82_FR_14696 82 FR 14642 - Airworthiness Directives; Airbus Airplanes

82 FR 14642 - Airworthiness Directives; Airbus Airplanes

DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration

Federal Register Volume 82, Issue 54 (March 22, 2017)

Page Range14642-14646
FR Document2017-05251

We are revising an earlier proposal to supersede Airworthiness Directive (AD) 2013-10-03 for all Airbus Model A330-200, -200 Freighter, and -300 series airplanes; and Model A340-200, -300, -500, and -600 series airplanes. This action revises the notice of proposed rulemaking (NPRM) by adding a replacement of certain main landing gear (MLG) with MLG that have an improved bogie beam. We are proposing this AD to address the unsafe condition on these products. Since these actions impose an additional burden over those proposed in the NPRM, we are reopening the comment period to allow the public the chance to comment on these proposed changes.

Federal Register, Volume 82 Issue 54 (Wednesday, March 22, 2017)
[Federal Register Volume 82, Number 54 (Wednesday, March 22, 2017)]
[Proposed Rules]
[Pages 14642-14646]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-05251]


========================================================================
Proposed Rules
                                                Federal Register
________________________________________________________________________

This section of the FEDERAL REGISTER contains notices to the public of 
the proposed issuance of rules and regulations. The purpose of these 
notices is to give interested persons an opportunity to participate in 
the rule making prior to the adoption of the final rules.

========================================================================


Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / 
Proposed Rules

[[Page 14642]]



DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2016-3984; Directorate Identifier 2014-NM-119-AD]
RIN 2120-AA64


Airworthiness Directives; Airbus Airplanes

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Supplemental notice of proposed rulemaking (SNPRM); reopening 
of comment period.

-----------------------------------------------------------------------

SUMMARY: We are revising an earlier proposal to supersede Airworthiness 
Directive (AD) 2013-10-03 for all Airbus Model A330-200, -200 
Freighter, and -300 series airplanes; and Model A340-200, -300, -500, 
and -600 series airplanes. This action revises the notice of proposed 
rulemaking (NPRM) by adding a replacement of certain main landing gear 
(MLG) with MLG that have an improved bogie beam. We are proposing this 
AD to address the unsafe condition on these products. Since these 
actions impose an additional burden over those proposed in the NPRM, we 
are reopening the comment period to allow the public the chance to 
comment on these proposed changes.

DATES: We must receive comments on this SNPRM by May 8, 2017.

ADDRESSES: You may send comments, using the procedures found in 14 CFR 
11.43 and 11.45, by any of the following methods:
     Federal eRulemaking Portal: Go to http://www.regulations.gov. Follow the instructions for submitting comments.
     Fax: 202-493-2251.
     Mail: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE., Washington, DC 20590.
     Hand Delivery: U.S. Department of Transportation, Docket 
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New 
Jersey Avenue SE., Washington, DC, between 9 a.m. and 5 p.m., Monday 
through Friday, except Federal holidays.
    For Airbus service information identified in this SNPRM, contact 
Airbus SAS, Airworthiness Office--EAL, 1 Rond Point Maurice Bellonte, 
31707 Blagnac Cedex, France; telephone: +33 5 61 93 36 96; fax: +33 5 
61 93 45 80; email: [email protected]; Internet http://www.airbus.com.
    For Messier-Bugatti-Dowty service information identified in this 
SNPRM, contact Messier Services Americas, Customer Support Center, 
45360 Severn Way, Sterling, VA 20166-8910; phone: 703-450-8233; fax: 
703-404-1621; Internet: https://techpubs.services/messier-dowty.com.
    You may view this referenced service information at the FAA, 
Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For 
information on the availability of this material at the FAA, call 425-
227-1221.

Examining the AD Docket

    You may examine the AD docket on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2016-
3984; or in person at the Docket Management Facility between 9 a.m. and 
5 p.m., Monday through Friday, except Federal holidays. The AD docket 
contains this proposed AD, the regulatory evaluation, any comments 
received, and other information. The street address for the Docket 
Office (telephone: 800-647-5527) is in the ADDRESSES section. Comments 
will be available in the AD docket shortly after receipt.

FOR FURTHER INFORMATION CONTACT: Vladimir Ulyanov, Aerospace Engineer, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
1601 Lind Avenue SW., Renton, WA 98057-3356; telephone: 425-227-1138; 
fax: 425-227-1149.

SUPPLEMENTARY INFORMATION:

Comments Invited

    We invite you to send any written relevant data, views, or 
arguments about this proposed AD. Send your comments to an address 
listed under the ADDRESSES section. Include ``Docket No. FAA-2016-3984; 
Directorate Identifier 2014-NM-119-AD'' at the beginning of your 
comments. We specifically invite comments on the overall regulatory, 
economic, environmental, and energy aspects of this proposed AD. We 
will consider all comments received by the closing date and may amend 
this proposed AD based on those comments.
    We will post all comments we receive, without change, to http://www.regulations.gov, including any personal information you provide. We 
will also post a report summarizing each substantive verbal contact we 
receive about this proposed AD.

Discussion

    On May 13, 2013, we issued AD 2013-10-03, Amendment 39-17456 (78 FR 
31386, May 24, 2013) (``AD 2013-10-03''). AD 2013-10-03 requires 
actions intended to address an unsafe condition on all Airbus Model 
A330-200, -200 Freighter, and -300 series airplanes; and Model A340-
200, -300, --500, and -600 series airplanes. (AD 2013-10-03 superseded 
AD 2010-02-10, Amendment 39-16181 (75 FR 4477, January 28, 2010)).
    We issued an NPRM to amend 14 CFR part 39 by adding an AD that 
would apply to all Airbus Model A330-200, -200 Freighter, and -300 
series airplanes; and Model A340-200 and -300 series airplanes. The 
NPRM published in the Federal Register on March 1, 2016 (81 FR 10540) 
(``the NPRM''). The NPRM was prompted by reports of corroded and 
cracked bogie beams under the bogie stop pad. The NPRM proposed to 
remove Model A340-500 and -600 series airplanes from the applicability, 
remove certain one-time inspections of the MLG bogie beams and the 
sliding piston sub-assembly, revise certain compliance times, and 
provide, for certain airplanes, an optional terminating action for the 
repetitive actions.

Actions Since the NPRM Was Issued

    Since we issued the NPRM, we have determined that MLG having part 
number (P/N) 201252 series and P/N 201490 series should be replaced 
with a MLG that has an improved bogie beam, which would constitute 
terminating action for the repetitive inspections on the modified MLG.
    The European Aviation Safety Agency (EASA), which is the Technical 
Agent for the Member States of the European Union, has issued EASA AD 
2016-0108, dated June 8, 2016 (referred to after this

[[Page 14643]]

as the Mandatory Continuing Airworthiness Information, or ``the 
MCAI''), to correct an unsafe condition for certain Airbus Model A330-
200, -200 Freighter, and -300 series airplanes; and Model A340-200 and 
-300 series airplanes. The MCAI states:

    During a scheduled maintenance inspection on the Main Landing 
Gear (MLG), the bogie stop pad was found deformed and cracked. Upon 
removal of the bogie stop pad for replacement, the bogie beam was 
also found cracked. The results of a laboratory investigation 
indicated that an overload event had occurred and no fatigue 
propagation of the crack was evident. A second bogie beam crack was 
subsequently found on another aeroplane, located under a bogie stop 
pad which only had superficial paint damage.
    This condition, if not detected and corrected, could lead to 
landing gear bogie detachment from the aeroplane, or landing gear 
collapse, or a runway excursion, possibly resulting in damage to the 
aeroplane and injury to the occupants and/or people on the ground.
    To address this potential unsafe condition, EASA issued AD 2008-
0223 to require accomplishment of a one-time detailed inspection 
under the bogie stop pad of both MLG bogie beams. As a result of the 
one-time inspection required by that [EASA] AD, numerous bogie stop 
pad were found corroded and a few cracked. The one-time inspection 
was retained in EASA AD 2011-0211 [which corresponds to FAA AD 2013-
10-03], which superseded EASA AD 2008-0223, which also introduced 
repetitive inspections, except for A340-500/-600 aeroplanes.
    After EASA AD 2011-0211 was issued, further investigation led to 
the conclusion that the one-time inspection was no longer necessary 
and only the repetitive inspections should remain. In addition, it 
was determined that repetitive inspections were also necessary for 
MLG on A340-500/-600 aeroplanes.
    Prompted by these conclusions, EASA issued AD 2014-0120, 
partially retaining the requirements of EASA AD 2011-0211, which was 
superseded, and introducing repetitive detailed inspections of the 
MLG on A340-500 and A340-600 aeroplanes. Subsequently, further 
analysis indicated that repetitive inspections of the MLG on A340-
500/-600 aeroplanes were not necessary after all. In addition, the 
threshold for the inspection of MLG P/N 10-210 series was raised 
from 24 to 126 months, and Airbus developed a modification of the 
MLG P/N 10-210 series which provides an (optional) terminating 
action for the repetitive inspections.
    Consequently, EASA AD 2014-0120 was revised to delete the 
requirements for A340-500/-600 aeroplanes, to amend the inspection 
threshold for MLG P/N 10-210 series, and to introduce an optional 
terminating action for aeroplanes with MLG P/N 10-210 series.
    Since EASA AD 2014-0120R1 was issued, Airbus developed a 
modification (mod 205289) of the MLG P/N 201252 series and P/N 
201490 series that must be embodied in service with Airbus SB A330-
32-3275 or SB A340-32-4305. It was also identified that A340-500/-
600 aeroplanes could be removed from the applicability of this 
[EASA] AD as no more actions were required on these aeroplanes.
    For the reason described above, this [EASA] AD retains the 
requirements of EASA AD 2014-0120R1, which is superseded, removes 
the A340-500/-600 aeroplanes from the Applicability and requires the 
modification of the MLG P/N 201252 series and P/N 201490 series, 
which constitutes terminating action for the repetitive inspections 
required by this [EASA] AD.

    The required actions include repetitive detailed inspections for 
damage and corrosion of the sliding piston sub-assembly, and related 
investigative and corrective actions if necessary. Related 
investigative actions include a test for indications of corrosion and 
damage to the bogie assembly base material, and a magnetic particle 
inspection for cracks, corrosion, and damage of the bogie beam. 
Corrective actions include repairing affected parts.
    The required terminating action (for MLG having P/N 201252 series 
or P/N 201490 series) and the optional terminating action (for MLG 
having P/N 10-210) are modifications of the bogie beam of an MLG, which 
consist of installing a nickel under chrome coating, a new bogie beam 
stop pad, and new stop pad brackets.
    You may examine the MCAI in the AD docket on the Internet at http://www.regulations.gov by searching for and locating Docket No. FAA-2016-
3984.

Related Service Information Under 1 CFR Part 51

    Airbus has issued the following service information.
     Airbus Service Bulletin A330-32-3248, Revision 05, 
including Appendix 1, dated May 4, 2016; and Airbus Service Bulletin 
A340-32-4286, Revision 02, including Appendix 1, dated January 5, 2016; 
which describe procedures for doing an inspection for damage and 
corrosion of the MLG sliding piston sub-assembly, bogie beam stop pad 
and the bogie beam under the stop pad, and related investigative and 
corrective actions. These documents are distinct since they apply to 
different airplane models.
     Airbus Service Bulletin A330-32-3268, Revision 01, dated 
September 21, 2015, which describes procedures for modification of the 
bogie beam of an MLG having P/N 10-210 that includes installing a 
nickel under chrome coating, a new bogie beam stop pad, and new stop 
pad brackets.
     Airbus Service Bulletin A330-32-3275, dated December 23, 
2015, which describes procedures for modification of the bogie beam of 
an MLG having P/N 201252 series or P/N 201490 series that include 
installing a nickel under chrome coating, a new bogie beam stop pad, 
and new stop pad brackets.
     Airbus Service Bulletin A340-32-4300, dated April 20, 
2015; and Revision 01, dated September 21, 2015; which describe 
procedures for modification of the bogie beam of an MLG having P/N 10-
210 that include installing a nickel under chrome coating, a new bogie 
beam stop pad, and new stop pad brackets. These service bulletins are 
distinct since they are different revision levels.
     Airbus Service Bulletin A340-32-4305, dated December 23, 
2015, which describes procedures for modification of the bogie beam of 
an MLG having P/N 201252 series or P/N 201490 series that includes 
installing a nickel under chrome coating, a new bogie beam stop pad, 
and new stop pad brackets.
    Messier-Bugatti-Dowty has issued the following service information.
     Messier-Bugatti-Dowty Service Bulletin A33/34-32-305, 
including Appendix A, dated April 13, 2015, which describes procedures 
for modification of the bogie beam of an MLG having MLG P/N 10-210 
series that includes installing a nickel under chrome coating, a new 
bogie beam stop pad, and new stop pad brackets.
     Messier-Bugatti-Dowty Service Bulletin A33/34-32-306, 
Revision 1, including Appendix A, dated May 31, 2016, which describes 
procedures for modification of the bogie beam of an MLG having P/N 
201252 series or P/N 201490 series that includes installing a nickel 
under chrome coating, a new bogie beam stop pad, and new stop pad 
brackets.
    This service information is reasonably available because the 
interested parties have access to it through their normal course of 
business or by the means identified in the ADDRESSES section.

Comments

    We gave the public the opportunity to participate in developing 
this proposed AD. We considered the comments received on the proposal 
and the FAA's response to each comment.

Requests To Revise Applicability and Terminating Action

    Air France (AF) and American Airlines (AAL) requested that we 
revise the applicability of the proposed AD to exclude airplanes that 
have had Airbus Modification 204421 or Airbus

[[Page 14644]]

Modification 205289 incorporated in production.
    AAL also requested that we exclude airplanes from the applicability 
that have accomplished the actions specified in Airbus Service Bulletin 
A330-32-3268, dated April 20, 2015, which describes procedures for 
modification of the bogie beam of an MLG having P/N 10-210, and Airbus 
Service Bulletin A330-32-3275, dated December 23, 2015, which describes 
procedures for modification of the bogie beam of an MLG having P/N 
201490.
    AAL and AF also requested that we add Airbus Service Bulletin A330-
32-3275, dated December 23, 2015, as a terminating action in paragraph 
(m) of the proposed AD. AF also asked that we add Airbus Service 
Bulletin A340-32-4305, dated December 23, 2015, as a terminating action 
in paragraph (m) of the proposed AD. AF and AAL referenced the 
applicability in the MCAI as justification for the requests.
    We partially agree with the commenters' requests. We have revised 
paragraph (c) of this proposed AD to exclude airplanes that have 
embodied Airbus Modification 204421 or Airbus Modification 205289 in 
production, which corresponds with the MCAI. However, we have not 
revised paragraph (c) of this proposed AD to exclude airplanes on which 
Airbus Service Bulletin A330-32-3268, dated April 20, 2015; or Airbus 
Service Bulletin A330-32-3275, dated December 23, 2015; has been done 
because those airplanes are not excluded from the MCAI.
    We have added information to paragraph (m) of this proposed AD to 
specify that accomplishing the actions specified in Messier-Bugatti-
Dowty-Service Bulletin A33/34-32-305, including Appendix A, dated April 
13, 2015, for MLG having P/N 10-210, constitutes terminating action for 
the repetitive inspections. We also have added information in paragraph 
(m) of this proposed AD to specify that accomplishing the actions 
specified in the service information referenced in paragraph (k) of 
this proposed AD (which includes references to Airbus Service Bulletin 
A330-32-3275, dated December 23, 2015; and Airbus Service Bulletin 
A340-32-4305, dated December 23, 2015) constitutes terminating action 
for the repetitive inspections.

Additional Changes to This SNPRM

    We have clarified the affected airplanes for paragraphs (h)(1) and 
(h)(3) of this AD by changing the text ``For airplanes . . . having an 
MLG P/N 201252 series and P/N 201490 series'' to ``For airplanes . . . 
having an MLG P/N 201252 series or P/N 201490 series'' (replaced the 
``and'' with an ``or'').
    We have removed the reporting requirements from this SNPRM. We have 
also revised the Costs of Compliance section of this SNPRM to reflect 
the revised proposed requirements.

FAA's Determination and Requirements of This SNPRM

    This product has been approved by the aviation authority of another 
country, and is approved for operation in the United States. Pursuant 
to our bilateral agreement with the State of Design Authority, we have 
been notified of the unsafe condition described in the MCAI and service 
information referenced above. We are proposing this AD because we 
evaluated all pertinent information and determined an unsafe condition 
exists and is likely to exist or develop on other products of these 
same type designs.
    Certain changes described above expand the scope of the NPRM. As a 
result, we have determined that it is necessary to reopen the comment 
period to provide additional opportunity for the public to comment on 
this SNPRM.

Costs of Compliance

    We estimate that this proposed AD affects 89 Model A330-200, -200 
Freighter, and -300 series airplanes of U.S. registry.
    We estimate that it would take about 13 work-hours per product to 
comply with the basic requirements of this proposed AD. The average 
labor rate is $85 per work-hour. Based on these figures, we estimate 
the cost of this proposed AD on U.S. operators to be $98,345, or $1,105 
per product.
    Currently, there are no Model A340-200, or -300 series airplanes on 
the U.S. Register. However, if an affected airplane is imported and 
placed on the U.S. Register in the future, it would be subject to the 
same per-airplane cost specified above for the Model A330-200, -200 
Freighter, and -300 series airplanes.
    In addition, we estimate that any necessary follow-on actions would 
take about 24 work-hours and require parts costing $78, for a cost of 
$2,118 per product. We have no way of determining the number of 
aircraft that might need these actions.
    According to the manufacturer, all of the parts costs of the 
optional terminating action specified in this SNPRM may be covered 
under warranty, thereby reducing the cost impact on affected 
individuals. We do not control warranty coverage for affected 
individuals. As a result, we have included all costs in our cost 
estimate. We have received no definitive data that would enable us to 
provide the work-hour cost estimates for the optional terminating 
action specified in this proposed AD.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. ``Subtitle VII: Aviation 
Programs,'' describes in more detail the scope of the Agency's 
authority.
    We are issuing this rulemaking under the authority described in 
``Subtitle VII, Part A, Subpart III, Section 44701: General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We determined that this proposed AD would not have federalism 
implications under Executive Order 13132. This proposed AD would not 
have a substantial direct effect on the States, on the relationship 
between the national Government and the States, or on the distribution 
of power and responsibilities among the various levels of government.
    For the reasons discussed above, I certify this proposed 
regulation:
    1. Is not a ``significant regulatory action'' under Executive Order 
12866;
    2. Is not a ``significant rule'' under the DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979);
    3. Will not affect intrastate aviation in Alaska; and
    4. Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

The Proposed Amendment

    Accordingly, under the authority delegated to me by the 
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:

[[Page 14645]]

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority:  49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13   [Amended]

0
2. The FAA amends Sec.  39.13 by removing Airworthiness Directive (AD) 
2013-10-03, Amendment 39-17456 (78 FR 31386, May 24, 2013), and adding 
the following new AD:

Airbus: Docket No. FAA-2016-3984; Directorate Identifier 2014-NM-
119-AD.

(a) Comments Due Date

    We must receive comments by May 8, 2017.

(b) Affected ADs

    This AD replaces AD 2013-10-03, Amendment 39-17456 (78 FR 31386, 
May 24, 2013) (``AD 2013-10-03'').

(c) Applicability

    This AD applies to Airbus airplanes identified in paragraphs 
(c)(1) and (c)(2) of this AD, certificated in any category, all 
serial numbers, except those airplanes that have embodied Airbus 
Modification 204421 or Airbus Modification 205289 in production.
    (1) Model A330-201, -202, -203, -223, -223F, -243, -243F, -301, 
-302, -303,
    -321, -322, -323, -341, -342, and -343 airplanes.
    (2) Model A340-211, -212, -213, -311, -312, and -313 airplanes.

(d) Subject

    Air Transport Association (ATA) of America Code 32, Landing 
gear.

(e) Reason

    This AD was prompted by reports of corroded and cracked bogie 
beams under the bogie stop pad. We are issuing this AD to detect and 
correct damage or corrosion under the bogie stop pad of both main 
landing gear (MLG) bogie beams; this condition could result in a 
damaged bogie beam and consequent detachment of the beam from the 
airplane, collapse of the MLG, or departure of the airplane from the 
runway, possibly resulting in damage to the airplane and injury to 
occupants.

(f) Compliance

    Comply with this AD within the compliance times specified, 
unless already done.

(g) Repetitive Inspections, Related Investigative Actions, and 
Corrective Actions

    For Model A330-200, -200 Freighter, and -300 series airplanes; 
and Model A340-200 and -300 series airplanes; equipped with a MLG 
having part number (P/N) 201252 series, P/N 201490 series, or P/N 
10-210 series: Do the applicable actions required by paragraph 
(g)(1) or (g)(2) of this AD.
    (1) For airplanes equipped, as of the effective date of this AD, 
with a MLG that has been previously inspected as specified in Airbus 
Service Bulletin A330-32-3220, Airbus Service Bulletin A330-32-3248, 
Airbus Service Bulletin A340-32-4264, or Airbus Service Bulletin 
A340-32-4286, as applicable: At applicable times specified in 
paragraphs (h)(1) and (h)(2) of this AD, do a detailed inspection 
for damage (e.g., cracking and fretting) and corrosion of the MLG 
sliding piston sub-assembly, bogie beam stop pad, and the bogie beam 
under the stop pad; and do all applicable related investigative and 
corrective actions; in accordance with the Accomplishment 
Instructions of Airbus Service Bulletin A330-32-3248, Revision 05, 
including Appendix 1, dated May 4, 2016; or Airbus Service Bulletin 
A340-32-4286, Revision 02, including Appendix 1, dated January 5, 
2016; as applicable; except as required by paragraph (j) of this AD. 
Do all applicable related investigative and corrective actions 
before further flight. Repeat the inspection of the MLG sliding 
piston sub-assembly, bogie beam stop pad, and the bogie beam under 
the stop pad, thereafter, at intervals not to exceed 2,500 flight 
cycles or 24 months, whichever occurs first.
    (2) For airplanes equipped, as of the effective date of this AD, 
with a MLG that has not been previously inspected as specified in 
Airbus Service Bulletin A330-32-3220, Airbus Service Bulletin A330-
32-3248, Airbus Service Bulletin A340-32-4264, or Airbus Service 
Bulletin A340-32-4286, as applicable: At the applicable times 
specified in paragraphs (h)(3) and (h)(4) of this AD, do a detailed 
inspection for damage (e.g., cracking and fretting) and corrosion of 
the MLG sliding piston sub-assembly, bogie beam stop pad, and the 
bogie beam under the stop pad; and do all applicable related 
investigative and corrective actions; in accordance with the 
Accomplishment Instructions of Airbus Service Bulletin A330-32-3248, 
Revision 05, including Appendix 1, dated May 4, 2016 or Airbus 
Service Bulletin A340-32-4286, Revision 02, including Appendix 1, 
dated January 5, 2016; as applicable; except as required by 
paragraph (j) of this AD. Do all applicable related investigative 
and corrective actions before further flight. Repeat the inspection 
of the MLG sliding piston sub-assembly, bogie beam stop pad, and the 
bogie beam under the stop pad, thereafter, at intervals not to 
exceed 2,500 flight cycles or 24 months, whichever occurs first.

(h) Compliance Times for the Actions Required by Paragraph (g) of This 
AD

    Do the applicable actions required by paragraph (g) of this AD 
at the applicable time specified in paragraph (h)(1), (h)(2), 
(h)(3), or (h)(4) of this AD.
    (1) For airplanes identified in paragraph (g)(1) of this AD 
having an MLG P/N 201252 series or P/N 201490 series: Before the 
accumulation of 2,500 total flight cycles or 24 months, whichever 
occurs first since the later of the times specified in paragraphs 
(h)(1)(i) and (h)(1)(ii) of this AD.
    (i) Since first flight after a MLG overhaul.
    (ii) Since first flight after the most recent accomplishment of 
an inspection of the MLG, as specified in Airbus Service Bulletin 
A330-32-3220, Airbus Service Bulletin A330-32-3248, Airbus Service 
Bulletin A340-32-4286, or Airbus Service Bulletin A340-32-4264, as 
applicable.
    (2) For airplanes identified in paragraph (g)(1) of this AD 
having an MLG P/N 10-210 series: Before the accumulation of 126 
months since first flight of the MLG on an airplane or since first 
flight on an airplane after the most recent inspection of the MLG, 
as specified in Airbus Service Bulletin A330-32-3248, or Airbus 
Service Bulletin A340-32-4286, as applicable.
    (3) For airplanes identified in paragraph (g)(2) of this AD 
having an MLG P/N 201252 series or P/N 201490 series: At the later 
of the times specified in paragraphs (h)(3)(i) and (h)(3)(ii) of 
this AD.
    (i) Before the accumulation of 2,500 total flight cycles or 24 
months, whichever occurs first since the later of the times 
specified in paragraphs (h)(3)(i)(A) and (h)(3)(i)(B) of this AD.
    (A) Since first flight of the MLG on an airplane.
    (B) Since first flight after a MLG overhaul.
    (ii) Within 16 months after the effective date of this AD.
    (4) For airplanes identified in paragraph (g)(2) of this AD 
having MLG P/N 10-210 series: Before the accumulation of 126 months 
since first flight of the MLG on an airplane.

(i) Optional Overhaul

    For the purposes of this AD, accomplishment of an MLG overhaul 
is acceptable instead of an inspection required by paragraph (g) of 
this AD. The inspections required by paragraph (g) of this AD are 
not terminated by an MLG overhaul, but are required at the next 
applicable compliance time required by paragraph (g) of this AD.

(j) Service Information Exception

    If the applicable service information specified in paragraph (g) 
of this AD specifies to contact Messier-Dowty for instructions, or 
if any repair required by paragraph (g) of this AD is beyond the 
maximum repair allowance specified in the applicable service 
information specified in paragraph (g) of this AD: Before further 
flight, repair using a method approved by the Manager, International 
Branch, ANM-116, Transport Airplane Directorate, FAA; or the 
European Aviation Safety Agency (EASA); or Airbus's EASA Design 
Organization Approval (DOA).

(k) MLG Modification

    For airplanes equipped with MLG having P/N 201252 series or MLG 
having P/N 201490 series: Before the accumulation of 126 months 
since first flight of the MLG on an airplane or since first flight 
on an airplane after the most recent overhaul as of the effective 
date of this AD, as applicable, replace that MLG with a MLG having 
P/N 201252 series or MLG having P/N 201490 series that has an 
improved bogie beam, as defined in Airbus Service Bulletin A330-32-
3275, dated December 23, 2015; or Airbus Service Bulletin A340-32-
4305, dated December 23, 2015; as applicable; and in accordance with 
the Accomplishment Instructions of Messier-Bugatti-Dowty Service 
Bulletin A33/34-32-306, Revision 1, including Appendix A, dated May 
31, 2016.

[[Page 14646]]

(l) Terminating Action Limitation

    Accomplishment of corrective actions required by paragraph (g) 
of this AD does not constitute terminating action for the repetitive 
inspections required by this AD.

(m) Terminating Action for Certain Airplanes

    (1) For airplanes with any MLG having P/N 10-210 series: 
Modification of the bogie beam of each MLG having P/N 10-210 series, 
as specified in Airbus Service Bulletin A330-32-3268, Revision 01, 
dated September 21, 2015; or Airbus Service Bulletin A340-32-4300, 
dated April 20, 2015; or Revision 01, dated September 21, 2015; as 
applicable; and in accordance with the Accomplishment Instructions 
of Messier-Bugatti-Dowty Service Bulletin A33/34-32-305, including 
Appendix A, dated April 13, 2015; constitutes terminating action for 
the repetitive inspection requirements of this AD for that airplane, 
provided that, following in-service modification, the airplane 
remains in post-service bulletin configuration.
    (2) For airplanes with any MLG having P/N 201252 series or P/N 
201490 series: Installation of both left-hand and right-hand MLG 
having P/N 201252 series or P/N 201490 series that has an improved 
bogie beam, as required by paragraph (k) of this AD, constitutes 
terminating action for the repetitive inspections requirements of 
this AD for that airplane, provided that, following in-service 
modification, the airplane remains in post-service bulletin 
configuration.

(n) Parts Installation Prohibition

    Do not install on any airplane a pre-Airbus modification MLG 
having P/N 201252 series or pre-Airbus modification MLG having P/N 
201490 series, as specified in paragraph (n)(1) or (n)(2) of this 
AD, as applicable; or a pre-Airbus modification MLG having P/N 10-
210 series, as specified in paragraph (n)(3) or (n)(4) of this AD, 
as applicable.
    (1) For any airplane that is in post-Airbus Modification 205289 
configuration, or on which the modification required by paragraph 
(k) of this AD has been done: From the effective date of this AD.
    (2) For any airplane that is in pre-Airbus Modification 205289 
configuration, or on which the modification required by paragraph 
(k) of this AD has not been done: After modification of that 
airplane, as required by paragraph (k) of this AD.
    (3) For any airplane that is in post-Airbus Modification 204421 
configuration, or on which the modification specified in paragraph 
(m)(1) of this AD has been done: From the effective date of this AD.
    (4) For an airplane that is in pre-Airbus Modification 204421, 
or on which the modification required by paragraph (m)(1) of this AD 
has not been done: After modification of that airplane, as required 
by paragraph (m)(1) of this AD.

(o) Credit for Previous Actions

    (1) This paragraph provides credit for the actions required by 
paragraph (g) of this AD, if those actions were performed before the 
effective date of this AD using the service information identified 
in paragraphs (o)(1)(i) through (o)(1)(vii) or (o)(2) of this AD, as 
applicable.
    (i) Airbus Service Bulletin A330-32-3248, dated October 5, 2011, 
which is not incorporated by reference in this AD.
    (ii) Airbus Service Bulletin A330-32-3248, Revision 01, 
including Appendix 01, dated December 13, 2012, which was 
incorporated by reference in AD 2013-10-03, Amendment 39-17456 (78 
FR 31386, May 24, 2013).
    (iii) Airbus Service Bulletin A330-32-3248, Revision 02, dated 
April 16, 2014, which is not incorporated by reference in this AD.
    (iv) Airbus Service Bulletin A330-32-3248, Revision 03, dated 
November 27, 2015, which is not incorporated by reference in this 
AD.
    (v) Airbus Service Bulletin A330-32-3248, Revision 04, dated 
January 5, 2016, which is not incorporated by reference in this AD.
    (vi) Airbus Service Bulletin A340-32-4286, dated October 5, 
2011, which was incorporated by reference in AD 2013-10-03, 
Amendment 39-17456 (78 FR 31386, May 24, 2013).
    (vii) Airbus Service Bulletin A340-32-4286, Revision 01, dated 
November 27, 2015, which is not incorporated by reference in this 
AD.
    (2) This paragraph provides credit for the actions required by 
paragraph (k) of this AD, if those actions were performed before the 
effective date of this AD using Messier-Bugatti-Dowty Service 
Bulletin A33/34-32-306, dated December 21, 2015, which is not 
incorporated by reference in this AD.

(p) Other FAA AD Provisions

    The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
has the authority to approve AMOCs for this AD, if requested using 
the procedures found in 14 CFR 39.19. In accordance with 14 CFR 
39.19, send your request to your principal inspector or local Flight 
Standards District Office, as appropriate. If sending information 
directly to the International Branch, send it to ATTN: Vladimir 
Ulyanov, Aerospace Engineer, International Branch, ANM-116, 
Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton, 
WA 98057-3356; telephone: 425-227-1138; fax: 425-227-1149. 
Information may be emailed to: [email protected].
    (i) Before using any approved AMOC, notify your appropriate 
principal inspector, or lacking a principal inspector, the manager 
of the local flight standards district office/certificate holding 
district office. The AMOC approval letter must specifically 
reference this AD.
    (ii) AMOCs approved previously for AD 2013-10-03 are not 
approved as AMOCs with this AD.
    (2) Contacting the Manufacturer: As of the effective date of 
this AD, for any requirement in this AD to obtain corrective actions 
from a manufacturer, the action must be accomplished using a method 
approved by the Manager, International Branch, ANM-116, Transport 
Airplane Directorate, FAA; or EASA; or Airbus's EASA DOA. If 
approved by the DOA, the approval must include the DOA-authorized 
signature.
    (3) Required for Compliance (RC): Except as required by 
paragraph (j) of this AD: If any service information contains 
procedures or tests that are identified as RC, those procedures and 
tests must be done to comply with this AD; any procedures or tests 
that are not identified as RC are recommended. Those procedures and 
tests that are not identified as RC may be deviated from using 
accepted methods in accordance with the operator's maintenance or 
inspection program without obtaining approval of an AMOC, provided 
the procedures and tests identified as RC can be done and the 
airplane can be put back in an airworthy condition. Any 
substitutions or changes to procedures or tests identified as RC 
require approval of an AMOC.

(q) Related Information

    (1) Refer to Mandatory Continuing Airworthiness Information 
(MCAI) EASA AD 2016-0108, dated June 8, 2016, for related 
information. This MCAI may be found in the AD docket on the Internet 
at http://www.regulations.gov by searching for and locating Docket 
No. FAA-2016-3984.
    (2) For Airbus service information identified in this AD, 
contact Airbus SAS, Airworthiness Office--EAL, 1 Rond Point Maurice 
Bellonte, 31707 Blagnac Cedex, France; telephone: +33 5 61 93 36 96; 
fax: +33 5 61 93 45 80; email: [email protected]; 
Internet http://www.airbus.com. For Messier-Bugatti-Dowty service 
information identified in this AD, contact Messier Services 
Americas, Customer Support Center, 45360 Severn Way, Sterling, VA 
20166-8910; phone: 703-450-8233; fax: 703-404-1621; Internet: 
https://techpubs.services/messier-dowty.com. You may view this 
service information at the FAA, Transport Airplane Directorate, 1601 
Lind Avenue SW., Renton, WA. For information on the availability of 
this material at the FAA, call 425-227-1221.

    Issued in Renton, Washington, on March 9, 2017.
Michael Kaszycki,
Acting Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. 2017-05251 Filed 3-21-17; 8:45 am]
 BILLING CODE 4910-13-P



                                                    14642

                                                    Proposed Rules                                                                                                Federal Register
                                                                                                                                                                  Vol. 82, No. 54

                                                                                                                                                                  Wednesday, March 22, 2017



                                                    This section of the FEDERAL REGISTER                    W12–140, 1200 New Jersey Avenue SE.,                  your comments. We specifically invite
                                                    contains notices to the public of the proposed          Washington, DC, between 9 a.m. and 5                  comments on the overall regulatory,
                                                    issuance of rules and regulations. The                  p.m., Monday through Friday, except                   economic, environmental, and energy
                                                    purpose of these notices is to give interested          Federal holidays.                                     aspects of this proposed AD. We will
                                                    persons an opportunity to participate in the               For Airbus service information                     consider all comments received by the
                                                    rule making prior to the adoption of the final
                                                                                                            identified in this SNPRM, contact                     closing date and may amend this
                                                    rules.
                                                                                                            Airbus SAS, Airworthiness Office—                     proposed AD based on those comments.
                                                                                                            EAL, 1 Rond Point Maurice Bellonte,                     We will post all comments we
                                                    DEPARTMENT OF TRANSPORTATION                            31707 Blagnac Cedex, France;                          receive, without change, to http://
                                                                                                            telephone: +33 5 61 93 36 96; fax: +33                www.regulations.gov, including any
                                                    Federal Aviation Administration                         5 61 93 45 80; email:                                 personal information you provide. We
                                                                                                            airworthiness.A330-A340@airbus.com;                   will also post a report summarizing each
                                                    14 CFR Part 39                                          Internet http://www.airbus.com.                       substantive verbal contact we receive
                                                                                                               For Messier-Bugatti-Dowty service                  about this proposed AD.
                                                    [Docket No. FAA–2016–3984; Directorate
                                                    Identifier 2014–NM–119–AD]
                                                                                                            information identified in this SNPRM,                 Discussion
                                                                                                            contact Messier Services Americas,
                                                    RIN 2120–AA64                                           Customer Support Center, 45360 Severn                    On May 13, 2013, we issued AD
                                                                                                            Way, Sterling, VA 20166–8910; phone:                  2013–10–03, Amendment 39–17456 (78
                                                    Airworthiness Directives; Airbus                        703–450–8233; fax: 703–404–1621;                      FR 31386, May 24, 2013) (‘‘AD 2013–
                                                    Airplanes                                               Internet: https://techpubs.services/                  10–03’’). AD 2013–10–03 requires
                                                                                                            messier-dowty.com.                                    actions intended to address an unsafe
                                                    AGENCY:  Federal Aviation                                                                                     condition on all Airbus Model A330–
                                                    Administration (FAA), DOT.                                 You may view this referenced service
                                                                                                            information at the FAA, Transport                     200, –200 Freighter, and –300 series
                                                    ACTION: Supplemental notice of                                                                                airplanes; and Model A340–200, –300,
                                                    proposed rulemaking (SNPRM);                            Airplane Directorate, 1601 Lind Avenue
                                                                                                            SW., Renton, WA. For information on                   -–500, and –600 series airplanes. (AD
                                                    reopening of comment period.                                                                                  2013–10–03 superseded AD 2010–02–
                                                                                                            the availability of this material at the
                                                    SUMMARY:   We are revising an earlier                   FAA, call 425–227–1221.                               10, Amendment 39–16181 (75 FR 4477,
                                                    proposal to supersede Airworthiness                                                                           January 28, 2010)).
                                                                                                            Examining the AD Docket                                  We issued an NPRM to amend 14 CFR
                                                    Directive (AD) 2013–10–03 for all
                                                                                                               You may examine the AD docket on                   part 39 by adding an AD that would
                                                    Airbus Model A330–200, –200
                                                                                                            the Internet at http://                               apply to all Airbus Model A330–200,
                                                    Freighter, and –300 series airplanes; and                                                                     –200 Freighter, and –300 series
                                                    Model A340–200, –300, –500, and –600                    www.regulations.gov by searching for
                                                                                                            and locating Docket No. FAA–2016–                     airplanes; and Model A340–200 and
                                                    series airplanes. This action revises the                                                                     –300 series airplanes. The NPRM
                                                    notice of proposed rulemaking (NPRM)                    3984; or in person at the Docket
                                                                                                            Management Facility between 9 a.m.                    published in the Federal Register on
                                                    by adding a replacement of certain main                                                                       March 1, 2016 (81 FR 10540) (‘‘the
                                                    landing gear (MLG) with MLG that have                   and 5 p.m., Monday through Friday,
                                                                                                            except Federal holidays. The AD docket                NPRM’’). The NPRM was prompted by
                                                    an improved bogie beam. We are                                                                                reports of corroded and cracked bogie
                                                    proposing this AD to address the unsafe                 contains this proposed AD, the
                                                                                                                                                                  beams under the bogie stop pad. The
                                                    condition on these products. Since these                regulatory evaluation, any comments
                                                                                                                                                                  NPRM proposed to remove Model
                                                    actions impose an additional burden                     received, and other information. The
                                                                                                                                                                  A340–500 and –600 series airplanes
                                                    over those proposed in the NPRM, we                     street address for the Docket Office
                                                                                                                                                                  from the applicability, remove certain
                                                    are reopening the comment period to                     (telephone: 800–647–5527) is in the
                                                                                                                                                                  one-time inspections of the MLG bogie
                                                    allow the public the chance to comment                  ADDRESSES section. Comments will be
                                                                                                                                                                  beams and the sliding piston sub-
                                                    on these proposed changes.                              available in the AD docket shortly after
                                                                                                                                                                  assembly, revise certain compliance
                                                    DATES: We must receive comments on                      receipt.
                                                                                                                                                                  times, and provide, for certain airplanes,
                                                    this SNPRM by May 8, 2017.                              FOR FURTHER INFORMATION CONTACT:                      an optional terminating action for the
                                                    ADDRESSES: You may send comments,                       Vladimir Ulyanov, Aerospace Engineer,                 repetitive actions.
                                                    using the procedures found in 14 CFR                    International Branch, ANM–116,
                                                                                                            Transport Airplane Directorate, FAA,                  Actions Since the NPRM Was Issued
                                                    11.43 and 11.45, by any of the following
                                                    methods:                                                1601 Lind Avenue SW., Renton, WA                        Since we issued the NPRM, we have
                                                       • Federal eRulemaking Portal: Go to                  98057–3356; telephone: 425–227–1138;                  determined that MLG having part
                                                    http://www.regulations.gov. Follow the                  fax: 425–227–1149.                                    number (P/N) 201252 series and P/N
                                                    instructions for submitting comments.                   SUPPLEMENTARY INFORMATION:                            201490 series should be replaced with
                                                       • Fax: 202–493–2251.                                                                                       a MLG that has an improved bogie
jstallworth on DSK7TPTVN1PROD with PROPOSALS




                                                       • Mail: U.S. Department of                           Comments Invited
                                                                                                                                                                  beam, which would constitute
                                                    Transportation, Docket Operations, M–                     We invite you to send any written                   terminating action for the repetitive
                                                    30, West Building Ground Floor, Room                    relevant data, views, or arguments about              inspections on the modified MLG.
                                                    W12–140, 1200 New Jersey Avenue SE.,                    this proposed AD. Send your comments                    The European Aviation Safety Agency
                                                    Washington, DC 20590.                                   to an address listed under the                        (EASA), which is the Technical Agent
                                                       • Hand Delivery: U.S. Department of                  ADDRESSES section. Include ‘‘Docket No.               for the Member States of the European
                                                    Transportation, Docket Operations, M–                   FAA–2016–3984; Directorate Identifier                 Union, has issued EASA AD 2016–0108,
                                                    30, West Building Ground Floor, Room                    2014–NM–119–AD’’ at the beginning of                  dated June 8, 2016 (referred to after this


                                               VerDate Sep<11>2014   14:55 Mar 21, 2017   Jkt 241001   PO 00000   Frm 00001   Fmt 4702   Sfmt 4702   E:\FR\FM\22MRP1.SGM   22MRP1


                                                                          Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Proposed Rules                                         14643

                                                    as the Mandatory Continuing                             service with Airbus SB A330–32–3275 or SB               • Airbus Service Bulletin A330–32–
                                                    Airworthiness Information, or ‘‘the                     A340–32–4305. It was also identified that             3275, dated December 23, 2015, which
                                                    MCAI’’), to correct an unsafe condition                 A340–500/–600 aeroplanes could be removed             describes procedures for modification of
                                                                                                            from the applicability of this [EASA] AD as
                                                    for certain Airbus Model A330–200,                                                                            the bogie beam of an MLG having P/N
                                                                                                            no more actions were required on these
                                                    –200 Freighter, and –300 series                         aeroplanes.                                           201252 series or P/N 201490 series that
                                                    airplanes; and Model A340–200 and                          For the reason described above, this               include installing a nickel under
                                                    –300 series airplanes. The MCAI states:                 [EASA] AD retains the requirements of EASA            chrome coating, a new bogie beam stop
                                                       During a scheduled maintenance                       AD 2014–0120R1, which is superseded,                  pad, and new stop pad brackets.
                                                    inspection on the Main Landing Gear (MLG),              removes the A340–500/–600 aeroplanes from               • Airbus Service Bulletin A340–32–
                                                    the bogie stop pad was found deformed and               the Applicability and requires the                    4300, dated April 20, 2015; and
                                                    cracked. Upon removal of the bogie stop pad             modification of the MLG P/N 201252 series             Revision 01, dated September 21, 2015;
                                                    for replacement, the bogie beam was also                and P/N 201490 series, which constitutes              which describe procedures for
                                                    found cracked. The results of a laboratory              terminating action for the repetitive
                                                                                                            inspections required by this [EASA] AD.
                                                                                                                                                                  modification of the bogie beam of an
                                                    investigation indicated that an overload
                                                                                                                                                                  MLG having P/N 10–210 that include
                                                    event had occurred and no fatigue
                                                    propagation of the crack was evident. A
                                                                                                               The required actions include                       installing a nickel under chrome
                                                    second bogie beam crack was subsequently                repetitive detailed inspections for                   coating, a new bogie beam stop pad, and
                                                    found on another aeroplane, located under a             damage and corrosion of the sliding                   new stop pad brackets. These service
                                                    bogie stop pad which only had superficial               piston sub-assembly, and related                      bulletins are distinct since they are
                                                    paint damage.                                           investigative and corrective actions if               different revision levels.
                                                       This condition, if not detected and                  necessary. Related investigative actions                • Airbus Service Bulletin A340–32–
                                                    corrected, could lead to landing gear bogie             include a test for indications of                     4305, dated December 23, 2015, which
                                                    detachment from the aeroplane, or landing               corrosion and damage to the bogie
                                                    gear collapse, or a runway excursion,
                                                                                                                                                                  describes procedures for modification of
                                                    possibly resulting in damage to the aeroplane
                                                                                                            assembly base material, and a magnetic                the bogie beam of an MLG having P/N
                                                    and injury to the occupants and/or people on            particle inspection for cracks, corrosion,            201252 series or P/N 201490 series that
                                                    the ground.                                             and damage of the bogie beam.                         includes installing a nickel under
                                                       To address this potential unsafe condition,          Corrective actions include repairing                  chrome coating, a new bogie beam stop
                                                    EASA issued AD 2008–0223 to require                     affected parts.                                       pad, and new stop pad brackets.
                                                    accomplishment of a one-time detailed                      The required terminating action (for                 Messier-Bugatti-Dowty has issued the
                                                    inspection under the bogie stop pad of both             MLG having P/N 201252 series or P/N                   following service information.
                                                    MLG bogie beams. As a result of the one-time
                                                    inspection required by that [EASA] AD,
                                                                                                            201490 series) and the optional                         • Messier-Bugatti-Dowty Service
                                                    numerous bogie stop pad were found                      terminating action (for MLG having P/N                Bulletin A33/34–32–305, including
                                                    corroded and a few cracked. The one-time                10–210) are modifications of the bogie                Appendix A, dated April 13, 2015,
                                                    inspection was retained in EASA AD 2011–                beam of an MLG, which consist of                      which describes procedures for
                                                    0211 [which corresponds to FAA AD 2013–                 installing a nickel under chrome                      modification of the bogie beam of an
                                                    10–03], which superseded EASA AD 2008–                  coating, a new bogie beam stop pad, and               MLG having MLG P/N 10–210 series
                                                    0223, which also introduced repetitive                  new stop pad brackets.                                that includes installing a nickel under
                                                    inspections, except for A340–500/–600                      You may examine the MCAI in the                    chrome coating, a new bogie beam stop
                                                    aeroplanes.
                                                       After EASA AD 2011–0211 was issued,
                                                                                                            AD docket on the Internet at http://                  pad, and new stop pad brackets.
                                                    further investigation led to the conclusion             www.regulations.gov by searching for                    • Messier-Bugatti-Dowty Service
                                                    that the one-time inspection was no longer              and locating Docket No. FAA–2016–                     Bulletin A33/34–32–306, Revision 1,
                                                    necessary and only the repetitive inspections           3984.                                                 including Appendix A, dated May 31,
                                                    should remain. In addition, it was                                                                            2016, which describes procedures for
                                                    determined that repetitive inspections were             Related Service Information Under 1
                                                                                                            CFR Part 51                                           modification of the bogie beam of an
                                                    also necessary for MLG on A340–500/–600                                                                       MLG having P/N 201252 series or P/N
                                                    aeroplanes.                                                Airbus has issued the following
                                                       Prompted by these conclusions, EASA
                                                                                                                                                                  201490 series that includes installing a
                                                                                                            service information.                                  nickel under chrome coating, a new
                                                    issued AD 2014–0120, partially retaining the
                                                    requirements of EASA AD 2011–0211, which                   • Airbus Service Bulletin A330–32–                 bogie beam stop pad, and new stop pad
                                                    was superseded, and introducing repetitive              3248, Revision 05, including Appendix                 brackets.
                                                    detailed inspections of the MLG on A340–                1, dated May 4, 2016; and Airbus                        This service information is reasonably
                                                    500 and A340–600 aeroplanes. Subsequently,              Service Bulletin A340–32–4286,                        available because the interested parties
                                                    further analysis indicated that repetitive              Revision 02, including Appendix 1,                    have access to it through their normal
                                                    inspections of the MLG on A340–500/–600                 dated January 5, 2016; which describe                 course of business or by the means
                                                    aeroplanes were not necessary after all. In             procedures for doing an inspection for                identified in the ADDRESSES section.
                                                    addition, the threshold for the inspection of           damage and corrosion of the MLG
                                                    MLG P/N 10–210 series was raised from 24                                                                      Comments
                                                    to 126 months, and Airbus developed a
                                                                                                            sliding piston sub-assembly, bogie beam
                                                    modification of the MLG P/N 10–210 series               stop pad and the bogie beam under the                   We gave the public the opportunity to
                                                    which provides an (optional) terminating                stop pad, and related investigative and               participate in developing this proposed
                                                    action for the repetitive inspections.                  corrective actions. These documents are               AD. We considered the comments
                                                       Consequently, EASA AD 2014–0120 was                  distinct since they apply to different                received on the proposal and the FAA’s
                                                    revised to delete the requirements for A340–            airplane models.                                      response to each comment.
jstallworth on DSK7TPTVN1PROD with PROPOSALS




                                                    500/–600 aeroplanes, to amend the                          • Airbus Service Bulletin A330–32–
                                                    inspection threshold for MLG P/N 10–210                 3268, Revision 01, dated September 21,                Requests To Revise Applicability and
                                                    series, and to introduce an optional
                                                                                                            2015, which describes procedures for                  Terminating Action
                                                    terminating action for aeroplanes with MLG
                                                    P/N 10–210 series.                                      modification of the bogie beam of an                    Air France (AF) and American
                                                       Since EASA AD 2014–0120R1 was issued,                MLG having P/N 10–210 that includes                   Airlines (AAL) requested that we revise
                                                    Airbus developed a modification (mod                    installing a nickel under chrome                      the applicability of the proposed AD to
                                                    205289) of the MLG P/N 201252 series and                coating, a new bogie beam stop pad, and               exclude airplanes that have had Airbus
                                                    P/N 201490 series that must be embodied in              new stop pad brackets.                                Modification 204421 or Airbus


                                               VerDate Sep<11>2014   14:55 Mar 21, 2017   Jkt 241001   PO 00000   Frm 00002   Fmt 4702   Sfmt 4702   E:\FR\FM\22MRP1.SGM   22MRP1


                                                    14644                 Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Proposed Rules

                                                    Modification 205289 incorporated in                     ‘‘For airplanes . . . having an MLG P/                affected individuals. As a result, we
                                                    production.                                             N 201252 series or P/N 201490 series’’                have included all costs in our cost
                                                      AAL also requested that we exclude                    (replaced the ‘‘and’’ with an ‘‘or’’).                estimate. We have received no definitive
                                                    airplanes from the applicability that                      We have removed the reporting                      data that would enable us to provide the
                                                    have accomplished the actions specified                 requirements from this SNPRM. We                      work-hour cost estimates for the
                                                    in Airbus Service Bulletin A330–32–                     have also revised the Costs of                        optional terminating action specified in
                                                    3268, dated April 20, 2015, which                       Compliance section of this SNPRM to                   this proposed AD.
                                                    describes procedures for modification of                reflect the revised proposed
                                                    the bogie beam of an MLG having P/N                     requirements.                                         Authority for This Rulemaking
                                                    10–210, and Airbus Service Bulletin                                                                              Title 49 of the United States Code
                                                    A330–32–3275, dated December 23,                        FAA’s Determination and Requirements                  specifies the FAA’s authority to issue
                                                    2015, which describes procedures for                    of This SNPRM                                         rules on aviation safety. Subtitle I,
                                                    modification of the bogie beam of an                      This product has been approved by                   section 106, describes the authority of
                                                    MLG having P/N 201490.                                  the aviation authority of another                     the FAA Administrator. ‘‘Subtitle VII:
                                                      AAL and AF also requested that we                     country, and is approved for operation                Aviation Programs,’’ describes in more
                                                    add Airbus Service Bulletin A330–32–                    in the United States. Pursuant to our                 detail the scope of the Agency’s
                                                    3275, dated December 23, 2015, as a                     bilateral agreement with the State of                 authority.
                                                    terminating action in paragraph (m) of                  Design Authority, we have been notified                  We are issuing this rulemaking under
                                                    the proposed AD. AF also asked that we                  of the unsafe condition described in the              the authority described in ‘‘Subtitle VII,
                                                    add Airbus Service Bulletin A340–32–                    MCAI and service information                          Part A, Subpart III, Section 44701:
                                                    4305, dated December 23, 2015, as a                     referenced above. We are proposing this               General requirements.’’ Under that
                                                    terminating action in paragraph (m) of                  AD because we evaluated all pertinent                 section, Congress charges the FAA with
                                                    the proposed AD. AF and AAL                             information and determined an unsafe                  promoting safe flight of civil aircraft in
                                                    referenced the applicability in the MCAI                condition exists and is likely to exist or            air commerce by prescribing regulations
                                                    as justification for the requests.                      develop on other products of these same               for practices, methods, and procedures
                                                      We partially agree with the                           type designs.                                         the Administrator finds necessary for
                                                    commenters’ requests. We have revised                     Certain changes described above                     safety in air commerce. This regulation
                                                    paragraph (c) of this proposed AD to                    expand the scope of the NPRM. As a                    is within the scope of that authority
                                                    exclude airplanes that have embodied                    result, we have determined that it is                 because it addresses an unsafe condition
                                                    Airbus Modification 204421 or Airbus                    necessary to reopen the comment period                that is likely to exist or develop on
                                                    Modification 205289 in production,                      to provide additional opportunity for                 products identified in this rulemaking
                                                    which corresponds with the MCAI.                        the public to comment on this SNPRM.                  action.
                                                    However, we have not revised
                                                    paragraph (c) of this proposed AD to                    Costs of Compliance                                   Regulatory Findings
                                                    exclude airplanes on which Airbus                          We estimate that this proposed AD                    We determined that this proposed AD
                                                    Service Bulletin A330–32–3268, dated                    affects 89 Model A330–200, –200                       would not have federalism implications
                                                    April 20, 2015; or Airbus Service                       Freighter, and –300 series airplanes of               under Executive Order 13132. This
                                                    Bulletin A330–32–3275, dated                            U.S. registry.                                        proposed AD would not have a
                                                    December 23, 2015; has been done                           We estimate that it would take about               substantial direct effect on the States, on
                                                    because those airplanes are not                         13 work-hours per product to comply                   the relationship between the national
                                                    excluded from the MCAI.                                 with the basic requirements of this                   Government and the States, or on the
                                                      We have added information to                          proposed AD. The average labor rate is                distribution of power and
                                                    paragraph (m) of this proposed AD to                    $85 per work-hour. Based on these                     responsibilities among the various
                                                    specify that accomplishing the actions                  figures, we estimate the cost of this                 levels of government.
                                                    specified in Messier-Bugatti-Dowty-                     proposed AD on U.S. operators to be                     For the reasons discussed above, I
                                                    Service Bulletin A33/34–32–305,                         $98,345, or $1,105 per product.                       certify this proposed regulation:
                                                    including Appendix A, dated April 13,                      Currently, there are no Model A340–                  1. Is not a ‘‘significant regulatory
                                                    2015, for MLG having P/N 10–210,                        200, or –300 series airplanes on the U.S.             action’’ under Executive Order 12866;
                                                    constitutes terminating action for the                  Register. However, if an affected                       2. Is not a ‘‘significant rule’’ under the
                                                    repetitive inspections. We also have                    airplane is imported and placed on the                DOT Regulatory Policies and Procedures
                                                    added information in paragraph (m) of                   U.S. Register in the future, it would be              (44 FR 11034, February 26, 1979);
                                                    this proposed AD to specify that                        subject to the same per-airplane cost                   3. Will not affect intrastate aviation in
                                                    accomplishing the actions specified in                  specified above for the Model A330–                   Alaska; and
                                                    the service information referenced in                   200, -200 Freighter, and –300 series                    4. Will not have a significant
                                                    paragraph (k) of this proposed AD                       airplanes.                                            economic impact, positive or negative,
                                                    (which includes references to Airbus                       In addition, we estimate that any                  on a substantial number of small entities
                                                    Service Bulletin A330–32–3275, dated                    necessary follow-on actions would take                under the criteria of the Regulatory
                                                    December 23, 2015; and Airbus Service                   about 24 work-hours and require parts                 Flexibility Act.
                                                    Bulletin A340–32–4305, dated                            costing $78, for a cost of $2,118 per
                                                    December 23, 2015) constitutes                          product. We have no way of                            List of Subjects in 14 CFR Part 39
                                                                                                            determining the number of aircraft that                 Air transportation, Aircraft, Aviation
jstallworth on DSK7TPTVN1PROD with PROPOSALS




                                                    terminating action for the repetitive
                                                    inspections.                                            might need these actions.                             safety, Incorporation by reference,
                                                                                                               According to the manufacturer, all of              Safety.
                                                    Additional Changes to This SNPRM                        the parts costs of the optional
                                                      We have clarified the affected                        terminating action specified in this                  The Proposed Amendment
                                                    airplanes for paragraphs (h)(1) and (h)(3)              SNPRM may be covered under                              Accordingly, under the authority
                                                    of this AD by changing the text ‘‘For                   warranty, thereby reducing the cost                   delegated to me by the Administrator,
                                                    airplanes . . . having an MLG P/N                       impact on affected individuals. We do                 the FAA proposes to amend 14 CFR part
                                                    201252 series and P/N 201490 series’’ to                not control warranty coverage for                     39 as follows:


                                               VerDate Sep<11>2014   14:55 Mar 21, 2017   Jkt 241001   PO 00000   Frm 00003   Fmt 4702   Sfmt 4702   E:\FR\FM\22MRP1.SGM   22MRP1


                                                                          Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Proposed Rules                                                14645

                                                    PART 39—AIRWORTHINESS                                   Airbus Service Bulletin A330–32–3220,                 3248, Airbus Service Bulletin A340–32–4286,
                                                    DIRECTIVES                                              Airbus Service Bulletin A330–32–3248,                 or Airbus Service Bulletin A340–32–4264, as
                                                                                                            Airbus Service Bulletin A340–32–4264, or              applicable.
                                                    ■ 1. The authority citation for part 39                 Airbus Service Bulletin A340–32–4286, as                 (2) For airplanes identified in paragraph
                                                                                                            applicable: At applicable times specified in          (g)(1) of this AD having an MLG P/N 10–210
                                                    continues to read as follows:
                                                                                                            paragraphs (h)(1) and (h)(2) of this AD, do a         series: Before the accumulation of 126
                                                        Authority: 49 U.S.C. 106(g), 40113, 44701.          detailed inspection for damage (e.g., cracking        months since first flight of the MLG on an
                                                                                                            and fretting) and corrosion of the MLG                airplane or since first flight on an airplane
                                                    § 39.13   [Amended]                                     sliding piston sub-assembly, bogie beam stop          after the most recent inspection of the MLG,
                                                    ■ 2. The FAA amends § 39.13 by                          pad, and the bogie beam under the stop pad;           as specified in Airbus Service Bulletin A330–
                                                    removing Airworthiness Directive (AD)                   and do all applicable related investigative           32–3248, or Airbus Service Bulletin A340–
                                                    2013–10–03, Amendment 39–17456 (78                      and corrective actions; in accordance with            32–4286, as applicable.
                                                    FR 31386, May 24, 2013), and adding                     the Accomplishment Instructions of Airbus                (3) For airplanes identified in paragraph
                                                                                                            Service Bulletin A330–32–3248, Revision 05,           (g)(2) of this AD having an MLG P/N 201252
                                                    the following new AD:
                                                                                                            including Appendix 1, dated May 4, 2016; or           series or P/N 201490 series: At the later of
                                                    Airbus: Docket No. FAA–2016–3984;                       Airbus Service Bulletin A340–32–4286,                 the times specified in paragraphs (h)(3)(i) and
                                                        Directorate Identifier 2014–NM–119–AD.              Revision 02, including Appendix 1, dated              (h)(3)(ii) of this AD.
                                                                                                            January 5, 2016; as applicable; except as                (i) Before the accumulation of 2,500 total
                                                    (a) Comments Due Date
                                                                                                            required by paragraph (j) of this AD. Do all          flight cycles or 24 months, whichever occurs
                                                      We must receive comments by May 8,                    applicable related investigative and                  first since the later of the times specified in
                                                    2017.                                                   corrective actions before further flight.             paragraphs (h)(3)(i)(A) and (h)(3)(i)(B) of this
                                                    (b) Affected ADs                                        Repeat the inspection of the MLG sliding              AD.
                                                                                                            piston sub-assembly, bogie beam stop pad,                (A) Since first flight of the MLG on an
                                                      This AD replaces AD 2013–10–03,                                                                             airplane.
                                                                                                            and the bogie beam under the stop pad,
                                                    Amendment 39–17456 (78 FR 31386, May 24,                                                                         (B) Since first flight after a MLG overhaul.
                                                                                                            thereafter, at intervals not to exceed 2,500
                                                    2013) (‘‘AD 2013–10–03’’).                                                                                       (ii) Within 16 months after the effective
                                                                                                            flight cycles or 24 months, whichever occurs
                                                    (c) Applicability                                       first.                                                date of this AD.
                                                                                                               (2) For airplanes equipped, as of the                 (4) For airplanes identified in paragraph
                                                       This AD applies to Airbus airplanes                                                                        (g)(2) of this AD having MLG P/N 10–210
                                                    identified in paragraphs (c)(1) and (c)(2) of           effective date of this AD, with a MLG that has
                                                                                                            not been previously inspected as specified in         series: Before the accumulation of 126
                                                    this AD, certificated in any category, all serial                                                             months since first flight of the MLG on an
                                                    numbers, except those airplanes that have               Airbus Service Bulletin A330–32–3220,
                                                                                                            Airbus Service Bulletin A330–32–3248,                 airplane.
                                                    embodied Airbus Modification 204421 or
                                                    Airbus Modification 205289 in production.               Airbus Service Bulletin A340–32–4264, or              (i) Optional Overhaul
                                                       (1) Model A330–201, –202, –203, –223,                Airbus Service Bulletin A340–32–4286, as
                                                                                                                                                                     For the purposes of this AD,
                                                    –223F, –243, –243F, –301, –302, –303,                   applicable: At the applicable times specified
                                                                                                                                                                  accomplishment of an MLG overhaul is
                                                       –321, –322, –323, –341, –342, and –343               in paragraphs (h)(3) and (h)(4) of this AD, do
                                                                                                                                                                  acceptable instead of an inspection required
                                                    airplanes.                                              a detailed inspection for damage (e.g.,
                                                                                                                                                                  by paragraph (g) of this AD. The inspections
                                                       (2) Model A340–211, –212, –213, –311,                cracking and fretting) and corrosion of the
                                                                                                                                                                  required by paragraph (g) of this AD are not
                                                    –312, and –313 airplanes.                               MLG sliding piston sub-assembly, bogie
                                                                                                                                                                  terminated by an MLG overhaul, but are
                                                                                                            beam stop pad, and the bogie beam under the
                                                    (d) Subject                                                                                                   required at the next applicable compliance
                                                                                                            stop pad; and do all applicable related
                                                                                                                                                                  time required by paragraph (g) of this AD.
                                                      Air Transport Association (ATA) of                    investigative and corrective actions; in
                                                    America Code 32, Landing gear.                          accordance with the Accomplishment                    (j) Service Information Exception
                                                                                                            Instructions of Airbus Service Bulletin A330–            If the applicable service information
                                                    (e) Reason                                              32–3248, Revision 05, including Appendix 1,           specified in paragraph (g) of this AD specifies
                                                       This AD was prompted by reports of                   dated May 4, 2016 or Airbus Service Bulletin          to contact Messier-Dowty for instructions, or
                                                    corroded and cracked bogie beams under the              A340–32–4286, Revision 02, including                  if any repair required by paragraph (g) of this
                                                    bogie stop pad. We are issuing this AD to               Appendix 1, dated January 5, 2016; as                 AD is beyond the maximum repair allowance
                                                    detect and correct damage or corrosion under            applicable; except as required by paragraph           specified in the applicable service
                                                    the bogie stop pad of both main landing gear            (j) of this AD. Do all applicable related             information specified in paragraph (g) of this
                                                    (MLG) bogie beams; this condition could                 investigative and corrective actions before           AD: Before further flight, repair using a
                                                    result in a damaged bogie beam and                      further flight. Repeat the inspection of the          method approved by the Manager,
                                                    consequent detachment of the beam from the              MLG sliding piston sub-assembly, bogie                International Branch, ANM–116, Transport
                                                    airplane, collapse of the MLG, or departure             beam stop pad, and the bogie beam under the           Airplane Directorate, FAA; or the European
                                                    of the airplane from the runway, possibly               stop pad, thereafter, at intervals not to exceed      Aviation Safety Agency (EASA); or Airbus’s
                                                    resulting in damage to the airplane and                 2,500 flight cycles or 24 months, whichever           EASA Design Organization Approval (DOA).
                                                    injury to occupants.                                    occurs first.
                                                                                                                                                                  (k) MLG Modification
                                                    (f) Compliance                                          (h) Compliance Times for the Actions
                                                                                                                                                                     For airplanes equipped with MLG having
                                                                                                            Required by Paragraph (g) of This AD
                                                       Comply with this AD within the                                                                             P/N 201252 series or MLG having P/N
                                                    compliance times specified, unless already                 Do the applicable actions required by              201490 series: Before the accumulation of
                                                    done.                                                   paragraph (g) of this AD at the applicable            126 months since first flight of the MLG on
                                                                                                            time specified in paragraph (h)(1), (h)(2),           an airplane or since first flight on an airplane
                                                    (g) Repetitive Inspections, Related                     (h)(3), or (h)(4) of this AD.                         after the most recent overhaul as of the
                                                    Investigative Actions, and Corrective                      (1) For airplanes identified in paragraph          effective date of this AD, as applicable,
                                                    Actions                                                 (g)(1) of this AD having an MLG P/N 201252            replace that MLG with a MLG having P/N
                                                       For Model A330–200, –200 Freighter, and              series or P/N 201490 series: Before the               201252 series or MLG having P/N 201490
jstallworth on DSK7TPTVN1PROD with PROPOSALS




                                                    –300 series airplanes; and Model A340–200               accumulation of 2,500 total flight cycles or 24       series that has an improved bogie beam, as
                                                    and –300 series airplanes; equipped with a              months, whichever occurs first since the later        defined in Airbus Service Bulletin A330–32–
                                                    MLG having part number (P/N) 201252                     of the times specified in paragraphs (h)(1)(i)        3275, dated December 23, 2015; or Airbus
                                                    series, P/N 201490 series, or P/N 10–210                and (h)(1)(ii) of this AD.                            Service Bulletin A340–32–4305, dated
                                                    series: Do the applicable actions required by              (i) Since first flight after a MLG overhaul.       December 23, 2015; as applicable; and in
                                                    paragraph (g)(1) or (g)(2) of this AD.                     (ii) Since first flight after the most recent      accordance with the Accomplishment
                                                       (1) For airplanes equipped, as of the                accomplishment of an inspection of the MLG,           Instructions of Messier-Bugatti-Dowty
                                                    effective date of this AD, with a MLG that has          as specified in Airbus Service Bulletin A330–         Service Bulletin A33/34–32–306, Revision 1,
                                                    been previously inspected as specified in               32–3220, Airbus Service Bulletin A330–32–             including Appendix A, dated May 31, 2016.



                                               VerDate Sep<11>2014   14:55 Mar 21, 2017   Jkt 241001   PO 00000   Frm 00004   Fmt 4702   Sfmt 4702   E:\FR\FM\22MRP1.SGM   22MRP1


                                                    14646                 Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Proposed Rules

                                                    (l) Terminating Action Limitation                          (i) Airbus Service Bulletin A330–32–3248,            (3) Required for Compliance (RC): Except
                                                       Accomplishment of corrective actions                 dated October 5, 2011, which is not                   as required by paragraph (j) of this AD: If any
                                                    required by paragraph (g) of this AD does not           incorporated by reference in this AD.                 service information contains procedures or
                                                    constitute terminating action for the                      (ii) Airbus Service Bulletin A330–32–3248,         tests that are identified as RC, those
                                                    repetitive inspections required by this AD.             Revision 01, including Appendix 01, dated             procedures and tests must be done to comply
                                                                                                            December 13, 2012, which was incorporated             with this AD; any procedures or tests that are
                                                    (m) Terminating Action for Certain                      by reference in AD 2013–10–03, Amendment              not identified as RC are recommended. Those
                                                    Airplanes                                               39–17456 (78 FR 31386, May 24, 2013).                 procedures and tests that are not identified
                                                      (1) For airplanes with any MLG having P/                 (iii) Airbus Service Bulletin A330–32–             as RC may be deviated from using accepted
                                                    N 10–210 series: Modification of the bogie              3248, Revision 02, dated April 16, 2014,              methods in accordance with the operator’s
                                                    beam of each MLG having P/N 10–210 series,              which is not incorporated by reference in this        maintenance or inspection program without
                                                    as specified in Airbus Service Bulletin A330–           AD.                                                   obtaining approval of an AMOC, provided
                                                    32–3268, Revision 01, dated September 21,                  (iv) Airbus Service Bulletin A330–32–              the procedures and tests identified as RC can
                                                    2015; or Airbus Service Bulletin A340–32–               3248, Revision 03, dated November 27, 2015,           be done and the airplane can be put back in
                                                    4300, dated April 20, 2015; or Revision 01,             which is not incorporated by reference in this        an airworthy condition. Any substitutions or
                                                    dated September 21, 2015; as applicable; and            AD.                                                   changes to procedures or tests identified as
                                                    in accordance with the Accomplishment                      (v) Airbus Service Bulletin A330–32–3248,          RC require approval of an AMOC.
                                                    Instructions of Messier-Bugatti-Dowty                   Revision 04, dated January 5, 2016, which is
                                                                                                            not incorporated by reference in this AD.             (q) Related Information
                                                    Service Bulletin A33/34–32–305, including
                                                    Appendix A, dated April 13, 2015;                          (vi) Airbus Service Bulletin A340–32–                (1) Refer to Mandatory Continuing
                                                    constitutes terminating action for the                  4286, dated October 5, 2011, which was                Airworthiness Information (MCAI) EASA AD
                                                    repetitive inspection requirements of this AD           incorporated by reference in AD 2013–10–03,           2016–0108, dated June 8, 2016, for related
                                                    for that airplane, provided that, following in-         Amendment 39–17456 (78 FR 31386, May 24,              information. This MCAI may be found in the
                                                    service modification, the airplane remains in           2013).                                                AD docket on the Internet at http://
                                                    post-service bulletin configuration.                       (vii) Airbus Service Bulletin A340–32–             www.regulations.gov by searching for and
                                                      (2) For airplanes with any MLG having P/              4286, Revision 01, dated November 27, 2015,           locating Docket No. FAA–2016–3984.
                                                    N 201252 series or P/N 201490 series:                   which is not incorporated by reference in this          (2) For Airbus service information
                                                    Installation of both left-hand and right-hand           AD.                                                   identified in this AD, contact Airbus SAS,
                                                    MLG having P/N 201252 series or P/N                        (2) This paragraph provides credit for the         Airworthiness Office—EAL, 1 Rond Point
                                                    201490 series that has an improved bogie                actions required by paragraph (k) of this AD,         Maurice Bellonte, 31707 Blagnac Cedex,
                                                    beam, as required by paragraph (k) of this              if those actions were performed before the            France; telephone: +33 5 61 93 36 96; fax:
                                                    AD, constitutes terminating action for the              effective date of this AD using Messier-              +33 5 61 93 45 80; email:
                                                    repetitive inspections requirements of this             Bugatti-Dowty Service Bulletin A33/34–32–             airworthiness.A330-A340@airbus.com;
                                                    AD for that airplane, provided that, following          306, dated December 21, 2015, which is not            Internet http://www.airbus.com. For Messier-
                                                    in-service modification, the airplane remains           incorporated by reference in this AD.                 Bugatti-Dowty service information identified
                                                    in post-service bulletin configuration.                 (p) Other FAA AD Provisions                           in this AD, contact Messier Services
                                                    (n) Parts Installation Prohibition                                                                            Americas, Customer Support Center, 45360
                                                                                                               The following provisions also apply to this        Severn Way, Sterling, VA 20166–8910;
                                                      Do not install on any airplane a pre-Airbus           AD:                                                   phone: 703–450–8233; fax: 703–404–1621;
                                                    modification MLG having P/N 201252 series                  (1) Alternative Methods of Compliance
                                                                                                                                                                  Internet: https://techpubs.services/messier-
                                                    or pre-Airbus modification MLG having P/N               (AMOCs): The Manager, International
                                                                                                                                                                  dowty.com. You may view this service
                                                    201490 series, as specified in paragraph                Branch, ANM–116, Transport Airplane
                                                                                                                                                                  information at the FAA, Transport Airplane
                                                    (n)(1) or (n)(2) of this AD, as applicable; or          Directorate, FAA, has the authority to
                                                                                                                                                                  Directorate, 1601 Lind Avenue SW., Renton,
                                                    a pre-Airbus modification MLG having P/N                approve AMOCs for this AD, if requested
                                                                                                                                                                  WA. For information on the availability of
                                                    10–210 series, as specified in paragraph                using the procedures found in 14 CFR 39.19.
                                                                                                                                                                  this material at the FAA, call 425–227–1221.
                                                    (n)(3) or (n)(4) of this AD, as applicable.             In accordance with 14 CFR 39.19, send your
                                                      (1) For any airplane that is in post-Airbus           request to your principal inspector or local            Issued in Renton, Washington, on March 9,
                                                    Modification 205289 configuration, or on                Flight Standards District Office, as                  2017.
                                                    which the modification required by                      appropriate. If sending information directly          Michael Kaszycki,
                                                    paragraph (k) of this AD has been done: From            to the International Branch, send it to ATTN:
                                                                                                                                                                  Acting Manager, Transport Airplane
                                                    the effective date of this AD.                          Vladimir Ulyanov, Aerospace Engineer,
                                                                                                                                                                  Directorate, Aircraft Certification Service.
                                                      (2) For any airplane that is in pre-Airbus            International Branch, ANM–116, Transport
                                                    Modification 205289 configuration, or on                Airplane Directorate, FAA, 1601 Lind                  [FR Doc. 2017–05251 Filed 3–21–17; 8:45 am]
                                                    which the modification required by                      Avenue SW., Renton, WA 98057–3356;                    BILLING CODE 4910–13–P
                                                    paragraph (k) of this AD has not been done:             telephone: 425–227–1138; fax: 425–227–
                                                    After modification of that airplane, as                 1149. Information may be emailed to: 9-
                                                    required by paragraph (k) of this AD.                   ANM-116-AMOC-REQUESTS@faa.gov.                        DEPARTMENT OF TRANSPORTATION
                                                      (3) For any airplane that is in post-Airbus              (i) Before using any approved AMOC,
                                                    Modification 204421 configuration, or on                notify your appropriate principal inspector,          Federal Aviation Administration
                                                    which the modification specified in                     or lacking a principal inspector, the manager
                                                    paragraph (m)(1) of this AD has been done:              of the local flight standards district office/        14 CFR Part 39
                                                    From the effective date of this AD.                     certificate holding district office. The AMOC
                                                      (4) For an airplane that is in pre-Airbus             approval letter must specifically reference           [Docket No. FAA–2016–9380; Directorate
                                                    Modification 204421, or on which the                    this AD.                                              Identifier 2016–NE–21–AD
                                                    modification required by paragraph (m)(1) of               (ii) AMOCs approved previously for AD
                                                    this AD has not been done: After                        2013–10–03 are not approved as AMOCs                  RIN 2120–AA64
                                                    modification of that airplane, as required by           with this AD.
                                                    paragraph (m)(1) of this AD.                               (2) Contacting the Manufacturer: As of the         Airworthiness Directives; CFE
jstallworth on DSK7TPTVN1PROD with PROPOSALS




                                                                                                            effective date of this AD, for any requirement        Company Turbofan Engines
                                                    (o) Credit for Previous Actions                         in this AD to obtain corrective actions from
                                                       (1) This paragraph provides credit for the           a manufacturer, the action must be                    AGENCY:  Federal Aviation
                                                    actions required by paragraph (g) of this AD,           accomplished using a method approved by               Administration (FAA), DOT.
                                                    if those actions were performed before the              the Manager, International Branch, ANM–               ACTION: Proposed rule; withdrawal.
                                                    effective date of this AD using the service             116, Transport Airplane Directorate, FAA; or
                                                    information identified in paragraphs (o)(1)(i)          EASA; or Airbus’s EASA DOA. If approved               SUMMARY:   The FAA is withdrawing a
                                                    through (o)(1)(vii) or (o)(2) of this AD, as            by the DOA, the approval must include the             notice of proposed rulemaking (NPRM).
                                                    applicable.                                             DOA-authorized signature.                             The NPRM proposed a new


                                               VerDate Sep<11>2014   14:55 Mar 21, 2017   Jkt 241001   PO 00000   Frm 00005   Fmt 4702   Sfmt 4702   E:\FR\FM\22MRP1.SGM   22MRP1



Document Created: 2017-03-22 03:59:07
Document Modified: 2017-03-22 03:59:07
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionProposed Rules
ActionSupplemental notice of proposed rulemaking (SNPRM); reopening of comment period.
DatesWe must receive comments on this SNPRM by May 8, 2017.
ContactVladimir Ulyanov, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton, WA 98057-3356; telephone: 425-227-1138; fax: 425-227-1149.
FR Citation82 FR 14642 
RIN Number2120-AA64
CFR AssociatedAir Transportation; Aircraft; Aviation Safety; Incorporation by Reference and Safety

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR