82 FR 12808 - Wisconsin Public Service Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 43 (March 7, 2017)

Page Range12808-12809
FR Document2017-04375

Federal Register, Volume 82 Issue 43 (Tuesday, March 7, 2017)
[Federal Register Volume 82, Number 43 (Tuesday, March 7, 2017)]
[Notices]
[Pages 12808-12809]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-04375]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1940-029]


Wisconsin Public Service Corporation; Notice of Application 
Accepted for Filing, Soliciting Motions To Intervene and Protests, 
Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Preliminary Terms and Conditions, and Preliminary 
Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major New License.
    b. Project No.: 1940-029.
    c. Date filed: March 28, 2016.
    d. Applicant: Wisconsin Public Service Corporation.
    e. Name of Project: Tomahawk Hydroelectric Project.
    f. Location: The existing project is located on the Wisconsin River 
in Lincoln County, Wisconsin. The project does not affect federal 
lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Todd Jastremski, Asset Manager Hydro 
Operations, We Energies, 800 Industrial Park Drive, Iron Mountain, MI 
49801, Telephone (906) 779-4099.
    i. FERC Contact: Lee Emery, Telephone (202) 502-8379, and email 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-1940-029.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing Tomahawk Hydroelectric Project consists of: (1) A 
27-foot-high and 2,968-foot-long reinforced concrete and embankment dam 
that includes a: (a) 400-foot-long saddle dike, (b) 1,400-foot-long 
detached embankment, (c) 400-foot-long earthen embankment, (d) 125-
foot-long concrete non-overflow slab and buttress section, (e) 267-
foot-long concrete gated spillway section, (f) 9-foot-long concrete 
sluice gate section, (g) 300-foot-long right embankment, and (h) 67-
foot-long concrete and brick masonry powerhouse housing two generating 
units with a total installed capacity of 2.6 megawatts; (2) a 67.5-
foot-wide, 18 foot-high intake and ten 6-foot-wide sections of steel 
trashracks with clear bar spacing of 2.5 inches that is integral with 
the powerhouse; (3) Lake Mohawksin, the project reservoir with a 
surface area of 2,773 acres and 1,367 acre-feet of usable storage at 
the maximum full pool elevation of 1,435.5 feet National Geodetic 
Vertical Datum; (4) two 27.25-foot-long, 31.75-foot-wide, 9.25-foot-
high draft tubes that discharges into a 34-foot-long, 60-foot-wide 
tailrace; (5) a 100-foot-long, 24.9 kilovolt transmission power line; 
and (6) appurtenant facilities. The project is estimated to generate an 
average of 9,836 megawatt-hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro

[[Page 12809]]

Licensing Schedule. Revisions to the schedule may be made as 
appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations,             April, 2017.
 preliminary terms and conditions,
 and preliminary fishway
 prescriptions.
Commission issues EA.................  September, 2017.
Comments on EA.......................  October, 2017.
Modified terms and conditions........  December, 2017.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: March 1, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-04375 Filed 3-6-17; 8:45 am]
 BILLING CODE 6717-01-P


Current View
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 12808 

2024 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR