81_FR_95830 81 FR 95581 - Salt Lake City Corporation; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

81 FR 95581 - Salt Lake City Corporation; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 81, Issue 249 (December 28, 2016)

Page Range95581-95582
FR Document2016-31339

Federal Register, Volume 81 Issue 249 (Wednesday, December 28, 2016)
[Federal Register Volume 81, Number 249 (Wednesday, December 28, 2016)]
[Notices]
[Pages 95581-95582]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2016-31339]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD17-6-000]


Salt Lake City Corporation; Notice of Preliminary Determination 
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On December 20, 2016, Salt Lake City Corporation filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act (FPA), as amended by section 4 
of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 
proposed 10th East 500 South PRV Station Hydropower Project would have 
an installed capacity of 225 kilowatts (kW) and would be located on 
Salt Lake City Corporation's existing 36-inch-diameter water 
distribution pipe, in a new pressure reducing valve (PRV) station. The 
project would be located in Salt Lake City, in Salt Lake County, Utah.
    Applicant Contact: David Pearson, Salt Lake City Corporation, 
Department of Public Utilities, 1530 S. West Temple, Salt Lake City, UT 
84115, Phone No. (801) 707-0777.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
[email protected].
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A proposed generating unit with an 
installed capacity of 225-kW on the 36-inch-diameter water distribution 
pipe, in a new 34-foot by 27-foot PRV station; and (2) appurtenant 
facilities. The proposed project would have an estimated annual 
generating capacity of 810 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by   The conduit is a                     Y
 HREA.                            tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i), as amended   The facility is                      Y
 by HREA.                         constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii), as amended  The facility has an                  Y
 by HREA.                         installed capacity
                                  that does not exceed
                                  5 megawatts.
FPA 30(a)(3)(C)(iii), as         On or before August 9,               Y
 amended by HREA.                 2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff has preliminarily determined that the proposal 
satisfies the requirements for a qualifying conduit hydropower facility 
under 16 U.S.C. 823a, and is exempted from the licensing requirements 
of the FPA.
    Comments and Motions to Intervene: The deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    The deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2015).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may

[[Page 95582]]

also be viewed on the Web at http://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary'' link. Enter the docket number 
(e.g., CD17-6-000) in the docket number field to access the document. 
For assistance, call toll-free 1-866-208-3676 or email 
[email protected]. For TTY, call (202) 502-8659.

    Dated: December 21, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-31339 Filed 12-27-16; 8:45 am]
 BILLING CODE 6717-01-P



                                                                         Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices                                              95581

                                                captioned entities as Exempt Wholesale                  construct a qualifying conduit                        project would consist of: (1) A proposed
                                                Generators became effective by                          hydropower facility, pursuant to section              generating unit with an installed
                                                operation of the Commission’s                           30 of the Federal Power Act (FPA), as                 capacity of 225-kW on the 36-inch-
                                                regulations. 18 CFR 366.7(a).                           amended by section 4 of the                           diameter water distribution pipe, in a
                                                  Dated: December 21, 2016.                             Hydropower Regulatory Efficiency Act                  new 34-foot by 27-foot PRV station; and
                                                Nathaniel J. Davis, Sr.,                                of 2013 (HREA). The proposed 10th East                (2) appurtenant facilities. The proposed
                                                Deputy Secretary.
                                                                                                        500 South PRV Station Hydropower                      project would have an estimated annual
                                                                                                        Project would have an installed capacity              generating capacity of 810 megawatt-
                                                [FR Doc. 2016–31343 Filed 12–27–16; 8:45 am]
                                                                                                        of 225 kilowatts (kW) and would be                    hours.
                                                BILLING CODE 6717–01–P
                                                                                                        located on Salt Lake City Corporation’s
                                                                                                        existing 36-inch-diameter water                         A qualifying conduit hydropower
                                                                                                        distribution pipe, in a new pressure                  facility is one that is determined or
                                                DEPARTMENT OF ENERGY                                                                                          deemed to meet all of the criteria shown
                                                                                                        reducing valve (PRV) station. The
                                                Federal Energy Regulatory                               project would be located in Salt Lake                 in the table below.
                                                Commission                                              City, in Salt Lake County, Utah.
                                                                                                          Applicant Contact: David Pearson,
                                                [Docket No. CD17–6–000]                                 Salt Lake City Corporation, Department
                                                Salt Lake City Corporation; Notice of                   of Public Utilities, 1530 S. West Temple,
                                                Preliminary Determination of a                          Salt Lake City, UT 84115, Phone No.
                                                Qualifying Conduit Hydropower                           (801) 707–0777.
                                                                                                          FERC Contact: Robert Bell, Phone No.
                                                Facility and Soliciting Comments and
                                                Motions To Intervene                                    (202) 502–6062, email: robert.bell@
                                                                                                        ferc.gov.
                                                  On December 20, 2016, Salt Lake City                    Qualifying Conduit Hydropower
                                                Corporation filed a notice of intent to                 Facility Description: The proposed

                                                                                  TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                Satisfies
                                                            Statutory provision                                                              Description                                         (Y/N)

                                                FPA 30(a)(3)(A), as amended by HREA ..             The conduit is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade            Y
                                                                                                     water conveyance that is operated for the distribution of water for agricultural,
                                                                                                     municipal, or industrial consumption and not primarily for the generation of elec-
                                                                                                     tricity.
                                                FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                     power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                     erally owned conduit.
                                                FPA 30(a)(3)(C)(ii), as amended              by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                  HREA.
                                                FPA 30(a)(3)(C)(iii), as amended             by    On or before August 9, 2013, the facility is not licensed, or exempted from the li-             Y
                                                  HREA.                                             censing requirements of Part I of the FPA.



                                                   Preliminary Determination: Based                     all capital letters the ‘‘COMMENTS                    registration, using the eComment system
                                                upon the above criteria, Commission                     CONTESTING QUALIFICATION FOR A                        at http://www.ferc.gov/docs-filing/
                                                staff has preliminarily determined that                 CONDUIT HYDROPOWER FACILITY’’                         ecomment.asp. You must include your
                                                the proposal satisfies the requirements                 or ‘‘MOTION TO INTERVENE,’’ as                        name and contact information at the end
                                                for a qualifying conduit hydropower                     applicable; (2) state in the heading the              of your comments. For assistance,
                                                facility under 16 U.S.C. 823a, and is                   name of the applicant and the project                 please contact FERC Online Support at
                                                exempted from the licensing                             number of the application to which the                FERCOnlineSupport@ferc.gov, (866)
                                                requirements of the FPA.                                filing responds; (3) state the name,                  208–3676 (toll free), or (202) 502–8659
                                                   Comments and Motions to Intervene:                   address, and telephone number of the                  (TTY). In lieu of electronic filing, please
                                                The deadline for filing comments                        person filing; and (4) otherwise comply               send a paper copy to: Secretary, Federal
                                                contesting whether the facility meets the               with the requirements of sections                     Energy Regulatory Commission, 888
                                                qualifying criteria is 45 days from the                 385.2001 through 385.2005 of the                      First Street, NE., Washington, DC 20426.
                                                issuance date of this notice.                           Commission’s regulations.1 All                        A copy of all other filings in reference
                                                   The deadline for filing motions to                   comments contesting Commission staff’s                to this application must be accompanied
                                                intervene is 30 days from the issuance                  preliminary determination that the                    by proof of service on all persons listed
                                                date of this notice.                                    facility meets the qualifying criteria                in the service list prepared by the
                                                   Anyone may submit comments or a                      must set forth their evidentiary basis.               Commission in this proceeding, in
                                                motion to intervene in accordance with                     The Commission strongly encourages                 accordance with 18 CFR 4.34(b) and
sradovich on DSK3GMQ082PROD with NOTICES




                                                the requirements of Rules of Practice                   electronic filing. Please file motions to             385.2010.
                                                and Procedure, 18 CFR 385.210 and                       intervene and comments using the                         Locations of Notice of Intent: Copies
                                                385.214. Any motions to intervene must                  Commission’s eFiling system at http://                of the notice of intent can be obtained
                                                be received on or before the specified                  www.ferc.gov/docs-filing/efiling.asp.                 directly from the applicant or such
                                                deadline date for the particular                        Commenters can submit brief comments                  copies can be viewed and reproduced at
                                                proceeding.                                             up to 6,000 characters, without prior                 the Commission in its Public Reference
                                                   Filing and Service of Responsive                                                                           Room, Room 2A, 888 First Street NE.,
                                                Documents: All filings must (1) bear in                   1 18   CFR 385.2001–2005 (2015).                    Washington, DC 20426. The filing may


                                           VerDate Sep<11>2014   18:54 Dec 27, 2016   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\28DEN1.SGM   28DEN1


                                                95582                                  Federal Register / Vol. 81, No. 249 / Wednesday, December 28, 2016 / Notices

                                                also be viewed on the Web at http://                                 DATES:  Comments on the collection of                     collection requirement with no changes
                                                www.ferc.gov/docs-filing/elibrary.asp                                information are due by January 27,                        to the reporting requirements.
                                                using the ‘‘eLibrary’’ link. Enter the                               2017.                                                        Abstract: Under section 215 of the
                                                docket number (e.g., CD17–6–000) in                                  ADDRESSES: Comments filed with OMB,                       Federal Power Act (FPA),1 the
                                                the docket number field to access the                                identified by RD16–6–000, FERC–725Z                       Commission proposes to approve
                                                document. For assistance, call toll-free                             (OMB Control No. 1902–0276), and                          Reliability Standards TOP–010–1 (Real-
                                                1–866–208–3676 or email                                              FERC–725A(1B) (OMB Control No.                            time Reliability Monitoring and
                                                FERCOnlineSupport@ferc.gov. For TTY,                                 TBD), should be sent via email to the                     Analysis Capabilities) and IRO–018–1
                                                call (202) 502–8659.                                                 Office of Information and Regulatory                      (Reliability Coordinator Real-time
                                                  Dated: December 21, 2016.                                          Affairs: oira_submission@omb.gov.                         Reliability Monitoring and Analysis
                                                Nathaniel J. Davis, Sr.,                                             Attention: Federal Energy Regulatory                      Capabilities), submitted by North
                                                Deputy Secretary.                                                    Commission Desk Officer. The Desk                         American Electric Corporation (NERC).
                                                [FR Doc. 2016–31339 Filed 12–27–16; 8:45 am]
                                                                                                                     Officer may also be reached via                           In this order, the Reliability Standards
                                                                                                                     telephone at 202–395–4718.                                build on monitoring, real-time
                                                BILLING CODE 6717–01–P
                                                                                                                        A copy of the comments should also                     assessments and support effective
                                                                                                                     be sent to the Commission, in Docket                      situational awareness. The Reliability
                                                DEPARTMENT OF ENERGY                                                 No. RD16–6, by either of the following                    Standards accomplish this by requiring
                                                                                                                     methods:                                                  applicable entities to: (1) Provide
                                                Federal Energy Regulatory                                               • eFiling at Commission’s Web site:                    notification to operators of real-time
                                                Commission                                                           http://www.ferc.gov/docs-filing/                          monitoring alarm failures; (2) provide
                                                                                                                     efiling.asp.                                              operators with indications of the quality
                                                [Docket No. RD16–6–000]                                                 • Mail/Hand Delivery/Courier:                          of information being provided by their
                                                                                                                     Federal Energy Regulatory Commission,
                                                Proposed Consolidated Information                                                                                              monitoring and analysis capabilities;
                                                                                                                     Secretary of the Commission, 888 First
                                                Collection Activities [FERC–725A(1B)                                                                                           and (3) address deficiencies in the
                                                                                                                     Street NE., Washington, DC 20426.
                                                and FERC–725Z]; Comment Request                                         Instructions: All submissions must be                  quality of information being provided
                                                                                                                     formatted and filed in accordance with                    by their monitoring and analysis
                                                AGENCY:  Federal Energy Regulatory                                   submission guidelines at: http://                         capabilities.
                                                Commission, Department of Energy.                                    www.ferc.gov/help/submission-                                FERC–725A(1B) address situational
                                                ACTION: Comment request.                                             guide.asp. For user assistance contact                    awareness objectives by providing for
                                                                                                                     FERC Online Support by email at                           operator awareness when key alarming
                                                SUMMARY:   In compliance with the                                    ferconlinesupport@ferc.gov, or by phone                   tools are not performing as intended.
                                                requirements of the Paperwork                                        at: (866) 208–3676 (toll-free), or (202)                  These collections will improve real-time
                                                Reduction Act of 1995, the Federal                                   502–8659 for TTY.                                         situational awareness capabilities and
                                                Energy Regulatory Collection                                            Docket: Users interested in receiving                  enhance reliable operations by requiring
                                                (Commission or FERC) is submitting                                   automatic notification of activity in this                reliability coordinators, transmission
                                                FERC–725A(1B) (Mandatory Reliability                                 docket or in viewing/downloading                          operators, and balancing authorities to
                                                Standards for the Bulk Power System)                                 comments and issuances in this docket                     provide operators with an improved
                                                and FERC–725AZ (Mandatory                                            may do so at http://www.ferc.gov/docs-                    awareness of system conditions analysis
                                                Reliability Standards: IRO Reliability                               filing/docs-filing.asp.                                   capabilities, including alarm
                                                Standards), in Docket No. RD16–6 to the                              FOR FURTHER INFORMATION CONTACT:                          availability, so that operators may take
                                                Office of Management and Budget                                      Ellen Brown may be reached by email                       appropriate steps to ensure reliability.
                                                (OMB) for review of the information                                  at DataClearance@FERC.gov, by                             These functions include planning,
                                                collection requirements. Any interested                              telephone at (202) 502–8663, and by fax                   operations, data sharing, monitoring,
                                                person may file comments directly with                               at (202) 273–0873.                                        and analysis.
                                                OMB and should address a copy of
                                                                                                                     SUPPLEMENTARY INFORMATION:                                   Type of Respondents: Balancing
                                                those comments to the Commission as
                                                explained below. The Commission                                        Authority: 44 U.S.C. 3507(a)(1)(D).                     Authority (BA),Transmission
                                                issued a Notice in the Federal Register                                                                                        Operations (TOP) and Reliability
                                                                                                                       Title: FERC–725A(1B), (Mandatory
                                                (81 FR 66952, 9/29/2016) requesting                                                                                            Coordinators (RC).
                                                                                                                     Reliability Standards for the Bulk Power
                                                public comments. FERC received no                                    System).                                                     Estimate of Annual Burden 2: The
                                                comments in response to FERC–                                          OMB Control No.: TBD.                                   Commission estimates the annual public
                                                725A(1B) or FERC–725Z and is making                                    Type of Request: Three-year extension                   reporting burden for the information
                                                this notation in the submittal to OMB.                               of FERC–725A(1B) information                              collection as:
                                                                                         FERC–725A(1B), CHANGES DUE TO TOP–010–1 IN DOCKET NO. RD16–6–000
                                                                                                                                     Annual                                                    Total annual burden     Cost per
                                                                                          Requirements &          Number of         number of     Total number       Average burden &
                                                            Entity                                                                                                                             hours & total annual   respondent
                                                                                              period            respondents 3    responses per    of Responses       cost per response 4               cost               ($)
                                                                                                                                   respondent

                                                                                                                     (1)               (2)        (1) * (2) = (3)             (4)                  (3) * (4) = (5)      (5) ÷ (1)
sradovich on DSK3GMQ082PROD with NOTICES




                                                BA 5   .............................   Year 1 Implementa-                  100               1                100   70 hrs.; $4,494.00 .....   7,000 hrs.;               $4,494.00
                                                                                         tion (one-time re-                                                                                      $449,400.00.
                                                                                         porting).

                                                  1 Section 215 was added by the Energy Policy Act                     2 Burden is the total time, effort, or financial        of what is included in the information collection
                                                of 2005, Public Law 109–58, 119 Stat. 594 (2005)                     resources expended by persons to generate,                burden, reference 5 Code of Federal Regulations
                                                (codified at 16 U.S.C. 824o).                                        maintain, retain, or disclose or provide information      1320.3.
                                                                                                                     to or for a Federal agency. For further explanation



                                           VerDate Sep<11>2014            18:54 Dec 27, 2016       Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\28DEN1.SGM       28DEN1



Document Created: 2016-12-28 02:16:54
Document Modified: 2016-12-28 02:16:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation81 FR 95581 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR