
receiving this notice in the mail and are available at www.ferc.gov 
using the link called ``eLibrary'' or from the Commission's Public 
Reference Room, 888 First Street NE., Washington, DC 20426, or call 
(202) 502-8371. For instructions on connecting to eLibrary, refer to 
the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Project construction activities would result in temporary 
disturbance of about 130 acres of land. This would consist of 40.4 
acres associated with activities related to abandonment in place, 71.3 
acres for activities associated with abandonment by removal, and 9.7 
acres associated with use of a construction wareyard. Land disturbed by 
abandonment activities would primarily occur within Texas Eastern's 
existing, previously disturbed right-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the abandonment of the proposed project under these general headings:
     Geology and soils;
     land use;
     water resources, fisheries, and wetlands;
     cultural resources;
     vegetation and wildlife;
     endangered and threatened species;
     public safety; and
     cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section, beginning on page 2.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues of 
this project to formally cooperate with us in the preparation of the 
EA.\3\ Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the applicable State Historic Preservation Office(s) (SHPO), and 
to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\4\ We will define the project-specific 
Area of Potential Effects (APE) in consultation with the SHPO(s) as the 
project develops. On natural gas facility projects, the APE at a 
minimum encompasses all areas subject to ground disturbance (examples 
include construction right-of-way, contractor/pipe storage yards, 
compressor stations, and access roads). Our EA for this project will 
document our findings on the impacts on historic properties and 
summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Currently Identified Environmental Issues

    We have already identified some issues that we think deserve 
attention based on a preliminary review of the

[[Page 95577]]

proposed facilities and the environmental information provided by Texas 
Eastern. This preliminary list of issues may be changed based on your 
comments and our analysis.
     Water Quality and Fisheries--A number of pipeline sections 
would be removed from beneath stream beds by excavation.
     PCB Contamination--Portions of the pipeline to be 
abandoned may contain polychlorinated biphenyls (PCBs).

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If we publish and distribute the EA, copies of the EA will be sent 
to the environmental mailing list for public review and comment. If you 
would prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are in 
the ``Document-less Intervention Guide'' under the ``e-filing'' link on 
the Commission's Web site. Motions to intervene are more fully 
described at http://www.ferc.gov/resources/guides/how-to/intervene.asp.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP17-
6-000). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
    Finally, any public sessions or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31341 Filed 12-27-16; 8:45 am]
 BILLING CODE 6717-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 95575 