82_FR_16887 82 FR 16822 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 16822 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 65 (April 6, 2017)

Page Range16822-16823
FR Document2017-06838

Federal Register, Volume 82 Issue 65 (Thursday, April 6, 2017)
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16822-16823]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06838]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14834-000]


Merchant Hydro Developers, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On January 18, 2017, Merchant Hydro Developers, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Stony Creek Pumped Storage Hydro Project to be located near the town of 
Somerset in Somerset County, Pennsylvania. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or

[[Page 16823]]

otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) A new 
upper reservoir having a surface area of 100 acres and a storage 
capacity of 1,500 acre-feet at a surface elevation of approximately 
2,540 feet above mean sea level (msl) created through construction of 
new roller-compacted concrete or rock-filled dams; (2) a new lower 
reservoir having a surface area of 40 acres and a storage capacity of 
1,800 acre-feet at a surface elevation of approximately 1,800 feet msl 
created through construction of new roller-compacted concrete or rock-
filled dams; (3) a new 2,560-foot-long, 48-inch-diameter penstock 
connecting the upper and lower reservoirs; (4) a new 150-foot-long, 50-
foot-wide powerhouse containing two turbine-generator units with a 
total rated capacity of 91 megawatts; (5) a new transmission line 
connecting the powerhouse to a nearby electric grid interconnection 
point with options to evaluate multiple grid interconnection locations; 
and (6) appurtenant facilities. Possible initial fill water and make-up 
water would come from Stony Creek Lake. The proposed project would have 
an annual generation of 332,152 megawatt-hours.
    Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 
5710 Oak Crest Drive, Doylestown, PA 18902; phone: (267) 254-6107.
    FERC Contact: Tim Looney; phone: (202) 502-6096.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14834-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14834) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: March 30, 2017.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2017-06838 Filed 4-5-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                  16822                          Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices

                                                  inspection and reproduction at the                      below. The daytime meeting will focus                 greenmountainpower.com) on or before
                                                  address in paragraph h.                                 on resource agency, Indian tribes, and                April 11, 2017.
                                                     Register online at http://                           non-governmental organization
                                                  www.ferc.gov/docs-filing/                                                                                     Meeting Objectives
                                                                                                          concerns, while the evening meeting is
                                                  esubscription.asp to be notified via                    primarily for receiving input from the                   At the scoping meetings, staff will: (1)
                                                  email of new filing and issuances                       public. We invite all interested                      Initiate scoping of the issues; (2) review
                                                  related to this or other pending projects.              individuals, organizations, and agencies              and discuss existing conditions and
                                                  For assistance, contact FERC Online                     to attend one or both of the meetings,                resource management objectives; (3)
                                                  Support.                                                and to assist staff in identifying                    review and discuss existing information
                                                     o. With this notice, we are soliciting               particular study needs, as well as the                and identify preliminary information
                                                  comments on the PAD and                                 scope of environmental issues to be                   and study needs; (4) review and discuss
                                                  Commission’s staff Scoping Document 1                   addressed in the environmental                        the process plan and schedule for pre-
                                                  (SD1), as well as study requests. All                   document. The times and locations of                  filing activity that incorporates the time
                                                  comments on the PAD and SD1, and                        these meetings are as follows:                        frames provided for in Part 5 of the
                                                  study requests should be sent to the                                                                          Commission’s regulations and, to the
                                                  address above in paragraph h. In                        Evening Scoping Meeting                               extent possible, maximizes coordination
                                                  addition, all comments on the PAD and                     Date: Tuesday, April 25, 2017.                      of federal, state, and tribal permitting
                                                  SD1, study requests, requests for                         Time: 6:00 p.m.                                     and certification processes; and (5)
                                                  cooperating agency status, and all                        Location: Waterbury Municipal                       discuss the appropriateness of any
                                                  communications to and from                              Complex, 28 North Main Street,                        federal or state agency or Indian tribe
                                                  Commission staff related to the merits of               Waterbury, VT 05676.                                  acting as a cooperating agency for
                                                  the potential application must be filed                   Phone: (802) 244–7033.                              development of an environmental
                                                  with the Commission.                                                                                          document.
                                                     The Commission strongly encourages                   Daytime Scoping Meeting                                  Meeting participants should come
                                                  electronic filing. Please file all                         Date: Wednesday, April 26, 2017.                   prepared to discuss their issues and/or
                                                  documents using the Commission’s                           Time: 9:00 a.m.                                    concerns. Please review the PAD in
                                                  eFiling system at http://www.ferc.gov/                     Location: Capitol Plaza Hotel and                  preparation for the scoping meetings.
                                                  docs-filing/efiling.asp. Commenters can                 Conference Center, 100 State Street,                  Directions on how to obtain a copy of
                                                  submit brief comments up to 6,000                       Montpelier, VT 05602.                                 the PAD and SD1 are included in item
                                                  characters, without prior registration,                    Phone: (802) 223–5252.                             n. of this document.
                                                  using the eComment system at http://                       Scoping Document 1 (SD1), which
                                                                                                          outlines the subject areas to be                      Meeting Procedures
                                                  www.ferc.gov/docs-filing/
                                                  ecomment.asp. You must include your                     addressed in the environmental                          The meetings will be recorded by a
                                                  name and contact information at the end                 document, was mailed to the                           stenographer and will be placed in the
                                                  of your comments. For assistance,                       individuals and entities on the                       public records of the project.
                                                  please contact FERC Online Support at                   Commission’s mailing list. Copies of                    Dated: March 31, 2017.
                                                  FERCOnlineSupport@ferc.gov. In lieu of                  SD1 will be available at the scoping                  Kimberly D. Bose,
                                                  electronic filing, please send a paper                  meetings, or may be viewed on the web                 Secretary.
                                                  copy to: Secretary, Federal Energy                      at http://www.ferc.gov, using the                     [FR Doc. 2017–06846 Filed 4–5–17; 8:45 am]
                                                  Regulatory Commission, 888 First Street                 ‘‘eLibrary’’ link. Follow the directions
                                                                                                                                                                BILLING CODE 6717–01–P
                                                  NE., Washington, DC 20426. The first                    for accessing information in paragraph
                                                  page of any filing should include docket                n. Based on all oral and written
                                                  number P–2879–011.                                      comments, a Scoping Document 2 (SD2)                  DEPARTMENT OF ENERGY
                                                     All filings with the Commission must                 may be issued. SD2 may include a
                                                  bear the appropriate heading:                           revised process plan and schedule, as                 Federal Energy Regulatory
                                                  ‘‘Comments on Pre-Application                           well as a list of issues, identified                  Commission
                                                  Document,’’ ‘‘Study Requests,’’                         through the scoping process.
                                                                                                                                                                [Project No. 14834–000]
                                                  ‘‘Comments on Scoping Document 1,’’                     Environmental Site Review
                                                  ‘‘Request for Cooperating Agency                                                                              Merchant Hydro Developers, LLC;
                                                  Status,’’ or ‘‘Communications to and                       The potential applicant and
                                                                                                                                                                Notice of Preliminary Permit
                                                  from Commission Staff.’’ Any                            Commission staff will conduct an
                                                                                                                                                                Application Accepted for Filing and
                                                  individual or entity interested in                      Environmental Site Review (site visit) of
                                                                                                                                                                Soliciting Comments, Motions To
                                                  submitting study requests, commenting                   the project on Tuesday, April 25,
                                                                                                                                                                Intervene, and Competing Applications
                                                  on the PAD or SD1, and any agency                       starting at 2:00 p.m., and ending at or
                                                  requesting cooperating status must do so                about 3:30. All participants should meet                 On January 18, 2017, Merchant Hydro
                                                  by May 30, 2017.                                        at 1:45 p.m. at 341 Power Plant Road,                 Developers, LLC, filed an application for
                                                     p. Although our current intent is to                 Duxbury, Vermont, at the parking lot                  a preliminary permit, pursuant to
                                                  prepare an environmental assessment                     located to the left off Power Plant Road              section 4(f) of the Federal Power Act
                                                  (EA), there is the possibility that an                  before you reach the substation and                   (FPA), proposing to study the feasibility
                                                  Environmental Impact Statement (EIS)                    powerhouse. Participants are                          of the Stony Creek Pumped Storage
                                                  will be required. Nevertheless, this                    responsible for their own transportation.             Hydro Project to be located near the
                                                                                                          Persons with questions about the site                 town of Somerset in Somerset County,
mstockstill on DSK3G9T082PROD with NOTICES




                                                  meeting will satisfy the NEPA scoping
                                                  requirements, irrespective of whether an                visit should contact John Greenan (802–               Pennsylvania. The sole purpose of a
                                                  EA or EIS is issued by the Commission.                  770–3213) or Gary Lemay (603–428–                     preliminary permit, if issued, is to grant
                                                                                                          4960). Persons planning on participating              the permit holder priority to file a
                                                  Scoping Meetings                                        in the site visit should contact Gary                 license application during the permit
                                                    Commission staff will hold two                        Lemay (603–428–4960; glemay@                          term. A preliminary permit does not
                                                  scoping meetings in the vicinity of the                 gomezandsullivan.com) or Sharon Lucia                 authorize the permit holder to perform
                                                  project at the times and places noted                   (Sharon.Lucia@                                        any land-disturbing activities or


                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000   Frm 00044   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1


                                                                                 Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices                                                    16823

                                                  otherwise enter upon lands or waters                       More information about this project,               may do so at http://www.ferc.gov/docs-
                                                  owned by others without the owners’                     including a copy of the application, can              filing/docs-filing.asp.
                                                  express permission.                                     be viewed or printed on the ‘‘eLibrary’’              FOR FURTHER INFORMATION CONTACT:
                                                     The proposed project would consist of                link of the Commission’s Web site at                  Ellen Brown may be reached by email
                                                  the following: (1) A new upper reservoir                http://www.ferc.gov/docs-filing/                      at DataClearance@FERC.gov, telephone
                                                  having a surface area of 100 acres and                  elibrary.asp. Enter the docket number                 at (202) 502–8663, and fax at (202) 273–
                                                  a storage capacity of 1,500 acre-feet at a              (P–14834) in the docket number field to               0873.
                                                  surface elevation of approximately 2,540                access the document. For assistance,
                                                  feet above mean sea level (msl) created                 contact FERC Online Support.                          SUPPLEMENTARY INFORMATION:
                                                  through construction of new roller-                                                                              Title: FERC–725E, Mandatory
                                                                                                            Dated: March 30, 2017.
                                                  compacted concrete or rock-filled dams;                                                                       Reliability Standards for the Western
                                                                                                          Kimberly D. Bose,
                                                  (2) a new lower reservoir having a                                                                            Electric Coordinating Council.
                                                  surface area of 40 acres and a storage                  Secretary.
                                                                                                                                                                   OMB Control No.: 1902–0246.
                                                  capacity of 1,800 acre-feet at a surface                [FR Doc. 2017–06838 Filed 4–5–17; 8:45 am]
                                                                                                                                                                   Type of Request: Revision to the
                                                  elevation of approximately 1,800 feet                   BILLING CODE 6717–01–P
                                                                                                                                                                FERC–725E information collection
                                                  msl created through construction of new                                                                       requirements, as discussed in Docket
                                                  roller-compacted concrete or rock-filled                                                                      No. RD16–10.
                                                  dams; (3) a new 2,560-foot-long, 48-                    DEPARTMENT OF ENERGY
                                                                                                                                                                   Abstract: On March 23, 2016 (and
                                                  inch-diameter penstock connecting the
                                                                                                          Federal Energy Regulatory                             supplemented on November 16, 2016),
                                                  upper and lower reservoirs; (4) a new
                                                                                                          Commission                                            the North American Electric Reliability
                                                  150-foot-long, 50-foot-wide powerhouse
                                                                                                                                                                Corporation (NERC) and Western
                                                  containing two turbine-generator units                  [Docket No. RD16–10–000]
                                                                                                                                                                Electricity Coordinating Council
                                                  with a total rated capacity of 91
                                                                                                          Commission Information Collection                     (WECC) filed a joint petition to retire
                                                  megawatts; (5) a new transmission line
                                                                                                          Activities (FERC–725e); Comment                       regional Reliability Standard TOP–007–
                                                  connecting the powerhouse to a nearby
                                                                                                          Request; Revision                                     WECC–1a—System Operating Limits
                                                  electric grid interconnection point with
                                                                                                                                                                (‘‘SOL’’). The purpose of the proposed
                                                  options to evaluate multiple grid
                                                                                                          AGENCY:  Federal Energy Regulatory                    retirement is to shift away from the
                                                  interconnection locations; and (6)
                                                                                                          Commission, Department of Energy.                     path-centric model and allow entities in
                                                  appurtenant facilities. Possible initial
                                                  fill water and make-up water would                      ACTION: Notice of revised information                 the Western Interconnection to align
                                                  come from Stony Creek Lake. The                         collection and request for comments.                  their operating practices with the
                                                  proposed project would have an annual                                                                         framework established in the continent-
                                                                                                          SUMMARY:    In compliance with the                    wide TOP/IRO Reliability Standards
                                                  generation of 332,152 megawatt-hours.                   requirements of the Paperwork
                                                     Applicant Contact: Adam Rousselle,                                                                         approved in Order No. 817,1 which,
                                                                                                          Reduction Act the Federal Energy                      according to NERC and WECC, achieve
                                                  Merchant Hydro Developers, LLC, 5710
                                                                                                          Regulatory Commission (Commission or                  the objective of operating within
                                                  Oak Crest Drive, Doylestown, PA 18902;
                                                                                                          FERC) is soliciting public comment on                 acceptable pre- and post-contingency
                                                  phone: (267) 254–6107.
                                                     FERC Contact: Tim Looney; phone:                     a revision to the information collection,             reliability criteria (i.e., within SOLs and
                                                  (202) 502–6096.                                         FERC–725E (Mandatory Reliability                      Interconnection Reliability Operating
                                                     Deadline for filing comments, motions                Standards for the Western Electric                    Limits (‘‘IROL’’). On March 10, 2017,
                                                  to intervene, competing applications                    Coordinating Council) which will be                   the Commission approved the
                                                  (without notices of intent), or notices of              submitted to the Office of Management                 retirement of regional Reliability
                                                  intent to file competing applications: 60               and Budget (OMB) for a review of the                  Standard TOP–007–WECC–1a.2
                                                  days from the issuance of this notice.                  information collection requirements.                     The remaining reporting requirements
                                                  Competing applications and notices of                   DATES: Comments on the collection of                  included in FERC–725E are not being
                                                  intent must meet the requirements of 18                 information are due June 5, 2017.                     revised.3
                                                  CFR 4.36.                                               ADDRESSES: You may submit comments                       Type of Respondents: Public utilities.
                                                     The Commission strongly encourages                   (identified by Docket No. RD16–10–000)                   Estimate of Annual Burden 4: The
                                                  electronic filing. Please file comments,                by either of the following methods:                   Commission estimates the reduction in
                                                  motions to intervene, notices of intent,                   • eFiling at Commission’s Web site:                the annual public reporting burden for
                                                  and competing applications using the                    http://www.ferc.gov/docs-filing/                      the FERC–725E (due to the retirement of
                                                  Commission’s eFiling system at http://                  efiling.asp
                                                  www.ferc.gov/docs-filing/efiling.asp.                      • Mail/Hand Delivery/Courier:                         1 The burdens related to Order No. 871 are
                                                  Commenters can submit brief comments                    Federal Energy Regulatory Commission,                 included in FERC–725Z (Mandatory Reliability
                                                  up to 6,000 characters, without prior                   Secretary of the Commission, 888 First                Standards: IRO Reliability Standards, OMB Control
                                                  registration, using the eComment system                 Street NE., Washington, DC 20426.                     No. 1902–0276), and FERC–725A Mandatory
                                                  at http://www.ferc.gov/docs-filing/                        Instructions: All submissions must be              Reliability Standards for the Bulk-Power System,
                                                                                                                                                                OMB Control No. 1902–0244).
                                                  ecomment.asp. You must include your                     formatted and filed in accordance with                   2 The Delegated Letter Order is posted in FERC’s
                                                  name and contact information at the end                 submission guidelines at: http://                     eLibrary at https://elibrary.ferc.gov/idmws/
                                                  of your comments. For assistance,                       www.ferc.gov/help/submission-                         common/opennat.asp?fileID=14515285.
                                                  please contact FERC Online Support at                   guide.asp. For user assistance contact                   3 In the current OMB-approved inventory for

                                                  FERCOnlineSupport@ferc.gov, (866)                       FERC Online Support by email at                       FERC–725E, the total remaining requirements are
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                estimated annually at 7,038 burden hours for
                                                  208–3676 (toll free), or (202) 502–8659                 ferconlinesupport@ferc.gov, or by phone               reporting and 771 burden hours for recordkeeping.
                                                  (TTY). In lieu of electronic filing, please             at: (866) 208–3676 (toll-free), or (202)                 4 Burden is defined as the total time, effort, or

                                                  send a paper copy to: Secretary, Federal                502–8659 for TTY.                                     financial resources expended by persons to
                                                  Energy Regulatory Commission, 888                          Docket: Users interested in receiving              generate, maintain, retain, or disclose or provide
                                                                                                                                                                information to or for a Federal agency. For further
                                                  First Street NE., Washington, DC 20426.                 automatic notification of activity in this            explanation of what is included in the information
                                                  The first page of any filing should                     docket or in viewing/downloading                      collection burden, refer to 5 Code of Federal
                                                  include docket number P–14834–000.                      comments and issuances in this docket                 Regulations 1320.3.



                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1



Document Created: 2017-04-06 01:46:38
Document Modified: 2017-04-06 01:46:38
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 16822 

2025 Federal Register | Disclaimer | Privacy Policy