82_FR_11374 82 FR 11340 - Energy Answers Arecibo, LLC: Notice of availability of a Final Environmental Impact Statement

82 FR 11340 - Energy Answers Arecibo, LLC: Notice of availability of a Final Environmental Impact Statement

DEPARTMENT OF AGRICULTURE
Rural Utilities Service

Federal Register Volume 82, Issue 34 (February 22, 2017)

Page Range11340-11341
FR Document2017-03404

The Rural Utilities Service (RUS), an agency within the Department of Agriculture (USDA), has prepared a Final Environmental Impact Statement (FEIS) to meet its responsibilities under the National Environmental Policy Act (NEPA), RUS's implementing regulations, 7 CFR part 1970, and other applicable environmental requirements related to providing financial assistance for Energy Answers Arecibo, LLC's (Energy Answers) proposed (Project) in Arecibo, Puerto Rico. RUS will also use the FEIS to meet its responsibilities under Section 106 of the National Historic Preservation Act, 54 U.S.C. 300101, and its implementing regulations, ``Protection of Historic Properties'' (36 CFR part 800). The FEIS addresses the construction, operation, and maintenance of Energy Answers' proposed Project, a waste-to-energy generation and resource recovery facility described previously in the Draft Environmental Impact Statement (DEIS). It also addresses the roughly 3,820 comments received during the comment periods for the DEIS. The overall project area encompasses parts of the Cambalache Ward in Arecibo, Puerto Rico.

Federal Register, Volume 82 Issue 34 (Wednesday, February 22, 2017)
[Federal Register Volume 82, Number 34 (Wednesday, February 22, 2017)]
[Notices]
[Pages 11340-11341]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-03404]


-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Rural Utilities Service


Energy Answers Arecibo, LLC: Notice of availability of a Final 
Environmental Impact Statement

AGENCY: Rural Utilities Service, USDA.

ACTION: Notice of Availability of a Final Environmental Impact 
Statement.

-----------------------------------------------------------------------

SUMMARY: The Rural Utilities Service (RUS), an agency within the 
Department of Agriculture (USDA), has prepared a Final Environmental 
Impact Statement (FEIS) to meet its responsibilities under the National 
Environmental Policy Act (NEPA), RUS's implementing regulations, 7 CFR 
part 1970, and other applicable environmental requirements related to 
providing financial assistance for Energy Answers Arecibo, LLC's 
(Energy Answers) proposed (Project) in Arecibo, Puerto Rico. RUS will 
also use the FEIS to meet its responsibilities under Section 106 of the 
National Historic Preservation Act, 54 U.S.C. 300101, and its 
implementing regulations, ``Protection of Historic Properties'' (36 CFR 
part 800). The FEIS addresses the construction, operation, and 
maintenance of Energy Answers' proposed Project, a waste-to-energy 
generation and resource recovery facility described previously in the 
Draft Environmental Impact Statement (DEIS). It also addresses the 
roughly 3,820 comments received during the comment periods for the 
DEIS. The overall project area encompasses parts of the Cambalache Ward 
in Arecibo, Puerto Rico.

DATES: Written comments on the FEIS will be accepted 30 days following 
the publication of the Environmental Protection Agency's environmental 
impact statement receipt notice in the Federal Register. Notices of 
Availability of the FEIS will be published in the local newspapers. 
After a 30-day public review period on the FEIS, RUS will consider 
comments and prepare a Record of Decision for its respective action. 
The environmental review process is expected to conclude in the late 
winter or spring of 2017.

FOR FURTHER INFORMATION CONTACT: To receive copies of the FEIS or 
request information on the proposed Project, the FEIS process, and RUS 
financing, contact Mr. Steven Polacek, Environmental Protection 
Specialist, Rural Utilities Service, Water and Environmental Programs, 
1400 Independence Ave. SW., Mail Stop 1571, Washington, DC 20250, 
telephone: (202) 205-9805, fax: (202) 690-0649, or email: 
[email protected]. Copies of the FEIS will be available for 
review in the Arecibo Public Library (Nicolas Nabal Barreto), located 
at: 210 Santiago Iglesias Pantin Ave., Arecibo, Puerto Rico 00612.

SUPPLEMENTARY INFORMATION: Energy Answers plans to request financial 
assistance for the proposed Project from RUS. Completing the 
Environmental Impact Statement (EIS) is a precursor requirement to 
processing a loan application from Energy Answers. Upon completion of 
the EIS process, RUS would review Energy Answers' application along 
with other technical and financial considerations. Energy Answers 
proposes to construct a waste to energy generation and resource 
recovery facility in the Cambalache Ward of Arecibo, Puerto Rico. The 
proposed facility would receive and process approximately 2,300 tons of 
municipal waste per day and generate a gross capacity of 77 megawatts 
(MW). The Puerto Rico Electric Power Authority will purchase power 
generated from the facility. The preferred location of the facility is 
the site of a former paper mill and would cover approximately 79.6 
acres of the 90-acre parcel. The proposal would include the following 
facility components: A municipal solid waste receiving and processing 
building; processed refuse fuel storage building; boiler and steam 
turbine; emission control system; ash processing and storage building; 
and other associated infrastructure and buildings. Two other connected 
actions, which would be constructed by other utilities, include 
installation of an approximately 2.0-mile raw water line and 
construction of a 115 kilovolt (kV) transmission line approximately 0.8 
miles in length. The connected actions will be addressed in the 
proposed Project's EIS.
    In accordance with 7 CFR 1970.15(c)(2) and 40 CFR 1502.18, RUS 
incorporates as an appendix received on the environmental impact 
analyses and associated documentation prepared by the Puerto Rico 
Industrial Development Company (PRIDCO) and the United States 
Environmental Protection Agency (USEPA) where appropriate. PRIDCO 
served as a lead agency in preparing an EIS under the Puerto Rico 
Environmental Public Policy Act, Article 4(B)(3), Law No. 416 
(September 22, 2004). The USEPA completed air quality analyses and 
issued a Prevention of Significant Deterioration (PSD) permit for the 
proposed Project on June 11, 2013. As applicable, the EIS documents 
changes in the affected environment and environmental consequences that 
may have changed since issuance of the PRIDCO-EIS and USEPA PSD permit.
    Under NEPA regulations, RUS is required to identify and evaluate 
reasonable alternatives to the Project, as well as a no-action 
alternative. Reasonable alternatives are those that are ``practical or 
feasible from the technical and economic standpoint.'' In determining 
reasonable alternatives, RUS considered a number of factors including 
the proposed action's size and scope, state of the technology, economic 
considerations, legal considerations, socioeconomic concerns, 
availability of resources, and the timeframe in which the identified 
need must be fulfilled. Alternative site locations, thermal conversion 
technologies, cooling process water sources, alternative fuels and 
renewable energy technologies were also considered.
    RUS reviewed multiple needs including (1) providing a dispatchable 
electrical generation resource that adds to Puerto Rico Electric Power 
Authority's (PREPA) reserve capacity levels, (2) helping PREPA meet the 
Renewable Energy Portfolio Standard enacted by Puerto Rico and use 
cleaner and more environmentally friendly energy resources, and (3) 
decreasing Puerto Rico's dependence on imported

[[Page 11341]]

fossil fuels and contributing to the fuel diversification of the 
generation both owned and purchased by PREPA.
    Of the alternatives considered by RUS, the Arecibo Waste-to-Energy 
and Resource Recovery Project best minimizes or mitigates the potential 
impacts on the environment while meeting the proposed purpose and need 
for the project.
    RUS is authorized to make loans and loan guarantees that finance 
the construction of water lines, electrical transmission lines, Waste-
to-Energy and Resource Recovery facilities. RUS is responsible for 
completing the environmental review process prior to processing Energy 
Answers' application.
    Completion of the environmental review process allows the project 
proponents to submit an application for financing to RUS. It does not 
represent a commitment to fund the project or a determination that the 
applicant has met the agency's underwriting criteria. All loan 
applicants are required to demonstrate eligibility, financial 
feasibility and provide reasonably adequate security for any financing 
made available from RUS.The proposed Project is subject to the 
jurisdiction of, and contingent upon, compliance with all relevant 
presidential executive orders and federal, state, and local 
environmental laws and regulations in addition to the completion of the 
environmental review requirements as prescribed in RUS's Environmental 
Policies and Procedures, 7 CFR part 1970.
    RUS has prepared the FEIS to analyze the impacts of its respective 
Federal actions and the proposed Project in accordance with NEPA, as 
amended, the Council in Environmental Quality (CEQ) Regulations for 
Implementing the Procedural Provisions of NEPA (40 CFR parts 1500-
1508), and Rural Development's Environmental Policies and Procedures (7 
CFR part 1970). RUS has already prepared and published a DEIS which can 
be found on the Agency Web site at http://www.rd.usda.gov/publications/environmental-studies/impact-statements/arecibo-waste-energy-generation-and-resource.
    In accordance with 7 CFR 1970.15(c)(2) and 40 CFR 1502.18, RUS 
incorporates, as an appendix, the environmental impact analyses and 
associated documentation prepared by the Puerto Rico Industrial 
Development Company (PRIDCO) and the USEPA where appropriate. PRIDCO 
served as a lead agency in preparing an EIS under the Puerto Rico 
Environmental Public Policy Act, Article 4(B)(3), Law No. 416 
(September 22, 2004). The USEPA completed air quality analyses and 
issued a Prevention of Significant Deterioration (PSD) permit for the 
proposed Project on June 11, 2013. As applicable, the EIS documents 
changes in the affected environment and environmental consequences that 
may have changed since issuance of the PRIDCO-EIS and USEPA PSD permit.
    RUS has determined that its action regarding the proposed Project 
would be an undertaking subject to review under Section 106 of the 
National Historic Preservation Act, 16 U.S.C. 470 and its implementing 
regulations, ``Protection of Historic Properties'' (36 CFR part 800). 
As part of its broad environmental review process, RUS must take into 
account the effect of the proposed Project on historic properties in 
accordance with Section 106. Pursuant to 36 CFR 800.2(d)(3), RUS is 
using its procedures for public involvement under NEPA to meet its 
responsibilities to solicit and consider the views of the public during 
Section 106 review. Accordingly, comments submitted in response to this 
Notice will inform RUS decision-making in its Section 106 review 
process.
    The Final EIS is available in both Spanish and English for review 
at the following Web site: http://www.rd.usda.gov/publications/environmental-studies/impact-statements/arecibo-waste-energy-generation-and-resource. The Final EIS will be available for review 30 
days after the USEPA's EIS receipt notice in the Federal Register. 
Following this review period, RUS will publish a Record of Decision 
(ROD). Notices announcing the availability of the ROD will be published 
in the Federal Register and in local newspapers.
    This Notice of Availability also serves as a notice of proposed 
floodplain and wetland action. It is anticipated that Energy Answers 
would need to fill 2.4 acres (9,793.4 square meters) of on-site 
wetlands for proposed Project. Energy Answers will be required to 
implement mitigation for the wetland conversion, as contained in their 
Section 404 permit. Additionally, excavation required for the proposed 
Project is expected to result in a small increase in base flood 
elevations along predominately undeveloped properties located east and 
west, as well as immediately upstream, of the Project site.

Christopher A. McLean,
Assistant Administrator--Electric Program, Rural Utilities Service.
[FR Doc. 2017-03404 Filed 2-21-17; 8:45 am]
 BILLING CODE P



                                                11340                     Federal Register / Vol. 82, No. 34 / Wednesday, February 22, 2017 / Notices

                                                Comments may also be sent to the Desk                   proposed Project, a waste-to-energy                   components: A municipal solid waste
                                                Officer for Agriculture, Office of                      generation and resource recovery                      receiving and processing building;
                                                Information and Regulatory Affairs,                     facility described previously in the Draft            processed refuse fuel storage building;
                                                Office of Management and Budget                         Environmental Impact Statement (DEIS).                boiler and steam turbine; emission
                                                (OMB), Washington, DC 20503.                            It also addresses the roughly 3,820                   control system; ash processing and
                                                  All comments received in response to                  comments received during the comment                  storage building; and other associated
                                                this notice, including names and                        periods for the DEIS. The overall project             infrastructure and buildings. Two other
                                                addresses when provided, will be a                      area encompasses parts of the                         connected actions, which would be
                                                matter of public record. Comments will                  Cambalache Ward in Arecibo, Puerto                    constructed by other utilities, include
                                                be summarized and included in the                       Rico.                                                 installation of an approximately 2.0-
                                                submission for Office of Management                     DATES: Written comments on the FEIS                   mile raw water line and construction of
                                                and Budget approval.                                    will be accepted 30 days following the                a 115 kilovolt (kV) transmission line
                                                                                                        publication of the Environmental                      approximately 0.8 miles in length. The
                                                E-Government Act Compliance                                                                                   connected actions will be addressed in
                                                                                                        Protection Agency’s environmental
                                                   FAS is committed to complying with                   impact statement receipt notice in the                the proposed Project’s EIS.
                                                the E-Government Act of 2002, to                        Federal Register. Notices of Availability               In accordance with 7 CFR
                                                promote the use of the Internet and                     of the FEIS will be published in the                  1970.15(c)(2) and 40 CFR 1502.18, RUS
                                                other information technologies to                       local newspapers. After a 30-day public               incorporates as an appendix received on
                                                provide increased opportunities for                     review period on the FEIS, RUS will                   the environmental impact analyses and
                                                citizen access to Government                            consider comments and prepare a                       associated documentation prepared by
                                                information and services, and for other                 Record of Decision for its respective                 the Puerto Rico Industrial Development
                                                purposes.                                               action. The environmental review                      Company (PRIDCO) and the United
                                                   Persons with disabilities who require                process is expected to conclude in the                States Environmental Protection Agency
                                                an alternative means for communication                  late winter or spring of 2017.                        (USEPA) where appropriate. PRIDCO
                                                of information (e.g., Braille, large print,                                                                   served as a lead agency in preparing an
                                                                                                        FOR FURTHER INFORMATION CONTACT: To
                                                audiotape, etc.) should contact USDA’s                                                                        EIS under the Puerto Rico
                                                                                                        receive copies of the FEIS or request
                                                Target Center at (202) 720–2600 (voice                                                                        Environmental Public Policy Act,
                                                                                                        information on the proposed Project, the
                                                and TDD).                                                                                                     Article 4(B)(3), Law No. 416 (September
                                                                                                        FEIS process, and RUS financing,
                                                  Dated: February 13, 2017.
                                                                                                                                                              22, 2004). The USEPA completed air
                                                                                                        contact Mr. Steven Polacek,
                                                                                                                                                              quality analyses and issued a Prevention
                                                Holly Higgins,                                          Environmental Protection Specialist,
                                                                                                                                                              of Significant Deterioration (PSD)
                                                Acting Administrator, Foreign Agricultural              Rural Utilities Service, Water and
                                                                                                                                                              permit for the proposed Project on June
                                                Service.                                                Environmental Programs, 1400
                                                                                                                                                              11, 2013. As applicable, the EIS
                                                [FR Doc. 2017–03429 Filed 2–21–17; 8:45 am]             Independence Ave. SW., Mail Stop
                                                                                                                                                              documents changes in the affected
                                                                                                        1571, Washington, DC 20250, telephone:
                                                BILLING CODE 3410–10–P                                                                                        environment and environmental
                                                                                                        (202) 205–9805, fax: (202) 690–0649, or
                                                                                                                                                              consequences that may have changed
                                                                                                        email: Steve.Polacek@wdc.usda.gov.
                                                                                                                                                              since issuance of the PRIDCO–EIS and
                                                DEPARTMENT OF AGRICULTURE                               Copies of the FEIS will be available for
                                                                                                                                                              USEPA PSD permit.
                                                                                                        review in the Arecibo Public Library                    Under NEPA regulations, RUS is
                                                Rural Utilities Service                                 (Nicolas Nabal Barreto), located at: 210              required to identify and evaluate
                                                                                                        Santiago Iglesias Pantin Ave., Arecibo,               reasonable alternatives to the Project, as
                                                Energy Answers Arecibo, LLC: Notice                     Puerto Rico 00612.
                                                of availability of a Final Environmental                                                                      well as a no-action alternative.
                                                                                                        SUPPLEMENTARY INFORMATION: Energy                     Reasonable alternatives are those that
                                                Impact Statement                                        Answers plans to request financial                    are ‘‘practical or feasible from the
                                                AGENCY:Rural Utilities Service, USDA.                   assistance for the proposed Project from              technical and economic standpoint.’’ In
                                                ACTION:Notice of Availability of a Final                RUS. Completing the Environmental                     determining reasonable alternatives,
                                                Environmental Impact Statement.                         Impact Statement (EIS) is a precursor                 RUS considered a number of factors
                                                                                                        requirement to processing a loan                      including the proposed action’s size and
                                                SUMMARY:   The Rural Utilities Service                  application from Energy Answers. Upon                 scope, state of the technology, economic
                                                (RUS), an agency within the Department                  completion of the EIS process, RUS                    considerations, legal considerations,
                                                of Agriculture (USDA), has prepared a                   would review Energy Answers’                          socioeconomic concerns, availability of
                                                Final Environmental Impact Statement                    application along with other technical                resources, and the timeframe in which
                                                (FEIS) to meet its responsibilities under               and financial considerations. Energy                  the identified need must be fulfilled.
                                                the National Environmental Policy Act                   Answers proposes to construct a waste                 Alternative site locations, thermal
                                                (NEPA), RUS’s implementing                              to energy generation and resource                     conversion technologies, cooling
                                                regulations, 7 CFR part 1970, and other                 recovery facility in the Cambalache                   process water sources, alternative fuels
                                                applicable environmental requirements                   Ward of Arecibo, Puerto Rico. The                     and renewable energy technologies were
                                                related to providing financial assistance               proposed facility would receive and                   also considered.
                                                for Energy Answers Arecibo, LLC’s                       process approximately 2,300 tons of                     RUS reviewed multiple needs
                                                (Energy Answers) proposed (Project) in                  municipal waste per day and generate a                including (1) providing a dispatchable
                                                Arecibo, Puerto Rico. RUS will also use                 gross capacity of 77 megawatts (MW).                  electrical generation resource that adds
                                                the FEIS to meet its responsibilities                   The Puerto Rico Electric Power                        to Puerto Rico Electric Power
sradovich on DSK3GMQ082PROD with NOTICES




                                                under Section 106 of the National                       Authority will purchase power                         Authority’s (PREPA) reserve capacity
                                                Historic Preservation Act, 54 U.S.C.                    generated from the facility. The                      levels, (2) helping PREPA meet the
                                                300101, and its implementing                            preferred location of the facility is the             Renewable Energy Portfolio Standard
                                                regulations, ‘‘Protection of Historic                   site of a former paper mill and would                 enacted by Puerto Rico and use cleaner
                                                Properties’’ (36 CFR part 800). The FEIS                cover approximately 79.6 acres of the                 and more environmentally friendly
                                                addresses the construction, operation,                  90-acre parcel. The proposal would                    energy resources, and (3) decreasing
                                                and maintenance of Energy Answers’                      include the following facility                        Puerto Rico’s dependence on imported


                                           VerDate Sep<11>2014   16:05 Feb 21, 2017   Jkt 241001   PO 00000   Frm 00005   Fmt 4703   Sfmt 4703   E:\FR\FM\22FEN1.SGM   22FEN1


                                                                          Federal Register / Vol. 82, No. 34 / Wednesday, February 22, 2017 / Notices                                            11341

                                                fossil fuels and contributing to the fuel               issued a Prevention of Significant                    DEPARTMENT OF COMMERCE
                                                diversification of the generation both                  Deterioration (PSD) permit for the
                                                owned and purchased by PREPA.                           proposed Project on June 11, 2013. As                 Foreign-Trade Zones Board
                                                   Of the alternatives considered by                    applicable, the EIS documents changes                 [S–16–2017]
                                                RUS, the Arecibo Waste-to-Energy and                    in the affected environment and
                                                Resource Recovery Project best                          environmental consequences that may                   Foreign-Trade Zone 20—Norfolk,
                                                minimizes or mitigates the potential                    have changed since issuance of the                    Virginia; Application for Expansion of
                                                impacts on the environment while                        PRIDCO–EIS and USEPA PSD permit.                      Subzone 20E; STIHL Incorporated;
                                                meeting the proposed purpose and need                                                                         Virginia Beach, Virginia
                                                                                                           RUS has determined that its action
                                                for the project.
                                                   RUS is authorized to make loans and                  regarding the proposed Project would be                  An application has been submitted to
                                                loan guarantees that finance the                        an undertaking subject to review under                the Foreign-Trade Zones Board (the
                                                construction of water lines, electrical                 Section 106 of the National Historic                  Board) by the Virginia Port Authority,
                                                transmission lines, Waste-to-Energy and                 Preservation Act, 16 U.S.C. 470 and its               grantee of FTZ 20, requesting the
                                                Resource Recovery facilities. RUS is                    implementing regulations, ‘‘Protection                expansion of Subzone 20E to include an
                                                responsible for completing the                          of Historic Properties’’ (36 CFR part                 additional site of STIHL Incorporated,
                                                environmental review process prior to                   800). As part of its broad environmental              located in Virginia Beach, Virginia. The
                                                processing Energy Answers’ application.                 review process, RUS must take into                    application was submitted pursuant to
                                                   Completion of the environmental                      account the effect of the proposed                    the provisions of the Foreign-Trade
                                                review process allows the project                       Project on historic properties in                     Zones Act, as amended (19 U.S.C. 81a–
                                                proponents to submit an application for                 accordance with Section 106. Pursuant                 81u), and the regulations of the Board
                                                financing to RUS. It does not represent                 to 36 CFR 800.2(d)(3), RUS is using its               (15 CFR part 400). It was formally
                                                a commitment to fund the project or a                   procedures for public involvement                     docketed on February 6, 2017.
                                                determination that the applicant has                    under NEPA to meet its responsibilities                  Subzone 20E was approved on April
                                                met the agency’s underwriting criteria.                 to solicit and consider the views of the              24, 2009 (Board Order 1612, 74 FR
                                                All loan applicants are required to                     public during Section 106 review.                     21623, May 8, 2009) and consists of five
                                                demonstrate eligibility, financial                      Accordingly, comments submitted in                    sites (86.56 acres). They are as follows:
                                                feasibility and provide reasonably                      response to this Notice will inform RUS               Site 1 (47.02 acres)—536 Viking Drive,
                                                adequate security for any financing                     decision-making in its Section 106                    Virginia Beach; Site 2 (19.52 acres)—
                                                made available from RUS.The proposed                    review process.                                       2525 International Parkway, Virginia
                                                Project is subject to the jurisdiction of,                                                                    Beach; Site 3 (7.14 acres)—601 Central
                                                                                                           The Final EIS is available in both
                                                and contingent upon, compliance with                                                                          Drive, Virginia Beach; Site 4 (10.26
                                                                                                        Spanish and English for review at the
                                                all relevant presidential executive                                                                           acres)—825 London Bridge Road,
                                                                                                        following Web site: http://
                                                orders and federal, state, and local                                                                          Virginia Beach; and, Site 5 (2.62
                                                                                                        www.rd.usda.gov/publications/
                                                environmental laws and regulations in                                                                         acres)—528 Viking Drive, Virginia
                                                                                                        environmental-studies/impact-
                                                addition to the completion of the                                                                             Beach. The applicant is requesting
                                                                                                        statements/arecibo-waste-energy-
                                                environmental review requirements as                                                                          authority to expand the subzone to
                                                                                                        generation-and-resource. The Final EIS
                                                prescribed in RUS’s Environmental                                                                             include an additional site: Proposed Site
                                                                                                        will be available for review 30 days after
                                                Policies and Procedures, 7 CFR part                                                                           6 (45 acres)—2600 International
                                                                                                        the USEPA’s EIS receipt notice in the
                                                1970.                                                                                                         Parkway, Virginia Beach. The existing
                                                   RUS has prepared the FEIS to analyze                 Federal Register. Following this review
                                                                                                                                                              subzone and the proposed site would be
                                                the impacts of its respective Federal                   period, RUS will publish a Record of
                                                                                                                                                              subject to the existing activation limit of
                                                actions and the proposed Project in                     Decision (ROD). Notices announcing the
                                                                                                                                                              FTZ 20. No additional authorization for
                                                accordance with NEPA, as amended, the                   availability of the ROD will be
                                                                                                                                                              production activity has been requested
                                                Council in Environmental Quality (CEQ)                  published in the Federal Register and in
                                                                                                                                                              at this time.
                                                Regulations for Implementing the                        local newspapers.                                        In accordance with the Board’s
                                                Procedural Provisions of NEPA (40 CFR                      This Notice of Availability also serves            regulations, Kathleen Boyce of the FTZ
                                                parts 1500–1508), and Rural                             as a notice of proposed floodplain and                Staff is designated examiner to review
                                                Development’s Environmental Policies                    wetland action. It is anticipated that                the application and make
                                                and Procedures (7 CFR part 1970). RUS                   Energy Answers would need to fill 2.4                 recommendations to the Executive
                                                has already prepared and published a                    acres (9,793.4 square meters) of on-site              Secretary.
                                                DEIS which can be found on the Agency                   wetlands for proposed Project. Energy                    Public comment is invited from
                                                Web site at http://www.rd.usda.gov/                     Answers will be required to implement                 interested parties. Submissions shall be
                                                publications/environmental-studies/                     mitigation for the wetland conversion,                addressed to the Board’s Executive
                                                impact-statements/arecibo-waste-                        as contained in their Section 404                     Secretary at the address below. The
                                                energy-generation-and-resource.                         permit. Additionally, excavation                      closing period for their receipt is April
                                                   In accordance with 7 CFR                             required for the proposed Project is                  3, 2017. Rebuttal comments in response
                                                1970.15(c)(2) and 40 CFR 1502.18, RUS                   expected to result in a small increase in             to material submitted during the
                                                incorporates, as an appendix, the                       base flood elevations along                           foregoing period may be submitted
                                                environmental impact analyses and                       predominately undeveloped properties                  during the subsequent 15-day period to
                                                associated documentation prepared by                    located east and west, as well as                     April 18, 2017.
                                                the Puerto Rico Industrial Development                                                                           A copy of the application will be
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        immediately upstream, of the Project
                                                Company (PRIDCO) and the USEPA                          site.                                                 available for public inspection at the
                                                where appropriate. PRIDCO served as a                                                                         Office of the Executive Secretary,
                                                lead agency in preparing an EIS under                   Christopher A. McLean,                                Foreign-Trade Zones Board, Room
                                                the Puerto Rico Environmental Public                    Assistant Administrator—Electric Program,             21013, U.S. Department of Commerce,
                                                Policy Act, Article 4(B)(3), Law No. 416                Rural Utilities Service.                              1401 Constitution Avenue NW.,
                                                (September 22, 2004). The USEPA                         [FR Doc. 2017–03404 Filed 2–21–17; 8:45 am]           Washington, DC 20230–0002, and in the
                                                completed air quality analyses and                      BILLING CODE P                                        ‘‘Reading Room’’ section of the Board’s


                                           VerDate Sep<11>2014   16:05 Feb 21, 2017   Jkt 241001   PO 00000   Frm 00006   Fmt 4703   Sfmt 4703   E:\FR\FM\22FEN1.SGM   22FEN1



Document Created: 2017-02-22 00:08:37
Document Modified: 2017-02-22 00:08:37
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of Availability of a Final Environmental Impact Statement.
DatesWritten comments on the FEIS will be accepted 30 days following the publication of the Environmental Protection Agency's environmental impact statement receipt notice in the Federal Register. Notices of Availability of the FEIS will be published in the local newspapers. After a 30-day public review period on the FEIS, RUS will consider comments and prepare a Record of Decision for its respective action. The environmental review process is expected to conclude in the late winter or spring of 2017.
ContactTo receive copies of the FEIS or request information on the proposed Project, the FEIS process, and RUS financing, contact Mr. Steven Polacek, Environmental Protection Specialist, Rural Utilities Service, Water and Environmental Programs, 1400 Independence Ave. SW., Mail Stop 1571, Washington, DC 20250, telephone: (202) 205-9805, fax: (202) 690-0649, or email: [email protected] Copies of the FEIS will be available for review in the Arecibo Public Library (Nicolas Nabal Barreto), located at: 210 Santiago Iglesias Pantin Ave., Arecibo, Puerto Rico 00612.
FR Citation82 FR 11340 