DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 43 (March 7, 2017)

Page Range12809-12810
FR Document2017-04376

Federal Register, Volume 82 Issue 43 (Tuesday, March 7, 2017)
[Federal Register Volume 82, Number 43 (Tuesday, March 7, 2017)]
[Notices]
[Pages 12809-12810]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-04376]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1966-054]


Wisconsin Public Service Corporation; Notice of Application 
Accepted for Filing, Soliciting Motions To Intervene and Protests, 
Ready for Environmental Analysis, and Soliciting Comments, 
Recommendations, Preliminary Terms and Conditions, and Preliminary 
Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major New License.
    b. Project No.: 1966-054.
    c. Date filed: March 28, 2016.
    d. Applicant: Wisconsin Public Service Corporation.
    e. Name of Project: Grandfather Falls Hydroelectric Project.
    f. Location: The existing project is located on the Wisconsin River 
in Lincoln County, Wisconsin. The project does affect federal lands. 
There are non-reservation federal lands within the Project Boundary. 
One Bureau of Land Management (BLM)-owned island (0.1 acres) is located 
in the tailrace of the project boundary.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Todd Jastremski, Asset Manager Hydro 
Operations, We Energies, 800 Industrial Park Drive, Iron Mountain, MI 
49801, Telephone (906) 779-4099.
    i. FERC Contact: Lee Emery, Telephone (202) 502-8379, and email 
[email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected]. (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-1966-054.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing Grandfather Falls Hydroelectric Project consists 
of: (1) A 36-foot-high and 762-foot-long reinforced concrete dam 
consisting of a 52-foot-long masonry retaining wall, a 263-foot-long 
concrete spillway section, a 147-foot-long non-overflow masonry dam, 
and a 300-foot-long rockfill embankment; (2) a 108-foot-long, 12-foot-
wide timber (concrete pier supported) canal bridge that crosses the 
upstream end of the canal, three intake canal embankments totaling 
3,400 feet in length, a 4,000-foot-long, 300-foot-wide intake canal, 
and a 55.5-foot-wide intake structure; (3) an existing 340-acre 
reservoir at elevation 1,397.1 National Geodetic Vertical Datum (NGVD) 
and a gross storage capacity of 2,200 acre-feet with the pool elevation 
maintained between 1,396.1 and 1,397.1 feet NGVD; (4) two 55.5-foot-
wide, 30.5-foot-high trashracks with clear bar spacing of 2.5 inches; 
(5) an 11-foot-diameter, 1,317-foot-long wood-stave penstock that 
transitions into a 30-foot-long steel penstock and a 13.5-foot-diameter 
1,310-foot-long wood-stave penstock that transitions into a 30-foot-
long steel penstock; (6) a 51-foot-diameter surge tank with a 37.87-
foot-high internal riser and a 39-foot-diameter surge tank with a 
33.43-foot-high internal riser that are connected to the steel portion 
of the penstocks; (7) a 67-foot-wide, 53-foot-long, 46-foot-high 
concrete and masonry powerhouse containing two generating units with a 
total installed capacity of 17.24 megawatts (MW); (8) a 50-foot-long, 
60-foot-wide bedrock excavated tailrace; (9) a 300-foot-long, 46 
kilovolt overhead transmission power line; and (10) appurtenant 
facilities. The project is estimated to generate an average of 
72,031.72 megawatt-hours annually.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.

[[Page 12810]]

    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule: The application will be processed according 
to the following revised Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations,             April, 2017.
 preliminary terms and conditions,
 and preliminary fishway
 prescriptions.
Commission issues EA.................  September, 2017.
Comments on EA or EIS................  October, 2017.
Modified terms and conditions........  December, 2017.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in Sec.  5.22: (1) A copy of the 
water quality certification; (2) a copy of the request for 
certification, including proof of the date on which the certifying 
agency received the request; or (3) evidence of waiver of water quality 
certification.

    Dated: March 1, 2017.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-04376 Filed 3-6-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                         Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices                                                                                      12809

                                                Licensing Schedule. Revisions to the
                                                schedule may be made as appropriate.

                                                                                                                                    Milestone                                                                                                Target date

                                                Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................                                                 April, 2017.
                                                Commission issues EA ...............................................................................................................................................................      September, 2017.
                                                Comments on EA ........................................................................................................................................................................   October, 2017.
                                                Modified terms and conditions ....................................................................................................................................................        December, 2017.



                                                   p. Final amendments to the                                               g. Filed Pursuant to: Federal Power                                      l. The existing Grandfather Falls
                                                application must be filed with the                                       Act 16 U.S.C. 791(a)–825(r).                                             Hydroelectric Project consists of: (1) A
                                                Commission no later than 30 days from                                       h. Applicant Contact: Todd                                            36-foot-high and 762-foot-long
                                                the issuance date of this notice.                                        Jastremski, Asset Manager Hydro                                          reinforced concrete dam consisting of a
                                                   q. A license applicant must file no                                   Operations, We Energies, 800 Industrial                                  52-foot-long masonry retaining wall, a
                                                later than 60 days following the date of                                 Park Drive, Iron Mountain, MI 49801,                                     263-foot-long concrete spillway section,
                                                issuance of the notice of acceptance and                                 Telephone (906) 779–4099.                                                a 147-foot-long non-overflow masonry
                                                ready for environmental analysis                                            i. FERC Contact: Lee Emery,                                           dam, and a 300-foot-long rockfill
                                                provided for in 5.22: (1) A copy of the                                  Telephone (202) 502–8379, and email                                      embankment; (2) a 108-foot-long, 12-
                                                water quality certification; (2) a copy of                               lee.emery@ferc.gov.                                                      foot-wide timber (concrete pier
                                                the request for certification, including                                    j. Deadline for filing motions to                                     supported) canal bridge that crosses the
                                                proof of the date on which the certifying                                intervene and protests, comments,                                        upstream end of the canal, three intake
                                                agency received the request; or (3)                                      recommendations, preliminary terms                                       canal embankments totaling 3,400 feet
                                                evidence of waiver of water quality                                      and conditions, and preliminary                                          in length, a 4,000-foot-long, 300-foot-
                                                certification.                                                           prescriptions: 60 days from the issuance                                 wide intake canal, and a 55.5-foot-wide
                                                  Dated: March 1, 2017.                                                  date of this notice; reply comments are                                  intake structure; (3) an existing 340-acre
                                                Kimberly D. Bose,                                                        due 105 days from the issuance date of                                   reservoir at elevation 1,397.1 National
                                                Secretary.                                                               this notice.                                                             Geodetic Vertical Datum (NGVD) and a
                                                [FR Doc. 2017–04375 Filed 3–6–17; 8:45 am]                                  The Commission strongly encourages                                    gross storage capacity of 2,200 acre-feet
                                                BILLING CODE 6717–01–P                                                   electronic filing. Please file motions to                                with the pool elevation maintained
                                                                                                                         intervene, protests, comments,                                           between 1,396.1 and 1,397.1 feet NGVD;
                                                                                                                         recommendations, preliminary terms                                       (4) two 55.5-foot-wide, 30.5-foot-high
                                                DEPARTMENT OF ENERGY                                                     and conditions, and preliminary                                          trashracks with clear bar spacing of 2.5
                                                                                                                         fishway prescriptions using the                                          inches; (5) an 11-foot-diameter, 1,317-
                                                Federal Energy Regulatory                                                Commission’s eFiling system at http://                                   foot-long wood-stave penstock that
                                                Commission                                                               www.ferc.gov/docs-filing/efiling.asp.                                    transitions into a 30-foot-long steel
                                                [Project No. 1966–054]                                                   Commenters can submit brief comments                                     penstock and a 13.5-foot-diameter
                                                                                                                         up to 6,000 characters, without prior                                    1,310-foot-long wood-stave penstock
                                                Wisconsin Public Service Corporation;                                    registration, using the eComment system                                  that transitions into a 30-foot-long steel
                                                Notice of Application Accepted for                                       at http://www.ferc.gov/docs-filing/                                      penstock; (6) a 51-foot-diameter surge
                                                Filing, Soliciting Motions To Intervene                                  ecomment.asp. You must include your                                      tank with a 37.87-foot-high internal riser
                                                and Protests, Ready for Environmental                                    name and contact information at the end                                  and a 39-foot-diameter surge tank with
                                                Analysis, and Soliciting Comments,                                       of your comments. For assistance,                                        a 33.43-foot-high internal riser that are
                                                Recommendations, Preliminary Terms                                       please contact FERC Online Support at                                    connected to the steel portion of the
                                                and Conditions, and Preliminary                                          FERCOnlineSupport@ferc.gov. (866)                                        penstocks; (7) a 67-foot-wide, 53-foot-
                                                Fishway Prescriptions                                                    208–3676 (toll free), or (202) 502–8659                                  long, 46-foot-high concrete and masonry
                                                                                                                         (TTY). In lieu of electronic filing, please                              powerhouse containing two generating
                                                  Take notice that the following                                         send a paper copy to: Secretary, Federal                                 units with a total installed capacity of
                                                hydroelectric application has been filed                                 Energy Regulatory Commission, 888                                        17.24 megawatts (MW); (8) a 50-foot-
                                                with the Commission and is available                                     First Street NE., Washington, DC 20426.                                  long, 60-foot-wide bedrock excavated
                                                for public inspection.                                                   The first page of any filing should                                      tailrace; (9) a 300-foot-long, 46 kilovolt
                                                  a. Type of Application: Major New                                                                                                               overhead transmission power line; and
                                                                                                                         include docket number P–1966–054.
                                                License.                                                                                                                                          (10) appurtenant facilities. The project
                                                  b. Project No.: 1966–054.                                                 The Commission’s Rules of Practice
                                                                                                                         require all intervenors filing documents                                 is estimated to generate an average of
                                                  c. Date filed: March 28, 2016.
                                                                                                                         with the Commission to serve a copy of                                   72,031.72 megawatt-hours annually.
                                                  d. Applicant: Wisconsin Public
                                                Service Corporation.                                                     that document on each person on the                                         m. A copy of the application is
                                                  e. Name of Project: Grandfather Falls                                  official service list for the project.                                   available for review at the Commission
                                                Hydroelectric Project.                                                   Further, if an intervenor files comments                                 in the Public Reference Room or may be
                                                  f. Location: The existing project is                                   or documents with the Commission                                         viewed on the Commission’s Web site at
                                                located on the Wisconsin River in                                        relating to the merits of an issue that                                  http://www.ferc.gov using the
sradovich on DSK3GMQ082PROD with NOTICES




                                                Lincoln County, Wisconsin. The project                                   may affect the responsibilities of a                                     ‘‘eLibrary’’ link. Enter the docket
                                                does affect federal lands. There are non-                                particular resource agency, they must                                    number excluding the last three digits in
                                                reservation federal lands within the                                     also serve a copy of the document on                                     the docket number field to access the
                                                Project Boundary. One Bureau of Land                                     that resource agency.                                                    document. For assistance, contact FERC
                                                Management (BLM)-owned island (0.1                                          k. This application has been accepted                                 Online Support. A copy is also available
                                                acres) is located in the tailrace of the                                 for filing and is now ready for                                          for inspection and reproduction at the
                                                project boundary.                                                        environmental analysis.                                                  address in item h above.


                                           VerDate Sep<11>2014        16:01 Mar 06, 2017         Jkt 241001      PO 00000       Frm 00028       Fmt 4703      Sfmt 4703      E:\FR\FM\07MRN1.SGM              07MRN1


                                                12810                                    Federal Register / Vol. 82, No. 43 / Tuesday, March 7, 2017 / Notices

                                                  Register online at http://                                            on or before the specified comment date                                 forth their evidentiary basis and
                                                www.ferc.gov/docs-filing/                                               for the particular application.                                         otherwise comply with the requirements
                                                esubscription.asp to be notified via                                       All filings must (1) bear in all capital                             of 18 CFR 4.34(b). Agencies may obtain
                                                email of new filings and issuances                                      letters the title ‘‘PROTEST’’, ‘‘MOTION                                 copies of the application directly from
                                                related to this or other pending projects.                              TO INTERVENE’’, ‘‘COMMENTS,’’                                           the applicant. A copy of any protest or
                                                For assistance, contact FERC Online                                     ‘‘REPLY COMMENTS,’’                                                     motion to intervene must be served
                                                Support.                                                                ‘‘RECOMMENDATIONS,’’                                                    upon each representative of the
                                                  n. Anyone may submit comments, a                                      ‘‘PRELIMINARY TERMS AND                                                 applicant specified in the particular
                                                protest, or a motion to intervene in                                    CONDITIONS,’’ or ‘‘PRELIMINARY                                          application. A copy of all other filings
                                                accordance with the requirements of                                     FISHWAY PRESCRIPTIONS;’’ (2) set                                        in reference to this application must be
                                                Rules of Practice and Procedure, 18 CFR                                 forth in the heading the name of the                                    accompanied by proof of service on all
                                                385.210, .211, and .214. In determining                                 applicant and the project number of the                                 persons listed in the service list
                                                the appropriate action to take, the                                     application to which the filing                                         prepared by the Commission in this
                                                Commission will consider all protests or                                responds; (3) furnish the name, address,                                proceeding, in accordance with 18 CFR
                                                other comments filed, but only those                                    and telephone number of the person                                      4.34(b) and 385.2010.
                                                who file a motion to intervene in                                       protesting or intervening; and (4)                                        o. Procedural Schedule: The
                                                accordance with the Commission’s                                        otherwise comply with the requirements                                  application will be processed according
                                                Rules may become a party to the                                         of 18 CFR 385.2001 through 385.2005.                                    to the following revised Hydro
                                                proceeding. Any comments, protests, or                                  All comments, recommendations, terms                                    Licensing Schedule. Revisions to the
                                                motions to intervene must be received                                   and conditions or prescriptions must set                                schedule may be made as appropriate.

                                                                                                                                  Milestone                                                                                               Target date

                                                Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ......................................                                              April, 2017.
                                                Commission issues EA ...............................................................................................................................................................   September, 2017.
                                                Comments on EA or EIS .............................................................................................................................................................    October, 2017.
                                                Modified terms and conditions ....................................................................................................................................................     December, 2017.



                                                   p. Final amendments to the                                           ER10–2449–010; ER13–2308–005;                                              Description: Notice of Non-Material
                                                application must be filed with the                                      ER12–2510–007; ER12–2512–007;                                           Change in Status of the Riverstone MBR
                                                Commission no later than 30 days from                                   ER12–2513–007; ER10–3286–011;                                           Entities.
                                                the issuance date of this notice.                                       ER10–3299–010; ER10–3310–012;                                              Filed Date: 2/27/17.
                                                   q. A license applicant must file no                                  ER11–2489–009; ER12–726–007; ER12–                                         Accession Number: 20170227–5242.
                                                later than 60 days following the date of                                2639–007; ER11–3620–010; ER12–1431–                                        Comments Due: 5 p.m. ET 3/20/17.
                                                issuance of the notice of acceptance and                                008; ER12–1434–008; ER12–1432–008;                                         Docket Numbers: ER16–2100–001;
                                                ready for environmental analysis                                        ER12–1435–008; ER13–2102–006;                                           ER16–2101–001.
                                                provided for in § 5.22: (1) A copy of the                               ER14–1439–006; ER15–1019–005;                                              Applicants: Gila River Power LLC.
                                                water quality certification; (2) a copy of                              ER10–2628–005; ER11–3959–007.                                              Description: Second Supplement to
                                                the request for certification, including                                  Applicants: Lower Mount Bethel                                        June 30, 2016 and October 3, 2016
                                                proof of the date on which the certifying                               Energy, LLC, Brunner Island, LLC, Talen                                 Updated Market Power Analysis for
                                                agency received the request; or (3)                                     Energy Marketing, LLC, Talen Montana,                                   Southwest Region of Gila River Power
                                                evidence of waiver of water quality                                     LLC, Martins Creek, LLC, Montour, LLC,                                  LLC, et. al.
                                                certification.                                                          Susquehanna Nuclear, LLC, Broadview                                        Filed Date: 2/28/17.
                                                  Dated: March 1, 2017.
                                                                                                                        Energy JN, LLC, Broadview Energy KW,                                       Accession Number: 20170228–5360.
                                                                                                                        LLC, Grady Wind Energy Center, LLC,                                        Comments Due: 5 p.m. ET 3/21/17.
                                                Kimberly D. Bose,
                                                                                                                        Bayonne Plant Holding, L.L.C., Camden
                                                Secretary.                                                                                                                                         Docket Numbers: ER17–468–002.
                                                                                                                        Plant Holding, L.L.C., Dartmouth Power
                                                [FR Doc. 2017–04376 Filed 3–6–17; 8:45 am]                                                                                                         Applicants: Ohio Valley Electric
                                                                                                                        Associates Limited Partnership,
                                                BILLING CODE 6717–01–P                                                  Elmwood Park Power, LLC, Newark Bay                                     Corporation.
                                                                                                                        Cogeneration Partnership, L.P.,                                            Description: Compliance filing: Errata
                                                                                                                        Pedricktown Cogeneration Company LP,                                    to December 1 Amendment Filing to be
                                                DEPARTMENT OF ENERGY                                                    York Generation Company LLC,                                            effective 10/14/2016.
                                                                                                                        Sapphire Power Marketing LLC,                                              Filed Date: 2/28/17.
                                                Federal Energy Regulatory                                                                                                                          Accession Number: 20170228–5246.
                                                                                                                        Brandon Shores LLC, H.A. Wagner LLC,
                                                Commission                                                                                                                                         Comments Due: 5 p.m. ET 3/21/17.
                                                                                                                        Raven Power Marketing LLC,
                                                                                                                        Millennium Power Partners, LP, New                                         Docket Numbers: ER17–1057–000.
                                                Combined Notice of Filings #1
                                                                                                                        Athens Generating Company, LLC, New                                        Applicants: PJM Interconnection,
                                                   Take notice that the Commission                                      Harquahala Generating Company, LLC,                                     L.L.C.
                                                received the following electric rate                                    Hatchet Ridge Wind, LLC, Spring Valley                                     Description: § 205(d) Rate Filing:
                                                filings:                                                                Wind LLC, Ocotillo Express LLC,                                         Revisions to OA Sched 1, sec 7.9 and
                                                   Docket Numbers: ER10–1959–006;                                                                                                               OATT Att K-Appx, sect 7.9 RE Residual
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                        Lyonsdale Biomass, LLC, ReEnergy
                                                ER15–2014–003; ER15–2013–005;                                           Ashland LLC, ReEnergy Fort Fairfield                                    ARR to be effective 5/1/2017.
                                                ER15–2020–004; ER15–2018–003;                                           LLC, ReEnergy Livermore Falls LLC,                                         Filed Date: 2/28/17.
                                                ER15–2022–003; ER15–2026–003;                                           ReEnergy Stratton LLC, ReEnergy Black                                      Accession Number: 20170228–5235.
                                                ER17–105–002; ER17–104–002; ER17–                                       River LLC, TrailStone Power, LLC,                                          Comments Due: 5 p.m. ET 3/21/17.
                                                556–001; ER10–2432–012; ER10–2435–                                      Fowler Ridge IV Wind Farm LLC, Lost                                        Docket Numbers: ER17–1060–000.
                                                012; ER10–2440–010; ER10–71–004;                                        Creek Wind, LLC, Post Rock Wind                                            Applicants: Public Service Company
                                                ER10–2444–012; ER10–2446–010;                                           Power Project, LLC.                                                     of Colorado.


                                           VerDate Sep<11>2014        16:01 Mar 06, 2017        Jkt 241001      PO 00000      Frm 00029       Fmt 4703      Sfmt 4703      E:\FR\FM\07MRN1.SGM             07MRN1



Document Created: 2018-02-01 14:49:10
Document Modified: 2018-02-01 14:49:10
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 12809 