[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Pages 16183-16184]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06417]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP16-38-000]


Columbia Gas Transmission, LLC; Notice of Availability of the 
Environmental Assessment for the Proposed WB Xpress Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) for the WB 
XPress Project, proposed by Columbia Gas Transmission, LLC (Columbia) 
in the above-referenced docket. Columbia requests authorization to 
perform the following: (i) Installation, construction, and operation of 
about 29.3 miles of various diameter pipeline; (ii) modifications to 
seven existing compressor stations; (iii) construction and operation of 
two new compressor stations; (iv) uprates and restoration of the 
maximum allowable operating pressure (MAOP) on various segments of the 
existing WB and VB natural gas transmission pipeline systems; and (v) 
installation of various appurtenant and auxiliary facilities, all 
located in either Braxton, Clay, Grant, Hardy, Kanawha, Pendleton, 
Randolph, and Upshur Counties, West Virginia, or Clark, Fairfax, 
Fauquier, Loudoun, Shenandoah, or Warren Counties, Virginia.
    The EA assesses the potential environmental effects of the 
construction and operation of the WB XPress Project in accordance with 
the requirements of the National Environmental Policy Act (NEPA). The 
FERC staff concludes that approval of the proposed project, with 
appropriate mitigating measures, would not constitute a major federal 
action significantly affecting the quality of the human environment.
    The U.S. Forest Service (USFS), U.S. Fish and Wildlife Service, 
U.S. Army Corps of Engineers, West Virginia Department of Environmental 
Protection, and West Virginia Division of Natural Resources 
participated as cooperating agencies in the preparation of the EA. 
Cooperating agencies have jurisdiction by law or special expertise with 
respect to resources potentially affected by the proposal and 
participate in the NEPA analysis. The USFS and U.S. Army Corps of 
Engineers will adopt the EA to fulfill their agency's NEPA obligations. 
The USFS will use the EA, as well as other supporting documentation, to 
consider the issuance of right-of-way authorization for the portion of 
the project on National Forest System lands. The U.S. Army Corps of 
Engineers will use the EA and supporting documentation to consider the 
issuance of Clean Water Act Section 404 and Rivers and Harbors Act 
Section 10 permits.
    The proposed WB XPress Project includes the following facilities:

West Virginia

    Aboveground Facilities:
     One new West Virginia Compressor Station: A new, natural 
gas-fired compressor station at approximately MP 0.3 of the Line WB-5 
Extension in Kanawha County, West Virginia.
     Installation of new valve sites and launcher/receiver 
facilities along Line WB-5 in Kanawha, Grant and Clay Counties, West 
Virginia.
     Modifications to increase horsepower at four (4) existing 
Compressor Stations including Cleveland, Files Creek, Seneca, and Lost 
River Compressor Stations in Upshur, Randolph, Pendleton, and Hardy 
Counties, West Virginia, respectively.
     Modifications to existing natural gas pipeline 
appurtenances at the Frametown Compressor Station in Braxton County, 
West Virginia.
     Modifications to four existing Valve Sites including Glady 
Valve Site in Randolph County, West Virginia; Dink Valve Site in Clay 
County, West Virginia; Whitmer and Smokehole in Pendleton County, West 
Virginia; and one regulator station, Panther Mountain Regulator 
Station, in Kanawha County, West Virginia.
    Pipeline Facilities:
     Line WB-5 Extension: Installation of approximately 0.3 
mile of new 36-inch-diameter natural gas transmission pipeline from the 
planned new Compressor Station to the Panther Mountain Regulator 
Station in Kanawha County, West Virginia.
     Line WB-22: Installation of approximately 0.6 mile of new 
36-inch-diameter natural gas transmission pipeline from the proposed 
new West Virginia Compressor Stations to the Panther Regulator Station, 
ending at the proposed WB-22 Receiver Site in Kanawha County, West 
Virginia.
     Line WB: Generally lift and lay replacement of 
approximately 25.5 miles of 26-inch-diameter natural gas transmission 
pipeline loop and associated appurtenances in Randolph and Pendleton 
Counties, West Virginia.
     Line WB: Replacement of 5 sections, totaling approximately 
0.3 mile of 26-inch-diameter natural gas transmission pipeline between 
Mileposts (MP) 134.6 and 146.4 in Pendleton, Grant, and Hardy Counties, 
West Virginia.

[[Page 16184]]

     Line WB-5: Replacement of approximately 1,185 feet (0.2 
mile) of 36-inch-diameter natural gas transmission pipeline between MP 
4.5 and MP 4.7 in Grant County, West Virginia.
    MAOP Restoration:
     Line WB-5: Incremental pressure increase of approximately 
72.4 miles of the Line WB-5 Segment to restore this segment to its 
originally certificated MAOP of 1,000 square inch gauge (psig) in 
Upshur, Randolph, Pendleton, Grant and Hardy Counties, West Virginia.
    Uprate Segments:
     Line WB-6: Incremental pressure increase of approximately 
2.4 miles of the Line WB-6 to 1,000 psig MAOP in Randolph County, West 
Virginia.
     Line WB-5: Incremental pressure increase of approximately 
22.1 miles of the Line WB-5 Segment to 1,000 psig in Pendleton, Grant, 
and Hardy Counties, West Virginia.

Virginia

    Aboveground Facilities:
     One new, electric-driven compressor station at 
approximately MP 0.0 of the proposed new Line VA-1 in Fairfax County, 
Virginia.
     Installation of a receiver facility at the end of the 
proposed Line VA-1, in Fairfax County, Virginia.
     Modifications to increase horsepower at the existing 
Strasburg Compressor Station located in Shenandoah County Virginia, in 
order to increase capacity for the transportation of additional volume 
along Columbia's Line VB natural gas pipeline system.
     Modifications to existing natural gas pipeline 
appurtenances at the Loudoun Compressor Station in Loudoun County, 
Virginia.
     Modifications to the existing Dysart Valve Site, in 
Shenandoah County, Virginia and one metering station, Nineveh Meter 
Station, in Warren County, Virginia.
    Pipeline Facilities:
     Line VA-1: Installation of approximately 2.2 miles of new 
12-inch-diameter natural gas transmission pipeline and associated 
appurtenances in Fairfax County, Virginia.
    MAOP Restoration:
     Line VB-5: Incremental pressure increase of approximately 
70.4 miles of the Line VB-5 Segment to restore this segment to its 
originally certificated MAOP of 1,000 psig in Shenandoah, Warren, 
Clark, Fauquier, and Loudoun Counties, Virginia.
    The USFS's purpose and need for the proposed action is to respond 
to a special use application, submitted by Columbia on August 19, 2016, 
to allow the construction and operation of the WB XPress project on 
national forest system lands managed by the Monongahela National 
Forest.
    The FERC staff mailed copies of the EA to federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American tribes; 
potentially affected landowners; interested individuals and groups; and 
newspapers and libraries in the project area. Everyone on our 
environmental mailing list will receive a CD version of the EA. In 
addition, the EA is available for public viewing on the FERC's Web site 
(www.ferc.gov) using the eLibrary link. A limited number of copies of 
the EA are available for distribution and public inspection at: Federal 
Energy Regulatory Commission Public Reference Room 888 First Street 
NE., Room 2A Washington, DC 20426 (202) 502-8371.
    Any person wishing to comment on the EA may do so. Your comments 
should focus on the potential environmental effects, reasonable 
alternatives, and measures to avoid or lessen environmental impacts. 
The more specific your comments, the more useful they will be. To 
ensure that the Commission has the opportunity to consider your 
comments prior to making its decision on this project, it is important 
that we receive your comments in Washington, DC on or before April 24, 
2017.
    For your convenience, there are three methods you can use to file 
your comments to the Commission. In all instances, please reference the 
project docket number (CP16-38-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or [email protected].
    (1) You can file your comments electronically using the eComment 
feature on the Commission's Web site (www.ferc.gov) under the link to 
Documents and Filings. This is an easy method for submitting brief, 
text-only comments on a project;
    (2) You can also file your comments electronically using the 
eFiling feature on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.
    Any person seeking to become a party to the proceeding must file a 
motion to intervene pursuant to Rule 214 of the Commission's Rules of 
Practice and Procedures (18 CFR 385.214).\1\ Only intervenors have the 
right to seek rehearing of the Commission's decision. The Commission 
grants affected landowners and others with environmental concerns 
intervenor status upon showing good cause by stating that they have a 
clear and direct interest in this proceeding which no other party can 
adequately represent. Simply filing environmental comments will not 
give you intervenor status, but you do not need intervenor status to 
have your comments considered.
---------------------------------------------------------------------------

    \1\ See the previous discussion on the methods for filing 
comments.
---------------------------------------------------------------------------

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search,'' and enter the docket number 
excluding the last three digits in the Docket Number field (i.e., CP16-
38). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.

    Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06417 Filed 3-31-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices                                           16183

                                                  containing two turbine-generator units                  DEPARTMENT OF ENERGY                                  System lands. The U.S. Army Corps of
                                                  with a total rated capacity of 172                                                                            Engineers will use the EA and
                                                  megawatts; (6) a new transmission line                  Federal Energy Regulatory                             supporting documentation to consider
                                                  connecting the powerhouse to a nearby                   Commission                                            the issuance of Clean Water Act Section
                                                  electric grid interconnection point with                [Docket No. CP16–38–000]                              404 and Rivers and Harbors Act Section
                                                  options to evaluate multiple grid                                                                             10 permits.
                                                  interconnection locations; and (7)                      Columbia Gas Transmission, LLC;                         The proposed WB XPress Project
                                                  appurtenant facilities. Possible initial                Notice of Availability of the                         includes the following facilities:
                                                  fill water and make-up water would                      Environmental Assessment for the                      West Virginia
                                                  come from the Lackawanna River. The                     Proposed WB Xpress Project
                                                                                                                                                                   Aboveground Facilities:
                                                  proposed project would have an annual                      The staff of the Federal Energy                       • One new West Virginia Compressor
                                                  generation of 502,717 megawatt-hours.                   Regulatory Commission (FERC or                        Station: A new, natural gas-fired
                                                     Applicant Contact: Adam Rousselle,                   Commission) has prepared an                           compressor station at approximately MP
                                                  Merchant Hydro Developers, LLC, 5710                    environmental assessment (EA) for the                 0.3 of the Line WB–5 Extension in
                                                  Oak Crest Drive, Doylestown, PA 18902;                  WB XPress Project, proposed by                        Kanawha County, West Virginia.
                                                  phone: (267) 254–6107.                                  Columbia Gas Transmission, LLC                           • Installation of new valve sites and
                                                                                                          (Columbia) in the above-referenced                    launcher/receiver facilities along Line
                                                     FERC Contact: Tim Looney; phone:                     docket. Columbia requests authorization               WB–5 in Kanawha, Grant and Clay
                                                  (202) 502–6096.                                         to perform the following: (i) Installation,           Counties, West Virginia.
                                                     Deadline for filing comments, motions                construction, and operation of about                     • Modifications to increase
                                                  to intervene, competing applications                    29.3 miles of various diameter pipeline;              horsepower at four (4) existing
                                                  (without notices of intent), or notices of              (ii) modifications to seven existing                  Compressor Stations including
                                                  intent to file competing applications: 60               compressor stations; (iii) construction               Cleveland, Files Creek, Seneca, and Lost
                                                  days from the issuance of this notice.                  and operation of two new compressor                   River Compressor Stations in Upshur,
                                                  Competing applications and notices of                   stations; (iv) uprates and restoration of             Randolph, Pendleton, and Hardy
                                                  intent must meet the requirements of 18                 the maximum allowable operating                       Counties, West Virginia, respectively.
                                                  CFR 4.36.                                               pressure (MAOP) on various segments                      • Modifications to existing natural
                                                                                                          of the existing WB and VB natural gas                 gas pipeline appurtenances at the
                                                     The Commission strongly encourages                   transmission pipeline systems; and (v)                Frametown Compressor Station in
                                                  electronic filing. Please file comments,                installation of various appurtenant and               Braxton County, West Virginia.
                                                  motions to intervene, notices of intent,                auxiliary facilities, all located in either              • Modifications to four existing Valve
                                                  and competing applications using the                    Braxton, Clay, Grant, Hardy, Kanawha,                 Sites including Glady Valve Site in
                                                  Commission’s eFiling system at http://                  Pendleton, Randolph, and Upshur                       Randolph County, West Virginia; Dink
                                                  www.ferc.gov/docs-filing/efiling.asp.                   Counties, West Virginia, or Clark,                    Valve Site in Clay County, West
                                                  Commenters can submit brief comments                    Fairfax, Fauquier, Loudoun,                           Virginia; Whitmer and Smokehole in
                                                  up to 6,000 characters, without prior                   Shenandoah, or Warren Counties,                       Pendleton County, West Virginia; and
                                                  registration, using the eComment system                 Virginia.                                             one regulator station, Panther Mountain
                                                  at http://www.ferc.gov/docs-filing/                        The EA assesses the potential                      Regulator Station, in Kanawha County,
                                                  ecomment.asp. You must include your                     environmental effects of the                          West Virginia.
                                                  name and contact information at the end                 construction and operation of the WB                     Pipeline Facilities:
                                                  of your comments. For assistance,                       XPress Project in accordance with the                    • Line WB–5 Extension: Installation
                                                  please contact FERC Online Support at                   requirements of the National                          of approximately 0.3 mile of new 36-
                                                                                                          Environmental Policy Act (NEPA). The                  inch-diameter natural gas transmission
                                                  FERCOnlineSupport@ferc.gov, (866)
                                                                                                          FERC staff concludes that approval of                 pipeline from the planned new
                                                  208–3676 (toll free), or (202) 502–8659
                                                                                                          the proposed project, with appropriate                Compressor Station to the Panther
                                                  (TTY). In lieu of electronic filing, please
                                                                                                          mitigating measures, would not                        Mountain Regulator Station in Kanawha
                                                  send a paper copy to: Secretary, Federal                constitute a major federal action                     County, West Virginia.
                                                  Energy Regulatory Commission, 888                       significantly affecting the quality of the               • Line WB–22: Installation of
                                                  First Street NE., Washington, DC 20426.                 human environment.                                    approximately 0.6 mile of new 36-inch-
                                                  The first page of any filing should                        The U.S. Forest Service (USFS), U.S.               diameter natural gas transmission
                                                  include docket number P–14808–000.                      Fish and Wildlife Service, U.S. Army                  pipeline from the proposed new West
                                                     More information about this project,                 Corps of Engineers, West Virginia                     Virginia Compressor Stations to the
                                                  including a copy of the application, can                Department of Environmental                           Panther Regulator Station, ending at the
                                                  be viewed or printed on the ‘‘eLibrary’’                Protection, and West Virginia Division                proposed WB–22 Receiver Site in
                                                  link of the Commission’s Web site at                    of Natural Resources participated as                  Kanawha County, West Virginia.
                                                  http://www.ferc.gov/docs-filing/                        cooperating agencies in the preparation                  • Line WB: Generally lift and lay
                                                  elibrary.asp. Enter the docket number                   of the EA. Cooperating agencies have                  replacement of approximately 25.5
                                                  (P–14808) in the docket number field to                 jurisdiction by law or special expertise              miles of 26-inch-diameter natural gas
                                                  access the document. For assistance,                    with respect to resources potentially                 transmission pipeline loop and
                                                                                                          affected by the proposal and participate              associated appurtenances in Randolph
                                                  contact FERC Online Support.
                                                                                                          in the NEPA analysis. The USFS and                    and Pendleton Counties, West Virginia.
mstockstill on DSK3G9T082PROD with NOTICES




                                                    Dated: March 28, 2017.                                U.S. Army Corps of Engineers will                        • Line WB: Replacement of 5
                                                  Kimberly D. Bose,                                       adopt the EA to fulfill their agency’s                sections, totaling approximately 0.3
                                                  Secretary.                                              NEPA obligations. The USFS will use                   mile of 26-inch-diameter natural gas
                                                  [FR Doc. 2017–06469 Filed 3–31–17; 8:45 am]             the EA, as well as other supporting                   transmission pipeline between
                                                                                                          documentation, to consider the issuance               Mileposts (MP) 134.6 and 146.4 in
                                                  BILLING CODE 6717–01–P
                                                                                                          of right-of-way authorization for the                 Pendleton, Grant, and Hardy Counties,
                                                                                                          portion of the project on National Forest             West Virginia.


                                             VerDate Sep<11>2014   18:32 Mar 31, 2017   Jkt 241001   PO 00000   Frm 00028   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1


                                                  16184                           Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices

                                                     • Line WB–5: Replacement of                          the construction and operation of the                 project, please select ‘‘Comment on a
                                                  approximately 1,185 feet (0.2 mile) of                  WB XPress project on national forest                  Filing’’; or
                                                  36-inch-diameter natural gas                            system lands managed by the                              (3) You can file a paper copy of your
                                                  transmission pipeline between MP 4.5                    Monongahela National Forest.                          comments by mailing them to the
                                                  and MP 4.7 in Grant County, West                           The FERC staff mailed copies of the                following address: Kimberly D. Bose,
                                                  Virginia.                                               EA to federal, state, and local                       Secretary, Federal Energy Regulatory
                                                     MAOP Restoration:                                    government representatives and
                                                     • Line WB–5: Incremental pressure                                                                          Commission, 888 First Street NE., Room
                                                                                                          agencies; elected officials;
                                                  increase of approximately 72.4 miles of                                                                       1A, Washington, DC 20426.
                                                                                                          environmental and public interest
                                                  the Line WB–5 Segment to restore this                   groups; Native American tribes;                          Any person seeking to become a party
                                                  segment to its originally certificated                  potentially affected landowners;                      to the proceeding must file a motion to
                                                  MAOP of 1,000 square inch gauge (psig)                  interested individuals and groups; and                intervene pursuant to Rule 214 of the
                                                  in Upshur, Randolph, Pendleton, Grant                   newspapers and libraries in the project               Commission’s Rules of Practice and
                                                  and Hardy Counties, West Virginia.                      area. Everyone on our environmental                   Procedures (18 CFR 385.214).1 Only
                                                     Uprate Segments:                                     mailing list will receive a CD version of             intervenors have the right to seek
                                                     • Line WB–6: Incremental pressure                    the EA. In addition, the EA is available              rehearing of the Commission’s decision.
                                                  increase of approximately 2.4 miles of                  for public viewing on the FERC’s Web                  The Commission grants affected
                                                  the Line WB–6 to 1,000 psig MAOP in                     site (www.ferc.gov) using the eLibrary                landowners and others with
                                                  Randolph County, West Virginia.                         link. A limited number of copies of the               environmental concerns intervenor
                                                     • Line WB–5: Incremental pressure                    EA are available for distribution and                 status upon showing good cause by
                                                  increase of approximately 22.1 miles of                 public inspection at: Federal Energy
                                                  the Line WB–5 Segment to 1,000 psig in                                                                        stating that they have a clear and direct
                                                                                                          Regulatory Commission Public                          interest in this proceeding which no
                                                  Pendleton, Grant, and Hardy Counties,                   Reference Room 888 First Street NE.,
                                                  West Virginia.                                                                                                other party can adequately represent.
                                                                                                          Room 2A Washington, DC 20426 (202)                    Simply filing environmental comments
                                                  Virginia                                                502–8371.                                             will not give you intervenor status, but
                                                                                                             Any person wishing to comment on                   you do not need intervenor status to
                                                     Aboveground Facilities:
                                                                                                          the EA may do so. Your comments
                                                     • One new, electric-driven                                                                                 have your comments considered.
                                                                                                          should focus on the potential
                                                  compressor station at approximately MP                                                                           Additional information about the
                                                                                                          environmental effects, reasonable
                                                  0.0 of the proposed new Line VA–1 in                                                                          project is available from the
                                                                                                          alternatives, and measures to avoid or
                                                  Fairfax County, Virginia.                                                                                     Commission’s Office of External Affairs,
                                                     • Installation of a receiver facility at             lessen environmental impacts. The more
                                                                                                          specific your comments, the more useful               at (866) 208–FERC, or on the FERC Web
                                                  the end of the proposed Line VA–1, in
                                                                                                          they will be. To ensure that the                      site (www.ferc.gov) using the eLibrary
                                                  Fairfax County, Virginia.
                                                     • Modifications to increase                          Commission has the opportunity to                     link. Click on the eLibrary link, click on
                                                  horsepower at the existing Strasburg                    consider your comments prior to                       ‘‘General Search,’’ and enter the docket
                                                  Compressor Station located in                           making its decision on this project, it is            number excluding the last three digits in
                                                  Shenandoah County Virginia, in order                    important that we receive your                        the Docket Number field (i.e., CP16–38).
                                                  to increase capacity for the                            comments in Washington, DC on or                      Be sure you have selected an
                                                  transportation of additional volume                     before April 24, 2017.                                appropriate date range. For assistance,
                                                  along Columbia’s Line VB natural gas                       For your convenience, there are three              please contact FERC Online Support at
                                                  pipeline system.                                        methods you can use to file your                      FercOnlineSupport@ferc.gov or toll free
                                                     • Modifications to existing natural                  comments to the Commission. In all                    at (866) 208–3676, or for TTY, contact
                                                  gas pipeline appurtenances at the                       instances, please reference the project               (202) 502–8659. The eLibrary link also
                                                  Loudoun Compressor Station in                           docket number (CP16–38–000) with                      provides access to the texts of formal
                                                  Loudoun County, Virginia.                               your submission. The Commission                       documents issued by the Commission,
                                                     • Modifications to the existing Dysart               encourages electronic filing of
                                                                                                                                                                such as orders, notices, and
                                                  Valve Site, in Shenandoah County,                       comments and has expert staff available
                                                                                                                                                                rulemakings.
                                                  Virginia and one metering station,                      to assist you at (202) 502–8258 or
                                                                                                          efiling@ferc.gov.                                        In addition, the Commission offers a
                                                  Nineveh Meter Station, in Warren
                                                  County, Virginia.                                          (1) You can file your comments                     free service called eSubscription which
                                                     Pipeline Facilities:                                 electronically using the eComment                     allows you to keep track of all formal
                                                     • Line VA–1: Installation of                         feature on the Commission’s Web site                  issuances and submittals in specific
                                                  approximately 2.2 miles of new 12-inch-                 (www.ferc.gov) under the link to                      dockets. This can reduce the amount of
                                                  diameter natural gas transmission                       Documents and Filings. This is an easy                time you spend researching proceedings
                                                  pipeline and associated appurtenances                   method for submitting brief, text-only                by automatically providing you with
                                                  in Fairfax County, Virginia.                            comments on a project;                                notification of these filings, document
                                                     MAOP Restoration:                                       (2) You can also file your comments                summaries, and direct links to the
                                                     • Line VB–5: Incremental pressure                    electronically using the eFiling feature              documents. Go to www.ferc.gov/docs-
                                                  increase of approximately 70.4 miles of                 on the Commission’s Web site                          filing/esubscription.asp.
                                                  the Line VB–5 Segment to restore this                   (www.ferc.gov) under the link to
                                                                                                                                                                  Dated: March 24, 2017.
                                                  segment to its originally certificated                  Documents and Filings. With eFiling,
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                          you can provide comments in a variety                 Kimberly D. Bose,
                                                  MAOP of 1,000 psig in Shenandoah,
                                                  Warren, Clark, Fauquier, and Loudoun                    of formats by attaching them as a file                Secretary.
                                                  Counties, Virginia.                                     with your submission. New eFiling                     [FR Doc. 2017–06417 Filed 3–31–17; 8:45 am]
                                                     The USFS’s purpose and need for the                  users must first create an account by                 BILLING CODE 6717–01–P
                                                  proposed action is to respond to a                      clicking on ‘‘eRegister.’’ You must select
                                                  special use application, submitted by                   the type of filing you are making. If you                1 See the previous discussion on the methods for

                                                  Columbia on August 19, 2016, to allow                   are filing a comment on a particular                  filing comments.



                                             VerDate Sep<11>2014   18:32 Mar 31, 2017   Jkt 241001   PO 00000   Frm 00029   Fmt 4703   Sfmt 9990   E:\FR\FM\03APN1.SGM   03APN1



Document Created: 2017-04-01 09:36:17
Document Modified: 2017-04-01 09:36:17
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 16183 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR