In compliance with the requirements of the Paperwork Reduction Act the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on a revision to the information collection, FERC-725E (Mandatory Reliability Standards for the Western Electric Coordinating Council) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements.

Federal Register, Volume 82 Issue 65 (Thursday, April 6, 2017)
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16823-16824]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06847]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RD16-10-000]


Commission Information Collection Activities (FERC-725e); Comment 
Request; Revision

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of revised information collection and request for 
comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act the Federal Energy Regulatory Commission (Commission or FERC) is 
soliciting public comment on a revision to the information collection, 
FERC-725E (Mandatory Reliability Standards for the Western Electric 
Coordinating Council) which will be submitted to the Office of 
Management and Budget (OMB) for a review of the information collection 
requirements.

DATES: Comments on the collection of information are due June 5, 2017.

ADDRESSES: You may submit comments (identified by Docket No. RD16-10-
000) by either of the following methods:
     eFiling at Commission's Web site: http://www.ferc.gov/docs-filing/efiling.asp
     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: http://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at [email protected], or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at http://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663, and fax at (202) 
273-0873.

SUPPLEMENTARY INFORMATION:
    Title: FERC-725E, Mandatory Reliability Standards for the Western 
Electric Coordinating Council.
    OMB Control No.: 1902-0246.
    Type of Request: Revision to the FERC-725E information collection 
requirements, as discussed in Docket No. RD16-10.
    Abstract: On March 23, 2016 (and supplemented on November 16, 
2016), the North American Electric Reliability Corporation (NERC) and 
Western Electricity Coordinating Council (WECC) filed a joint petition 
to retire regional Reliability Standard TOP-007-WECC-1a--System 
Operating Limits (``SOL''). The purpose of the proposed retirement is 
to shift away from the path-centric model and allow entities in the 
Western Interconnection to align their operating practices with the 
framework established in the continent-wide TOP/IRO Reliability 
Standards approved in Order No. 817,\1\ which, according to NERC and 
WECC, achieve the objective of operating within acceptable pre- and 
post-contingency reliability criteria (i.e., within SOLs and 
Interconnection Reliability Operating Limits (``IROL''). On March 10, 
2017, the Commission approved the retirement of regional Reliability 
Standard TOP-007-WECC-1a.\2\
---------------------------------------------------------------------------

    \1\ The burdens related to Order No. 871 are included in FERC-
725Z (Mandatory Reliability Standards: IRO Reliability Standards, 
OMB Control No. 1902-0276), and FERC-725A Mandatory Reliability 
Standards for the Bulk-Power System, OMB Control No. 1902-0244).
    \2\ The Delegated Letter Order is posted in FERC's eLibrary at 
https://elibrary.ferc.gov/idmws/common/opennat.asp?fileID=14515285.
---------------------------------------------------------------------------

    The remaining reporting requirements included in FERC-725E are not 
being revised.\3\
---------------------------------------------------------------------------

    \3\ In the current OMB-approved inventory for FERC-725E, the 
total remaining requirements are estimated annually at 7,038 burden 
hours for reporting and 771 burden hours for recordkeeping.
---------------------------------------------------------------------------

    Type of Respondents: Public utilities.
    Estimate of Annual Burden \4\: The Commission estimates the 
reduction in the annual public reporting burden for the FERC-725E (due 
to the retirement of

[[Page 16824]]

regional Reliability Standard TOP-007-WECC-1a) as follows: \5\
---------------------------------------------------------------------------

    \4\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 Code of Federal Regulations 1320.3.
    \5\ The reductions in burden and cost shown in the table are the 
same figures as those in the current OMB-approved inventory for the 
reporting and recordkeeping requirements, now being retired.

   FERC-725E, Mandatory Reliability Standards for the Western Electric Coordinating Council, Reductions Due to
                                               Docket No. RD16-10
----------------------------------------------------------------------------------------------------------------
                                                                                                   Total annual
    Information collection        Number of     Annual number   Total number    Average burden    burden hours &
         requirements            respondents    of responses    of responses   hours & cost per    total annual
                                               per respondent                      response            cost
                                          (1)             (2)     (1) * (2) =  (4).............  (3) * (4) = (5)
                                                                          (3)
----------------------------------------------------------------------------------------------------------------
Reporting Requirement--                     9               3              27  40 hrs.; $2,908.  1,080 hrs.;
 Transmission Operators that                                                                      $78,516.
 operate qualified transfer
 paths \6\.
Recordkeeping Requirement--                 9               1  ..............  12 hrs.; $347...  108 hrs.;
 Transmission Operators that                                                                      $3,124.
 operate qualified transfer
 paths.
                              ----------------------------------------------------------------------------------
    TOTAL REDUCTION (Due to    ..............  ..............  ..............  ................  1,188 hrs.;
     Docket No. RD16-10).                                                                         $81,640.
----------------------------------------------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.
---------------------------------------------------------------------------

    \6\ This is based on burden estimates taken from the Order in 
Docket No. RR07-11-000, P. 130.

    Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06847 Filed 4-5-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices                                                    16823

                                                  otherwise enter upon lands or waters                       More information about this project,               may do so at http://www.ferc.gov/docs-
                                                  owned by others without the owners’                     including a copy of the application, can              filing/docs-filing.asp.
                                                  express permission.                                     be viewed or printed on the ‘‘eLibrary’’              FOR FURTHER INFORMATION CONTACT:
                                                     The proposed project would consist of                link of the Commission’s Web site at                  Ellen Brown may be reached by email
                                                  the following: (1) A new upper reservoir                http://www.ferc.gov/docs-filing/                      at DataClearance@FERC.gov, telephone
                                                  having a surface area of 100 acres and                  elibrary.asp. Enter the docket number                 at (202) 502–8663, and fax at (202) 273–
                                                  a storage capacity of 1,500 acre-feet at a              (P–14834) in the docket number field to               0873.
                                                  surface elevation of approximately 2,540                access the document. For assistance,
                                                  feet above mean sea level (msl) created                 contact FERC Online Support.                          SUPPLEMENTARY INFORMATION:
                                                  through construction of new roller-                                                                              Title: FERC–725E, Mandatory
                                                                                                            Dated: March 30, 2017.
                                                  compacted concrete or rock-filled dams;                                                                       Reliability Standards for the Western
                                                                                                          Kimberly D. Bose,
                                                  (2) a new lower reservoir having a                                                                            Electric Coordinating Council.
                                                  surface area of 40 acres and a storage                  Secretary.
                                                                                                                                                                   OMB Control No.: 1902–0246.
                                                  capacity of 1,800 acre-feet at a surface                [FR Doc. 2017–06838 Filed 4–5–17; 8:45 am]
                                                                                                                                                                   Type of Request: Revision to the
                                                  elevation of approximately 1,800 feet                   BILLING CODE 6717–01–P
                                                                                                                                                                FERC–725E information collection
                                                  msl created through construction of new                                                                       requirements, as discussed in Docket
                                                  roller-compacted concrete or rock-filled                                                                      No. RD16–10.
                                                  dams; (3) a new 2,560-foot-long, 48-                    DEPARTMENT OF ENERGY
                                                                                                                                                                   Abstract: On March 23, 2016 (and
                                                  inch-diameter penstock connecting the
                                                                                                          Federal Energy Regulatory                             supplemented on November 16, 2016),
                                                  upper and lower reservoirs; (4) a new
                                                                                                          Commission                                            the North American Electric Reliability
                                                  150-foot-long, 50-foot-wide powerhouse
                                                                                                                                                                Corporation (NERC) and Western
                                                  containing two turbine-generator units                  [Docket No. RD16–10–000]
                                                                                                                                                                Electricity Coordinating Council
                                                  with a total rated capacity of 91
                                                                                                          Commission Information Collection                     (WECC) filed a joint petition to retire
                                                  megawatts; (5) a new transmission line
                                                                                                          Activities (FERC–725e); Comment                       regional Reliability Standard TOP–007–
                                                  connecting the powerhouse to a nearby
                                                                                                          Request; Revision                                     WECC–1a—System Operating Limits
                                                  electric grid interconnection point with
                                                                                                                                                                (‘‘SOL’’). The purpose of the proposed
                                                  options to evaluate multiple grid
                                                                                                          AGENCY:  Federal Energy Regulatory                    retirement is to shift away from the
                                                  interconnection locations; and (6)
                                                                                                          Commission, Department of Energy.                     path-centric model and allow entities in
                                                  appurtenant facilities. Possible initial
                                                  fill water and make-up water would                      ACTION: Notice of revised information                 the Western Interconnection to align
                                                  come from Stony Creek Lake. The                         collection and request for comments.                  their operating practices with the
                                                  proposed project would have an annual                                                                         framework established in the continent-
                                                                                                          SUMMARY:    In compliance with the                    wide TOP/IRO Reliability Standards
                                                  generation of 332,152 megawatt-hours.                   requirements of the Paperwork
                                                     Applicant Contact: Adam Rousselle,                                                                         approved in Order No. 817,1 which,
                                                                                                          Reduction Act the Federal Energy                      according to NERC and WECC, achieve
                                                  Merchant Hydro Developers, LLC, 5710
                                                                                                          Regulatory Commission (Commission or                  the objective of operating within
                                                  Oak Crest Drive, Doylestown, PA 18902;
                                                                                                          FERC) is soliciting public comment on                 acceptable pre- and post-contingency
                                                  phone: (267) 254–6107.
                                                     FERC Contact: Tim Looney; phone:                     a revision to the information collection,             reliability criteria (i.e., within SOLs and
                                                  (202) 502–6096.                                         FERC–725E (Mandatory Reliability                      Interconnection Reliability Operating
                                                     Deadline for filing comments, motions                Standards for the Western Electric                    Limits (‘‘IROL’’). On March 10, 2017,
                                                  to intervene, competing applications                    Coordinating Council) which will be                   the Commission approved the
                                                  (without notices of intent), or notices of              submitted to the Office of Management                 retirement of regional Reliability
                                                  intent to file competing applications: 60               and Budget (OMB) for a review of the                  Standard TOP–007–WECC–1a.2
                                                  days from the issuance of this notice.                  information collection requirements.                     The remaining reporting requirements
                                                  Competing applications and notices of                   DATES: Comments on the collection of                  included in FERC–725E are not being
                                                  intent must meet the requirements of 18                 information are due June 5, 2017.                     revised.3
                                                  CFR 4.36.                                               ADDRESSES: You may submit comments                       Type of Respondents: Public utilities.
                                                     The Commission strongly encourages                   (identified by Docket No. RD16–10–000)                   Estimate of Annual Burden 4: The
                                                  electronic filing. Please file comments,                by either of the following methods:                   Commission estimates the reduction in
                                                  motions to intervene, notices of intent,                   • eFiling at Commission’s Web site:                the annual public reporting burden for
                                                  and competing applications using the                    http://www.ferc.gov/docs-filing/                      the FERC–725E (due to the retirement of
                                                  Commission’s eFiling system at http://                  efiling.asp
                                                  www.ferc.gov/docs-filing/efiling.asp.                      • Mail/Hand Delivery/Courier:                         1 The burdens related to Order No. 871 are
                                                  Commenters can submit brief comments                    Federal Energy Regulatory Commission,                 included in FERC–725Z (Mandatory Reliability
                                                  up to 6,000 characters, without prior                   Secretary of the Commission, 888 First                Standards: IRO Reliability Standards, OMB Control
                                                  registration, using the eComment system                 Street NE., Washington, DC 20426.                     No. 1902–0276), and FERC–725A Mandatory
                                                  at http://www.ferc.gov/docs-filing/                        Instructions: All submissions must be              Reliability Standards for the Bulk-Power System,
                                                                                                                                                                OMB Control No. 1902–0244).
                                                  ecomment.asp. You must include your                     formatted and filed in accordance with                   2 The Delegated Letter Order is posted in FERC’s
                                                  name and contact information at the end                 submission guidelines at: http://                     eLibrary at https://elibrary.ferc.gov/idmws/
                                                  of your comments. For assistance,                       www.ferc.gov/help/submission-                         common/opennat.asp?fileID=14515285.
                                                  please contact FERC Online Support at                   guide.asp. For user assistance contact                   3 In the current OMB-approved inventory for

                                                  FERCOnlineSupport@ferc.gov, (866)                       FERC Online Support by email at                       FERC–725E, the total remaining requirements are
mstockstill on DSK3G9T082PROD with NOTICES




                                                                                                                                                                estimated annually at 7,038 burden hours for
                                                  208–3676 (toll free), or (202) 502–8659                 ferconlinesupport@ferc.gov, or by phone               reporting and 771 burden hours for recordkeeping.
                                                  (TTY). In lieu of electronic filing, please             at: (866) 208–3676 (toll-free), or (202)                 4 Burden is defined as the total time, effort, or

                                                  send a paper copy to: Secretary, Federal                502–8659 for TTY.                                     financial resources expended by persons to
                                                  Energy Regulatory Commission, 888                          Docket: Users interested in receiving              generate, maintain, retain, or disclose or provide
                                                                                                                                                                information to or for a Federal agency. For further
                                                  First Street NE., Washington, DC 20426.                 automatic notification of activity in this            explanation of what is included in the information
                                                  The first page of any filing should                     docket or in viewing/downloading                      collection burden, refer to 5 Code of Federal
                                                  include docket number P–14834–000.                      comments and issuances in this docket                 Regulations 1320.3.



                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1


                                                  16824                          Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices

                                                  regional Reliability Standard TOP–007–
                                                  WECC–1a) as follows: 5

                                                   FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
                                                                                        DUE TO DOCKET NO. RD16–10
                                                                                                                                       Annual                                               Average burden                     Total annual burden
                                                                                                          Number of                   number of                Total number
                                                       Information collection requirements                                                                                                  hours & cost per                   hours & total annual
                                                                                                         respondents               responses per               of responses                    response                                cost
                                                                                                                                     respondent

                                                                                                                 (1)                        (2)                (1) * (2) = (3)                         (4)                         (3) * (4) = (5)

                                                  Reporting Requirement—Transmission Op-                                      9                         3                         27     40 hrs.; $2,908 ..........            1,080 hrs.; $78,516.
                                                    erators that operate qualified transfer
                                                    paths 6.
                                                  Recordkeeping Requirement—Transmission                                     9                           1    ........................   12 hrs.; $347 .............           108 hrs.; $3,124.
                                                    Operators that operate qualified transfer
                                                    paths.

                                                       TOTAL REDUCTION (Due to Docket                   ........................   ........................   ........................   ...................................   1,188 hrs.; $81,640.
                                                        No. RD16–10).



                                                    Comments: Comments are invited on:                        d. Applicant: Alabama Power                                                   The Commission’s Rules of Practice
                                                  (1) Whether the collection of                            Company.                                                                      and Procedure require all intervenors
                                                  information is necessary for the proper                     e. Name of Project: Martin Dam                                             filing documents with the Commission
                                                  performance of the functions of the                      Hydroelectric Project.                                                        to serve a copy of that document on
                                                  Commission, including whether the                           f. Location: The project is located on                                     each person whose name appears on the
                                                  information will have practical utility;                 the Tallapoosa River in Coosa and                                             official service list for the project.
                                                  (2) the accuracy of the agency’s estimate                Elmore counties, Alabama.                                                     Further, if an intervenor files comments
                                                  of the burden and cost of the collection                    g. Filed Pursuant to: Federal Power                                        or documents with the Commission
                                                  of information, including the validity of                Act, 16 U.S.C. 791a–825r.                                                     relating to the merits of an issue that
                                                  the methodology and assumptions used;                       h. Applicant Contact: David                                                may affect the responsibilities of a
                                                  (3) ways to enhance the quality, utility                 Anderson, (205) 257–1398, dkanders@                                           particular resource agency, they must
                                                  and clarity of the information collection;               southernco.com.                                                               also serve a copy of the document on
                                                  and (4) ways to minimize the burden of                      i. FERC Contact: Krista Sakallaris,                                        that resource agency.
                                                  the collection of information on those                   (202) 502–6302, krista.sakallaris@                                               k. Description of Request: The
                                                  who are to respond, including the use                    ferc.gov.                                                                     licensee filed for Commission approval
                                                  of automated collection techniques or                       j. Deadline for filing comments,                                           a revised Shoreline Management Plan
                                                  other forms of information technology.                   motions to intervene, and protests: May                                       pursuant to Article 412 of the license
                                                    Dated: March 31, 2017.                                 1, 2017.                                                                      order issued December 17, 2015. The
                                                  Kimberly D. Bose,                                           The Commission strongly encourages                                         revised plan incorporates the provisions
                                                  Secretary.                                               electronic filing. Please file comments,                                      required by Article 412 into the
                                                  [FR Doc. 2017–06847 Filed 4–5–17; 8:45 am]               motions to intervene, and protests using                                      previously approved plan, as well as
                                                                                                           the Commission’s eFiling system at                                            project boundary modifications and the
                                                  BILLING CODE 6717–01–P
                                                                                                           http://www.ferc.gov/docs-filing/                                              reclassification of some project lands.
                                                                                                           efiling.asp. Commenters can submit                                            The plan also includes three proposed
                                                  DEPARTMENT OF ENERGY                                     brief comments up to 6,000 characters,                                        changes to the project boundary, these
                                                                                                           without prior registration, using the                                         changes were previously reviewed and
                                                  Federal Energy Regulatory                                eComment system at http://                                                    acted on at the time of relicensing;
                                                  Commission                                               www.ferc.gov/docs-filing/                                                     however, Alabama Power has received
                                                                                                           ecomment.asp. You must include your                                           and provided additional information
                                                  [Project No. 349–193]                                    name and contact information at the end                                       prompting the request for potential
                                                                                                           of your comments. For assistance,                                             revision to the previously approved
                                                  Alabama Power Company; Notice of                                                                                                       plan.
                                                  Application Accepted for Filing and                      please contact FERC Online Support at
                                                  Soliciting Comments, Motions To                          FERCOnlineSupport@ferc.gov, (866)                                                l. Locations of the Application: A
                                                  Intervene, and Protests                                  208–3676 (toll free), or (202) 502–8659                                       copy of the application is available for
                                                                                                           (TTY). In lieu of electronic filing, please                                   inspection and reproduction at the
                                                    Take notice that the following                         send a paper copy to: Secretary, Federal                                      Commission’s Public Reference Room,
                                                  hydroelectric application has been filed                 Energy Regulatory Commission, 888                                             located at 888 First Street NE., Room
                                                  with the Commission and is available                     First Street NE., Washington, DC 20426.                                       2A, Washington, DC 20426, or by calling
mstockstill on DSK3G9T082PROD with NOTICES




                                                  for public inspection:                                   The first page of any filing should                                           (202) 502–8371. This filing may also be
                                                    a. Application Type: Shoreline                         include docket number P–349–193.                                              viewed on the Commission’s Web site at
                                                  Management Plan.                                         Comments emailed to Commission staff                                          http://www.ferc.gov using the
                                                    b. Project No: 349–193.                                are not considered part of the                                                ‘‘eLibrary’’ link. Enter the docket
                                                    c. Date Filed: December 19, 2016.                      Commission record.                                                            number excluding the last three digits in
                                                    5 The reductions in burden and cost shown in the       OMB-approved inventory for the reporting and                                    6 This is based on burden estimates taken from

                                                  table are the same figures as those in the current       recordkeeping requirements, now being retired.                                the Order in Docket No. RR07–11–000, P. 130.



                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000     Frm 00046        Fmt 4703       Sfmt 4703       E:\FR\FM\06APN1.SGM              06APN1



Document Created: 2017-04-06 01:46:52
Document Modified: 2017-04-06 01:46:52
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
ActionNotice of revised information collection and request for comments.
DatesComments on the collection of information are due June 5, 2017.
ContactEllen Brown may be reached by email at [email protected], telephone at (202) 502-8663, and fax at (202) 273-0873.
FR Citation82 FR 16823 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR