82_FR_16253 82 FR 16191 - Commission Information Collection Activities (FERC-510, FERC-520, FERC-561, and FERC-583); Consolidated Comment Request; Extension

82 FR 16191 - Commission Information Collection Activities (FERC-510, FERC-520, FERC-561, and FERC-583); Consolidated Comment Request; Extension

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 62 (April 3, 2017)

Page Range16191-16194
FR Document2017-06420

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden of the information collections described below.

Federal Register, Volume 82 Issue 62 (Monday, April 3, 2017)
[Federal Register Volume 82, Number 62 (Monday, April 3, 2017)]
[Notices]
[Pages 16191-16194]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06420]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC17-9-000]


Commission Information Collection Activities (FERC-510, FERC-520, 
FERC-561, and FERC-583); Consolidated Comment Request; Extension

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of information collections and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the requirements and burden of 
the information collections described below.

DATES: Comments on the collections of information are due June 2, 2017.

ADDRESSES: You may submit comments (identified by Docket No. IC17-9-
000) by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp.
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.

    Please reference the specific collection number and/or title in 
your comments.

[[Page 16192]]

    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION: 
    Type of Request: Three-year extension of the information collection 
requirements for all collections described below with no changes to the 
current reporting requirements. Please note that each collection is 
distinct from the next.
    Comments: Comments are invited on: (1) Whether the collections of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

FERC-510 [Application for Surrender of a Hydropower License]

OMB Control No.: 1902-0068

    Abstract: The information collected under the requirements of FERC-
510 is used by the Commission to implement the statutory provisions of 
sections 4(e), 6 and 13 of the Federal Power Act (FPA) (16 U.S.C. 
797(e), 799, and 806). Section 4(e) gives the Commission authority to 
issue licenses for the purposes of constructing, operating and 
maintaining dams, water conduits, reservoirs, powerhouses, transmission 
lines or other power project works necessary or convenient for 
developing and improving navigation, transmission and utilization of 
power using bodies of water over which Congress has jurisdiction. 
Section 6 gives the Commission the authority to prescribe the 
conditions of licenses including the revocation or surrender of the 
license. Section 13 defines the Commission's authority to delegate time 
periods for when a license must be terminated if project construction 
has not begun. Surrender of a license may be desired by a licensee when 
a licensed project is retired or not constructed or natural 
catastrophes have damaged or destroyed the project facilities.
    FERC-510 is the application for the surrender of a hydropower 
license. The information is used by Commission staff to determine the 
broad impact of such surrender. The Commission will issue a notice 
soliciting comments from the public and other agencies and conduct a 
careful review of the application before issuing an order for Surrender 
of a License. The order is the result of an analysis of the information 
produced (i.e., dam safety, public safety, and environmental concerns, 
etc.), which is examined to determine whether any conditions must be 
satisfied before granting the surrender. The order implements the 
existing regulations and is inclusive for surrender of all types of 
hydropower licenses issued by FERC and its predecessor, the Federal 
Power Commission. The Commission implements these mandatory filing 
requirements in the Code of Federal Regulations (CFR) under 18 CFR 6.1 
through 6.4.
    Type of Respondent: Private or Municipal Hydropower Licensees.
    Estimate of Annual Burden: \1\ The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:
---------------------------------------------------------------------------

    \1\ ``Burden'' is the total time, effort, or financial resources 
expended by persons to generate, maintain, retain, or disclose or 
provide information to or for a Federal agency. For additional 
information, refer to Title 5 Code of Federal Regulations 1320.3.
    \2\ The Commission staff thinks that the average respondent for 
this collection is similarly situated to the Commission, in terms of 
salary plus benefits. Based upon FERC's 2017 annual average of 
$158,754 (for salary plus benefits), the average hourly cost is 
$76.50/hour.

                                               FERC-510 Application for Surrender of a Hydropower License
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                      Annual number
       Number of respondents          of responses    Total number      Average burden and cost  per      Total annual burden hours and      Cost per
                                     per respondent   of responses                response                      total annual cost         respondent ($)
(1)                                             (2)     (1) * (2) =  (4)..............................  (3) * (4) = (5).................       (5) / (1)
                                                                (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
14.................................               1              14  80 hrs.; \3\ $6,120..............  1,120 hrs.; $85,680.............          $6,120
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-520 [Application for Authority To Hold Interlocking Directorate 
Positions]

OMB Control No.: 1902-0083

    Abstract: The Federal Power Act (FPA), as amended by the Public 
Utility Regulatory Policies Act of 1978 (PURPA), mandates federal 
oversight and approval of certain electric corporate activities to 
ensure that neither public nor private interests are adversely 
affected. Accordingly, the FPA proscribes related information filing 
requirements to achieve this goal. Such filing requirements are found 
in the Code of Federal Regulations (CFR), specifically in 18 CFR part 
45, and serve as the basis for FERC-520.
---------------------------------------------------------------------------

    \3\ Based on additional information, we are revising the 
estimated average burden per response to 80 hours (rather than 10 
hours). The reporting requirements have not changed.
---------------------------------------------------------------------------

    FERC-520 is divided into two types of applications: Full and 
informational. The full application, as specified in 18 CFR 45.8, 
implements the FPA requirement under section 305(b) that it is unlawful 
for any person to concurrently hold the positions of officer or 
director of more than one public utility; or a public utility and a 
financial institution that is authorized to underwrite or participate 
in the marketing of public utility securities; or a public utility and 
an electrical equipment supplier to that public utility, unless 
authorized by order of the Commission. In order to obtain 
authorization, an applicant must demonstrate that neither public nor 
private interests will be adversely affected by the holding of the 
position. The full application provides the

[[Page 16193]]

Commission with information about any interlocking position for which 
the applicant seeks authorization including, but not limited to, a 
description of duties and the estimated time devoted to the position.
    An informational application, specified in 18 CFR 45.9, allows an 
applicant to receive automatic authorization for an interlocked 
position upon receipt of the filing by the Commission. The 
informational application applies only to those individuals who seek 
authorization as: (1) An officer or director of two or more public 
utilities where the same holding company owns, directly or indirectly, 
that percentage of each utility's stock (of whatever class or classes) 
which is required by each utility's by-laws to elect directors; (2) an 
officer or director of two public utilities, if one utility is owned, 
wholly or in part, by the other and, as its primary business, owns or 
operates transmission or generation facilities to provide transmission 
service or electric power for sale to its owners; or (3) an officer or 
director of more than one public utility, if such person is already 
authorized under part 45 to hold different positions as officer or 
director of those utilities where the interlock involves affiliated 
public utilities.
    Pursuant to 18 CFR 45.5, in the event that an applicant resigns or 
withdraws from Commission-authorized interlocked positions or is not 
re-elected or re-appointed to such interlocked positions, the 
Commission requires that the applicant submit a notice of change within 
30 days from the date of the change.
    Type of Respondents: Individuals who plan to concurrently become 
officers or directors of public utilities and of certain other covered 
entities must request authorization to hold such interlocking positions 
by submitting a FERC-520.
    Estimate of Annual Burden: \1\ The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:

                                      FERC-520 Application for Authority To Hold Interlocking Directorate Positions
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                Annual  number                                                                               Cost per
                                   Number of     of  responses   Total number     Average  burden and cost    Total annual  burden hours    respondent
                                  respondents   per respondent   of responses           per response             (total annual cost)            ($)
                                           (1)             (2)     (1) * (2) =  (4)                          (3) * (4) = (5)                   (5) / (1)
                                                                           (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
Full..........................              16               1              16  50 hrs.; $3,825............  800 hrs.; $61,200..........          $3,825
Informational.................             500               1             500  8 hrs.; $612...............  4,000 hrs.; $306,000.......             612
Notice of Change..............             200               1             200  0.25 hrs.; $19.13..........  50 hrs.; $3,825............           19.13
                               -------------------------------------------------------------------------------------------------------------------------
    Total.....................  ..............  ..............  ..............  ...........................  4,850 hrs.; $371,025.......  ..............
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-561 [Annual Report of Interlocking Positions]

OMB Control No.: 1902-0099

    Abstract: The FERC Form 561 responds to the FPA requirements for 
annual reporting of similar types of positions which public utility 
officers and directors hold with financial institutions, insurance 
companies, utility equipment and fuel providers, and with any of an 
electric utility's 20 largest purchasers of electric energy (i.e., the 
20 entities with high expenditures of electricity). The FPA 
specifically defines most of the information elements in the Form 561 
including the information that must be filed, the required filers, the 
directive to make the information available to the public, and the 
filing deadline.
    The Commission uses the information required by 18 CFR 131.31 and 
collected by the Form 561 to implement the FPA requirement that those 
who are authorized to hold interlocked directorates annually disclose 
all the interlocked positions held within the prior year. The Form 561 
data identifies persons holding interlocking positions between public 
utilities and other entities, allows the Commission to review these 
interlocking positions, and allows identification of possible conflicts 
of interest.
    Type of Respondents: Public utility officers and directors holding 
financial positions, insurance companies, security underwriters, 
electrical equipment suppliers, fuel provider, and any entity which is 
controlled by these.
    Estimate of Annual Burden: \1\ The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:

                                                 FERC Form 561--Annual Report of Interlocking Positions
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                     Annual  number
                                      of  responses   Total number     Average  burden and cost  per     Total annual  burden hours and      Cost per
       Number of respondents               per        of responses                response                     total  annual cost         respondent ($)
                                       respondent
(1)                                             (2)     (1) * (2) =  (4)..............................  (3) * (4) = (5).................       (5) / (1)
                                                                (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
2,700..............................               1           2,700  0.25 hrs.; $19.13................  675.00 hrs.; $51,637.50.........          $19.13
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-583 [Annual Kilowatt Generating Report (Annual Charges)]

OMB Control No.: 1902-0136

    Abstract: The FERC-583 is used by the Commission to implement the 
statutory provisions of section 10(e) of the Federal Power Act (FPA) 
(16 U.S.C. 803(e)), which requires the Commission to collect annual 
charges from hydropower licensees for, among other things, the cost of 
administering part I of the FPA and for the use of United States dams. 
In addition, section 3401 of the Omnibus Budget Reconciliation Act of 
1986 (OBRA) authorizes the Commission to ``assess and collect fees and 
annual charges in any fiscal year in amounts equal to all of the costs 
incurred by the Commission in that fiscal year.'' The information is

[[Page 16194]]

collected annually and used to determine the amounts of the annual 
charges to be assessed licensees for reimbursable government 
administrative costs and for the use of government dams. The Commission 
implements these filing requirements in the Code of Federal Regulations 
(CFR) under 18 CFR part 11.1 through 11.8.\4\
---------------------------------------------------------------------------

    \4\ As discussed in 18 CFR part 11, selected federal agencies 
(such as the United States Fish and Wildlife Service and the 
National Marine Fisheries Service) submit annual reports to the 
Commission on their federal costs in administering part I of the 
Federal Power Act. The filing requirements imposed on those federal 
agencies are not collected for general statistical purposes and are 
not a ``collection of information'' as defined by 5 CFR 
1320.3(c)(3). (The form and additional information on the 
information provided by those agencies is posted at https://www.ferc.gov/docs-filing/forms.asp#ofa.)
---------------------------------------------------------------------------

    Type of Respondent: FERC-regulated private and public hydropower 
licensees.
    Estimate of Annual Burden: \1\ The Commission estimates the total 
annual burden and cost \2\ for this information collection as follows:

                                                       FERC-583--Annual Kilowatt Generating Report
                                                                    [Annual Charges]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                     Annual  number
                                      of  responses   Total number     Average  burden and cost  per     Total annual  burden hours  and     Cost per
     Number of respondents \5\             per        of responses                response                     total  annual cost         respondent ($)
                                       respondent
(1)                                             (2)     (1) * (2) =  (4)..............................  (3) * (4) = (5).................       (5) / (1)
                                                                (3)
--------------------------------------------------------------------------------------------------------------------------------------------------------
520................................               1             520  2 hrs.; $153.....................  1,040 hrs.; $79,560.............            $153
--------------------------------------------------------------------------------------------------------------------------------------------------------


    Dated: March 24, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06420 Filed 3-31-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                  Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices                                                  16191

                                                  time on the specified comment date.                     expansion plan. The total cost is                     documents on all other parties.
                                                  Protests may be considered, but                         approximately $30,500,000.                            However, the non-party commenters
                                                  intervention is necessary to become a                      Any questions regarding this                       will not receive copies of all documents
                                                  party to the proceeding.                                Application should be directed to                     filed by other parties or issued by the
                                                     eFiling is encouraged. More detailed                 Michael T Loeffler, Senior Director,                  Commission (except for the mailing of
                                                  information relating to filing                          Certificates and External Affairs for                 environmental documents issued by the
                                                  requirements, interventions, protests,                  Northern, 1111 South 103rd Street,                    Commission) and will not have the right
                                                  service, and qualifying facilities filings              Omaha, Nebraska 68124, by phone (402)                 to seek court review of the
                                                  can be found at: http://www.ferc.gov/                   398–7103, by fax (402) 398–7592, or by                Commission’s final order.
                                                  docs-filing/efiling/filing-req.pdf. For                 email at mike.loeffler@nngco.com.                        The Commission strongly encourages
                                                  other information, call (866) 208–3676                     Any person or the Commission’s Staff               electronic filings of comments, protests,
                                                  (toll free). For TTY, call (202) 502–8659.              may, within 60 days after the issuance                and interventions via the internet in lieu
                                                                                                          of the instant notice by the Commission,              of paper. See 18 CFR 385.2001(a) (1) (iii)
                                                    Dated: March 28, 2017.                                file pursuant to Rule 214 of the                      and the instructions on the
                                                  Kimberly D. Bose,                                       Commission’s Procedural Rules (18 CFR                 Commission’s Web site (www.ferc.gov)
                                                  Secretary.                                              385.214) a motion to intervene or notice              under the ‘‘e-Filing’’ link. Persons
                                                  [FR Doc. 2017–06467 Filed 3–31–17; 8:45 am]             of intervention and, pursuant to section              unable to file electronically should
                                                  BILLING CODE 6717–01–P                                  157.205 of the Commission’s                           submit an original and 5 copies of the
                                                                                                          Regulations under the NGA (18 CFR                     protest or intervention to the Federal
                                                                                                          157.205) a protest to the request. If no              Energy Regulatory Commission, 888
                                                  DEPARTMENT OF ENERGY                                    protest is filed within the time allowed              First Street NE., Washington, DC 20426.
                                                                                                          therefore, the proposed activity shall be
                                                  Federal Energy Regulatory                               deemed to be authorized effective the                   Dated: March 24, 2017.
                                                  Commission                                              day after the time allowed for protest. If            Kimberly D. Bose,
                                                                                                          a protest is filed and not withdrawn                  Secretary.
                                                  [Docket No. CP17–76–000]                                within 30 days after the time allowed                 [FR Doc. 2017–06419 Filed 3–31–17; 8:45 am]
                                                                                                          for filing a protest, the instant request             BILLING CODE 6717–01–P
                                                  Northern Natural Gas Company; Notice                    shall be treated as an application for
                                                  of Request Under Blanket                                authorization pursuant to section 7 of
                                                  Authorization                                           the NGA.                                              DEPARTMENT OF ENERGY
                                                                                                             Pursuant to section 157.9 of the
                                                     Take notice that on March 15, 2017,                  Commission’s rules, 18 CFR 157.9,                     Federal Energy Regulatory
                                                  Northern Natural Gas Company                            within 90 days of this Notice the                     Commission
                                                  (Northern), 1111 South 103rd Street,                    Commission staff will either: Complete                [Docket No. IC17–9–000]
                                                  Omaha, Nebraska 68124, filed in Docket                  its environmental assessment (EA) and
                                                  No. CP17–76–000 a prior notice request                  place it into the Commission’s public                 Commission Information Collection
                                                  pursuant to sections 157.205, 157.208,                  record (eLibrary) for this proceeding, or             Activities (FERC–510, FERC–520,
                                                  and 157.216 of the Federal Energy                       issue a Notice of Schedule for                        FERC–561, and FERC–583);
                                                  Regulatory Commission’s (Commission)                    Environmental Review. If a Notice of                  Consolidated Comment Request;
                                                  regulations under the Natural Gas Act                   Schedule for Environmental Review is                  Extension
                                                  (NGA) and Northern’s blanket                            issued, it will indicate, among other
                                                  authorizations issued in Docket No.                     milestones, the anticipated date for the              AGENCY:  Federal Energy Regulatory
                                                  CP82–401–000. Northern seeks                            Commission staff’s issuance of the final              Commission, Department of Energy.
                                                  authorization to (1) install and operate                environmental impact statement (FEIS)                 ACTION: Notice of information
                                                  a compressor station and (2) abandon                    or EA for this proposal. The filing of the            collections and request for comments.
                                                  segments of pipeline, all as more fully                 EA in the Commission’s public record
                                                  set forth in the application which is on                                                                      SUMMARY:   In compliance with the
                                                                                                          for this proceeding or the issuance of a
                                                  file with the Commission and open to                                                                          requirements of the Paperwork
                                                                                                          Notice of Schedule for Environmental
                                                  public inspection. The filing may also                  Review will serve to notify federal and               Reduction Act of 1995, the Federal
                                                  be viewed on the web at http://                         state agencies of the timing for the                  Energy Regulatory Commission
                                                  www.ferc.gov using the ‘‘eLibrary’’ link.               completion of all necessary reviews, and              (Commission or FERC) is soliciting
                                                  Enter the docket number excluding the                   the subsequent need to complete all                   public comment on the requirements
                                                  last three digits in the docket number                  federal authorizations within 90 days of              and burden of the information
                                                  field to access the document. For                       the date of issuance of the Commission                collections described below.
                                                  assistance, contact FERC at                             staff’s FEIS or EA.                                   DATES: Comments on the collections of
                                                  FERCOnlineSupport@ferc.gov or call                         Persons who wish to comment only                   information are due June 2, 2017.
                                                  toll-free, (866) 208–3676 or TTY, (202)                 on the environmental review of this                   ADDRESSES: You may submit comments
                                                  502–8659.                                               project should submit an original and                 (identified by Docket No. IC17–9–000)
                                                     Northern proposes to install and                     two copies of their comments to the                   by either of the following methods:
                                                  operate a new 15,900-horsepower (HP)                    Secretary of the Commission.                             • eFiling at Commission’s Web site:
                                                  compressor station (Lake Mills                          Environmental commenters will be                      http://www.ferc.gov/docs-filing/efiling.
                                                  Compressor Station) in Worth County,                    placed on the Commission’s                            asp.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Iowa. Additionally, Northern proposes                   environmental mailing list, will receive                 • Mail/Hand Delivery/Courier:
                                                  to abandon approximately 60 feet of                     copies of the environmental documents,                Federal Energy Regulatory Commission,
                                                  pipe from both the D- and E-lines to                    and will be notified of meetings                      Secretary of the Commission, 888 First
                                                  facilitate tie-ins. Northern states that the            associated with the Commission’s                      Street NE., Washington, DC 20426.
                                                  facilities proposed herein constitute a                 environmental review process.                            Please reference the specific
                                                  discrete, stand-alone project under the                 Environmental commenters will not be                  collection number and/or title in your
                                                  large umbrella of the Northern Lights                   required to serve copies of filed                     comments.


                                             VerDate Sep<11>2014   18:32 Mar 31, 2017   Jkt 241001   PO 00000   Frm 00036   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM   03APN1


                                                  16192                                       Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices

                                                     Instructions: All submissions must be                                 validity of the methodology and                         Surrender of a license may be desired by
                                                  formatted and filed in accordance with                                   assumptions used; (3) ways to enhance                   a licensee when a licensed project is
                                                  submission guidelines at: http://                                        the quality, utility and clarity of the                 retired or not constructed or natural
                                                  www.ferc.gov/help/submission-                                            information collections; and (4) ways to                catastrophes have damaged or destroyed
                                                  guide.asp. For user assistance contact                                   minimize the burden of the collections                  the project facilities.
                                                  FERC Online Support by email at                                          of information on those who are to                         FERC–510 is the application for the
                                                  ferconlinesupport@ferc.gov, or by phone                                  respond, including the use of automated                 surrender of a hydropower license. The
                                                  at: (866) 208–3676 (toll-free), or (202)                                 collection techniques or other forms of                 information is used by Commission staff
                                                  502–8659 for TTY.                                                        information technology.                                 to determine the broad impact of such
                                                     Docket: Users interested in receiving                                                                                         surrender. The Commission will issue a
                                                                                                                           FERC–510 [Application for Surrender
                                                  automatic notification of activity in this                                                                                       notice soliciting comments from the
                                                                                                                           of a Hydropower License]
                                                  docket or in viewing/downloading                                                                                                 public and other agencies and conduct
                                                  comments and issuances in this docket                                    OMB Control No.: 1902–0068
                                                                                                                                                                                   a careful review of the application
                                                  may do so at http://www.ferc.gov/docs-                                      Abstract: The information collected                  before issuing an order for Surrender of
                                                  filing/docs-filing.asp.                                                  under the requirements of FERC–510 is                   a License. The order is the result of an
                                                  FOR FURTHER INFORMATION CONTACT:                                         used by the Commission to implement                     analysis of the information produced
                                                  Ellen Brown may be reached by email                                      the statutory provisions of sections 4(e),              (i.e., dam safety, public safety, and
                                                  at DataClearance@FERC.gov, telephone                                     6 and 13 of the Federal Power Act (FPA)                 environmental concerns, etc.), which is
                                                  at (202) 502–8663, and fax at (202) 273–                                 (16 U.S.C. 797(e), 799, and 806). Section               examined to determine whether any
                                                  0873.                                                                    4(e) gives the Commission authority to                  conditions must be satisfied before
                                                  SUPPLEMENTARY INFORMATION:                                               issue licenses for the purposes of                      granting the surrender. The order
                                                     Type of Request: Three-year extension                                 constructing, operating and maintaining                 implements the existing regulations and
                                                  of the information collection                                            dams, water conduits, reservoirs,                       is inclusive for surrender of all types of
                                                  requirements for all collections                                         powerhouses, transmission lines or                      hydropower licenses issued by FERC
                                                  described below with no changes to the                                   other power project works necessary or                  and its predecessor, the Federal Power
                                                  current reporting requirements. Please                                   convenient for developing and                           Commission. The Commission
                                                  note that each collection is distinct from                               improving navigation, transmission and                  implements these mandatory filing
                                                  the next.                                                                utilization of power using bodies of                    requirements in the Code of Federal
                                                     Comments: Comments are invited on:                                    water over which Congress has
                                                                                                                                                                                   Regulations (CFR) under 18 CFR 6.1
                                                  (1) Whether the collections of                                           jurisdiction. Section 6 gives the
                                                                                                                                                                                   through 6.4.
                                                  information are necessary for the proper                                 Commission the authority to prescribe
                                                  performance of the functions of the                                      the conditions of licenses including the                   Type of Respondent: Private or
                                                  Commission, including whether the                                        revocation or surrender of the license.                 Municipal Hydropower Licensees.
                                                  information will have practical utility;                                 Section 13 defines the Commission’s                        Estimate of Annual Burden: 1 The
                                                  (2) the accuracy of the agency’s                                         authority to delegate time periods for                  Commission estimates the total annual
                                                  estimates of the burden and cost of the                                  when a license must be terminated if                    burden and cost 2 for this information
                                                  collections of information, including the                                project construction has not begun.                     collection as follows:

                                                                                               FERC–510 APPLICATION FOR SURRENDER OF A HYDROPOWER LICENSE
                                                                                                                             Annual                                                             Total annual
                                                                                                                                                                        Average                                          Cost per
                                                                                                                            number of        Total number                                       burden hours
                                                                 Number of respondents                                                                              burden and cost                                     respondent
                                                                                                                         responses per       of responses                                         and total
                                                                                                                                                                     per response                                           ($)
                                                                                                                           respondent                                                            annual cost

                                                                                 (1)                                            (2)          (1) * (2) = (3)              (4)                   (3) * (4) = (5)           (5) ÷ (1)

                                                  14 .................................................................                 1                  14   80 hrs.; 3 $6,120 ........   1,120 hrs.; $85,680 ...            $6,120



                                                  FERC–520 [Application for Authority                                      filing requirements to achieve this goal.               financial institution that is authorized to
                                                  To Hold Interlocking Directorate                                         Such filing requirements are found in                   underwrite or participate in the
                                                  Positions]                                                               the Code of Federal Regulations (CFR),                  marketing of public utility securities; or
                                                                                                                           specifically in 18 CFR part 45, and serve               a public utility and an electrical
                                                  OMB Control No.: 1902–0083                                               as the basis for FERC–520.                              equipment supplier to that public
                                                    Abstract: The Federal Power Act                                           FERC–520 is divided into two types of                utility, unless authorized by order of the
                                                  (FPA), as amended by the Public Utility                                  applications: Full and informational.                   Commission. In order to obtain
                                                  Regulatory Policies Act of 1978                                          The full application, as specified in 18                authorization, an applicant must
                                                  (PURPA), mandates federal oversight                                      CFR 45.8, implements the FPA                            demonstrate that neither public nor
                                                  and approval of certain electric                                         requirement under section 305(b) that it                private interests will be adversely
                                                  corporate activities to ensure that                                      is unlawful for any person to                           affected by the holding of the position.
                                                  neither public nor private interests are                                 concurrently hold the positions of                      The full application provides the
mstockstill on DSK3G9T082PROD with NOTICES




                                                  adversely affected. Accordingly, the                                     officer or director of more than one
                                                  FPA proscribes related information                                       public utility; or a public utility and a
                                                    1 ‘‘Burden’’ is the total time, effort, or financial                     2 The Commission staff thinks that the average          3 Based on additional information, we are revising

                                                  resources expended by persons to generate,                               respondent for this collection is similarly situated    the estimated average burden per response to 80
                                                  maintain, retain, or disclose or provide information                     to the Commission, in terms of salary plus benefits.    hours (rather than 10 hours). The reporting
                                                  to or for a Federal agency. For additional                               Based upon FERC’s 2017 annual average of                requirements have not changed.
                                                  information, refer to Title 5 Code of Federal                            $158,754 (for salary plus benefits), the average
                                                  Regulations 1320.3.                                                      hourly cost is $76.50/hour.



                                             VerDate Sep<11>2014         19:47 Mar 31, 2017          Jkt 241001      PO 00000    Frm 00037   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM     03APN1


                                                                                             Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices                                                                                           16193

                                                  Commission with information about any                                     whatever class or classes) which is                                           interlocked positions or is not re-elected
                                                  interlocking position for which the                                       required by each utility’s by-laws to                                         or re-appointed to such interlocked
                                                  applicant seeks authorization including,                                  elect directors; (2) an officer or director                                   positions, the Commission requires that
                                                  but not limited to, a description of                                      of two public utilities, if one utility is                                    the applicant submit a notice of change
                                                  duties and the estimated time devoted                                     owned, wholly or in part, by the other                                        within 30 days from the date of the
                                                  to the position.                                                          and, as its primary business, owns or                                         change.
                                                    An informational application,                                           operates transmission or generation
                                                  specified in 18 CFR 45.9, allows an                                                                                                                       Type of Respondents: Individuals
                                                                                                                            facilities to provide transmission service
                                                  applicant to receive automatic                                                                                                                          who plan to concurrently become
                                                                                                                            or electric power for sale to its owners;
                                                  authorization for an interlocked position                                                                                                               officers or directors of public utilities
                                                                                                                            or (3) an officer or director of more than
                                                  upon receipt of the filing by the                                                                                                                       and of certain other covered entities
                                                                                                                            one public utility, if such person is
                                                  Commission. The informational                                                                                                                           must request authorization to hold such
                                                                                                                            already authorized under part 45 to hold
                                                  application applies only to those                                         different positions as officer or director                                    interlocking positions by submitting a
                                                  individuals who seek authorization as:                                    of those utilities where the interlock                                        FERC–520.
                                                  (1) An officer or director of two or more                                 involves affiliated public utilities.                                           Estimate of Annual Burden: 1 The
                                                  public utilities where the same holding                                     Pursuant to 18 CFR 45.5, in the event                                       Commission estimates the total annual
                                                  company owns, directly or indirectly,                                     that an applicant resigns or withdraws                                        burden and cost 2 for this information
                                                  that percentage of each utility’s stock (of                               from Commission-authorized                                                    collection as follows:

                                                                            FERC–520 APPLICATION FOR AUTHORITY TO HOLD INTERLOCKING DIRECTORATE POSITIONS
                                                                                                                            Annual                                                    Average                             Total annual               Cost per
                                                                                                Number of                  number of                Total number                  burden and cost                         burden hours              respondent
                                                                                               respondents              responses per               of responses                   per response                        (total annual cost)              ($)
                                                                                                                          respondent

                                                                                                      (1)                        (2)                (1) * (2) = (3)                          (4)                          (3) * (4) = (5)              (5) ÷ (1)

                                                  Full ...................................                      16                           1                        16      50 hrs.; $3,825 ..........             800 hrs.; $61,200 ......                 $3,825
                                                  Informational ....................                           500                           1                       500      8 hrs.; $612 ...............           4,000 hrs.; $306,000                        612
                                                  Notice of Change .............                               200                           1                       200      0.25 hrs.; $19.13 .......              50 hrs.; $3,825 ..........                19.13

                                                        Total ..........................     ........................   ........................   ........................   ....................................   4,850 hrs.; $371,025         ........................



                                                  FERC–561 [Annual Report of                                                specifically defines most of the                                              between public utilities and other
                                                  Interlocking Positions]                                                   information elements in the Form 561                                          entities, allows the Commission to
                                                                                                                            including the information that must be                                        review these interlocking positions, and
                                                  OMB Control No.: 1902–0099
                                                                                                                            filed, the required filers, the directive to                                  allows identification of possible
                                                     Abstract: The FERC Form 561                                            make the information available to the                                         conflicts of interest.
                                                  responds to the FPA requirements for                                      public, and the filing deadline.                                                 Type of Respondents: Public utility
                                                  annual reporting of similar types of                                         The Commission uses the information                                        officers and directors holding financial
                                                  positions which public utility officers                                   required by 18 CFR 131.31 and collected                                       positions, insurance companies,
                                                  and directors hold with financial                                         by the Form 561 to implement the FPA                                          security underwriters, electrical
                                                  institutions, insurance companies,                                        requirement that those who are                                                equipment suppliers, fuel provider, and
                                                  utility equipment and fuel providers,                                     authorized to hold interlocked                                                any entity which is controlled by these.
                                                  and with any of an electric utility’s 20                                  directorates annually disclose all the                                           Estimate of Annual Burden: 1 The
                                                  largest purchasers of electric energy                                     interlocked positions held within the                                         Commission estimates the total annual
                                                  (i.e., the 20 entities with high                                          prior year. The Form 561 data identifies                                      burden and cost 2 for this information
                                                  expenditures of electricity). The FPA                                     persons holding interlocking positions                                        collection as follows:

                                                                                                   FERC FORM 561—ANNUAL REPORT OF INTERLOCKING POSITIONS
                                                                                                                            Annual                                                                                       Total annual
                                                                                                                                                                                      Average                                                        Cost per
                                                                                                                           number of                Total number                                                       burden hours and
                                                                 Number of respondents                                                                                            burden and cost                                                   respondent
                                                                                                                        responses per               of responses                                                             total
                                                                                                                                                                                   per response                                                         ($)
                                                                                                                          respondent                                                                                      annual cost

                                                                                (1)                                              (2)                (1) * (2) = (3)                          (4)                          (3) * (4) = (5)              (5) ÷ (1)

                                                  2,700 ............................................................                         1                    2,700       0.25 hrs.; $19.13 .......              675.00 hrs.;                              $19.13
                                                                                                                                                                                                                       $51,637.50.
mstockstill on DSK3G9T082PROD with NOTICES




                                                  FERC–583 [Annual Kilowatt Generating                                      the Federal Power Act (FPA) (16 U.S.C.                                        the Omnibus Budget Reconciliation Act
                                                  Report (Annual Charges)]                                                  803(e)), which requires the Commission                                        of 1986 (OBRA) authorizes the
                                                                                                                            to collect annual charges from                                                Commission to ‘‘assess and collect fees
                                                  OMB Control No.: 1902–0136
                                                                                                                            hydropower licensees for, among other                                         and annual charges in any fiscal year in
                                                    Abstract: The FERC–583 is used by                                       things, the cost of administering part I                                      amounts equal to all of the costs
                                                  the Commission to implement the                                           of the FPA and for the use of United                                          incurred by the Commission in that
                                                  statutory provisions of section 10(e) of                                  States dams. In addition, section 3401 of                                     fiscal year.’’ The information is


                                             VerDate Sep<11>2014         18:32 Mar 31, 2017        Jkt 241001       PO 00000        Frm 00038       Fmt 4703       Sfmt 4703       E:\FR\FM\03APN1.SGM               03APN1


                                                  16194                                       Federal Register / Vol. 82, No. 62 / Monday, April 3, 2017 / Notices

                                                  collected annually and used to                                          these filing requirements in the Code of                    Estimate of Annual Burden: 1 The
                                                  determine the amounts of the annual                                     Federal Regulations (CFR) under 18 CFR                    Commission estimates the total annual
                                                  charges to be assessed licensees for                                    part 11.1 through 11.8.4                                  burden and cost 2 for this information
                                                  reimbursable government administrative                                     Type of Respondent: FERC-regulated                     collection as follows:
                                                  costs and for the use of government                                     private and public hydropower
                                                  dams. The Commission implements                                         licensees.

                                                                                                              FERC–583—ANNUAL KILOWATT GENERATING REPORT
                                                                                                                                            [Annual Charges]

                                                                                                                            Annual                                                               Total annual
                                                                                                                                                                       Average                                            Cost per
                                                                                                                           number of        Total number                                         burden hours
                                                                Number of respondents 5                                                                            burden and cost                                       respondent
                                                                                                                        responses per       of responses                                           and total
                                                                                                                                                                    per response                                             ($)
                                                                                                                          respondent                                                              annual cost

                                                                                 (1)                                           (2)          (1) * (2) = (3)               (4)                    (3) * (4) = (5)          (5) ÷ (1)

                                                  520 ...............................................................                 1                520    2 hrs.; $153 ...............   1,040 hrs.; $79,560 ...              $153


                                                    Dated: March 24, 2017.                                                Box 127, Joplin, MO 64802, (417) 625–                     106 of the National Historic
                                                  Kimberly D. Bose,                                                       6587 or bmertens@empiredistrict.com;                      Preservation Act.
                                                  Secretary.                                                              and Randy Richardson, Plant Manager,                         m. Empire District Electric Company
                                                  [FR Doc. 2017–06420 Filed 3–31–17; 8:45 am]                             Empire District Electric Company, 2537                    filed with the Commission a Pre-
                                                  BILLING CODE 6717–01–P
                                                                                                                          Fir Road, Sarcoxie, MO 64862, (417)                       Application Document (PAD; including
                                                                                                                          625–6138 or RRichardson@                                  a proposed process plan and schedule),
                                                                                                                          empiredistrict.com.                                       pursuant to 18 CFR 5.6 of the
                                                  DEPARTMENT OF ENERGY                                                      i. FERC Contact: Colleen Corballis at                   Commission’s regulations.
                                                                                                                          (202) 502–8598 or email at                                   n. A copy of the PAD is available for
                                                  Federal Energy Regulatory                                               colleen.corballis@ferc.gov.
                                                  Commission                                                                                                                        review at the Commission in the Public
                                                                                                                            j. Cooperating agencies: Federal, state,                Reference Room or may be viewed on
                                                  [Project No. 2221–038]                                                  local, and tribal agencies with                           the Commission’s Web site (http://
                                                                                                                          jurisdiction and/or special expertise                     www.ferc.gov), using the ‘‘eLibrary’’
                                                  Empire District Electric Company;
                                                                                                                          with respect to environmental issues                      link. Enter the docket number,
                                                  Notice of Intent To File License
                                                                                                                          that wish to cooperate in the                             excluding the last three digits in the
                                                  Application, Filing of Pre-Application
                                                                                                                          preparation of the environmental                          docket number field to access the
                                                  Document (PAD), Commencement of
                                                                                                                          document should follow the                                document. For assistance, contact FERC
                                                  Pre-Filing Process, and Scoping;
                                                                                                                          instructions for filing such requests                     Online Support at
                                                  Request for Comments on the PAD
                                                                                                                          described in item o below. Cooperating                    FERCONlineSupport@ferc.gov, (866)
                                                  and Scoping Document, and
                                                                                                                          agencies should note the Commission’s                     208–3676 (toll free), or (202) 502–8659
                                                  Identification of Issues and Associated
                                                                                                                          policy that agencies that cooperate in                    (TTY). A copy is also available for
                                                  Study Requests
                                                                                                                          the preparation of the environmental                      inspection and reproduction at the
                                                    a. Type of Filing: Notice of Intent to                                document cannot also intervene. See 94                    address in paragraph h.
                                                  File License Application for a New                                      FERC ¶ 61,076 (2001).                                        Register online at http://
                                                  License and Commencing Pre-filing                                         k. With this notice, we are initiating                  www.ferc.gov/docs-filing/
                                                  Process.                                                                informal consultation with: (a) The U.S.                  esubscription.asp to be notified via
                                                    b. Project No.: 2221–038.                                             Fish and Wildlife Service under section                   email of new filing and issuances
                                                    c. Dated Filed: January 26, 2017.                                     7 of the Endangered Species Act and the                   related to this or other pending projects.
                                                    d. Submitted By: Empire District                                      joint agency regulations thereunder at                    For assistance, contact FERC Online
                                                  Electric Company.                                                       50 CFR, Part 402 and (b) the State                        Support.
                                                    e. Name of Project: Ozark Beach
                                                                                                                          Historic Preservation Officer, as                            o. With this notice, we are soliciting
                                                  Hydroelectric Project.
                                                    f. Location: On the White River near                                  required by section 106, National                         comments on the PAD and
                                                  the Town of Forsyth, in Taney County,                                   Historic Preservation Act, and the                        Commission’s staff Scoping Document 1
                                                  Missouri. The project occupies 5.1 acres                                implementing regulations of the                           (SD1), as well as study requests. All
                                                  of United States lands administered by                                  Advisory Council on Historic                              comments on the PAD and SD1, and
                                                  the U.S. Army Corps of Engineers.                                       Preservation at 36 CFR 800.2.                             study requests should be sent to Randy
                                                    g. Filed Pursuant to: 18 CFR part 5 of                                  l. With this notice, we are designating                 Richardson at the address above in
                                                  the Commission’s Regulations.                                           Empire District Electric Company as the                   paragraph h. In addition, all comments
                                                    h. Potential Applicant Contact: Blake                                 Commission’s non-federal                                  on the PAD and SD1, study requests,
                                                  Mertens, Vice President of Energy                                       representative for carrying out informal                  requests for cooperating agency status,
                                                  Supply and Delivery Operations,                                         consultation, pursuant to section 7 of                    and all communications to and from
mstockstill on DSK3G9T082PROD with NOTICES




                                                  Empire District Electric Company, P.O.                                  the Endangered Species Act and section                    Commission staff related to the merits of
                                                    4 As discussed in 18 CFR part 11, selected federal                    imposed on those federal agencies are not collected       posted at https://www.ferc.gov/docs-filing/
                                                  agencies (such as the United States Fish and                            for general statistical purposes and are not a            forms.asp#ofa.)
                                                  Wildlife Service and the National Marine Fisheries                      ‘‘collection of information’’ as defined by 5 CFR           5 Based on data from Fiscal Year 2016, there were

                                                  Service) submit annual reports to the Commission                        1320.3(c)(3). (The form and additional information        520 projects, owned by 242 FERC-regulated private
                                                  on their federal costs in administering part I of the                   on the information provided by those agencies is          and public licensees. Many of the licensees owned
                                                  Federal Power Act. The filing requirements                                                                                        multiple projects.



                                             VerDate Sep<11>2014         18:32 Mar 31, 2017         Jkt 241001      PO 00000    Frm 00039   Fmt 4703   Sfmt 4703   E:\FR\FM\03APN1.SGM       03APN1



Document Created: 2017-04-01 09:35:52
Document Modified: 2017-04-01 09:35:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of information collections and request for comments.
DatesComments on the collections of information are due June 2, 2017.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation82 FR 16191 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR