82_FR_16251 82 FR 16189 - Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

82 FR 16189 - Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 62 (April 3, 2017)

Page Range16189-16190
FR Document2017-06422

Federal Register, Volume 82 Issue 62 (Monday, April 3, 2017)
[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Pages 16189-16190]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06422]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2520-076]


Great Lakes Hydro America, LLC; Notice of Application Accepted 
for Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Major License.
    b. Project No.: 2520-076.
    c. Date filed: August 31, 2016.
    d. Applicant: Great Lakes Hydro America, LLC (Great Lakes Hydro).
    e. Name of Project: Mattaceunk Hydroelectric Project.
    f. Location: The existing project is located on the Penobscot River 
in Aroostook and Penobscot Counties, Maine. The project does not affect 
federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Kevin Bernier, Senior Compliance Specialist, 
Great Lakes Hydro America, LLC, 1024 Central Street, Millinocket, Maine 
04462; Telephone (207) 723-4341, x118.
    i. FERC Contact: Adam Peer, (202) 502-8449 or [email protected].
    j. Deadline for filing motions to intervene and protests, comments, 
recommendations, preliminary terms and conditions, and preliminary 
prescriptions: 60 days from the issuance date of this notice; reply 
comments are due 105 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
http://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-2520-076.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The existing Mattaceunk Hydroelectric Project consists of: (1) A 
1,060-foot-long, 45-foot-high dam (Weldon Dam) with a crest elevation 
of 236.0 feet (USGS datum), and includes: (i) A 110-foot-long earthen 
embankment extending to the left abutment; (ii) a combined intake and 
powerhouse structure; (iii) an upstream fish ladder; (iv) a 10-foot-
wide log sluice structure, controlled by an 8-foot-high vertical slide 
gate; (v) a 90-foot-long, 19-foot-high gated spillway with a single 
roller gate; (vi) a 657.5-foot-long, 70-foot high concrete gravity 
overflow spillway with 4-foot-high flashboards to create a maximum 
flashboard crest elevation of 240.0 feet; and (vii) a retaining wall at 
the right abutment; (2) a 1,664-acre reservoir with a total storage 
capacity of 20,981 acre-feet at a normal pool elevation of 240.00 feet 
(USGS datum); (3) a 142-foot-long, 99-foot-wide powerhouse (Weldon 
Station) integral to the dam containing two Kaplan turbines rated at 
5,479 kilowatt (kW) and two fixed-blade propeller turbines rated at 
5,489 kW, each driving a 6,000 kilovolt-ampere (kVA), 4,800 kW vertical 
synchronous generator for an authorized installed capacity of 19.2 
megawatts (MW); (4) a downstream fishway; (5) an outdoor substation 
adjacent to the powerhouse; (6) a 9-mile-long, 34.5-kilovolt (kV) 
transmission line within a 120-foot-wide right of way; and (7) 
appurtenant facilities. The project generates about 123,332 megawatt-
hours (MWh) annually.
    The Mattaceunk Project is operated with minimal fluctuations of the 
reservoir surface elevation. Flexibility on reservoir elevations is 
required to provide for safe installation of the project's flashboards 
and to allow an adequate margin for wave action, debris loads, or 
sudden pool increases that might cause flashboard failure. The existing 
license requires a reservoir surface elevation no lower than 1.0 foot 
below the dam crest elevation of 236.0 feet when the 4-foot-high 
flashboards are not in use, and no lower than 2.0 feet below the top of 
flashboard elevation of 240.0 feet when the 4-foot-high flashboards are 
in use. The existing license also requires a year-round continuous 
minimum flow of 1,674 cubic feet per second (cfs) or inflow, whichever 
is less, and a daily average minimum flow of 2,392 cfs from July 1 
through September 30 and 2,000 cfs from October 1 through June 30, 
unless inflow is less than the stated daily average minimum flows (in 
which case outflow from the project must equal the inflow to the 
project). Great Lakes Hydro proposes to: (1) Install a seasonal 
upstream eel ramp; (2) install an upstream passage structure for 
American shad, alewife, and blueback herring; (3) install trashracks 
having 1-inch clear spacing to the full depth of the turbine intakes 
during the fish passage season; and (4) improve the recreation facility 
at the downstream angler access area.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in

[[Page 16190]]

accordance with the Commission's Rules may become a party to the 
proceeding. Any comments, protests, or motions to intervene must be 
received on or before the specified comment date for the particular 
application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. Procedural Schedule:
    The application will be processed according to the following 
revised Hydro Licensing Schedule. Revisions to the schedule may be made 
as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Filing of recommendations, preliminary   May 2017.
 terms and conditions, and preliminary
 fishway prescriptions.
Commission issues Draft EA or EIS......  November 2017.
Comments on Draft EA or EIS............  December 2017.
Modified Terms and Conditions..........  February 2017.
Commission Issues Final EA or EIS......  May 2018.
------------------------------------------------------------------------

    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. A license applicant must file no later than 60 days following 
the date of issuance of the notice of acceptance and ready for 
environmental analysis provided for in 5.22: (1) A copy of the water 
quality certification; (2) a copy of the request for certification, 
including proof of the date on which the certifying agency received the 
request; or (3) evidence of waiver of water quality certification.

    Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06422 Filed 3-31-17; 8:45 am]
BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices                                            16189

                                                  documents. Go to www.ferc.gov/docs-                     Commission’s eFiling system at http://                appurtenant facilities. The project
                                                  filing/esubscription.asp.                               www.ferc.gov/docs-filing/efiling.asp.                 generates about 123,332 megawatt-hours
                                                     Finally, public sessions or site visits              Commenters can submit brief comments                  (MWh) annually.
                                                  will be posted on the Commission’s                      up to 6,000 characters, without prior                    The Mattaceunk Project is operated
                                                  calendar located at www.ferc.gov/                       registration, using the eComment system               with minimal fluctuations of the
                                                  EventCalendar/EventsList.aspx along                     at http://www.ferc.gov/docs-filing/                   reservoir surface elevation. Flexibility
                                                  with other related information.                         ecomment.asp. You must include your                   on reservoir elevations is required to
                                                    Dated: March 24, 2017.                                name and contact information at the end               provide for safe installation of the
                                                                                                          of your comments. For assistance,                     project’s flashboards and to allow an
                                                  Kimberly D. Bose,
                                                                                                          please contact FERC Online Support at                 adequate margin for wave action, debris
                                                  Secretary.                                              FERCOnlineSupport@ferc.gov, (866)                     loads, or sudden pool increases that
                                                  [FR Doc. 2017–06418 Filed 3–31–17; 8:45 am]             208–3676 (toll free), or (202) 502–8659               might cause flashboard failure. The
                                                  BILLING CODE 6717–01–P                                  (TTY). In lieu of electronic filing, please           existing license requires a reservoir
                                                                                                          send a paper copy to: Secretary, Federal              surface elevation no lower than 1.0 foot
                                                                                                          Energy Regulatory Commission, 888                     below the dam crest elevation of 236.0
                                                  DEPARTMENT OF ENERGY                                    First Street NE., Washington, DC 20426.               feet when the 4-foot-high flashboards
                                                                                                          The first page of any filing should                   are not in use, and no lower than 2.0
                                                  Federal Energy Regulatory                                                                                     feet below the top of flashboard
                                                                                                          include docket number P–2520–076.
                                                  Commission                                                 The Commission’s Rules of Practice                 elevation of 240.0 feet when the 4-foot-
                                                  [Project No. 2520–076]                                  require all intervenors filing documents              high flashboards are in use. The existing
                                                                                                          with the Commission to serve a copy of                license also requires a year-round
                                                  Great Lakes Hydro America, LLC;                         that document on each person on the                   continuous minimum flow of 1,674
                                                  Notice of Application Accepted for                      official service list for the project.                cubic feet per second (cfs) or inflow,
                                                  Filing, Soliciting Motions To Intervene                 Further, if an intervenor files comments              whichever is less, and a daily average
                                                  and Protests, Ready for Environmental                   or documents with the Commission                      minimum flow of 2,392 cfs from July 1
                                                  Analysis, and Soliciting Comments,                      relating to the merits of an issue that               through September 30 and 2,000 cfs
                                                  Recommendations, Preliminary Terms                      may affect the responsibilities of a                  from October 1 through June 30, unless
                                                  and Conditions, and Preliminary                         particular resource agency, they must                 inflow is less than the stated daily
                                                  Fishway Prescriptions                                   also serve a copy of the document on                  average minimum flows (in which case
                                                                                                          that resource agency.                                 outflow from the project must equal the
                                                     Take notice that the following                          k. This application has been accepted              inflow to the project). Great Lakes
                                                  hydroelectric application has been filed                for filing and is now ready for                       Hydro proposes to: (1) Install a seasonal
                                                  with the Commission and is available                    environmental analysis.                               upstream eel ramp; (2) install an
                                                  for public inspection.                                     l. The existing Mattaceunk                         upstream passage structure for
                                                     a. Type of Application: Major License.               Hydroelectric Project consists of: (1) A              American shad, alewife, and blueback
                                                     b. Project No.: 2520–076.                            1,060-foot-long, 45-foot-high dam                     herring; (3) install trashracks having 1-
                                                     c. Date filed: August 31, 2016.                      (Weldon Dam) with a crest elevation of                inch clear spacing to the full depth of
                                                     d. Applicant: Great Lakes Hydro                      236.0 feet (USGS datum), and includes:                the turbine intakes during the fish
                                                  America, LLC (Great Lakes Hydro).                       (i) A 110-foot-long earthen embankment                passage season; and (4) improve the
                                                     e. Name of Project: Mattaceunk                       extending to the left abutment; (ii) a                recreation facility at the downstream
                                                  Hydroelectric Project.                                  combined intake and powerhouse                        angler access area.
                                                     f. Location: The existing project is                 structure; (iii) an upstream fish ladder;                m. A copy of the application is
                                                  located on the Penobscot River in                       (iv) a 10-foot-wide log sluice structure,             available for review at the Commission
                                                  Aroostook and Penobscot Counties,                       controlled by an 8-foot-high vertical                 in the Public Reference Room or may be
                                                  Maine. The project does not affect                      slide gate; (v) a 90-foot-long, 19-foot-              viewed on the Commission’s Web site at
                                                  federal lands.                                          high gated spillway with a single roller              http://www.ferc.gov using the
                                                     g. Filed Pursuant to: Federal Power                  gate; (vi) a 657.5-foot-long, 70-foot high            ‘‘eLibrary’’ link. Enter the docket
                                                  Act 16 U.S.C. 791 (a)–825(r).                           concrete gravity overflow spillway with               number excluding the last three digits in
                                                     h. Applicant Contact: Kevin Bernier,                 4-foot-high flashboards to create a                   the docket number field to access the
                                                  Senior Compliance Specialist, Great                     maximum flashboard crest elevation of                 document. For assistance, contact FERC
                                                  Lakes Hydro America, LLC, 1024                          240.0 feet; and (vii) a retaining wall at             Online Support. A copy is also available
                                                  Central Street, Millinocket, Maine                      the right abutment; (2) a 1,664-acre                  for inspection and reproduction at the
                                                  04462; Telephone (207) 723–4341, x118.                  reservoir with a total storage capacity of            address in item h above.
                                                     i. FERC Contact: Adam Peer, (202)                    20,981 acre-feet at a normal pool                        Register online at http://
                                                  502–8449 or adam.peer@ferc.gov.                         elevation of 240.00 feet (USGS datum);                www.ferc.gov/docs-filing/
                                                     j. Deadline for filing motions to                    (3) a 142-foot-long, 99-foot-wide                     esubscription.asp to be notified via
                                                  intervene and protests, comments,                       powerhouse (Weldon Station) integral to               email of new filings and issuances
                                                  recommendations, preliminary terms                      the dam containing two Kaplan turbines                related to this or other pending projects.
                                                  and conditions, and preliminary                         rated at 5,479 kilowatt (kW) and two                  For assistance, contact FERC Online
                                                  prescriptions: 60 days from the issuance                fixed-blade propeller turbines rated at               Support.
                                                  date of this notice; reply comments are                 5,489 kW, each driving a 6,000 kilovolt-                 n. Anyone may submit comments, a
                                                  due 105 days from the issuance date of                  ampere (kVA), 4,800 kW vertical                       protest, or a motion to intervene in
mstockstill on DSK3G9T082PROD with NOTICES




                                                  this notice.                                            synchronous generator for an authorized               accordance with the requirements of
                                                     The Commission strongly encourages                   installed capacity of 19.2 megawatts                  Rules of Practice and Procedure, 18 CFR
                                                  electronic filing. Please file motions to               (MW); (4) a downstream fishway; (5) an                385.210, .211, and .214. In determining
                                                  intervene, protests, comments,                          outdoor substation adjacent to the                    the appropriate action to take, the
                                                  recommendations, preliminary terms                      powerhouse; (6) a 9-mile-long, 34.5-                  Commission will consider all protests or
                                                  and conditions, and preliminary                         kilovolt (kV) transmission line within a              other comments filed, but only those
                                                  fishway prescriptions using the                         120-foot-wide right of way; and (7)                   who file a motion to intervene in


                                             VerDate Sep<11>2014   18:32 Mar 31, 2017   Jkt 241001   PO 00000   Frm 00034   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1


                                                  16190                               Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices

                                                  accordance with the Commission’s                          agency received the request; or (3)                      Docket Numbers: ER17–1319–000.
                                                  Rules may become a party to the                           evidence of waiver of water quality                      Applicants: Southwest Power Pool,
                                                  proceeding. Any comments, protests, or                    certification.                                        Inc.
                                                  motions to intervene must be received                       Dated: March 24, 2017.                                 Description: § 205(d) Rate Filing:
                                                  on or before the specified comment date                   Kimberly D. Bose,
                                                                                                                                                                  2646R4 Kansas Municipal Energy
                                                  for the particular application.                                                                                 Agency NITSA and NOA to be effective
                                                                                                            Secretary.
                                                     All filings must (1) bear in all capital                                                                     3/1/2017.
                                                                                                            [FR Doc. 2017–06422 Filed 3–31–17; 8:45 am]
                                                  letters the title ‘‘PROTEST’’, ‘‘MOTION                                                                            Filed Date: 3/28/17.
                                                  TO INTERVENE’’, ‘‘COMMENTS,’’                             BILLING CODE 6717–01–P                                   Accession Number: 20170328–5121.
                                                  ‘‘REPLY COMMENTS,’’                                                                                                Comments Due: 5 p.m. ET 4/18/17.
                                                  ‘‘RECOMMENDATIONS,’’                                                                                               Docket Numbers: ER17–1320–000.
                                                  ‘‘PRELIMINARY TERMS AND                                   DEPARTMENT OF ENERGY
                                                                                                                                                                     Applicants: Odyssey Solar, LLC.
                                                  CONDITIONS,’’ or ‘‘PRELIMINARY                            Federal Energy Regulatory                                Description: Baseline eTariff Filing:
                                                  FISHWAY PRESCRIPTIONS;’’ (2) set                          Commission                                            Baseline new to be effective 12/13/9998.
                                                  forth in the heading the name of the                                                                               Filed Date: 3/28/17.
                                                  applicant and the project number of the                   Combined Notice of Filings #2                            Accession Number: 20170328–5183.
                                                  application to which the filing                                                                                    Comments Due: 5 p.m. ET 4/18/17.
                                                  responds; (3) furnish the name, address,                     Take notice that the Commission
                                                                                                            received the following exempt                            Docket Numbers: ER17–1321–000.
                                                  and telephone number of the person                                                                                 Applicants: Puget Sound Energy, Inc.
                                                  protesting or intervening; and (4)                        wholesale generator filings:
                                                                                                                                                                     Description: Initial rate filing: RES
                                                  otherwise comply with the requirements                       Docket Numbers: EG17–84–000.
                                                                                                               Applicants: Midlothian Energy, LLC.                Engineering and Procurement
                                                  of 18 CFR 385.2001 through 385.2005.                                                                            Agreement, Original Service Agreement
                                                  All comments, recommendations, terms                         Description: Notice of Self-
                                                                                                            Certification of Exempt Wholesale                     No. 831 to be effective 3/1/2017.
                                                  and conditions or prescriptions must set                                                                           Filed Date: 3/28/17.
                                                  forth their evidentiary basis and                         Generator Status.
                                                                                                               Filed Date: 3/28/17.                                  Accession Number: 20170328–5212
                                                  otherwise comply with the requirements                                                                             Comments Due: 5 p.m. ET 4/18/17.
                                                  of 18 CFR 4.34(b). Agencies may obtain                       Accession Number: 20170328–5201.
                                                  copies of the application directly from                      Comments Due: 5 p.m. ET 4/18/17.                      Docket Numbers: ER17–1322–000.
                                                  the applicant. A copy of any protest or                      Docket Numbers: EG17–85–000.                          Applicants: Western Massachusetts
                                                  motion to intervene must be served                           Applicants: Hays Energy, LLC.                      Electric Company.
                                                  upon each representative of the                              Description: Notice of Self-                          Description: § 205(d) Rate Filing:
                                                  applicant specified in the particular                     Certification of Exempt Wholesale                     Interconnection and Operating
                                                  application. A copy of all other filings                  Generator Status.                                     Agreement with Essential Power MA.
                                                  in reference to this application must be                     Filed Date: 3/28/17.                               Amendment No. 2 to be effective 3/29/
                                                  accompanied by proof of service on all                       Accession Number: 20170328–5205.                   2017.
                                                  persons listed in the service list                           Comments Due: 5 p.m. ET 4/18/17.                      Filed Date: 3/28/17.
                                                  prepared by the Commission in this                           Docket Numbers: EG17–86–000.                          Accession Number: 20170328–5214.
                                                  proceeding, in accordance with 18 CFR                        Applicants: COLETO CREEK POWER,                       Comments Due: 5 p.m. ET 4/18/17.
                                                  4.34(b) and 385.2010.                                     LP.                                                      Docket Numbers: ER17–1323–000.
                                                     o. Procedural Schedule:                                   Description: Notice of Self-                          Applicants: Midcontinent
                                                     The application will be processed                      Certification of Exempt Wholesale                     Independent System Operator, Inc.,
                                                  according to the following revised                        Generator Status.                                     Ameren Illinois Company,
                                                  Hydro Licensing Schedule. Revisions to                       Filed Date: 3/28/17.                               MidAmerican Energy Company.
                                                  the schedule may be made as                                  Accession Number: 20170328–5207.                      Description: § 205(d) Rate Filing:
                                                  appropriate.                                                 Comments Due: 5 p.m. ET 4/18/17.                   2017–03–28_SA 3009 ATXI–MEC TIA
                                                                                                               Take notice that the Commission                    to be effective 3/30/2017.
                                                             Milestone                   Target date                                                                 Filed Date: 3/28/17.
                                                                                                            received the following electric rate
                                                  Filing of recommendations, pre-     May 2017.             filings:                                                 Accession Number: 20170328–5224.
                                                     liminary terms and condi-                                 Docket Numbers: ER17–714–001.                         Comments Due: 5 p.m. ET 4/18/17.
                                                     tions, and preliminary fishway                                                                                  Docket Numbers: ER17–1324–000.
                                                     prescriptions.                                            Applicants: Virginia Electric and
                                                  Commission issues Draft EA or       November 2017.        Power Company, PJM Interconnection,                      Applicants: Playa Solar 2, LLC.
                                                     EIS.                                                   LLC.                                                     Description: Baseline eTariff Filing:
                                                  Comments on Draft EA or EIS         December 2017.           Description: Compliance filing:                    Application for Initial Market-Based
                                                  Modified Terms and Conditions       February 2017.                                                              Rate Tariff and Granting Certain
                                                  Commission Issues Final EA or       May 2018.             Compliance filing per 2/28/2017 order
                                                     EIS.                                                   to correct Att. H–16A eff 1/1/17 & 2/1/               Waivers to be effective 3/29/2017.
                                                                                                            17 to be effective 1/1/2017.                             Filed Date: 3/28/17.
                                                     p. Final amendments to the                                Filed Date: 3/28/17.                                  Accession Number: 20170328–5242
                                                  application must be filed with the                           Accession Number: 20170328–5126.                      Comments Due: 5 p.m. ET 4/18/17.
                                                  Commission no later than 30 days from                        Comments Due: 5 p.m. ET 4/18/17.                      The filings are accessible in the
                                                  the issuance date of this notice.                            Docket Numbers: ER17–1318–000.                     Commission’s eLibrary system by
                                                     q. A license applicant must file no                       Applicants: Redbed Plains Wind Farm                clicking on the links or querying the
mstockstill on DSK3G9T082PROD with NOTICES




                                                  later than 60 days following the date of                  LLC.                                                  docket number.
                                                  issuance of the notice of acceptance and                     Description: Baseline eTariff Filing:                 Any person desiring to intervene or
                                                  ready for environmental analysis                          MBR Application to be effective 5/28/                 protest in any of the above proceedings
                                                  provided for in 5.22: (1) A copy of the                   2017.                                                 must file in accordance with Rules 211
                                                  water quality certification; (2) a copy of                   Filed Date: 3/28/17.                               and 214 of the Commission’s
                                                  the request for certification, including                     Accession Number: 20170328–5102.                   Regulations (18 CFR 385.211 and
                                                  proof of the date on which the certifying                    Comments Due: 5 p.m. ET 4/18/17.                   385.214) on or before 5:00 p.m. Eastern


                                             VerDate Sep<11>2014    18:32 Mar 31, 2017   Jkt 241001    PO 00000   Frm 00035   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1



Document Created: 2017-04-01 09:35:58
Document Modified: 2017-04-01 09:35:58
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 16189 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR