82_FR_10636 82 FR 10607 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Relocation of Air Cooled Chiller Pump 3, VWS-MP-03

82 FR 10607 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Relocation of Air Cooled Chiller Pump 3, VWS-MP-03

NUCLEAR REGULATORY COMMISSION

Federal Register Volume 82, Issue 29 (February 14, 2017)

Page Range10607-10608
FR Document2017-02958

The U.S. Nuclear Regulatory Commission (NRC) is granting an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 64 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

Federal Register, Volume 82 Issue 29 (Tuesday, February 14, 2017)
[Federal Register Volume 82, Number 29 (Tuesday, February 14, 2017)]
[Notices]
[Pages 10607-10608]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-02958]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-025 and 52-026; NRC-2008-0252]


Southern Nuclear Operating Company, Inc., Vogtle Electric 
Generating Plant, Units 3 and 4; Relocation of Air Cooled Chiller Pump 
3, VWS-MP-03

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption and combined license amendment; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is granting an 
exemption to allow a departure from the certification information of 
Tier 1 of the generic design control document (DCD) and is issuing 
License Amendment No. 64 to Combined Licenses (COL), NPF-91 and NPF-92. 
The COLs were issued to Southern Nuclear Operating Company, Inc., and 
Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, 
LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, Authority of Georgia, 
and the City of Dalton, Georgia (the licensee); for construction and 
operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, 
located in Burke County, Georgia.
    The granting of the exemption allows the changes to Tier 1 
information asked for in the amendment. Because the acceptability of 
the exemption was determined in part by the acceptability of the 
amendment, the exemption and amendment are being issued concurrently.

DATES: The exemption and amendment were issued on January 13, 2017.

ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2008-0252. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: [email protected]. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly-available documents online in the 
ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to [email protected]. The 
ADAMS accession number for each document referenced (if it is available 
in ADAMS) is provided the first time that it is mentioned in this 
document. The request for the amendment and exemption was submitted by 
letter dated April 26, 2016 (ADAMS Accession No. ML16117A531), and 
supplemented by letter dated August 28, 2016 (ADAMS Accession No. 
ML16239A422).
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Chandu Patel, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-3025; email: [email protected].

SUPPLEMENTARY INFORMATION: 

I. Introduction

    The NRC is granting an exemption from paragraph B of section III, 
``Scope and Contents,'' of appendix D, ``Design Certification Rule for 
the AP1000,'' to part 52 of title 10 of the Code of Federal Regulations 
(10 CFR), and issuing License Amendment No. 64 to COLs, NPF-91 and NPF-
92, to the licensee. The exemption is required by Paragraph A.4 of 
Section VIII, ``Processes for Changes and Departures,'' of appendix D, 
to 10 CFR part 52 to allow the licensee to depart from Tier 1 
information. With the requested amendment, the licensee sought proposed 
changes to the Updated Final Safety Analysis Report Tier 2 and Tier 2* 
information to modify the overall design of the Central Chilled Water 
subsystem to relocate the Air Cooled Chiller Pump 3 (VWS-MP-03) and 
associated equipment from the auxiliary building to the annex building, 
for each unit. The amendment also involves changes to plant-specific 
Tier 1 information, with corresponding changes to Appendix C of the 
COLs, to relocate the air cooled chiller pump from the auxiliary 
building to the annex building, for each unit.
    Part of the justification for granting the exemption was provided 
by the review of the amendment. Because the exemption is necessary in 
order to issue the requested license amendment, the NRC granted the 
exemption and issued

[[Page 10608]]

the amendment concurrently, rather than in sequence. This included 
issuing a combined safety evaluation containing the NRC staff's review 
of both the exemption request and the license amendment. The exemption 
met all applicable regulatory criteria set forth in Sec. Sec.  50.12, 
52.7, and Section VIII.A.4 of appendix D to 10 CFR part 52. The license 
amendment was found to be acceptable as well. The combined safety 
evaluation is available in ADAMS under Accession No. ML16266A352.
    Identical exemption documents (except for referenced unit numbers 
and license numbers) were issued to the licensee for VEGP Units 3 and 4 
(COLs NPF-91 and NPF-92). The exemption documents for VEGP Units 3 and 
4 can be found in ADAMS under Accession Nos. ML16266A340 and 
ML16266A350, respectively. The exemption is reproduced (with the 
exception of abbreviated titles and additional citations) in Section II 
of this document. The amendment documents for COLs NPF-91 and NPF-92 
are available in ADAMS under Accession Nos. ML16266A326 and 
ML16266A334, respectively. A summary of the amendment documents is 
provided in Section III of this document.

II. Exemption

    Reproduced below is the exemption document issued to VEGP Units 3 
and Unit 4. It makes reference to the combined safety evaluation that 
provides the reasoning for the findings made by the NRC (and listed 
under Item 1) in order to grant the exemption:
    1. In a letter dated April 26, 2016, as supplemented August 28, 
2016, the licensee requested from the Commission an exemption to allow 
departures from Tier 1 information in the certified DCD incorporated by 
reference in 10 CFR part 52, appendix D, as part of License Amendment 
Request 15-018, ``Relocation of Air Cooled Chiller Pump 3, VWS-MP-03.''
    For the reasons set forth in Section 3.1 of the NRC staff's Safety 
Evaluation, which can be found in ADAMS under Accession No. 
ML16266A352, the Commission finds that:
    A. The exemption is authorized by law;
    B. the exemption presents no undue risk to public health and 
safety;
    C. the exemption is consistent with the common defense and 
security;
    D. special circumstances are present in that the application of the 
rule in this circumstance is not necessary to serve the underlying 
purpose of the rule;
    E. the special circumstances outweigh any decrease in safety that 
may result from the reduction in standardization caused by the 
exemption; and
    F. the exemption will not result in a significant decrease in the 
level of safety otherwise provided by the design.
    2. Accordingly, the licensee is granted an exemption from the 
certified DCD Tier 1 information, with corresponding changes to 
Appendix C of the Facility Combined License as described in the 
licensee's request dated April 26, 2016, as supplemented August 28, 
2016. This exemption is related to, and necessary for the granting of 
License Amendment No. 64, which is being issued concurrently with this 
exemption.
    3. As explained in Section 5.0 of the NRC staff's Safety Evaluation 
(ADAMS Accession No. ML16266A352), this exemption meets the eligibility 
criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment needs to be prepared in 
connection with the issuance of the exemption.
    4. This exemption is effective as of the date of its issuance.

III. License Amendment Request

    By letter dated April 26, 2016 (ADAMS Accession No. ML16117A531), 
and supplemented by letter dated August 28, 2016 (ADAMS Accession No. 
ML16239A422), the licensee requested that the NRC amend the COLs for 
VEGP, Units 3 and 4, COLs NPF-91 and NPF-92. The proposed amendment is 
described in Section I of this Federal Register notice.
    The Commission has determined for these amendments that the 
application complies with the standards and requirements of the Atomic 
Energy Act of 1954, as amended (the Act), and the Commission's rules 
and regulations. The Commission has made appropriate findings as 
required by the Act and the Commission's rules and regulations in 10 
CFR chapter I, which are set forth in the license amendment.
    A notice of consideration of issuance of amendment to facility 
operating license or COL, as applicable, proposed no significant 
hazards consideration determination, and opportunity for a hearing in 
connection with these actions, was published in the Federal Register on 
August 2, 2016 (81 FR 50736). No comments were received during the 30-
day comment period.
    The Commission has determined that these amendments satisfy the 
criteria for categorical exclusion in accordance with 10 CFR 51.22. 
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact 
statement or environmental assessment need be prepared for these 
amendments.

IV. Conclusion

    Using the reasons set forth in the combined safety evaluation, the 
staff granted the exemption and issued the amendment that the licensee 
requested on April 26, 2016, as supplemented August 28, 2016. The 
exemption and amendment were issued on January 13, 2017, as part of a 
combined package to the licensee (ADAMS Accession No. ML16265A618).

    Dated at Rockville, Maryland, this 6th day of February 2017.

    For the Nuclear Regulatory Commission.
Jennifer Dixon-Herrity,
Chief, Licensing Branch 4, Division of New Reactor Licensing, Office of 
New Reactors.
[FR Doc. 2017-02958 Filed 2-13-17; 8:45 am]
 BILLING CODE 7590-01-P



                                                                            Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices                                           10607

                                                III. License Amendment Request                          NUCLEAR REGULATORY                                    ‘‘ADAMS Public Documents’’ and then
                                                                                                        COMMISSION                                            select ‘‘Begin Web-based ADAMS
                                                   By letter dated August 23, 2016, the                                                                       Search.’’ For problems with ADAMS,
                                                licensee requested that the NRC amend                   [Docket Nos. 52–025 and 52–026; NRC–
                                                                                                        2008–0252]
                                                                                                                                                              please contact the NRC’s Public
                                                the COLs for VEGP, Units 3 and 4, COLs                                                                        Document Room (PDR) reference staff at
                                                NPF–91 and NPF–92. The proposed                         Southern Nuclear Operating Company,                   1–800–397–4209, 301–415–4737, or by
                                                amendment is described in Section I of                  Inc., Vogtle Electric Generating Plant,               email to pdr.resource@nrc.gov. The
                                                this Federal Register notice.                           Units 3 and 4; Relocation of Air Cooled               ADAMS accession number for each
                                                   The Commission has determined for                    Chiller Pump 3, VWS–MP–03                             document referenced (if it is available in
                                                these amendments that the application                                                                         ADAMS) is provided the first time that
                                                                                                        AGENCY:  Nuclear Regulatory                           it is mentioned in this document. The
                                                complies with the standards and
                                                                                                        Commission.                                           request for the amendment and
                                                requirements of the Atomic Energy Act
                                                                                                        ACTION: Exemption and combined                        exemption was submitted by letter
                                                of 1954, as amended (the Act), and the
                                                                                                        license amendment; issuance.                          dated April 26, 2016 (ADAMS
                                                Commission’s rules and regulations.
                                                                                                                                                              Accession No. ML16117A531), and
                                                The Commission has made appropriate                     SUMMARY:    The U.S. Nuclear Regulatory               supplemented by letter dated August 28,
                                                findings as required by the Act and the                 Commission (NRC) is granting an                       2016 (ADAMS Accession No.
                                                Commission’s rules and regulations in                   exemption to allow a departure from the               ML16239A422).
                                                10 CFR chapter I, which are set forth in                certification information of Tier 1 of the               • NRC’s PDR: You may examine and
                                                the license amendment.                                  generic design control document (DCD)                 purchase copies of public documents at
                                                   A notice of consideration of issuance                and is issuing License Amendment No.                  the NRC’s PDR, Room O1–F21, One
                                                of amendment to facility operating                      64 to Combined Licenses (COL), NPF–                   White Flint North, 11555 Rockville
                                                license or COL, as applicable, proposed                 91 and NPF–92. The COLs were issued                   Pike, Rockville, Maryland 20852.
                                                no significant hazards consideration                    to Southern Nuclear Operating                         FOR FURTHER INFORMATION CONTACT:
                                                determination, and opportunity for a                    Company, Inc., and Georgia Power                      Chandu Patel, Office of New Reactors,
                                                                                                        Company, Oglethorpe Power                             U.S. Nuclear Regulatory Commission,
                                                hearing in connection with these
                                                                                                        Corporation, MEAG Power SPVM, LLC,                    Washington, DC 20555–0001; telephone:
                                                actions, was published in the Federal
                                                                                                        MEAG Power SPVJ, LLC, MEAG Power                      301–415–3025; email: Chandu.Patel@
                                                Register on September 27, 2016 (81 FR                   SPVP, LLC, Authority of Georgia, and
                                                66301). No comments were received                                                                             nrc.gov.
                                                                                                        the City of Dalton, Georgia (the
                                                during the 30-day comment period.                       licensee); for construction and operation             SUPPLEMENTARY INFORMATION:
                                                   The Commission has determined that                   of the Vogtle Electric Generating Plant               I. Introduction
                                                these amendments satisfy the criteria for               (VEGP) Units 3 and 4, located in Burke
                                                                                                        County, Georgia.                                         The NRC is granting an exemption
                                                categorical exclusion in accordance
                                                                                                           The granting of the exemption allows               from paragraph B of section III, ‘‘Scope
                                                with 10 CFR 51.22. Therefore, pursuant
                                                                                                        the changes to Tier 1 information asked               and Contents,’’ of appendix D, ‘‘Design
                                                to 10 CFR 51.22(b), no environmental                                                                          Certification Rule for the AP1000,’’ to
                                                impact statement or environmental                       for in the amendment. Because the
                                                                                                        acceptability of the exemption was                    part 52 of title 10 of the Code of Federal
                                                assessment need be prepared for these                                                                         Regulations (10 CFR), and issuing
                                                amendments.                                             determined in part by the acceptability
                                                                                                        of the amendment, the exemption and                   License Amendment No. 64 to COLs,
                                                IV. Conclusion                                          amendment are being issued                            NPF–91 and NPF–92, to the licensee.
                                                                                                        concurrently.                                         The exemption is required by Paragraph
                                                   Using the reasons set forth in the                                                                         A.4 of Section VIII, ‘‘Processes for
                                                combined safety evaluation, the staff                   DATES: The exemption and amendment                    Changes and Departures,’’ of appendix
                                                granted the exemption and issued the                    were issued on January 13, 2017.                      D, to 10 CFR part 52 to allow the
                                                amendment that the licensee requested                   ADDRESSES: Please refer to Docket ID                  licensee to depart from Tier 1
                                                on August 23, 2016.                                     NRC–2008–0252 when contacting the                     information. With the requested
                                                                                                        NRC about the availability of                         amendment, the licensee sought
                                                   The exemption and amendment were
                                                                                                        information regarding this document.                  proposed changes to the Updated Final
                                                issued on November 30, 2016 as part of
                                                                                                        You may obtain publicly-available                     Safety Analysis Report Tier 2 and Tier
                                                a combined package to the licensee                      information related to this document                  2* information to modify the overall
                                                (ADAMS Accession No. ML16279A341).                      using any of the following methods:                   design of the Central Chilled Water
                                                  Dated at Rockville, Maryland, this 6th day              • Federal Rulemaking Web site: Go to                subsystem to relocate the Air Cooled
                                                of February 2017.                                       http://www.regulations.gov and search                 Chiller Pump 3 (VWS–MP–03) and
                                                  For the Nuclear Regulatory Commission.                for Docket ID NRC–2008–0252. Address                  associated equipment from the auxiliary
                                                Jennifer Dixon-Herrity,                                 questions about NRC dockets to Carol                  building to the annex building, for each
                                                                                                        Gallagher; telephone: 301–415–3463;                   unit. The amendment also involves
                                                Chief, Licensing Branch 4, Division of New
                                                Reactor Licensing, Office of New Reactors.
                                                                                                        email: Carol.Gallagher@nrc.gov. For                   changes to plant-specific Tier 1
                                                                                                        technical questions, contact the                      information, with corresponding
                                                [FR Doc. 2017–02959 Filed 2–13–17; 8:45 am]
                                                                                                        individual listed in the FOR FURTHER                  changes to Appendix C of the COLs, to
                                                BILLING CODE 7590–01–P                                  INFORMATION CONTACT section of this                   relocate the air cooled chiller pump
                                                                                                        document.
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              from the auxiliary building to the annex
                                                                                                          • NRC’s Agencywide Documents                        building, for each unit.
                                                                                                        Access and Management System                             Part of the justification for granting
                                                                                                        (ADAMS): You may obtain publicly-                     the exemption was provided by the
                                                                                                        available documents online in the                     review of the amendment. Because the
                                                                                                        ADAMS Public Documents collection at                  exemption is necessary in order to issue
                                                                                                        http://www.nrc.gov/reading-rm/                        the requested license amendment, the
                                                                                                        adams.html. To begin the search, select               NRC granted the exemption and issued


                                           VerDate Sep<11>2014   16:48 Feb 13, 2017   Jkt 241001   PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:\FR\FM\14FEN1.SGM   14FEN1


                                                10608                       Federal Register / Vol. 82, No. 29 / Tuesday, February 14, 2017 / Notices

                                                the amendment concurrently, rather                      from the reduction in standardization                 assessment need be prepared for these
                                                than in sequence. This included issuing                 caused by the exemption; and                          amendments.
                                                a combined safety evaluation containing                    F. the exemption will not result in a
                                                                                                                                                              IV. Conclusion
                                                the NRC staff’s review of both the                      significant decrease in the level of safety
                                                exemption request and the license                       otherwise provided by the design.                       Using the reasons set forth in the
                                                amendment. The exemption met all                           2. Accordingly, the licensee is granted            combined safety evaluation, the staff
                                                applicable regulatory criteria set forth in             an exemption from the certified DCD                   granted the exemption and issued the
                                                §§ 50.12, 52.7, and Section VIII.A.4 of                 Tier 1 information, with corresponding                amendment that the licensee requested
                                                appendix D to 10 CFR part 52. The                       changes to Appendix C of the Facility                 on April 26, 2016, as supplemented
                                                license amendment was found to be                       Combined License as described in the                  August 28, 2016. The exemption and
                                                acceptable as well. The combined safety                 licensee’s request dated April 26, 2016,              amendment were issued on January 13,
                                                evaluation is available in ADAMS under                  as supplemented August 28, 2016. This                 2017, as part of a combined package to
                                                Accession No. ML16266A352.                              exemption is related to, and necessary                the licensee (ADAMS Accession No.
                                                   Identical exemption documents                        for the granting of License Amendment                 ML16265A618).
                                                (except for referenced unit numbers and                 No. 64, which is being issued                           Dated at Rockville, Maryland, this 6th day
                                                license numbers) were issued to the                     concurrently with this exemption.                     of February 2017.
                                                licensee for VEGP Units 3 and 4 (COLs                      3. As explained in Section 5.0 of the                For the Nuclear Regulatory Commission.
                                                NPF–91 and NPF–92). The exemption                       NRC staff’s Safety Evaluation (ADAMS                  Jennifer Dixon-Herrity,
                                                documents for VEGP Units 3 and 4 can                    Accession No. ML16266A352), this                      Chief, Licensing Branch 4, Division of New
                                                be found in ADAMS under Accession                       exemption meets the eligibility criteria              Reactor Licensing, Office of New Reactors.
                                                Nos. ML16266A340 and ML16266A350,                       for categorical exclusion set forth in 10             [FR Doc. 2017–02958 Filed 2–13–17; 8:45 am]
                                                respectively. The exemption is                          CFR 51.22(c)(9). Therefore, pursuant to
                                                                                                                                                              BILLING CODE 7590–01–P
                                                reproduced (with the exception of                       10 CFR 51.22(b), no environmental
                                                abbreviated titles and additional                       impact statement or environmental
                                                citations) in Section II of this document.              assessment needs to be prepared in                    NUCLEAR REGULATORY
                                                The amendment documents for COLs                        connection with the issuance of the                   COMMISSION
                                                NPF–91 and NPF–92 are available in                      exemption.
                                                ADAMS under Accession Nos.                                 4. This exemption is effective as of the
                                                ML16266A326 and ML16266A334,                                                                                  [Docket Nos. 52–025 and 52–026; NRC–
                                                                                                        date of its issuance.                                 2008–0252]
                                                respectively. A summary of the
                                                amendment documents is provided in                      III. License Amendment Request
                                                                                                                                                              Southern Nuclear Operating Company,
                                                Section III of this document.                              By letter dated April 26, 2016                     Inc., Vogtle Electric Generating Plant,
                                                II. Exemption                                           (ADAMS Accession No. ML16117A531),                    Units 3 and 4; Radiologically
                                                                                                        and supplemented by letter dated                      Controlled Area Ventilation System
                                                   Reproduced below is the exemption                    August 28, 2016 (ADAMS Accession                      Design Changes
                                                document issued to VEGP Units 3 and                     No. ML16239A422), the licensee
                                                Unit 4. It makes reference to the                       requested that the NRC amend the COLs                 AGENCY:  Nuclear Regulatory
                                                combined safety evaluation that                         for VEGP, Units 3 and 4, COLs NPF–91                  Commission.
                                                provides the reasoning for the findings                 and NPF–92. The proposed amendment                    ACTION: Exemption and combined
                                                made by the NRC (and listed under Item                  is described in Section I of this Federal             license amendment; issuance.
                                                1) in order to grant the exemption:                     Register notice.
                                                   1. In a letter dated April 26, 2016, as                 The Commission has determined for                  SUMMARY:    The U.S. Nuclear Regulatory
                                                supplemented August 28, 2016, the                       these amendments that the application                 Commission (NRC) is granting an
                                                licensee requested from the Commission                  complies with the standards and                       exemption to allow a departure from the
                                                an exemption to allow departures from                   requirements of the Atomic Energy Act                 certification information of Tier 1 of the
                                                Tier 1 information in the certified DCD                 of 1954, as amended (the Act), and the                generic design control document (DCD)
                                                incorporated by reference in 10 CFR                     Commission’s rules and regulations.                   and is issuing License Amendment No.
                                                part 52, appendix D, as part of License                 The Commission has made appropriate                   57 to Combined Licenses (COLs), NPF–
                                                Amendment Request 15–018,                               findings as required by the Act and the               91 and NPF–92. The COLs were issued
                                                ‘‘Relocation of Air Cooled Chiller Pump                 Commission’s rules and regulations in                 to Southern Nuclear Operating
                                                3, VWS–MP–03.’’                                         10 CFR chapter I, which are set forth in              Company, Inc., and Georgia Power
                                                   For the reasons set forth in Section 3.1             the license amendment.                                Company, Oglethorpe Power
                                                of the NRC staff’s Safety Evaluation,                      A notice of consideration of issuance              Corporation, MEAG Power SPVM, LLC,
                                                which can be found in ADAMS under                       of amendment to facility operating                    MEAG Power SPVJ, LLC, MEAG Power
                                                Accession No. ML16266A352, the                          license or COL, as applicable, proposed               SPVP, LLC, Authority of Georgia, and
                                                Commission finds that:                                  no significant hazards consideration                  the City of Dalton, Georgia (the
                                                   A. The exemption is authorized by                    determination, and opportunity for a                  licensee); for construction and operation
                                                law;                                                    hearing in connection with these                      of the Vogtle Electric Generating Plant
                                                   B. the exemption presents no undue                   actions, was published in the Federal                 (VEGP) Units 3 and 4, located in Burke
                                                risk to public health and safety;                       Register on August 2, 2016 (81 FR                     County, Georgia.
                                                   C. the exemption is consistent with                  50736). No comments were received                        The granting of the exemption allows
sradovich on DSK3GMQ082PROD with NOTICES




                                                the common defense and security;                        during the 30-day comment period.                     the changes to Tier 1 information asked
                                                   D. special circumstances are present                    The Commission has determined that                 for in the amendment. Because the
                                                in that the application of the rule in this             these amendments satisfy the criteria for             acceptability of the exemption was
                                                circumstance is not necessary to serve                  categorical exclusion in accordance                   determined in part by the acceptability
                                                the underlying purpose of the rule;                     with 10 CFR 51.22. Therefore, pursuant                of the amendment, the exemption and
                                                   E. the special circumstances outweigh                to 10 CFR 51.22(b), no environmental                  amendment are being issued
                                                any decrease in safety that may result                  impact statement or environmental                     concurrently.


                                           VerDate Sep<11>2014   16:48 Feb 13, 2017   Jkt 241001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\14FEN1.SGM   14FEN1



Document Created: 2017-02-13 23:40:26
Document Modified: 2017-02-13 23:40:26
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionExemption and combined license amendment; issuance.
DatesThe exemption and amendment were issued on January 13, 2017.
ContactChandu Patel, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-3025; email: [email protected]
FR Citation82 FR 10607 