82_FR_13373 82 FR 13327 - Water Street Land, LLC; Notice of Availability of Environmental Assessment

82 FR 13327 - Water Street Land, LLC; Notice of Availability of Environmental Assessment

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 46 (March 10, 2017)

Page Range13327-13327
FR Document2017-04722

Federal Register, Volume 82 Issue 46 (Friday, March 10, 2017)
[Federal Register Volume 82, Number 46 (Friday, March 10, 2017)]
[Notices]
[Page 13327]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-04722]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14680-002-RI]


Water Street Land, LLC; Notice of Availability of Environmental 
Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's regulations, 18 CFR part 
380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has 
reviewed the application for exemption from licensing for the Natick 
Pond Dam Hydroelectric Project, to be located on the Pawtuxet River, in 
the towns of Warwick and West Warwick, Kent County, Rhode Island, and 
has prepared an Environmental Assessment (EA). In the EA, Commission 
staff analyzes the potential environmental effects of the project and 
concludes that issuing an exemption for the project, with appropriate 
environmental measures, would not constitute a major federal action 
significantly affecting the quality of the human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at http://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number, excluding the last three digits in the docket number 
field, to access the document. For assistance, contact FERC Online 
Support at [email protected] or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, contact FERC Online Support.
    For further information, contact John Ramer at (202) 502-8969 or 
[email protected].

    Dated: March 3, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-04722 Filed 3-9-17; 8:45 am]
BILLING CODE 6717-01-P



                                                                                Federal Register / Vol. 82, No. 46 / Friday, March 10, 2017 / Notices                                          13327

                                                Cooperative, Inc. to be effective                       the Federal Energy Regulatory                         facilities by Spire STL Pipeline
                                                5/6/2017.                                               Commission’s regulations, 18 CFR part                 Company, LLC (Spire) in Scott, Greene,
                                                   Filed Date: 3/6/17.                                  380 (Order No. 486, 52 FR 47879), the                 and Jersey Counties, Illinois and St.
                                                   Accession Number: 20170306–5112.                     Office of Energy Projects has reviewed                Charles and St. Louis Counties,
                                                   Comments Due: 5 p.m. ET 3/27/17.                     the application for exemption from                    Missouri. The Commission will use this
                                                   Docket Numbers: ER17–1105–000.                       licensing for the Natick Pond Dam                     EA in its decision-making process to
                                                   Applicants: PacifiCorp.                              Hydroelectric Project, to be located on               determine whether the Project is in the
                                                   Description: § 205(d) Rate Filing:                   the Pawtuxet River, in the towns of                   public convenience and necessity.
                                                Exelon NITSA (OR D.A.) to be effective                  Warwick and West Warwick, Kent                           On October 26, 2016, the Federal
                                                2/28/2017.                                              County, Rhode Island, and has prepared                Energy Regulatory Commission (FERC
                                                   Filed Date: 3/6/17.                                  an Environmental Assessment (EA). In                  or Commission) issued in Docket No.
                                                   Accession Number: 20170306–5129.                                                                           PF16–9–000 a Notice of Intent to
                                                   Comments Due: 5 p.m. ET 3/27/17.                     the EA, Commission staff analyzes the
                                                                                                        potential environmental effects of the                Prepare an Environmental Assessment
                                                   Take notice that the Commission                      project and concludes that issuing an                 for the Planned Spire STL Pipeline
                                                received the following electric                         exemption for the project, with                       Project, Request for Comments on
                                                reliability filings:                                    appropriate environmental measures,                   Environmental Issues, and Notice of
                                                   Docket Numbers: RR17–3–000.                          would not constitute a major federal                  Public Scoping Sessions (NOI). Spire
                                                   Applicants: North American Electric                  action significantly affecting the quality            has subsequently filed a potential
                                                Reliability Corporation.                                of the human environment.                             pipeline route alternative in St. Louis
                                                   Description: Petition of the North                                                                         County, Missouri.
                                                                                                           A copy of the EA is on file with the
                                                American Electric Reliability                                                                                    This supplemental notice announces
                                                                                                        Commission and is available for public
                                                Corporation for Approval of                                                                                   the opening of the scoping process the
                                                                                                        inspection. The EA may also be viewed
                                                Amendments to the Texas Reliability                                                                           Commission will use to gather input
                                                                                                        on the Commission’s Web site at http://
                                                Entity Bylaws and Regional Reliability                                                                        from the public and interested agencies
                                                                                                        www.ferc.gov using the ‘‘eLibrary’’ link.
                                                Standards Development Process.                                                                                regarding the pipeline route alternative.
                                                   Filed Date: 3/6/17.                                  Enter the docket number, excluding the
                                                                                                        last three digits in the docket number                You can make a difference by providing
                                                   Accession Number: 20170306–5079.                                                                           us with your specific comments or
                                                   Comments Due: 5 p.m. ET 3/27/17.                     field, to access the document. For
                                                                                                        assistance, contact FERC Online                       concerns about the new route under
                                                   The filings are accessible in the                                                                          consideration. Your comments should
                                                Commission’s eLibrary system by                         Support at FERCOnlineSupport@
                                                                                                        ferc.gov or toll-free at 1–866–208–3676,              focus on the potential environmental
                                                clicking on the links or querying the                                                                         effects, reasonable alternatives, and
                                                docket number.                                          or for TTY, (202) 502–8659. You may
                                                                                                        also register online at http://                       measures to avoid or lessen
                                                   Any person desiring to intervene or                                                                        environmental impacts. Your input will
                                                protest in any of the above proceedings                 www.ferc.gov/docs-filing/
                                                                                                                                                              help the Commission staff determine
                                                must file in accordance with Rules 211                  esubscription.asp to be notified via
                                                                                                                                                              what issues to evaluate in the EA. To
                                                and 214 of the Commission’s                             email of new filings and issuances
                                                                                                                                                              ensure that your comments are timely
                                                Regulations (18 CFR 385.211 and                         related to this or other pending projects.
                                                                                                                                                              and properly recorded, please send your
                                                385.214) on or before 5:00 p.m. Eastern                 For assistance, contact FERC Online
                                                                                                                                                              comments so that the Commission
                                                time on the specified comment date.                     Support.
                                                                                                                                                              receives them in Washington, DC on or
                                                Protests may be considered, but                            For further information, contact John
                                                                                                                                                              before April 3, 2017.
                                                intervention is necessary to become a                   Ramer at (202) 502–8969 or john.ramer@                   This notice is being sent to a subset
                                                party to the proceeding.                                ferc.gov.                                             of the Commission’s current
                                                   eFiling is encouraged. More detailed                   Dated: March 3, 2017.                               environmental mailing list for this
                                                information relating to filing                          Kimberly D. Bose,                                     Project, relevant to the new alternative
                                                requirements, interventions, protests,                  Secretary.                                            in St. Louis County. State and local
                                                service, and qualifying facilities filings              [FR Doc. 2017–04722 Filed 3–9–17; 8:45 am]            government representatives should also
                                                can be found at: http://www.ferc.gov/                                                                         notify their constituents and encourage
                                                                                                        BILLING CODE 6717–01–P
                                                docs-filing/efiling/filing-req.pdf. For                                                                       them to comment on their areas of
                                                other information, call (866) 208–3676                                                                        concern.
                                                (toll free). For TTY, call (202) 502–8659.              DEPARTMENT OF ENERGY                                     If you are a landowner receiving this
                                                  Dated: March 6, 2017.                                                                                       notice, a pipeline company
                                                Nathaniel J. Davis, Sr.,                                Federal Energy Regulatory                             representative may contact you about
                                                Deputy Secretary.                                       Commission                                            the acquisition of an easement to
                                                                                                                                                              construct, operate, and maintain the
                                                [FR Doc. 2017–04727 Filed 3–9–17; 8:45 am]              [Docket No. CP17–40–000]
                                                                                                                                                              planned facilities. The company would
                                                BILLING CODE 6717–01–P
                                                                                                        Spire STL Pipeline Company, LLC;                      seek to negotiate a mutually acceptable
                                                                                                        Supplemental Notice of Intent To                      agreement. However, if the Commission
                                                DEPARTMENT OF ENERGY                                    Prepare an Environmental Assessment                   approves the Project, that approval
                                                                                                        for the Proposed Spire STL Pipeline                   conveys with it the right of eminent
                                                Federal Energy Regulatory                               Project and Request for Comments on                   domain. Therefore, if easement
                                                Commission                                              Environmental Issues                                  negotiations fail to produce an
sradovich on DSK3GMQ082PROD with NOTICES




                                                                                                                                                              agreement, the pipeline company could
                                                [Project No. 14680–002–RI]                                The staff of the Federal Energy                     initiate condemnation proceedings
                                                                                                        Regulatory Commission (FERC or                        where compensation would be
                                                Water Street Land, LLC; Notice of
                                                                                                        Commission) will prepare an                           determined in accordance with state
                                                Availability of Environmental
                                                                                                        environmental assessment (EA) that will               law.
                                                Assessment
                                                                                                        discuss the environmental impacts of                     A fact sheet prepared by the FERC
                                                  In accordance with the National                       the Spire STL Pipeline Project (Project)              entitled ‘‘An Interstate Natural Gas
                                                Environmental Policy Act of 1969 and                    involving construction and operation of               Facility On My Land? What Do I Need


                                           VerDate Sep<11>2014   18:37 Mar 09, 2017   Jkt 241001   PO 00000   Frm 00023   Fmt 4703   Sfmt 4703   E:\FR\FM\10MRN1.SGM   10MRN1



Document Created: 2018-02-01 14:52:54
Document Modified: 2018-02-01 14:52:54
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 13327 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR