82_FR_14765 82 FR 14711 - Brookfield White Pine Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

82 FR 14711 - Brookfield White Pine Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 54 (March 22, 2017)

Page Range14711-14712
FR Document2017-05674

Federal Register, Volume 82 Issue 54 (Wednesday, March 22, 2017)
[Federal Register Volume 82, Number 54 (Wednesday, March 22, 2017)]
[Notices]
[Pages 14711-14712]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-05674]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2302-085]


Brookfield White Pine Hydro LLC; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Proceeding: Amendment of License.
    b. Project No.: 2302-085.
    c. Date Filed: February 24, 2017.
    d. Licensee: Brookfield White Pine Hydro LLC.
    e. Name of Project: Lewiston Falls Project.
    f. Location: The project is located on the Androscoggin River in 
the town of Lewiston, Androscoggin County, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Licensee Contact: Mr. Nate Stevens, Brookfield White Pine Hydro 
LLC, 150 Main Street, Lewiston, ME 99156, (207) 755-5610, 
[email protected].
    i. FERC Contact: Ms. Rebecca Martin, (202) 502-6012, 
[email protected].
    j. Deadline for filing comments, interventions, and protests is 
April 13, 2017. The Commission strongly encourages electronic filing. 
Please file motions to intervene, protests and comments using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866)

[[Page 14712]]

208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, please send a paper copy to: Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426. The 
first page of any filing should include docket number P-2302-085.
    k. Description of Request: The licensee requests to remove the 
Canal System and its four non-operating canal generating facilities 
from the Lewiston Falls Project and convey the canals and the 
conveyance facilities to the City of Lewiston for non-hydropower 
redevelopment and public use. This would reduce the project's installed 
capacity from 35.6 MW to 28 MW, but the operation of the project would 
remain unchanged.
    l. This filing may be viewed on the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3676 or email [email protected], for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction in the Commission's Public Reference Room located at 888 
First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 
502-8371.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.212 and .214. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license amendment. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: March 13, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2017-05674 Filed 3-21-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                   Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Notices                                                                                       14711

                                                    used by the Commission to implement                                 projects that directly benefit from a                                         owners. The Federal entities that
                                                    the statutory provisions of Section 10(f)                           headwater improvement must pay an                                             typically respond are the U.S. Army
                                                    of the Federal Power Act (FPA).1 The                                equitable portion of the annual charges                                       Corps of Engineers and the U.S.
                                                    FPA authorizes the Commission to                                    for interest, maintenance, and                                                Department of Interior Bureau of
                                                    determine headwater benefits received                               depreciation of the headwater project to                                      Reclamation. The Non-Federal entities
                                                    by downstream hydropower project                                    the U.S. Treasury. The regulations                                            may consist of any Municipal or Non-
                                                    owners. Headwater benefits are the                                  provide for apportionment of these costs                                      Municipal hydropower project owner.
                                                    additional energy production possible at                            between the headwater project and
                                                    a downstream hydropower project                                     downstream projects based on                                                     Estimate of Annual Burden: 2 The
                                                    resulting from the regulation of river                              downstream energy gains and propose                                           Commission estimates the total Public
                                                    flows by an upstream storage reservoir.                             equitable apportionment methodology                                           Reporting Burden for this information
                                                       When the Commission completes a                                  that can be applied to all river basins in                                    collection as:
                                                    study of a river basin, it determines                               which headwater improvements are                                                 The estimates for cost per response
                                                    headwater benefits charges that will be                             built. The Commission requires owners                                         are derived using the 2017 FERC
                                                    apportioned among the various                                       of non-federal hydropower projects to                                         average salary plus benefits of $158,754/
                                                    downstream beneficiaries. A headwater                               file data for determining annual charges                                      year (or $76.50/hour). Commission staff
                                                    benefits charge and the cost incurred by                            as outlined in 18 Code of Federal                                             finds that the work done for this
                                                    the Commission to complete an                                       Regulations (CFR) Part 11.                                                    information collection is typically done
                                                    evaluation are paid by downstream                                      Type of Respondents: There are two                                         by wage categories similar to those at
                                                    hydropower project owners. In essence,                              types of entities that respond, Federal
                                                                                                                                                                                                      FERC.
                                                    the owners of non-federal hydropower                                and Non-Federal hydropower project

                                                                                       FERC–521—PAYMENTS FOR BENEFITS FROM HEADWATER IMPROVEMENTS
                                                                                                                Annual
                                                                                                              number of                     Total                  Average burden &                    Total annual burden               Cost per
                                                                                  Number of                   responses                  number of                      cost per                          hours & total                 respondent
                                                                                 respondents                     per                     responses                     response                            annual cost                      ($)
                                                                                                             respondent

                                                                                         (1)                        (2)                (1) * (2) = (3)                          (4)                        (3) * (4) = (5)                 (5) ÷ (1)

                                                    Federal and Non-                                  3                          1                         3     40 hrs.; $3,060 .......              120 hrs.; $9,180 ........   $3,060
                                                      Federal hydro-
                                                      power project
                                                      owners.

                                                         Total cost .........   ........................   ........................   ........................    .................................   120 hrs.; $9,180 ........   $3,060



                                                      The total estimated annual cost                                   DEPARTMENT OF ENERGY                                                            g. Filed Pursuant to: Federal Power
                                                    burden to each respondent is $3,060 [40                                                                                                           Act, 16 U.S.C. 791a–825r.
                                                    hours * $76.50/hour = $3,060].                                      Federal Energy Regulatory                                                       h. Licensee Contact: Mr. Nate Stevens,
                                                                                                                        Commission                                                                    Brookfield White Pine Hydro LLC, 150
                                                      Comments: Comments are invited on:
                                                    (1) Whether the collection of                                                                                                                     Main Street, Lewiston, ME 99156, (207)
                                                                                                                        [Project No. 2302–085]                                                        755–5610, Nathan.Stevens@
                                                    information is necessary for the proper
                                                                                                                                                                                                      brookfieldrenewable.com.
                                                    performance of the functions of the
                                                                                                                        Brookfield White Pine Hydro LLC;                                                i. FERC Contact: Ms. Rebecca Martin,
                                                    Commission, including whether the                                   Notice of Application Accepted for                                            (202) 502–6012, Rebecca.martin@
                                                    information will have practical utility;                            Filing, Soliciting Comments, Motions                                          ferc.gov.
                                                    (2) the accuracy of the agency’s estimate                           To Intervene, and Protests                                                      j. Deadline for filing comments,
                                                    of the burden and cost of the collection                                                                                                          interventions, and protests is April 13,
                                                    of information, including the validity of                             Take notice that the following                                              2017. The Commission strongly
                                                    the methodology and assumptions used;                               hydroelectric application has been filed                                      encourages electronic filing. Please file
                                                    (3) ways to enhance the quality, utility                            with the Commission and is available                                          motions to intervene, protests and
                                                    and clarity of the information collection;                          for public inspection:                                                        comments using the Commission’s
                                                    and (4) ways to minimize the burden of                                a. Type of Proceeding: Amendment of                                         eFiling system at http://www.ferc.gov/
                                                    the collection of information on those                              License.                                                                      docs-filing/efiling.asp. Commenters can
                                                    who are to respond, including the use                                 b. Project No.: 2302–085.                                                   submit brief comments up to 6,000
                                                    of automated collection techniques or                                 c. Date Filed: February 24, 2017.                                           characters, without prior registration,
                                                    other forms of information technology.                                d. Licensee: Brookfield White Pine                                          using the eComment system at http://
                                                      Dated: March 13, 2017.
                                                                                                                        Hydro LLC.                                                                    www.ferc.gov/docs-filing/
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                                          e. Name of Project: Lewiston Falls                                          ecomment.asp. You must include your
                                                    Nathaniel J. Davis, Sr.,
                                                                                                                        Project.                                                                      name and contact information at the end
                                                    Deputy Secretary.                                                     f. Location: The project is located on                                      of your comments. For assistance,
                                                    [FR Doc. 2017–05672 Filed 3–21–17; 8:45 am]                         the Androscoggin River in the town of                                         please contact FERC Online Support at
                                                    BILLING CODE 6717–01–P                                              Lewiston, Androscoggin County, Maine.                                         FERCOnlineSupport@ferc.gov, (866)
                                                      1 16U.S.C. 803.                                                   generate, maintain, retain, or disclose or provide                            collection burden, refer to 5 Code of Federal
                                                      2 Burden  is defined as the total time, effort, or                information to or for a Federal agency. For further                           Regulations 1320.3.
                                                    financial resources expended by persons to                          explanation of what is included in the information



                                               VerDate Sep<11>2014    18:14 Mar 21, 2017       Jkt 241001       PO 00000        Frm 00039       Fmt 4703         Sfmt 4703      E:\FR\FM\22MRN1.SGM            22MRN1


                                                    14712                       Federal Register / Vol. 82, No. 54 / Wednesday, March 22, 2017 / Notices

                                                    208–3676 (toll free), or (202) 502–8659                 party to the proceeding. Any comments,                DEPARTMENT OF ENERGY
                                                    (TTY). In lieu of electronic filing, please             protests, or motions to intervene must
                                                    send a paper copy to: Secretary, Federal                be received on or before the specified                Federal Energy Regulatory
                                                    Energy Regulatory Commission, 888                       comment date for the particular                       Commission
                                                    First Street NE., Washington, DC 20426.                 application.                                          [Docket No. CD17–8–000]
                                                    The first page of any filing should
                                                                                                               o. Filing and Service of Responsive
                                                    include docket number P–2302–085.                                                                             Town of Carbondale, Colorado; Notice
                                                                                                            Documents: Any filing must (1) bear in
                                                       k. Description of Request: The                                                                             of Preliminary Determination of a
                                                    licensee requests to remove the Canal                   all capital letters the title
                                                                                                            ‘‘COMMENTS’’, ‘‘PROTEST’’, or                         Qualifying Conduit Hydropower
                                                    System and its four non-operating canal                                                                       Facility and Soliciting Comments and
                                                    generating facilities from the Lewiston                 ‘‘MOTION TO INTERVENE’’ as
                                                                                                            applicable; (2) set forth in the heading              Motions To Intervene
                                                    Falls Project and convey the canals and
                                                    the conveyance facilities to the City of                the name of the applicant and the                        On March 9, 2017, the Town of
                                                    Lewiston for non-hydropower                             project number of the application to                  Carbondale, Colorado, filed a notice of
                                                    redevelopment and public use. This                      which the filing responds; (3) furnish                intent to construct a qualifying conduit
                                                    would reduce the project’s installed                    the name, address, and telephone                      hydropower facility, pursuant to section
                                                    capacity from 35.6 MW to 28 MW, but                     number of the person protesting or                    30 of the Federal Power Act (FPA), as
                                                    the operation of the project would                      intervening; and (4) otherwise comply                 amended by section 4 of the
                                                    remain unchanged.                                       with the requirements of 18 CFR                       Hydropower Regulatory Efficiency Act
                                                       l. This filing may be viewed on the                  385.2001 through 385.2005. All                        of 2013 (HREA). The proposed Town of
                                                    Commission’s Web site at http://                        comments, motions to intervene, or                    Carbondale Nettle Creek WTP Hydro
                                                    www.ferc.gov/docs-filing/elibrary.asp.                  protests must set forth their evidentiary             Project would have an installed capacity
                                                    Enter the docket number excluding the                   basis and otherwise comply with the                   of 28 kilowatts (kW), and would be
                                                    last three digits in the docket number                  requirements of 18 CFR 4.34(b). All                   located along an existing raw water
                                                    field to access the document. You may                   comments, motions to intervene, or                    pipeline adjacent to the applicant’s
                                                    also register online at http://                         protests should relate to project works               water treatment plant. The project
                                                    www.ferc.gov/docs-filing/                               which are the subject of the license                  would be located near the Town of
                                                    esubscription.asp to be notified via                    amendment. Agencies may obtain                        Carbondale in Pitkin County, Colorado.
                                                    email of new filings and issuances                      copies of the application directly from                  Applicant Contact: Mark O’Meara,
                                                    related to this or other pending projects.              the applicant. A copy of any protest or               Utility Director, Town of Carbondale,
                                                    For assistance, call 1–866–208–3676 or                                                                        511 Colorado Avenue, Carbondale, CO
                                                                                                            motion to intervene must be served
                                                    email FERCOnlineSupport@ferc.gov, for                                                                         81623 Phone No. (970) 963–3140.
                                                                                                            upon each representative of the
                                                    TTY, call (202) 502–8659. A copy is also                                                                         FERC Contact: Christopher Chaney,
                                                                                                            applicant specified in the particular
                                                    available for inspection and                                                                                  Phone No. (202) 502–6778, email:
                                                    reproduction in the Commission’s                        application. If an intervener files                   Christopher.Chaney@ferc.gov.
                                                    Public Reference Room located at 888                    comments or documents with the                           Qualifying Conduit Hydropower
                                                    First Street NE., Room 2A, Washington,                  Commission relating to the merits of an               Facility Description: The proposed
                                                    DC 20426, or by calling (202) 502–8371.                 issue that may affect the responsibilities            project would consist of: (1) An new
                                                       m. Individuals desiring to be included               of a particular resource agency, they                 pressure reduction valve vault
                                                    on the Commission’s mailing list should                 must also serve a copy of the document                containing one turbine/generating unit
                                                    so indicate by writing to the Secretary                 on that resource agency. A copy of all                with an installed capacity of 28 kW; (2)
                                                    of the Commission.                                      other filings in reference to this                    a short, 10-inch-diameter penstock
                                                       n. Comments, Protests, or Motions to                 application must be accompanied by                    teeing off the existing raw water
                                                    Intervene: Anyone may submit                            proof of service on all persons listed in             pipeline; (3) a short, 10-inch-diameter
                                                    comments, a protest, or a motion to                     the service list prepared by the                      discharge pipe returning water to the
                                                    intervene in accordance with the                        Commission in this proceeding, in                     existing raw water pipeline; and (4)
                                                    requirements of Rules of Practice and                   accordance with 18 CFR 4.34(b) and                    appurtenant facilities. The proposed
                                                    Procedure, 18 CFR 385.210, .211, .212                   385.2010.                                             project would have an estimated annual
                                                    and .214. In determining the appropriate                  Dated: March 13, 2017.                              generating capacity of 190,000 kilowatt-
                                                    action to take, the Commission will                                                                           hours.
                                                                                                            Nathaniel J. Davis, Sr.,
                                                    consider all protests or other comments                                                                          A qualifying conduit hydropower
                                                    filed, but only those who file a motion                 Deputy Secretary.                                     facility is one that is determined or
                                                    to intervene in accordance with the                     [FR Doc. 2017–05674 Filed 3–21–17; 8:45 am]           deemed to meet all of the criteria shown
                                                    Commission’s Rules may become a                         BILLING CODE 6717–01–P                                in the table below.

                                                                                      TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
                                                                                                                                                                                                    Satisfies
                                                                Statutory provision                                                            Description                                           (Y/N)
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                    FPA 30(a)(3)(A), as amended by HREA ..             The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or          Y
                                                                                                         similar manmade water conveyance that is operated for the distribution of water
                                                                                                         for agricultural, municipal, or industrial consumption and not primarily for the gen-
                                                                                                         eration of electricity.
                                                    FPA 30(a)(3)(C)(i), as amended by HREA             The facility is constructed, operated, or maintained for the generation of electric             Y
                                                                                                         power and uses for such generation only the hydroelectric potential of a non-fed-
                                                                                                         erally owned conduit.
                                                    FPA 30(a)(3)(C)(ii),      as   amended       by    The facility has an installed capacity that does not exceed 5 megawatts ..................      Y
                                                      HREA.



                                               VerDate Sep<11>2014   18:14 Mar 21, 2017   Jkt 241001   PO 00000   Frm 00040   Fmt 4703   Sfmt 4703   E:\FR\FM\22MRN1.SGM   22MRN1



Document Created: 2017-03-22 03:58:59
Document Modified: 2017-03-22 03:58:59
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 14711 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR