82_FR_14264 82 FR 14213 - Natural Gas Pipeline Company of America, LLC; Notice of Schedule for Environmental Review of the Gulf Coast Expansion Project

82 FR 14213 - Natural Gas Pipeline Company of America, LLC; Notice of Schedule for Environmental Review of the Gulf Coast Expansion Project

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 51 (March 17, 2017)

Page Range14213-14214
FR Document2017-05307

Federal Register, Volume 82 Issue 51 (Friday, March 17, 2017)
[Federal Register Volume 82, Number 51 (Friday, March 17, 2017)]
[Notices]
[Pages 14213-14214]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-05307]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-488-000]


Natural Gas Pipeline Company of America, LLC; Notice of Schedule 
for Environmental Review of the Gulf Coast Expansion Project

    On August 1, 2016, Natural Gas Pipeline Company of America, LLC 
(Natural) filed an application in Docket No. CP16-488-000 requesting a 
Certificate of Public Convenience and Necessity pursuant to Section 
7(b) and (c) of the Natural Gas Act to construct and abandon certain 
natural gas pipeline facilities. The proposed project is known as the 
Gulf Coast Expansion Project (Project) and would involve construction 
and abandonment of facilities in Wharton and Cass Counties, Texas, to 
transport 460,000 dekatherms per day of natural gas supplies to an 
existing delivery point in the South Texas Gulf Coast area.
    On August 12, 2016, the Federal Energy Regulatory Commission 
(Commission or FERC) issued its Notice of Application for the Project. 
Among other things, that notice alerted agencies issuing federal 
authorizations of the requirement to complete all necessary reviews and 
to reach a final decision on a request for a federal authorization 
within 90 days of the date of issuance of the Commission staff's 
Environmental Assessment (EA) for the Project. This instant notice 
identifies the FERC staff's planned schedule for the completion of the 
EA for the Project.

Schedule for Environmental Review

    Issuance of EA--April 21, 2017.
    90-day Federal Authorization Decision Deadline--July 20, 2017.
    If a schedule change becomes necessary, additional notice will be 
provided so that the relevant agencies are kept informed of the 
Project's progress.

Project Description

    The proposed Project consists of construction and operation of a 
new 15,900 horsepower (hp) compressor station (CS 394) and an 
approximately

[[Page 14214]]

4,000-foot-long, 30-inch-diameter lateral connecting to Natural's 
Amarillo to Gulf Coast Pipeline all located in Cass County, Texas. In 
addition, Natural is requesting approval to abandon in place two 3,800 
hp compressor units at its existing Compressor Station 301 located in 
Wharton County, Texas.

Background

    On September 14, 2016, the Commission issued a Notice of Intent To 
Prepare an Environmental Assessment for the Proposed Gulf Coast 
Expansion Project and Request for Comments on Environmental Issues 
(NOI). The NOI was sent to affected landowners; federal, state, and 
local government agencies; elected officials; environmental and public 
interest groups; Native American tribes; other interested parties; and 
local libraries and newspapers. In response to the NOI, the Commission 
received comments from Texas Parks & Wildlife regarding fish and 
wildlife resources. In addition, we received comments from Indian 
tribes requesting notification of inadvertent discoveries during 
construction and also requested a cultural resources survey be 
conducted.

Additional Information

    In order to receive notification of the issuance of the EA and to 
keep track of all formal issuances and submittals in specific dockets, 
the Commission offers a free service called eSubscription. This can 
reduce the amount of time you spend researching proceedings by 
automatically providing you with notification of these filings, 
document summaries, and direct links to the documents. Go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Additional information about the Project is available from the 
Commission's Office of External Affairs at (866) 208-FERC or on the 
FERC Web site (www.ferc.gov). Using the eLibrary link, select General 
Search from the eLibrary menu, enter the selected date range and Docket 
Number excluding the last three digits (i.e., CP16-488), and follow the 
instruction. For assistance with access to eLibrary, the helpline can 
be reached at (866) 208-3676, TTY (202) 502-8659, or at 
[email protected]. The eLibrary link on the FERC Web site also 
provides access to the texts of formal documents issued by the 
Commission, such as orders, notices, and rule makings.

    Dated: March 10, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-05307 Filed 3-16-17; 8:45 am]
BILLING CODE 6717-01-P



                                                                                    Federal Register / Vol. 82, No. 51 / Friday, March 17, 2017 / Notices                                                 14213

                                                    Green Power North America, Inc., 100                    concrete powerhouse with trash racks                  later than 30 days from the issuance
                                                    Brickstone Square, Suite 300, Andover,                  with a clear spacing of 1.5 inches, and               date of the notice of ready for
                                                    MA 01810; (978) 935–6039;                               containing two turbines rated at 850                  environmental analysis.
                                                    kevin.webb@enel.com.                                    horsepower (HP) and 1150 HP, and two                    Dated: March 10, 2017.
                                                       i. FERC Contact: Emily Carter, (202)                 generators having a rated capacity of                 Kimberly D. Bose,
                                                    502–6512 or emily.carter@ferc.gov.                      650 kilowatts (kW) and 850 kW,
                                                       j. Cooperating agencies: Federal, state,                                                                   Secretary.
                                                                                                            respectively; (5) a 300-foot-long and
                                                    local, and tribal agencies with                                                                               [FR Doc. 2017–05311 Filed 3–16–17; 8:45 am]
                                                                                                            approximately 50- to 60-foot-wide
                                                    jurisdiction and/or special expertise                   tailrace; (6) approximately 80-foot-long,             BILLING CODE 6717–01–P
                                                    with respect to environmental issues                    4.16-kilovolt underground generator
                                                    that wish to cooperate in the                           leads or transmission lines from the
                                                    preparation of the environmental                                                                              DEPARTMENT OF ENERGY
                                                                                                            powerhouse to an adjacent substation
                                                    document should follow the                              owned by the New York State Electric                  Federal Energy Regulatory
                                                    instructions for filing such requests                   and Gas Corporation; and (7)                          Commission
                                                    described in item l below. Cooperating                  appurtenant facilities.
                                                    agencies should note the Commission’s                      Goodyear Lake Hydro operates the                   [Docket No. CP16–488–000]
                                                    policy that agencies that cooperate in                  project in a run-of-river mode. The
                                                    the preparation of the environmental                                                                          Natural Gas Pipeline Company of
                                                                                                            project experiences substantial seasonal              America, LLC; Notice of Schedule for
                                                    document cannot also intervene. See 94                  and annual variations in generation, and
                                                    FERC ¶ 61,076 (2001).                                                                                         Environmental Review of the Gulf
                                                                                                            generates an annual average of 5,985                  Coast Expansion Project
                                                       k. Pursuant to section 4.32(b)(7) of the             megawatt-hours. Goodyear Lake Hydro
                                                    Commission’s regulations, if any                        proposes to continue to operate the                      On August 1, 2016, Natural Gas
                                                    resource agency, Indian Tribe, or person                project in run-of-river mode.                         Pipeline Company of America, LLC
                                                    believes that an additional scientific                     o. A copy of the application is                    (Natural) filed an application in Docket
                                                    study should be conducted in order to                   available for review at the Commission                No. CP16–488–000 requesting a
                                                    form an adequate factual basis for a                    in the Public Reference Room or may be                Certificate of Public Convenience and
                                                    complete analysis of the application on                 viewed on the Commission’s Web site at                Necessity pursuant to Section 7(b) and
                                                    its merit, the resource agency, Indian                  http://www.ferc.gov using the                         (c) of the Natural Gas Act to construct
                                                    Tribe, or person must file a request for                ‘‘eLibrary’’ link. Enter the docket                   and abandon certain natural gas
                                                    a study with the Commission not later                   number excluding the last three digits in             pipeline facilities. The proposed project
                                                    than 60 days from the date of filing of                 the docket number field to access the                 is known as the Gulf Coast Expansion
                                                    the application, and serve a copy of the                document. For assistance, contact FERC                Project (Project) and would involve
                                                    request on the applicant.                               Online Support. A copy is also available              construction and abandonment of
                                                       l. Deadline for filing additional study                                                                    facilities in Wharton and Cass Counties,
                                                                                                            for inspection and reproduction at the
                                                    requests and requests for cooperating                                                                         Texas, to transport 460,000 dekatherms
                                                                                                            address in item h above.
                                                    agency status: April 28, 2017.                                                                                per day of natural gas supplies to an
                                                       The Commission strongly encourages                      You may also register online at http://
                                                                                                            www.ferc.gov/docs-filing/                             existing delivery point in the South
                                                    electronic filing. Please file additional
                                                                                                            esubscription.asp to be notified via                  Texas Gulf Coast area.
                                                    study requests and requests for                                                                                  On August 12, 2016, the Federal
                                                    cooperating agency status using the                     email of new filings and issuances
                                                                                                            related to this or other pending projects.            Energy Regulatory Commission
                                                    Commission’s eFiling system at http://                                                                        (Commission or FERC) issued its Notice
                                                    www.ferc.gov/docs-filing/efiling.asp. For               For assistance, contact FERC Online
                                                                                                            Support.                                              of Application for the Project. Among
                                                    assistance, please contact FERC Online                                                                        other things, that notice alerted agencies
                                                    Support at FERCOnlineSupport@                              p. Procedural schedule and final
                                                                                                            amendments: The application will be                   issuing federal authorizations of the
                                                    ferc.gov, (866) 208–3676 (toll free), or                                                                      requirement to complete all necessary
                                                    (202) 502–8659 (TTY). In lieu of                        processed according to the following
                                                                                                            preliminary Hydro Licensing Schedule.                 reviews and to reach a final decision on
                                                    electronic filing, please send a paper                                                                        a request for a federal authorization
                                                    copy to: Secretary, Federal Energy                      Revisions to the schedule will be made
                                                                                                            as appropriate.                                       within 90 days of the date of issuance
                                                    Regulatory Commission, 888 First Street                                                                       of the Commission staff’s Environmental
                                                    NE., Washington, DC 20426. The first                    Issue Deficiency Letter (if necessary)
                                                                                                               April 2017                                         Assessment (EA) for the Project. This
                                                    page of any filing should include docket                                                                      instant notice identifies the FERC staff’s
                                                    number P–2788–017.                                      Request Additional Information April
                                                                                                               2017                                               planned schedule for the completion of
                                                       m. The application is not ready for
                                                                                                            Issue Acceptance Letter July 2017                     the EA for the Project.
                                                    environmental analysis at this time.
                                                       n. The existing Colliersville                        Issue Scoping Document 1 for                          Schedule for Environmental Review
                                                    Hydroelectric Project consists of: (1) A                   comments July 2017
                                                                                                                                                                    Issuance of EA—April 21, 2017.
                                                    200-foot-long, 35-foot-high reinforced-                 Request Additional Information (if                      90-day Federal Authorization
                                                    concrete Ambursen-type dam; (2) a 364-                     necessary) September 2017                          Decision Deadline—July 20, 2017.
                                                    acre reservoir (Goodyear Lake) with a                   Issue Scoping Document 2 November                       If a schedule change becomes
                                                    gross storage capacity of 7,800 acre-feet                  2017                                               necessary, additional notice will be
                                                    at a normal pool elevation of 1,150.22                  Issue notice of ready for environmental
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                                                                  provided so that the relevant agencies
                                                    feet National Geodetic Vertical Datum of                   analysis December 2017                             are kept informed of the Project’s
                                                    1929; (3) a 550-foot-long reinforced                    Commission issues EA or draft EA                      progress.
                                                    concrete power canal, approximately 50                     June 2018
                                                    feet wide and 6 feet deep at the head                   Comments on EA or draft EA July 2018                  Project Description
                                                    gates, extending from a head gate                       Commission issues final EA October                      The proposed Project consists of
                                                    structure adjacent to the dam (i.e., the                   2018                                               construction and operation of a new
                                                    intake) to the powerhouse; (4) a 103-                      Final amendments to the application                15,900 horsepower (hp) compressor
                                                    foot-long by 33-foot-wide reinforced                    must be filed with the Commission no                  station (CS 394) and an approximately


                                               VerDate Sep<11>2014   20:02 Mar 16, 2017   Jkt 241001   PO 00000   Frm 00016   Fmt 4703   Sfmt 4703   E:\FR\FM\17MRN1.SGM   17MRN1


                                                    14214                           Federal Register / Vol. 82, No. 51 / Friday, March 17, 2017 / Notices

                                                    4,000-foot-long, 30-inch-diameter lateral               DEPARTMENT OF ENERGY                                     k. Description of Project: The
                                                    connecting to Natural’s Amarillo to Gulf                                                                      proposed run-of-river Gunnuk Creek
                                                    Coast Pipeline all located in Cass                      Federal Energy Regulatory                             Hydroelectric Project would consist of:
                                                    County, Texas. In addition, Natural is                  Commission                                            (1) An existing 17-foot-high concrete
                                                    requesting approval to abandon in place                 [Docket No. DI17–2–000]                               dam on Gunnuk Creek; (2) an
                                                    two 3,800 hp compressor units at its                                                                          approximately 2,100-long, 54-inch-
                                                    existing Compressor Station 301 located                 Inside Passage Electric Cooperative;                  diameter steel penstock; (3) a 22 foot by
                                                    in Wharton County, Texas.                               Notice of Declaration of Intention and                46 foot powerhouse; (4) a single
                                                                                                            Soliciting Comments, Protests, and                    horizontal axis crossflow turbine and
                                                    Background                                                                                                    synchronous generator with a rated
                                                                                                            Motions To Intervene
                                                       On September 14, 2016, the                                                                                 capacity of 500 kilowatt; (5)a switchyard
                                                    Commission issued a Notice of Intent To                    Take notice that the following                     consisting of a pad mount transformer
                                                    Prepare an Environmental Assessment                     application has been filed with the                   adjacent to the powerhouse; (6) a 130-
                                                    for the Proposed Gulf Coast Expansion                   Commission and is available for public                foot-long, 12.5-kilovolt transmission
                                                    Project and Request for Comments on                     inspection:                                           line connecting the power from the
                                                                                                               a. Application Type: Declaration of                switchyard to a point of interconnection
                                                    Environmental Issues (NOI). The NOI
                                                                                                            Intention.                                            with an existing utility system; and (7)
                                                    was sent to affected landowners; federal,
                                                                                                               b. Docket No: DI17–2–000.                          appurtenant facilities.
                                                    state, and local government agencies;                      c. Date Filed: February 7, 2017, and
                                                    elected officials; environmental and                                                                             When a Declaration of Intention is
                                                                                                            supplemented on March 1, 2017.                        filed with the Federal Energy Regulatory
                                                    public interest groups; Native American                    d. Applicant: Inside Passage Electric
                                                    tribes; other interested parties; and local                                                                   Commission, the Federal Power Act
                                                                                                            Cooperative.                                          requires the Commission to investigate
                                                    libraries and newspapers. In response to                   e. Name of Project: Gunnuk Creek
                                                    the NOI, the Commission received                                                                              and determine if the project would
                                                                                                            Hydroelectric Project.                                affect the interests of interstate or
                                                    comments from Texas Parks & Wildlife                       f. Location: The proposed Gunnuk
                                                    regarding fish and wildlife resources. In                                                                     foreign commerce. The Commission also
                                                                                                            Creek Hydroelectric Project Project                   determines whether or not the project:
                                                    addition, we received comments from                     would be located on Gunnuk Creek,                     (1) Would be located on a navigable
                                                    Indian tribes requesting notification of                near the Town of Kake, on Kupreanof                   waterway; (2) would occupy public
                                                    inadvertent discoveries during                          Island, in Prince of Wales-Hyder Census               lands or reservations of the United
                                                    construction and also requested a                       Area, Alaska.                                         States; (3) would utilize surplus water
                                                    cultural resources survey be conducted.                    g. Filed Pursuant to: Section 23(b)(1)             or water power from a government dam;
                                                    Additional Information                                  of the Federal Power Act, 16 U.S.C.                   or (4) would be located on a non-
                                                                                                            817(b) (2012).                                        navigable stream over which Congress
                                                       In order to receive notification of the                 h. Applicant Contact: Brandon Shaw,                has Commerce Clause jurisdiction and
                                                    issuance of the EA and to keep track of                 Operations Manager, Inside Passage                    would be constructed or enlarged after
                                                    all formal issuances and submittals in                  Electric Cooperative, P.O. Box 210149,                1935.
                                                    specific dockets, the Commission offers                 12480 Mendenhall Loop Road, Auke                         l. Locations of the Application: This
                                                    a free service called eSubscription. This               Bay, AK 99821, telephone: (907) 789–                  filing may be viewed on the
                                                    can reduce the amount of time you                       3196; email: bshaw@myipec.org.                        Commission’s Web site at http://
                                                    spend researching proceedings by                           i. FERC Contact: Any questions on                  www.ferc.gov/docs-filing/elibrary.asp.
                                                    automatically providing you with                        this notice should be addressed to                    Enter the docket number excluding the
                                                    notification of these filings, document                 Jennifer Polardino, (202) 502–6437, or                last three digits in the docket number
                                                    summaries, and direct links to the                      email: Jennifer.Polardino@ferc.gov.                   field to access the document. You may
                                                    documents. Go to www.ferc.gov/docs-                        j. Deadline for filing comments,                   also register online at http://
                                                    filing/esubscription.asp.                               protests, and motions to intervene is: 30             www.ferc.gov/docs-filing/
                                                       Additional information about the                     days from the issuance date of this                   esubscription.asp to be notified via
                                                    Project is available from the                           notice by the Commission.                             email of new filings and issuances
                                                    Commission’s Office of External Affairs                    The Commission strongly encourages                 related to this or other pending projects.
                                                    at (866) 208–FERC or on the FERC Web                    electronic filing. Please file comments,              For assistance, call 1–866–208–3676 or
                                                    site (www.ferc.gov). Using the eLibrary                 protests, and motions to intervene using              email FERCOnlineSupport@ferc.gov, for
                                                    link, select General Search from the                    the Commission’s eFiling system at                    TTY, call (202) 502–8659. A copy is also
                                                    eLibrary menu, enter the selected date                  http://www.ferc.gov/docs-filing/                      available for inspection and
                                                    range and Docket Number excluding the                   efiling.asp. Commenters can submit                    reproduction at the address in item (h)
                                                    last three digits (i.e., CP16–488), and                 brief comments up to 6,000 characters,                above and in the Commission’s Public
                                                    follow the instruction. For assistance                  without prior registration, using the                 Reference Room located at 888 First
                                                    with access to eLibrary, the helpline can               eComment system at http://                            Street NE., Room 2A, Washington, DC
                                                    be reached at (866) 208–3676, TTY (202)                 www.ferc.gov/docs-filing/                             20426, or by calling (202) 502–8371.
                                                    502–8659, or at FERCOnlineSupport@                      ecomment.asp. You must include your                      m. Individuals desiring to be included
                                                    ferc.gov. The eLibrary link on the FERC                 name and contact information at the end               on the Commission’s mailing list should
                                                    Web site also provides access to the                    of your comments. For assistance,                     so indicate by writing to the Secretary
                                                                                                            please contact FERC Online Support at                 of the Commission.
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    texts of formal documents issued by the
                                                    Commission, such as orders, notices,                    FERCOnlineSupport@ferc.gov, (866)                        n. Comments, Protests, or Motions to
                                                    and rule makings.                                       208–3676 (toll free), or (202) 502–8659               Intervene: Anyone may submit
                                                                                                            (TTY). In lieu of electronic filing, please           comments, a protest, or a motion to
                                                      Dated: March 10, 2017.                                send a paper copy to: Secretary, Federal              intervene in accordance with the
                                                    Kimberly D. Bose,                                       Energy Regulatory Commission, 888                     requirements of Rules of Practice and
                                                    Secretary.                                              First Street NE., Washington, DC 20426.               Procedure, 18 CFR 385.210, .211, and
                                                    [FR Doc. 2017–05307 Filed 3–16–17; 8:45 am]             The first page of any filing should                   .214. In determining the appropriate
                                                    BILLING CODE 6717–01–P                                  include docket number DI17–2–000.                     action to take, the Commission will


                                               VerDate Sep<11>2014   20:02 Mar 16, 2017   Jkt 241001   PO 00000   Frm 00017   Fmt 4703   Sfmt 4703   E:\FR\FM\17MRN1.SGM   17MRN1



Document Created: 2017-03-17 02:49:01
Document Modified: 2017-03-17 02:49:01
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 14213 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR