82_FR_14040 82 FR 13990 - Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene

82 FR 13990 - Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 50 (March 16, 2017)

Page Range13990-13990
FR Document2017-05206

Federal Register, Volume 82 Issue 50 (Thursday, March 16, 2017)
[Federal Register Volume 82, Number 50 (Thursday, March 16, 2017)]
[Notices]
[Page 13990]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-05206]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14838-000]


Energy Resources USA, Inc.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments and Motions To 
Intervene

    On February 9, 2017, Energy Resources USA Inc., (Energy Resources) 
filed an application for a preliminary permit, pursuant to section 4(f) 
of the Federal Power Act (FPA), proposing to study the feasibility of 
the Caddo Dam Hydroelectric Project (project) to be located at the U.S. 
Army Corps of Engineers' Caddo Dam on the Cypress Bayou in Caddo Parish 
County, Louisiana. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed project would consist of the following: (1) A 70-foot-
long, 60-foot-wide intake area; (2) a 75-foot-long, 36-foot-wide 
powerhouse containing two vertical Kaplan generating units with a total 
capacity of 5 megawatts; (3) a 350-foot-long, 65-foot-wide tailrace; 
(4) a 60-foot-long, 50-foot-wide substation; and (5) a 0.35-mile-long, 
69 kilovolt transmission line. The estimated annual generation of the 
project would be 21.15 gigawatt-hours, and would operate as directed by 
the U.S. Army Corps of Engineers.
    Applicant Contact: Mr. Bernard Mount, Senior Project Manager, 
Energy Resources USA Inc., 4305 N Lincoln Ave., Room C, Chicago, 
Illinois 60618; phone: (312) 859-2032.
    FERC Contact: Navreet Deo; phone: (202) 502-6304.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14838-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14838-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: March 8, 2017.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-05206 Filed 3-15-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                  13990                        Federal Register / Vol. 82, No. 50 / Thursday, March 16, 2017 / Notices

                                                  estimated annual output of 53.8                         APPLICATION;’’ (2) set forth in the                      Applicant Contact: Mr. Bernard
                                                  gigawatt-hours. No changes to project                   heading the name of the applicant and                 Mount, Senior Project Manager, Energy
                                                  operation or facilities are proposed.                   the project number of the application to              Resources USA Inc., 4305 N Lincoln
                                                     m. A copy of the application is                      which the filing responds; (3) furnish                Ave., Room C, Chicago, Illinois 60618;
                                                  available for review at the Commission                  the name, address, and telephone                      phone: (312) 859–2032.
                                                  in the Public Reference Room or may be                  number of the person protesting or                       FERC Contact: Navreet Deo; phone:
                                                  viewed on the Commission’s Web site at                  intervening; and (4) otherwise comply                 (202) 502–6304.
                                                  http://www.ferc.gov using the                           with the requirements of 18 CFR                          Deadline for filing comments, motions
                                                  ‘‘eLibrary’’ link. Enter the docket                     385.2001 through 385.2005. Agencies                   to intervene, competing applications
                                                  number excluding the last three digits in               may obtain copies of the application                  (without notices of intent), or notices of
                                                  the docket number field to access the                   directly from the applicant. A copy of                intent to file competing applications: 60
                                                  document. For assistance, contact FERC                  any protest or motion to intervene must               days from the issuance of this notice.
                                                  Online Support. A copy is also available                be served upon each representative of                 Competing applications and notices of
                                                  for inspection and reproduction at the                  the applicant specified in the particular             intent must meet the requirements of 18
                                                  address in item h above.                                application.                                          CFR 4.36.
                                                     You may also register online at http://                                                                       The Commission strongly encourages
                                                  www.ferc.gov/docs-filing/                                 Dated: March 9, 2017.
                                                                                                          Kimberly D. Bose,
                                                                                                                                                                electronic filing. Please file comments,
                                                  esubscription.asp to be notified via                                                                          motions to intervene, notices of intent,
                                                  email of new filings and issuances                      Secretary.
                                                                                                                                                                and competing applications using the
                                                  related to this or other pending projects.              [FR Doc. 2017–05203 Filed 3–15–17; 8:45 am]
                                                                                                                                                                Commission’s eFiling system at http://
                                                  For assistance, contact FERC Online                     BILLING CODE 6717–01–P                                www.ferc.gov/docs-filing/efiling.asp.
                                                  Support.                                                                                                      Commenters can submit brief comments
                                                     n. Any qualified applicant desiring to                                                                     up to 6,000 characters, without prior
                                                  file a competing application must                       DEPARTMENT OF ENERGY
                                                                                                                                                                registration, using the eComment system
                                                  submit to the Commission, on or before                                                                        at http://www.ferc.gov/docs-filing/
                                                  the specified intervention deadline date,               Federal Energy Regulatory
                                                                                                          Commission                                            ecomment.asp. You must include your
                                                  a competing development application,
                                                                                                                                                                name and contact information at the end
                                                  or a notice of intent to file such an
                                                                                                                                                                of your comments. For assistance,
                                                  application. Submission of a timely                     [Project No. 14838–000]
                                                                                                                                                                please contact FERC Online Support at
                                                  notice of intent allows an interested
                                                                                                          Energy Resources USA, Inc.; Notice of                 FERCOnlineSupport@ferc.gov, (866)
                                                  person to file the competing
                                                                                                          Preliminary Permit Application                        208–3676 (toll free), or (202) 502–8659
                                                  development application no later than
                                                                                                          Accepted for Filing and Soliciting                    (TTY). In lieu of electronic filing, please
                                                  120 days after the specified intervention
                                                                                                          Comments and Motions To Intervene                     send a paper copy to: Secretary, Federal
                                                  deadline date. Applications for
                                                                                                                                                                Energy Regulatory Commission, 888
                                                  preliminary permits will not be
                                                                                                             On February 9, 2017, Energy                        First Street NE., Washington, DC 20426.
                                                  accepted in response to this notice.
                                                     A notice of intent must specify the                  Resources USA Inc., (Energy Resources)                The first page of any filing should
                                                  exact name, business address, and                       filed an application for a preliminary                include docket number P–14838–000.
                                                  telephone number of the prospective                     permit, pursuant to section 4(f) of the                  More information about this project,
                                                  applicant, and must include an                          Federal Power Act (FPA), proposing to                 including a copy of the application, can
                                                  unequivocal statement of intent to                      study the feasibility of the Caddo Dam                be viewed or printed on the ‘‘eLibrary’’
                                                  submit a development application. A                     Hydroelectric Project (project) to be                 link of Commission’s Web site at http://
                                                  notice of intent must be served on the                  located at the U.S. Army Corps of                     www.ferc.gov/docs-filing/elibrary.asp.
                                                  applicant(s) named in this public notice.               Engineers’ Caddo Dam on the Cypress                   Enter the docket number (P–14838–000)
                                                     Anyone may submit a protest or a                     Bayou in Caddo Parish County,                         in the docket number field to access the
                                                  motion to intervene in accordance with                  Louisiana. The sole purpose of a                      document. For assistance, contact FERC
                                                  the requirements of Rules of Practice                   preliminary permit, if issued, is to grant            Online Support.
                                                  and Procedure, 18 CFR 385.210,                          the permit holder priority to file a                    Dated: March 8, 2017.
                                                  385.211, and 385.214. In determining                    license application during the permit                 Kimberly D. Bose,
                                                  the appropriate action to take, the                     term. A preliminary permit does not                   Secretary.
                                                  Commission will consider all protests                   authorize the permit holder to perform
                                                                                                                                                                [FR Doc. 2017–05206 Filed 3–15–17; 8:45 am]
                                                  filed, but only those who file a motion                 any land-disturbing activities or
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  to intervene in accordance with the                     otherwise enter upon lands or waters
                                                  Commission’s Rules may become a                         owned by others without the owners’
                                                  party to the proceeding. Any protests or                express permission.                                   DEPARTMENT OF ENERGY
                                                  motions to intervene must be received                      The proposed project would consist of
                                                  on or before the specified deadline date                the following: (1) A 70-foot-long, 60-                Federal Energy Regulatory
                                                  for the particular application.                         foot-wide intake area; (2) a 75-foot-long,            Commission
                                                     When the application is ready for                    36-foot-wide powerhouse containing
                                                                                                          two vertical Kaplan generating units                  [Docket No. AD10–12–008]
                                                  environmental analysis, the
                                                  Commission will issue a public notice                   with a total capacity of 5 megawatts; (3)             Increasing Market and Planning
                                                  requesting comments,                                    a 350-foot-long, 65-foot-wide tailrace;
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                Efficiency Through Improved Software;
                                                  recommendations, terms and                              (4) a 60-foot-long, 50-foot-wide                      Notice of Technical Conference:
                                                  conditions, or prescriptions.                           substation; and (5) a 0.35-mile-long, 69              Increasing Real-Time and Day-Ahead
                                                     All filings must (1) bear in all capital             kilovolt transmission line. The                       Market Efficiency Through Improved
                                                  letters the title ‘‘PROTEST’’ or                        estimated annual generation of the                    Software
                                                  ‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE                       project would be 21.15 gigawatt-hours,
                                                  OF INTENT TO FILE COMPETING                             and would operate as directed by the                    Take notice that Commission staff
                                                  APPLICATION,’’ or ‘‘COMPETING                           U.S. Army Corps of Engineers.                         will convene a technical conference on


                                             VerDate Sep<11>2014   17:12 Mar 15, 2017   Jkt 241001   PO 00000   Frm 00018   Fmt 4703   Sfmt 4703   E:\FR\FM\16MRN1.SGM   16MRN1



Document Created: 2017-03-16 02:18:52
Document Modified: 2017-03-16 02:18:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 13990 

2025 Federal Register | Disclaimer | Privacy Policy