82_FR_16247 82 FR 16185 - Portland General Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Protests, and Motions To Intervene

82 FR 16185 - Portland General Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Protests, and Motions To Intervene

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 62 (April 3, 2017)

Page Range16185-16185
FR Document2017-06468

Federal Register, Volume 82 Issue 62 (Monday, April 3, 2017)
[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Page 16185]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06468]



[[Page 16185]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2195-148]


Portland General Electric Company; Notice of Application Accepted 
for Filing, Soliciting Comments, Protests, and Motions To Intervene

    Take notice that the following hydroelectric application has been 
filed with the Federal Energy Regulatory Commission and is available 
for public inspection:
    a. Type of Application: Non-project use of project lands and water.
    b. Project No: 2195-148.
    c. Date Filed: November 7, 2016 and supplemented on March 22, 2017.
    d. Applicant: Portland General Electric Company (licensee).
    e. Name of Project: Clackamas River Hydroelectric Project.
    f. Location: River Mill Development (Estacada Lake) of the 
Clackamas River Hydroelectric Project located in Clackamas County, 
Oregon.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Thomas Nilan, Manager, Portland General 
Electric Company, 121 SW. Salmon Street, 3 WTC-BR05, Portland, Oregon 
97204; phone (503) 464-8738.
    i. FERC Contact: Robert Ballantine at 202-502-6289, 
[email protected].
    j. Deadline for filing comments, protests, or motions to intervene 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file comments, 
protests, or motions to intervene using the Commission's eFiling system 
at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at [email protected], (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-2195-148.
    k. Description of Request: Portland General Electric Company 
requests Commission approval to grant the Oregon Department of Fish and 
Wildlife (Oregon DFW) an easement to use project lands and water within 
the River Mill development of the Clackamas River Hydroelectric 
Project, for the construction and operation of a gravity fed intake 
system. The intake would provide water to the Oregon DFW owned 
Clackamas Hatchery located outside of the project boundary on Dog 
Creek, a tributary of the Clackamas River. The intake would provide a 
continuous gravity fed 50 cubic feet per second (approximately 32 
million gallons per day) from Estacada Lake, to the fish hatchery. The 
intake system would be located within the project boundary 
approximately 250 feet upstream of the River Mill Dam on the south side 
of the forebay and consist of a dual-cylindrical intake screen, track 
system for deploying the intake screens into the reservoir, control 
building, and conveyance pipes. Project water routed to the hatchery 
would be returned to the Clackamas River via Dog Creek, downstream of 
the project.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling 202-502-8371. This filing may also be viewed on 
the Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 866-208-3676 or email 
[email protected], for TTY, call 202-502-8659. A copy is also 
available for inspection and reproduction at the address in item (h) 
above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all comments or protests filed, but only those who file a 
motion to intervene in accordance with the Commission's Rules may 
become a party to the proceeding. Any comments, protests, or motions to 
intervene must be received on or before the specified date for the 
particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENT''; ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person commenting, protesting or motioning to intervene; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. All comments, protests, or motions to intervene must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. If an intervener 
files comments or documents with the Commission relating to the merits 
of an issue that may affect the responsibilities of a particular 
resource agency, they must also serve a copy of the document on that 
resource agency. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Dated: March 28, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06468 Filed 3-31-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices                                                  16185

                                                  DEPARTMENT OF ENERGY                                    project lands and water within the River                 o. Filing and Service of Responsive
                                                                                                          Mill development of the Clackamas                     Documents: Any filing must (1) bear in
                                                  Federal Energy Regulatory                               River Hydroelectric Project, for the                  all capital letters the title ‘‘COMMENT’’;
                                                  Commission                                              construction and operation of a gravity               ‘‘PROTEST’’, or ‘‘MOTION TO
                                                  [Project No. 2195–148]                                  fed intake system. The intake would                   INTERVENE’’ as applicable; (2) set forth
                                                                                                          provide water to the Oregon DFW                       in the heading the name of the applicant
                                                  Portland General Electric Company;                      owned Clackamas Hatchery located                      and the project number of the
                                                  Notice of Application Accepted for                      outside of the project boundary on Dog                application to which the filing
                                                  Filing, Soliciting Comments, Protests,                  Creek, a tributary of the Clackamas                   responds; (3) furnish the name, address,
                                                  and Motions To Intervene                                River. The intake would provide a                     and telephone number of the person
                                                                                                          continuous gravity fed 50 cubic feet per              commenting, protesting or motioning to
                                                     Take notice that the following                       second (approximately 32 million                      intervene; and (4) otherwise comply
                                                  hydroelectric application has been filed                gallons per day) from Estacada Lake, to               with the requirements of 18 CFR
                                                  with the Federal Energy Regulatory                      the fish hatchery. The intake system                  385.2001 through 385.2005. All
                                                  Commission and is available for public                  would be located within the project                   comments, protests, or motions to
                                                  inspection:                                             boundary approximately 250 feet                       intervene must set forth their
                                                     a. Type of Application: Non-project                  upstream of the River Mill Dam on the                 evidentiary basis and otherwise comply
                                                  use of project lands and water.                         south side of the forebay and consist of              with the requirements of 18 CFR 4.34(b).
                                                     b. Project No: 2195–148.                             a dual-cylindrical intake screen, track               Agencies may obtain copies of the
                                                     c. Date Filed: November 7, 2016 and                                                                        application directly from the applicant.
                                                                                                          system for deploying the intake screens
                                                  supplemented on March 22, 2017.                                                                               A copy of any protest or motion to
                                                                                                          into the reservoir, control building, and
                                                     d. Applicant: Portland General
                                                                                                          conveyance pipes. Project water routed                intervene must be served upon each
                                                  Electric Company (licensee).
                                                                                                          to the hatchery would be returned to the              representative of the applicant specified
                                                     e. Name of Project: Clackamas River
                                                                                                          Clackamas River via Dog Creek,                        in the particular application. If an
                                                  Hydroelectric Project.
                                                     f. Location: River Mill Development                  downstream of the project.                            intervener files comments or documents
                                                  (Estacada Lake) of the Clackamas River                     l. Locations of the Application: A                 with the Commission relating to the
                                                  Hydroelectric Project located in                        copy of the application is available for              merits of an issue that may affect the
                                                  Clackamas County, Oregon.                               inspection and reproduction at the                    responsibilities of a particular resource
                                                     g. Filed Pursuant to: Federal Power                  Commission’s Public Reference Room,                   agency, they must also serve a copy of
                                                  Act, 16 U.S.C. 791a–825r.                               located at 888 First Street NE., Room                 the document on that resource agency.
                                                     h. Applicant Contact: Thomas Nilan,                  2A, Washington, DC 20426, or by calling               A copy of all other filings in reference
                                                  Manager, Portland General Electric                      202–502–8371. This filing may also be                 to this application must be accompanied
                                                  Company, 121 SW. Salmon Street, 3                       viewed on the Commission’s Web site at                by proof of service on all persons listed
                                                  WTC–BR05, Portland, Oregon 97204;                       http://www.ferc.gov using the                         in the service list prepared by the
                                                  phone (503) 464–8738.                                   ‘‘eLibrary’’ link. Enter the docket                   Commission in this proceeding, in
                                                     i. FERC Contact: Robert Ballantine at                number excluding the last three digits in             accordance with 18 CFR 4.34(b) and
                                                  202–502–6289, robert.ballantine@                        the docket number field to access the                 385.2010.
                                                  ferc.gov.                                               document. You may also register online                  Dated: March 28, 2017.
                                                     j. Deadline for filing comments,                     at http://www.ferc.gov/docs-filing/                   Kimberly D. Bose,
                                                  protests, or motions to intervene is 30                 esubscription.asp to be notified via                  Secretary.
                                                  days from the issuance of this notice by                email of new filings and issuances
                                                                                                                                                                [FR Doc. 2017–06468 Filed 3–31–17; 8:45 am]
                                                  the Commission. The Commission                          related to this or other pending projects.
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  strongly encourages electronic filing.                  For assistance, call 866–208–3676 or
                                                  Please file comments, protests, or                      email FERCOnlineSupport@ferc.gov, for
                                                  motions to intervene using the                          TTY, call 202–502–8659. A copy is also
                                                                                                                                                                DEPARTMENT OF ENERGY
                                                  Commission’s eFiling system at http://                  available for inspection and
                                                  www.ferc.gov/docs-filing/efiling.asp.                   reproduction at the address in item (h)               Federal Energy Regulatory
                                                  Commenters can submit brief comments                    above.                                                Commission
                                                  up to 6,000 characters, without prior                      m. Individuals desiring to be included
                                                                                                          on the Commission’s mailing list should               [Docket No. CD17–10–000]
                                                  registration, using the eComment system
                                                  at http://www.ferc.gov/docs-filing/                     so indicate by writing to the Secretary
                                                                                                                                                                Hurricane Creek Irrigating Ditch
                                                  ecomment.asp. You must include your                     of the Commission.
                                                                                                                                                                Company; Notice of Preliminary
                                                  name and contact information at the end                    n. Comments, Protests, or Motions to               Determination of a Qualifying Conduit
                                                  of your comments. For assistance,                       Intervene: Anyone may submit                          Hydropower Facility and Soliciting
                                                  please contact FERC Online Support at                   comments, a protest, or a motion to                   Comments and Motions To Intervene
                                                  FERCOnlineSupport@ferc.gov, (866)                       intervene in accordance with the
                                                  208–3676 (toll free), or (202) 502–8659                 requirements of Rules of Practice and                   On March 21, 2017, the Hurricane
                                                  (TTY). In lieu of electronic filing, please             Procedure, 18 CFR 385.210, .211, .214.                Creek Irrigating Ditch Company, filed a
                                                  send a paper copy to: Secretary, Federal                In determining the appropriate action to              notice of intent to construct a qualifying
                                                  Energy Regulatory Commission, 888                       take, the Commission will consider all                conduit hydropower facility, pursuant
                                                  First Street NE., Washington, DC 20426.                 comments or protests filed, but only                  to section 30 of the Federal Power Act
mstockstill on DSK3G9T082PROD with NOTICES




                                                  The first page of any filing should                     those who file a motion to intervene in               (FPA), as amended by section 4 of the
                                                  include docket number P–2195–148.                       accordance with the Commission’s                      Hydropower Regulatory Efficiency Act
                                                     k. Description of Request: Portland                  Rules may become a party to the                       of 2013 (HREA). The proposed
                                                  General Electric Company requests                       proceeding. Any comments, protests, or                Hurricane Hydro Station #2 & #4 Project
                                                  Commission approval to grant the                        motions to intervene must be received                 would have a combined installed
                                                  Oregon Department of Fish and Wildlife                  on or before the specified date for the               capacity of 104 kilowatts (kW), and
                                                  (Oregon DFW) an easement to use                         particular application.                               would be located along two sections of


                                             VerDate Sep<11>2014   18:32 Mar 31, 2017   Jkt 241001   PO 00000   Frm 00030   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1



Document Created: 2017-04-01 09:36:22
Document Modified: 2017-04-01 09:36:22
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 16185 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR