82_FR_14039 82 FR 13989 - Alaska Electric Light & Power Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

82 FR 13989 - Alaska Electric Light & Power Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 50 (March 16, 2017)

Page Range13989-13990
FR Document2017-05203

Federal Register, Volume 82 Issue 50 (Thursday, March 16, 2017)
[Federal Register Volume 82, Number 50 (Thursday, March 16, 2017)]
[Notices]
[Pages 13989-13990]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-05203]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

 Federal Energy Regulatory Commission

[Project No. 2307-078]


Alaska Electric Light & Power Company; Notice of Application 
Accepted for Filing and Soliciting Motions To Intervene and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2307-078.
    c. Date filed: August 31, 2016.
    d. Applicant: Alaska Electric Light & Power Company.
    e. Name of Project: Salmon and Annex Creek Hydroelectric Project.
    f. Location: On Salmon Creek and Annex Creek in the City and 
Borough of Juneau, Alaska. The project occupies about 648.45 acres of 
federal lands located in the Tongass National Forest administered by 
the United States Forest Service and operates under an existing license 
issued in 1988.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Christy Yearous, Project Manager, Alaska 
Electric Light & Power Company, 5601 Tongsard Ct., Juneau, AK 99801-
7201; (907) 780-2222.
    i. FERC Contact: Suzanne Novak at (202) 502-6665, 
[email protected].
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
filing motions to intervene and protests using the Commission's eFiling 
system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, 
please contact FERC Online Support at [email protected], (866) 
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The 
first page of any filing should include docket number P-2307-078.
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. The proposed Salmon and Annex Creek Project would consist of two 
developments, one on Salmon Creek and one on Annex Creek.
    The Salmon Creek development consists of the following existing 
facilities: (1) The 165-acre Salmon Creek reservoir impounded by a 648-
foot-long, 168-foot-high dam, with ten 5-foot-wide spillway bays; (2) a 
1,500-foot-long canal used to periodically divert water from tributary 
streams into Salmon Creek Reservoir; (3) a 10-foot-wide, 11-foot-high 
intake structure with trashracks; (4) a 3-foot-diameter conduit that 
conveys flows from the dam to the project valvehouse located 
immediately downstream; (5) a 4,290-foot-long, 3.3- to- 2-foot-diameter 
penstock that conveys flows from the valvehouse to the decommissioned 
Upper Powerhouse where it connects to a 11,030-foot-long, 3.5-foot-
diameter penstock that narrows to a 2.5-foot-diameter immediately 
before entering the Lower Powerhouse; (6) the 57-foot-long, 44-foot-
wide, 32-foot-high Lower Powerhouse, which contains a 6.9-megawatt (MW) 
impulse turbine; (7) an approximately 250-foot-long tailrace that flows 
underneath Egan Drive and empties into a pond adjacent to the Douglas 
Island Pink and Chum, Inc., hatchery; and (8) appurtenant facilities.
    The Annex Creek development consists of the following existing 
facilities: (1) The 264-acre Upper Annex Lake, impounded by a 118-foot-
long, 20-foot-high dam with a 57-foot-wide spillway that discharges 
flows in excess of those needed for generation into the 27-acre natural 
Lower Annex Lake via a 0.15-mile-long outlet stream; (2) a 61-foot 
long, 6-foot high timber saddle dam located just west of the main dam; 
(3) a lake tap intake on Upper Annex Lake; (4) a 1,433-foot-long power 
tunnel that narrows from 8 feet wide and 8 feet high at the intake to a 
6.5-foot-diameter tunnel at the project valvehouse;
    (5) the project valvehouse containing the penstock intake; (6) the 
7,097-foot-long, 3.5-foot-diameter penstock that narrows to a 2.8-foot 
diameter before it bifurcates at the powerhouse to provide flows to two 
impulse turbine units with a total installed capacity of 3.675 MW; (7) 
the 67-foot-long, 48-foot-wide, 40-foot-high powerhouse; (8) a tailrace 
that discharges flows over a weir into Taku Inlet; (9) a 12.5-mile-
long, 23-kilovolt (kV) transmission line that conveys power to the Than 
substation; and (10) appurtenant facilities.
    The project currently operates to provide base load generation with 
an

[[Page 13990]]

estimated annual output of 53.8 gigawatt-hours. No changes to project 
operation or facilities are proposed.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit a protest or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, 385.211, and 385.214. In determining the appropriate action to 
take, the Commission will consider all protests filed, but only those 
who file a motion to intervene in accordance with the Commission's 
Rules may become a party to the proceeding. Any protests or motions to 
intervene must be received on or before the specified deadline date for 
the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;'' (2) set forth in 
the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application.

     Dated: March 9, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-05203 Filed 3-15-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                               Federal Register / Vol. 82, No. 50 / Thursday, March 16, 2017 / Notices                                           13989




                                                  [FR Doc. 2017–05156 Filed 3–15–17; 8:45 am]                The Commission strongly encourages                 to- 2-foot-diameter penstock that
                                                  BILLING CODE 5001–06–C                                  electronic filing. Please file filing                 conveys flows from the valvehouse to
                                                                                                          motions to intervene and protests using               the decommissioned Upper Powerhouse
                                                                                                          the Commission’s eFiling system at                    where it connects to a 11,030-foot-long,
                                                  DEPARTMENT OF ENERGY                                    http://www.ferc.gov/docs-filing/                      3.5-foot-diameter penstock that narrows
                                                                                                          efiling.asp. For assistance, please                   to a 2.5-foot-diameter immediately
                                                  Federal Energy Regulatory                               contact FERC Online Support at                        before entering the Lower Powerhouse;
                                                  Commission                                              FERCOnlineSupport@ferc.gov, (866)                     (6) the 57-foot-long, 44-foot-wide, 32-
                                                                                                          208–3676 (toll free), or (202) 502–8659               foot-high Lower Powerhouse, which
                                                  [Project No. 2307–078]
                                                                                                          (TTY). In lieu of electronic filing, please           contains a 6.9-megawatt (MW) impulse
                                                  Alaska Electric Light & Power                           send a paper copy to: Secretary, Federal              turbine; (7) an approximately 250-foot-
                                                  Company; Notice of Application                          Energy Regulatory Commission, 888                     long tailrace that flows underneath Egan
                                                  Accepted for Filing and Soliciting                      First Street NE., Washington, DC 20426.               Drive and empties into a pond adjacent
                                                  Motions To Intervene and Protests                       The first page of any filing should                   to the Douglas Island Pink and Chum,
                                                                                                          include docket number P–2307–078.                     Inc., hatchery; and (8) appurtenant
                                                    Take notice that the following                           The Commission’s Rules of Practice                 facilities.
                                                  hydroelectric application has been filed                and Procedures require all intervenors                   The Annex Creek development
                                                  with the Commission and is available                    filing documents with the Commission                  consists of the following existing
                                                  for public inspection.                                  to serve a copy of that document on                   facilities: (1) The 264-acre Upper Annex
                                                    a. Type of Application: New Major                     each person on the official service list              Lake, impounded by a 118-foot-long, 20-
                                                  License.                                                for the project. Further, if an intervenor            foot-high dam with a 57-foot-wide
                                                    b. Project No.: 2307–078.                             files comments or documents with the                  spillway that discharges flows in excess
                                                    c. Date filed: August 31, 2016.                       Commission relating to the merits of an               of those needed for generation into the
                                                    d. Applicant: Alaska Electric Light &                 issue that may affect the responsibilities            27-acre natural Lower Annex Lake via a
                                                  Power Company.                                          of a particular resource agency, they                 0.15-mile-long outlet stream; (2) a 61-
                                                    e. Name of Project: Salmon and                        must also serve a copy of the document                foot long, 6-foot high timber saddle dam
                                                  Annex Creek Hydroelectric Project.                      on that resource agency.                              located just west of the main dam; (3)
                                                    f. Location: On Salmon Creek and                         k. This application has been accepted              a lake tap intake on Upper Annex Lake;
                                                  Annex Creek in the City and Borough of                  for filing, but is not ready for                      (4) a 1,433-foot-long power tunnel that
                                                  Juneau, Alaska. The project occupies                    environmental analysis at this time.                  narrows from 8 feet wide and 8 feet high
                                                  about 648.45 acres of federal lands                        l. The proposed Salmon and Annex                   at the intake to a 6.5-foot-diameter
                                                  located in the Tongass National Forest                  Creek Project would consist of two                    tunnel at the project valvehouse;
                                                  administered by the United States                       developments, one on Salmon Creek                        (5) the project valvehouse containing
                                                  Forest Service and operates under an                    and one on Annex Creek.                               the penstock intake; (6) the 7,097-foot-
                                                  existing license issued in 1988.                           The Salmon Creek development                       long, 3.5-foot-diameter penstock that
                                                    g. Filed Pursuant to: Federal Power                   consists of the following existing                    narrows to a 2.8-foot diameter before it
                                                  Act, 16 U.S.C. 791(a)–825(r).                           facilities: (1) The 165-acre Salmon Creek             bifurcates at the powerhouse to provide
                                                     h. Applicant Contact: Christy                        reservoir impounded by a 648-foot-long,               flows to two impulse turbine units with
                                                  Yearous, Project Manager, Alaska                        168-foot-high dam, with ten 5-foot-wide               a total installed capacity of 3.675 MW;
                                                  Electric Light & Power Company, 5601                    spillway bays; (2) a 1,500-foot-long                  (7) the 67-foot-long, 48-foot-wide, 40-
                                                  Tongsard Ct., Juneau, AK 99801–7201;                    canal used to periodically divert water               foot-high powerhouse; (8) a tailrace that
mstockstill on DSK3G9T082PROD with NOTICES




                                                  (907) 780–2222.                                         from tributary streams into Salmon                    discharges flows over a weir into Taku
                                                    i. FERC Contact: Suzanne Novak at                     Creek Reservoir; (3) a 10-foot-wide, 11-              Inlet; (9) a 12.5-mile-long, 23-kilovolt
                                                  (202) 502–6665, suzanne.novak@                          foot-high intake structure with                       (kV) transmission line that conveys
                                                  ferc.gov.                                               trashracks; (4) a 3-foot-diameter conduit             power to the Than substation; and (10)
                                                     j. Deadline for filing motions to                    that conveys flows from the dam to the                appurtenant facilities.
                                                  intervene and protests: 60 days from the                project valvehouse located immediately                   The project currently operates to
                                                                                                                                                                                                            EN16MR17.011</GPH>




                                                  issuance date of this notice.                           downstream; (5) a 4,290-foot-long, 3.3-               provide base load generation with an


                                             VerDate Sep<11>2014   17:12 Mar 15, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\16MRN1.SGM   16MRN1


                                                  13990                        Federal Register / Vol. 82, No. 50 / Thursday, March 16, 2017 / Notices

                                                  estimated annual output of 53.8                         APPLICATION;’’ (2) set forth in the                      Applicant Contact: Mr. Bernard
                                                  gigawatt-hours. No changes to project                   heading the name of the applicant and                 Mount, Senior Project Manager, Energy
                                                  operation or facilities are proposed.                   the project number of the application to              Resources USA Inc., 4305 N Lincoln
                                                     m. A copy of the application is                      which the filing responds; (3) furnish                Ave., Room C, Chicago, Illinois 60618;
                                                  available for review at the Commission                  the name, address, and telephone                      phone: (312) 859–2032.
                                                  in the Public Reference Room or may be                  number of the person protesting or                       FERC Contact: Navreet Deo; phone:
                                                  viewed on the Commission’s Web site at                  intervening; and (4) otherwise comply                 (202) 502–6304.
                                                  http://www.ferc.gov using the                           with the requirements of 18 CFR                          Deadline for filing comments, motions
                                                  ‘‘eLibrary’’ link. Enter the docket                     385.2001 through 385.2005. Agencies                   to intervene, competing applications
                                                  number excluding the last three digits in               may obtain copies of the application                  (without notices of intent), or notices of
                                                  the docket number field to access the                   directly from the applicant. A copy of                intent to file competing applications: 60
                                                  document. For assistance, contact FERC                  any protest or motion to intervene must               days from the issuance of this notice.
                                                  Online Support. A copy is also available                be served upon each representative of                 Competing applications and notices of
                                                  for inspection and reproduction at the                  the applicant specified in the particular             intent must meet the requirements of 18
                                                  address in item h above.                                application.                                          CFR 4.36.
                                                     You may also register online at http://                                                                       The Commission strongly encourages
                                                  www.ferc.gov/docs-filing/                                 Dated: March 9, 2017.
                                                                                                          Kimberly D. Bose,
                                                                                                                                                                electronic filing. Please file comments,
                                                  esubscription.asp to be notified via                                                                          motions to intervene, notices of intent,
                                                  email of new filings and issuances                      Secretary.
                                                                                                                                                                and competing applications using the
                                                  related to this or other pending projects.              [FR Doc. 2017–05203 Filed 3–15–17; 8:45 am]
                                                                                                                                                                Commission’s eFiling system at http://
                                                  For assistance, contact FERC Online                     BILLING CODE 6717–01–P                                www.ferc.gov/docs-filing/efiling.asp.
                                                  Support.                                                                                                      Commenters can submit brief comments
                                                     n. Any qualified applicant desiring to                                                                     up to 6,000 characters, without prior
                                                  file a competing application must                       DEPARTMENT OF ENERGY
                                                                                                                                                                registration, using the eComment system
                                                  submit to the Commission, on or before                                                                        at http://www.ferc.gov/docs-filing/
                                                  the specified intervention deadline date,               Federal Energy Regulatory
                                                                                                          Commission                                            ecomment.asp. You must include your
                                                  a competing development application,
                                                                                                                                                                name and contact information at the end
                                                  or a notice of intent to file such an
                                                                                                                                                                of your comments. For assistance,
                                                  application. Submission of a timely                     [Project No. 14838–000]
