82_FR_12851 82 FR 12808 - Wisconsin Public Service Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

82 FR 12808 - Wisconsin Public Service Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 43 (March 7, 2017)

Page Range12808-12809
FR Document2017-04375

Federal Register, Volume 82 Issue 43 (Tuesday, March 7, 2017)
[Federal Register Volume 82, Number 43 (Tuesday, March 7, 2017)]
[Notices]
[Pages 12808-12809]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-04375]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1940-029]


Wisconsin Public Service Corporation; Notice of Application 
Accepted for Filing, Soliciting Motions To Intervene and Protests, 
Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Preliminary Terms and Conditions, and Preliminary 
Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major New License.
    b. Project No.: 1940-029.
    c. Date filed: March 28, 2016.
    d. Applicant: Wisconsin Public Service Corporation.
    e. Name of Project: Tomahawk Hydroelectric Project.
    f. Location: The existing project is located on the Wisconsin River 
in Lincoln County, Wisconsin. The project does not affect federal 
lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Todd Jastremski, Asset Manager Hydro 
Operations, We Energies, 800 Industrial Park Drive, Iron Mountain, MI 
49801, Telephone (906) 779-4099.
    i. FERC Contact: Lee Emery, Telephone (202) 502-8379, and email 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-1940-029.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing Tomahawk Hydroelectric Project consists of: (1) A 
27-foot-high and 2,968-foot-long reinforced concrete and embankment dam 
that includes a: (a) 400-foot-long saddle dike, (b) 1,400-foot-long 
detached embankment, (c) 400-foot-long earthen embankment, (d) 125-
foot-long concrete non-overflow slab and buttress section, (e) 267-
foot-long concrete gated spillway section, (f) 9-foot-long concrete 
sluice gate section, (g) 300-foot-long right embankment, and (h) 67-
foot-long concrete and brick masonry powerhouse housing two generating 
units with a total installed capacity of 2.6 megawatts; (2) a 67.5-
foot-wide, 18 foot-high intake and ten 6-foot-wide sections of steel 
trashracks with clear bar spacing of 2.5 inches that is integral with 
the powerhouse; (3) Lake Mohawksin, the project reservoir with a 
surface area of 2,773 acres and 1,367 acre-feet of usable storage at 
the maximum full pool elevation of 1,435.5 feet National Geodetic 
Vertical Datum; (4) two 27.25-foot-long, 31.75-foot-wide, 9.25-foot-
high draft tubes that discharges into a 34-foot-long, 60-foot-wide 
tailrace; (5) a 100-foot-long, 24.9 kilovolt transmission power line; 
and (6) appurtenant facilities. The project is estimated to generate an 
average of 9,836 megawatt-hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro

[[Page 12809]]

Licensing Schedule. Revisions to the schedule may be made as 
appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations,             April, 2017.
 preliminary terms and conditions,
 and preliminary fishway
 prescriptions.
Commission issues EA.................  September, 2017.
Comments on EA.......................  October, 2017.
Modified terms and conditions........  December, 2017.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: March 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-04375 Filed 3-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                12808                          Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices

                                                link of Commission’s Web site at http://                Commission’s eFiling system at http://                in the Public Reference Room or may be
                                                www.ferc.gov/docs-filing/elibrary.asp.                  www.ferc.gov/docs-filing/efiling.asp.                 viewed on the Commission’s Web site at
                                                Enter the docket number (P–14800–000)                   Commenters can submit brief comments                  http://www.ferc.gov using the
                                                in the docket number field to access the                up to 6,000 characters, without prior                 ‘‘eLibrary’’ link. Enter the docket
                                                document. For assistance, contact FERC                  registration, using the eComment system               number excluding the last three digits in
                                                Online Support.                                         at http://www.ferc.gov/docs-filing/                   the docket number field to access the
                                                  Dated: March 1, 2017.                                 ecomment.asp. You must include your                   document. For assistance, contact FERC
                                                                                                        name and contact information at the end               Online Support. A copy is also available
                                                Kimberly D. Bose,
                                                                                                        of your comments. For assistance,                     for inspection and reproduction at the
                                                Secretary.
                                                                                                        please contact FERC Online Support at                 address in item h above.
                                                [FR Doc. 2017–04378 Filed 3–6–17; 8:45 am]              FERCOnlineSupport@ferc.gov, (866)                        Register online at http://
                                                BILLING CODE 6717–01–P                                  208–3676 (toll free), or (202) 502–8659               www.ferc.gov/docs-filing/
                                                                                                        (TTY). In lieu of electronic filing, please           esubscription.asp to be notified via
                                                                                                        send a paper copy to: Secretary, Federal              email of new filings and issuances
                                                DEPARTMENT OF ENERGY                                    Energy Regulatory Commission, 888                     related to this or other pending projects.
                                                                                                        First Street NE., Washington, DC 20426.               For assistance, contact FERC Online
                                                Federal Energy Regulatory
                                                                                                        The first page of any filing should                   Support.
                                                Commission
                                                                                                        include docket number P–1940–029.                        n. Anyone may submit comments, a
                                                [Project No. 1940–029]                                     The Commission’s Rules of Practice                 protest, or a motion to intervene in
                                                                                                        require all intervenors filing documents              accordance with the requirements of
                                                Wisconsin Public Service Corporation;                   with the Commission to serve a copy of                Rules of Practice and Procedure, 18 CFR
                                                Notice of Application Accepted for                      that document on each person on the                   385.210, .211, and .214. In determining
                                                Filing, Soliciting Motions To Intervene                 official service list for the project.                the appropriate action to take, the
                                                and Protests, Ready for Environmental                   Further, if an intervenor files comments              Commission will consider all protests or
                                                Analysis, and Soliciting Comments,                      or documents with the Commission                      other comments filed, but only those
                                                Recommendations, Preliminary Terms                      relating to the merits of an issue that               who file a motion to intervene in
                                                and Conditions, and Preliminary                         may affect the responsibilities of a                  accordance with the Commission’s
                                                Fishway Prescriptions                                   particular resource agency, they must                 Rules may become a party to the
                                                                                                        also serve a copy of the document on                  proceeding. Any comments, protests, or
                                                   Take notice that the following                       that resource agency.
                                                hydroelectric application has been filed                                                                      motions to intervene must be received
                                                                                                           k. This application has been accepted
                                                with the Commission and is available                                                                          on or before the specified comment date
                                                                                                        for filing and is now ready for
                                                for public inspection.                                  environmental analysis.                               for the particular application.
                                                   a. Type of Application: Major New                       l. The existing Tomahawk                              All filings must (1) bear in all capital
                                                License.                                                Hydroelectric Project consists of: (1) A              letters the title ‘‘PROTEST’’, ‘‘MOTION
                                                   b. Project No.: 1940–029.                            27-foot-high and 2,968-foot-long                      TO INTERVENE’’, ‘‘COMMENTS,’’
                                                   c. Date filed: March 28, 2016.                       reinforced concrete and embankment                    ‘‘REPLY COMMENTS,’’
                                                   d. Applicant: Wisconsin Public                       dam that includes a: (a) 400-foot-long                ‘‘RECOMMENDATIONS,’’
                                                Service Corporation.                                    saddle dike, (b) 1,400-foot-long                      ‘‘PRELIMINARY TERMS AND
                                                   e. Name of Project: Tomahawk                         detached embankment, (c) 400-foot-long                CONDITIONS,’’ or ‘‘PRELIMINARY
                                                Hydroelectric Project.                                  earthen embankment, (d) 125-foot-long                 FISHWAY PRESCRIPTIONS;’’ (2) set
                                                   f. Location: The existing project is                 concrete non-overflow slab and buttress               forth in the heading the name of the
                                                located on the Wisconsin River in                       section, (e) 267-foot-long concrete gated             applicant and the project number of the
                                                Lincoln County, Wisconsin. The project                  spillway section, (f) 9-foot-long concrete            application to which the filing
                                                does not affect federal lands.                          sluice gate section, (g) 300-foot-long                responds; (3) furnish the name, address,
                                                   g. Filed Pursuant to: Federal Power                  right embankment, and (h) 67-foot-long                and telephone number of the person
                                                Act 16 U.S.C. 791(a)–825(r).                            concrete and brick masonry powerhouse                 protesting or intervening; and (4)
                                                   h. Applicant Contact: Todd                           housing two generating units with a                   otherwise comply with the requirements
                                                Jastremski, Asset Manager Hydro                         total installed capacity of 2.6 megawatts;            of 18 CFR 385.2001 through 385.2005.
                                                Operations, We Energies, 800 Industrial                 (2) a 67.5-foot-wide, 18 foot-high intake             All comments, recommendations, terms
                                                Park Drive, Iron Mountain, MI 49801,                    and ten 6-foot-wide sections of steel                 and conditions or prescriptions must set
                                                Telephone (906) 779–4099.                               trashracks with clear bar spacing of 2.5              forth their evidentiary basis and
                                                   i. FERC Contact: Lee Emery,                          inches that is integral with the                      otherwise comply with the requirements
                                                Telephone (202) 502–8379, and email                     powerhouse; (3) Lake Mohawksin, the                   of 18 CFR 4.34(b). Agencies may obtain
                                                lee.emery@ferc.gov.                                     project reservoir with a surface area of              copies of the application directly from
                                                   j. Deadline for filing motions to                    2,773 acres and 1,367 acre-feet of usable             the applicant. A copy of any protest or
                                                intervene and protests, comments,                       storage at the maximum full pool                      motion to intervene must be served
                                                recommendations, preliminary terms                      elevation of 1,435.5 feet National                    upon each representative of the
                                                and conditions, and preliminary                         Geodetic Vertical Datum; (4) two 27.25-               applicant specified in the particular
                                                prescriptions: 60 days from the issuance                foot-long, 31.75-foot-wide, 9.25-foot-                application. A copy of all other filings
                                                date of this notice; reply comments are                 high draft tubes that discharges into a               in reference to this application must be
                                                due 105 days from the issuance date of                                                                        accompanied by proof of service on all
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                        34-foot-long, 60-foot-wide tailrace; (5) a
                                                this notice.                                            100-foot-long, 24.9 kilovolt transmission             persons listed in the service list
                                                   The Commission strongly encourages                   power line; and (6) appurtenant                       prepared by the Commission in this
                                                electronic filing. Please file motions to               facilities. The project is estimated to               proceeding, in accordance with 18 CFR
                                                intervene, protests, comments,                          generate an average of 9,836 megawatt-                4.34(b) and 385.2010.
                                                recommendations, preliminary terms                      hours annually.                                          o. Procedural Schedule: The
                                                and conditions, and preliminary                            m. A copy of the application is                    application will be processed according
                                                fishway prescriptions using the                         available for review at the Commission                to the following revised Hydro


                                           VerDate Sep<11>2014   16:01 Mar 06, 2017   Jkt 241001   PO 00000   Frm 00027   Fmt 4703   Sfmt 4703   E:\FR\FM\07MRN1.SGM   07MRN1


                                                                                         Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices                                                                                      12809

                                                Licensing Schedule. Revisions to the
                                                schedule may be made as appropriate.

                                                                                                                                    Milestone                                                                                                Target date

                                                Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................                                                 April, 2017.
                                                Commission issues EA ...............................................................................................................................................................      September, 2017.
                                                Comments on EA ........................................................................................................................................................................   October, 2017.
                                                Modified terms and conditions ....................................................................................................................................................        December, 2017.



                                                   p. Final amendments to the                                               g. Filed Pursuant to: Federal Power                                      l. The existing Grandfather Falls
                                                application must be filed with the                                       Act 16 U.S.C. 791(a)–825(r).                                             Hydroelectric Project consists of: (1) A
                                                Commission no later than 30 days from                                       h. Applicant Contact: Todd                                            36-foot-high and 762-foot-long
                                                the issuance date of this notice.                                        Jastremski, Asset Manager Hydro                                          reinforced concrete dam consisting of a
                                                   q. A license applicant must file no                                   Operations, We Energies, 800 Industrial                                  52-foot-long masonry retaining wall, a
                                                later than 60 days following the date of                                 Park Drive, Iron Mountain, MI 49801,                                     263-foot-long concrete spillway section,
                                                issuance of the notice of acceptance and                                 Telephone (906) 779–4099.                                                a 147-foot-long non-overflow masonry
                                                ready for environmental analysis                                            i. FERC Contact: Lee Emery,                                           dam, and a 300-foot-long rockfill
                                                provided for in 5.22: (1) A copy of the                                  Telephone (202) 502–8379, and email                                      embankment; (2) a 108-foot-long, 12-
                                                water quality certification; (2) a copy of                               lee.emery@ferc.gov.                                                      foot-wide timber (concrete pier
                                                the request for certification, including                                    j. Deadline for filing motions to                                     supported) canal bridge that crosses the
                                                proof of the date on which the certifying                                intervene and protests, comments,                                        upstream end of the canal, three intake
                                                agency received the request; or (3)                                      recommendations, preliminary terms                                       canal embankments totaling 3,400 feet
                                                evidence of waiver of water quality                                      and conditions, and preliminary                                          in length, a 4,000-foot-long, 300-foot-
                                                certification.                                                           prescriptions: 60 days from the issuance                                 wide intake canal, and a 55.5-foot-wide
                                                  Dated: March 1, 2017.                                                  date of this notice; reply comments are                                  intake structure; (3) an existing 340-acre
                                                Kimberly D. Bose,                                                        due 105 days from the issuance date of                                   reservoir at elevation 1,397.1 National
                                                Secretary.                                                               this notice.                                                             Geodetic Vertical Datum (NGVD) and a
                                                [FR Doc. 2017–04375 Filed 3–6–17; 8:45 am]                                  The Commission strongly encourages                                    gross storage capacity of 2,200 acre-feet
                                                BILLING CODE 6717–01–P                                                   electronic filing. Please file motions to                                with the pool elevation maintained
                                                                                                                         intervene, protests, comments,                                           between 1,396.1 and 1,397.1 feet NGVD;
                                                                                                                         recommendations, preliminary terms                                       (4) two 55.5-foot-wide, 30.5-foot-high
                                                DEPARTMENT OF ENERGY                                                     and conditions, and preliminary                                          trashracks with clear bar spacing of 2.5
                                                                                                                         fishway prescriptions using the                                          inches; (5) an 11-foot-diameter, 1,317-
                                                Federal Energy Regulatory                                                Commission’s eFiling system at http://                                   foot-long wood-stave penstock that
                                                Commission                                                               www.ferc.gov/docs-filing/efiling.asp.                                    transitions into a 30-foot-long steel
                                                [Project No. 1966–054]                                                   Commenters can submit brief comments                                     penstock and a 13.5-foot-diameter
                                                                                                                         up to 6,000 characters, without prior                                    1,310-foot-long wood-stave penstock
                                                Wisconsin Public Service Corporation;                                    registration, using the eComment system                                  that transitions into a 30-foot-long steel
                                                Notice of Application Accepted for                                       at http://www.ferc.gov/docs-filing/                                      penstock; (6) a 51-foot-diameter surge
                                                Filing, Soliciting Motions To Intervene                                  ecomment.asp. You must include your                                      tank with a 37.87-foot-high internal riser
                                                and Protests, Ready for Environmental                                    name and contact information at the end                                  and a 39-foot-diameter surge tank with
                                                Analysis, and Soliciting Comments,                                       of your comments. For assistance,                                        a 33.43-foot-high internal riser that are
                                                Recommendations, Preliminary Terms                                       please contact FERC Online Support at                                    connected to the steel portion of the
                                                and Conditions, and Preliminary                                          FERCOnlineSupport@ferc.gov. (866)                                        penstocks; (7) a 67-foot-wide, 53-foot-
                                                Fishway Prescriptions                                                    208–3676 (toll free), or (202) 502–8659                                  long, 46-foot-high concrete and masonry
                                                                                                                         (TTY). In lieu of electronic filing, please                              powerhouse containing two generating
                                                  Take notice that the following                                         send a paper copy to: Secretary, Federal                                 units with a total installed capacity of
                                                hydroelectric application has been filed                                 Energy Regulatory Commission, 888                                        17.24 megawatts (MW); (8) a 50-foot-
                                                with the Commission and is available                                     First Street NE., Washington, DC 20426.                                  long, 60-foot-wide bedrock excavated
                                                for public inspection.                                                   The first page of any filing should                                      tailrace; (9) a 300-foot-long, 46 kilovolt
                                                  a. Type of Application: Major New                                                                                                               overhead transmission power line; and
                                                                                                                         include docket number P–1966–054.
                                                License.                                                                                                                                          (10) appurtenant facilities. The project
                                                  b. Project No.: 1966–054.                                                 The Commission’s Rules of Practice
                                                                                                                         require all intervenors filing documents                                 is estimated to generate an average of
                                                  c. Date filed: March 28, 2016.
                                                                                                                         with the Commission to serve a copy of                                   72,031.72 megawatt-hours annually.
                                                  d. Applicant: Wisconsin Public
                                                Service Corporation.                                                     that document on each person on the                                         m. A copy of the application is
                                                  e. Name of Project: Grandfather Falls                                  official service list for the project.                                   available for review at the Commission
                                                Hydroelectric Project.                                                   Further, if an intervenor files comments                                 in the Public Reference Room or may be
                                                  f. Location: The existing project is                                   or documents with the Commission                                         viewed on the Commission’s Web site at
                                                located on the Wisconsin River in                                        relating to the merits of an issue that                                  http://www.ferc.gov using the
sradovich on DSK3GMQ082PROD with NOTICES




                                                Lincoln County, Wisconsin. The project                                   may affect the responsibilities of a                                     ‘‘eLibrary’’ link. Enter the docket
                                                does affect federal lands. There are non-                                particular resource agency, they must                                    number excluding the last three digits in
                                                reservation federal lands within the                                     also serve a copy of the document on                                     the docket number field to access the
                                                Project Boundary. One Bureau of Land                                     that resource agency.                                                    document. For assistance, contact FERC
                                                Management (BLM)-owned island (0.1                                          k. This application has been accepted                                 Online Support. A copy is also available
                                                acres) is located in the tailrace of the                                 for filing and is now ready for                                          for inspection and reproduction at the
                                                project boundary.                                                        environmental analysis.                                                  address in item h above.


                                           VerDate Sep<11>2014        16:01 Mar 06, 2017         Jkt 241001      PO 00000       Frm 00028       Fmt 4703      Sfmt 4703      E:\FR\FM\07MRN1.SGM              07MRN1



Document Created: 2018-02-01 14:49:23
Document Modified: 2018-02-01 14:49:23
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 12808 