82_FR_16889 82 FR 16824 - Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

82 FR 16824 - Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 65 (April 6, 2017)

Page Range16824-16825
FR Document2017-06845

Federal Register, Volume 82 Issue 65 (Thursday, April 6, 2017)
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16824-16825]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06845]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 349-193]


Alabama Power Company; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Shoreline Management Plan.
    b. Project No: 349-193.
    c. Date Filed: December 19, 2016.
    d. Applicant: Alabama Power Company.
    e. Name of Project: Martin Dam Hydroelectric Project.
    f. Location: The project is located on the Tallapoosa River in 
Coosa and Elmore counties, Alabama.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: David Anderson, (205) 257-1398, 
[email protected].
    i. FERC Contact: Krista Sakallaris, (202) 502-6302, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: May 1, 2017.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please 
send a paper copy to: Secretary, Federal Energy Regulatory Commission, 
888 First Street NE., Washington, DC 20426. The first page of any 
filing should include docket number P-349-193. Comments emailed to 
Commission staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee filed for Commission 
approval a revised Shoreline Management Plan pursuant to Article 412 of 
the license order issued December 17, 2015. The revised plan 
incorporates the provisions required by Article 412 into the previously 
approved plan, as well as project boundary modifications and the 
reclassification of some project lands. The plan also includes three 
proposed changes to the project boundary, these changes were previously 
reviewed and acted on at the time of relicensing; however, Alabama 
Power has received and provided additional information prompting the 
request for potential revision to the previously approved plan.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at http://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in

[[Page 16825]]

the docket number field to access the document. You may also register 
online at http://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above. Agencies may obtain copies of the application directly from 
the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06845 Filed 4-5-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                  16824                          Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices

                                                  regional Reliability Standard TOP–007–
                                                  WECC–1a) as follows: 5

                                                   FERC–725E, MANDATORY RELIABILITY STANDARDS FOR THE WESTERN ELECTRIC COORDINATING COUNCIL, REDUCTIONS
                                                                                        DUE TO DOCKET NO. RD16–10
                                                                                                                                       Annual                                               Average burden                     Total annual burden
                                                                                                          Number of                   number of                Total number
                                                       Information collection requirements                                                                                                  hours & cost per                   hours & total annual
                                                                                                         respondents               responses per               of responses                    response                                cost
                                                                                                                                     respondent

                                                                                                                 (1)                        (2)                (1) * (2) = (3)                         (4)                         (3) * (4) = (5)

                                                  Reporting Requirement—Transmission Op-                                      9                         3                         27     40 hrs.; $2,908 ..........            1,080 hrs.; $78,516.
                                                    erators that operate qualified transfer
                                                    paths 6.
                                                  Recordkeeping Requirement—Transmission                                     9                           1    ........................   12 hrs.; $347 .............           108 hrs.; $3,124.
                                                    Operators that operate qualified transfer
                                                    paths.

                                                       TOTAL REDUCTION (Due to Docket                   ........................   ........................   ........................   ...................................   1,188 hrs.; $81,640.
                                                        No. RD16–10).



                                                    Comments: Comments are invited on:                        d. Applicant: Alabama Power                                                   The Commission’s Rules of Practice
                                                  (1) Whether the collection of                            Company.                                                                      and Procedure require all intervenors
                                                  information is necessary for the proper                     e. Name of Project: Martin Dam                                             filing documents with the Commission
                                                  performance of the functions of the                      Hydroelectric Project.                                                        to serve a copy of that document on
                                                  Commission, including whether the                           f. Location: The project is located on                                     each person whose name appears on the
                                                  information will have practical utility;                 the Tallapoosa River in Coosa and                                             official service list for the project.
                                                  (2) the accuracy of the agency’s estimate                Elmore counties, Alabama.                                                     Further, if an intervenor files comments
                                                  of the burden and cost of the collection                    g. Filed Pursuant to: Federal Power                                        or documents with the Commission
                                                  of information, including the validity of                Act, 16 U.S.C. 791a–825r.                                                     relating to the merits of an issue that
                                                  the methodology and assumptions used;                       h. Applicant Contact: David                                                may affect the responsibilities of a
                                                  (3) ways to enhance the quality, utility                 Anderson, (205) 257–1398, dkanders@                                           particular resource agency, they must
                                                  and clarity of the information collection;               southernco.com.                                                               also serve a copy of the document on
                                                  and (4) ways to minimize the burden of                      i. FERC Contact: Krista Sakallaris,                                        that resource agency.
                                                  the collection of information on those                   (202) 502–6302, krista.sakallaris@                                               k. Description of Request: The
                                                  who are to respond, including the use                    ferc.gov.                                                                     licensee filed for Commission approval
                                                  of automated collection techniques or                       j. Deadline for filing comments,                                           a revised Shoreline Management Plan
                                                  other forms of information technology.                   motions to intervene, and protests: May                                       pursuant to Article 412 of the license
                                                    Dated: March 31, 2017.                                 1, 2017.                                                                      order issued December 17, 2015. The
                                                  Kimberly D. Bose,                                           The Commission strongly encourages                                         revised plan incorporates the provisions
                                                  Secretary.                                               electronic filing. Please file comments,                                      required by Article 412 into the
                                                  [FR Doc. 2017–06847 Filed 4–5–17; 8:45 am]               motions to intervene, and protests using                                      previously approved plan, as well as
                                                                                                           the Commission’s eFiling system at                                            project boundary modifications and the
                                                  BILLING CODE 6717–01–P
                                                                                                           http://www.ferc.gov/docs-filing/                                              reclassification of some project lands.
                                                                                                           efiling.asp. Commenters can submit                                            The plan also includes three proposed
                                                  DEPARTMENT OF ENERGY                                     brief comments up to 6,000 characters,                                        changes to the project boundary, these
                                                                                                           without prior registration, using the                                         changes were previously reviewed and
                                                  Federal Energy Regulatory                                eComment system at http://                                                    acted on at the time of relicensing;
                                                  Commission                                               www.ferc.gov/docs-filing/                                                     however, Alabama Power has received
                                                                                                           ecomment.asp. You must include your                                           and provided additional information
                                                  [Project No. 349–193]                                    name and contact information at the end                                       prompting the request for potential
                                                                                                           of your comments. For assistance,                                             revision to the previously approved
                                                  Alabama Power Company; Notice of                                                                                                       plan.
                                                  Application Accepted for Filing and                      please contact FERC Online Support at
                                                  Soliciting Comments, Motions To                          FERCOnlineSupport@ferc.gov, (866)                                                l. Locations of the Application: A
                                                  Intervene, and Protests                                  208–3676 (toll free), or (202) 502–8659                                       copy of the application is available for
                                                                                                           (TTY). In lieu of electronic filing, please                                   inspection and reproduction at the
                                                    Take notice that the following                         send a paper copy to: Secretary, Federal                                      Commission’s Public Reference Room,
                                                  hydroelectric application has been filed                 Energy Regulatory Commission, 888                                             located at 888 First Street NE., Room
                                                  with the Commission and is available                     First Street NE., Washington, DC 20426.                                       2A, Washington, DC 20426, or by calling
mstockstill on DSK3G9T082PROD with NOTICES




                                                  for public inspection:                                   The first page of any filing should                                           (202) 502–8371. This filing may also be
                                                    a. Application Type: Shoreline                         include docket number P–349–193.                                              viewed on the Commission’s Web site at
                                                  Management Plan.                                         Comments emailed to Commission staff                                          http://www.ferc.gov using the
                                                    b. Project No: 349–193.                                are not considered part of the                                                ‘‘eLibrary’’ link. Enter the docket
                                                    c. Date Filed: December 19, 2016.                      Commission record.                                                            number excluding the last three digits in
                                                    5 The reductions in burden and cost shown in the       OMB-approved inventory for the reporting and                                    6 This is based on burden estimates taken from

                                                  table are the same figures as those in the current       recordkeeping requirements, now being retired.                                the Order in Docket No. RR07–11–000, P. 130.