                                                                                                                                                                please contact FERC Online Support at
                                                  notice of intent allows an interested
                                                                                                          Energy Resources USA, Inc.; Notice of                 FERCOnlineSupport@ferc.gov, (866)
                                                  person to file the competing
                                                                                                          Preliminary Permit Application                        208–3676 (toll free), or (202) 502–8659
                                                  development application no later than
                                                                                                          Accepted for Filing and Soliciting                    (TTY). In lieu of electronic filing, please
                                                  120 days after the specified intervention
                                                                                                          Comments and Motions To Intervene                     send a paper copy to: Secretary, Federal
                                                  deadline date. Applications for
                                                                                                                                                                Energy Regulatory Commission, 888
                                                  preliminary permits will not be
                                                                                                             On February 9, 2017, Energy                        First Street NE., Washington, DC 20426.
                                                  accepted in response to this notice.
                                                     A notice of intent must specify the                  Resources USA Inc., (Energy Resources)                The first page of any filing should
                                                  exact name, business address, and                       filed an application for a preliminary                include docket number P–14838–000.
                                                  telephone number of the prospective                     permit, pursuant to section 4(f) of the                  More information about this project,
                                                  applicant, and must include an                          Federal Power Act (FPA), proposing to                 including a copy of the application, can
                                                  unequivocal statement of intent to                      study the feasibility of the Caddo Dam                be viewed or printed on the ‘‘eLibrary’’
                                                  submit a development application. A                     Hydroelectric Project (project) to be                 link of Commission’s Web site at http://
                                                  notice of intent must be served on the                  located at the U.S. Army Corps of                     www.ferc.gov/docs-filing/elibrary.asp.
                                                  applicant(s) named in this public notice.               Engineers’ Caddo Dam on the Cypress                   Enter the docket number (P–14838–000)
                                                     Anyone may submit a protest or a                     Bayou in Caddo Parish County,                         in the docket number field to access the
                                                  motion to intervene in accordance with                  Louisiana. The sole purpose of a                      document. For assistance, contact FERC
                                                  the requirements of Rules of Practice                   preliminary permit, if issued, is to grant            Online Support.
                                                  and Procedure, 18 CFR 385.210,                          the permit holder priority to file a                    Dated: March 8, 2017.
                                                  385.211, and 385.214. In determining                    license application during the permit                 Kimberly D. Bose,
                                                  the appropriate action to take, the                     term. A preliminary permit does not                   Secretary.
                                                  Commission will consider all protests                   authorize the permit holder to perform
                                                                                                                                                                [FR Doc. 2017–05206 Filed 3–15–17; 8:45 am]
                                                  filed, but only those who file a motion                 any land-disturbing activities or
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  to intervene in accordance with the                     otherwise enter upon lands or waters
                                                  Commission’s Rules may become a                         owned by others without the owners’
                                                  party to the proceeding. Any protests or                express permission.                                   DEPARTMENT OF ENERGY
                                                  motions to intervene must be received                      The proposed project would consist of
                                                  on or before the specified deadline date                the following: (1) A 70-foot-long, 60-                Federal Energy Regulatory
                                                  for the particular application.                         foot-wide intake area; (2) a 75-foot-long,            Commission
                                                     When the application is ready for                    36-foot-wide powerhouse containing
                                                                                                          two vertical Kaplan generating units                  [Docket No. AD10–12–008]
                                                  environmental analysis, the
                                                  Commission will issue a public notice                   with a total capacity of 5 megawatts; (3)             Increasing Market and Planning
                                                  requesting comments,                                    a 350-foot-long, 65-foot-wide tailrace;
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                Efficiency Through Improved Software;
                                                  recommendations, terms and                              (4) a 60-foot-long, 50-foot-wide                      Notice of Technical Conference:
                                                  conditions, or prescriptions.                           substation; and (5) a 0.35-mile-long, 69              Increasing Real-Time and Day-Ahead
                                                     All filings must (1) bear in all capital             kilovolt transmission line. The                       Market Efficiency Through Improved
                                                  letters the title ‘‘PROTEST’’ or                        estimated annual generation of the                    Software
                                                  ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE                       project would be 21.15 gigawatt-hours,
                                                  OF INTENT TO FILE COMPETING                             and would operate as directed by the                    Take notice that Commission staff
                                                  APPLICATION,’’ or ‘‘COMPETING                           U.S. Army Corps of Engineers.                         will convene a technical conference on


                                             VerDate Sep<11>2014   17:12 Mar 15, 2017   Jkt 241001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\16MRN1.SGM   16MRN1



Document Created: 2017-03-16 02:18:55
Document Modified: 2017-03-16 02:18:55
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 13989 