                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000     Frm 00046        Fmt 4703       Sfmt 4703       E:\FR\FM\06APN1.SGM              06APN1


                                                                                 Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices                                            16825

                                                  the docket number field to access the                   DEPARTMENT OF ENERGY                                     Applicants: Western Massachusetts
                                                  document. You may also register online                                                                        Electric Company.
                                                  at http://www.ferc.gov/docs-filing/                     Federal Energy Regulatory                                Description: § 205(d) Rate Filing: Two
                                                  esubscription.asp to be notified via                    Commission                                            Party Interconnection Agreement with
                                                  email of new filings and issuances                                                                            Nautilus Hydro for Red Bridge to be
                                                                                                          Combined Notice of Filings #1                         effective 3/29/2017.
                                                  related to this or other pending projects.
                                                  For assistance, call 1–866–208–3676 or                     Take notice that the Commission                       Filed Date: 3/30/17.
                                                  email FERCOnlineSupport@ferc.gov, for                   received the following electric rate                     Accession Number: 20170330–5001.
                                                  TTY, call (202) 502–8659. A copy is also                filings:                                                 Comments Due: 5 p.m. ET 4/20/17.
                                                  available for inspection and                               Docket Numbers: ER10–2507–011.                        Docket Numbers: ER17–1341–000.
                                                  reproduction at the address in item (h)                    Applicants: Westar Energy, Inc.                       Applicants: Southwest Power Pool,
                                                  above. Agencies may obtain copies of                       Description: Notice of Non-Material                Inc.
                                                                                                          Change in Status of Westar Energy, Inc.                  Description: § 205(d) Rate Filing: 3313
                                                  the application directly from the
                                                                                                             Filed Date: 3/29/17.                               WAPA & Grand Electric Coop
                                                  applicant.
                                                                                                             Accession Number: 20170329–5285.                   Interconnection Agreement to be
                                                     m. Individuals desiring to be included                                                                     effective 3/1/2017.
                                                                                                             Comments Due: 5 p.m. ET 4/19/17.
                                                  on the Commission’s mailing list should                                                                          Filed Date: 3/30/17.
                                                  so indicate by writing to the Secretary                    Docket Numbers: ER17–1335–000.                        Accession Number: 20170330–5005.
                                                  of the Commission.                                         Applicants: Western Massachusetts                     Comments Due: 5 p.m. ET 4/20/17.
                                                                                                          Electric Company.
                                                     n. Comments, Protests, or Motions to                    Description: § 205(d) Rate Filing: Two                Docket Numbers: ER17–1342–000.
                                                  Intervene: Anyone may submit                                                                                     Applicants: Duke Energy Florida, LLC
                                                                                                          Party Interconnection Agreement with
                                                  comments, a protest, or a motion to                                                                              Description: § 205(d) Rate Filing: Joint
                                                                                                          Nautilus Hydro for Dwight Hydro to be
                                                  intervene in accordance with the                                                                              OATT Real Power Loss (DEF) 2017 to be
                                                                                                          effective 3/29/2017.
                                                  requirements of Rules of Practice and                                                                         effective 5/1/2017.
                                                                                                             Filed Date: 3/29/17.
                                                                                                                                                                   Filed Date: 3/30/17.
                                                  Procedure, 18 CFR 385.210, .211, .214,                     Accession Number: 20170329–5236.
                                                                                                                                                                   Accession Number: 20170330–5036.
                                                  respectively. In determining the                           Comments Due: 5 p.m. ET 4/19/17.
                                                                                                                                                                   Comments Due: 5 p.m. ET 4/20/17.
                                                  appropriate action to take, the                            Docket Numbers: ER17–1336–000.
                                                                                                                                                                   Docket Numbers: ER17–1343–000.
                                                  Commission will consider all protests or                   Applicants: Western Massachusetts                     Applicants: Midcontinent
                                                  other comments filed, but only those                    Electric Company.                                     Independent System Operator, Inc.
                                                  who file a motion to intervene in                          Description: § 205(d) Rate Filing: Two                Description: § 205(d) Rate Filing:
                                                  accordance with the Commission’s                        Party Interconnection Agreement with                  2017–03–30_SA 1136 NSP–GM GIA
                                                  Rules may become a party to the                         Nautilus Hydro for Gardners Falls to be               (G171 G242 G239 J554) to be effective 3/
                                                  proceeding. Any comments, protests, or                  effective 3/29/2017.                                  16/2017.
                                                  motions to intervene must be received                      Filed Date: 3/29/17.                                  Filed Date: 3/30/17.
                                                  on or before the specified comment date                    Accession Number: 20170329–5245.                      Accession Number: 20170330–5091.
                                                  for the particular application.                            Comments Due: 5 p.m. ET 4/19/17.                      Comments Due: 5 p.m. ET 4/20/17.
                                                                                                             Docket Numbers: ER17–1337–000.                        Docket Numbers: ER17–1344–000.
                                                     o. Filing and Service of Documents:
                                                                                                             Applicants: California Independent                    Applicants: Public Service Company
                                                  Any filing must (1) bear in all capital
                                                                                                          System Operator Corporation.                          of Colorado.
                                                  letters the title ‘‘COMMENTS’’,                            Description: § 205(d) Rate Filing:
                                                  ‘‘PROTEST’’, or ‘‘MOTION TO                                                                                      Description: § 205(d) Rate Filing:
                                                                                                          2017–03–27 Extension of PIRP                          OATT Attach T—Form of Svc Agrmt for
                                                  INTERVENE’’ as applicable; (2) set forth                Protective Measures Amendment to be
                                                  in the heading the name of the applicant                                                                      BAAS to be effective 5/30/2017.
                                                                                                          effective 5/1/2017.                                      Filed Date: 3/30/17.
                                                  and the project number of the                              Filed Date: 3/29/17.                                  Accession Number: 20170330–5095.
                                                  application to which the filing                            Accession Number: 20170329–5249.                      Comments Due: 5 p.m. ET 4/20/17.
                                                  responds; (3) furnish the name, address,                   Comments Due: 5 p.m. ET 4/19/17.
                                                  and telephone number of the person                                                                               The filings are accessible in the
                                                                                                             Docket Numbers: ER17–1338–000.                     Commission’s eLibrary system by
                                                  commenting, protesting or intervening;                     Applicants: Western Massachusetts                  clicking on the links or querying the
                                                  and (4) otherwise comply with the                       Electric Company.                                     docket number.
                                                  requirements of 18 CFR 385.2001                            Description: § 205(d) Rate Filing: Two                Any person desiring to intervene or
                                                  through 385.2005. All comments,                         Party Interconnection Agreement with                  protest in any of the above proceedings
                                                  motions to intervene, or protests must                  Nautilus Hydro for Indian Orchard to be               must file in accordance with Rules 211
                                                  set forth their evidentiary basis. Any                  effective 3/29/2017.                                  and 214 of the Commission’s
                                                  filing made by an intervenor must be                       Filed Date: 3/29/17.                               Regulations (18 CFR 385.211 and
                                                  accompanied by proof of service on all                     Accession Number: 20170329–5255.                   385.214) on or before 5:00 p.m. Eastern
                                                  persons listed in the service list                         Comments Due: 5 p.m. ET 4/19/17.                   time on the specified comment date.
                                                  prepared by the Commission in this                         Docket Numbers: ER17–1339–000.                     Protests may be considered, but
                                                  proceeding, in accordance with 18 CFR                      Applicants: Western Massachusetts                  intervention is necessary to become a
                                                  385.2010.                                               Electric Company.                                     party to the proceeding.
                                                                                                             Description: § 205(d) Rate Filing: Two                eFiling is encouraged. More detailed
mstockstill on DSK3G9T082PROD with NOTICES




                                                    Dated: March 31, 2017.
                                                                                                          Party Interconnection Agreement with                  information relating to filing
                                                  Kimberly D. Bose,                                       Nautilus Hydro for Putts Bridge to be                 requirements, interventions, protests,
                                                  Secretary.                                              effective 3/29/2017.                                  service, and qualifying facilities filings
                                                  [FR Doc. 2017–06845 Filed 4–5–17; 8:45 am]                 Filed Date: 3/30/17.                               can be found at: http://www.ferc.gov/
                                                  BILLING CODE 6717–01–P                                     Accession Number: 20170330–5000.                   docs-filing/efiling/filing-req.pdf. For
                                                                                                             Comments Due: 5 p.m. ET 4/20/17.                   other information, call (866) 208–3676
                                                                                                             Docket Numbers: ER17–1340–000.                     (toll free). For TTY, call (202) 502–8659.


                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000   Frm 00047   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1



Document Created: 2017-04-06 01:46:41
Document Modified: 2017-04-06 01:46:41
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 16824 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR