82_FR_16892 82 FR 16827 - Notice of Commission Staff Attendance

82 FR 16827 - Notice of Commission Staff Attendance

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 65 (April 6, 2017)

Page Range16827-16828
FR Document2017-06843

Federal Register, Volume 82 Issue 65 (Thursday, April 6, 2017)
[Federal Register Volume 82, Number 65 (Thursday, April 6, 2017)]
[Notices]
[Pages 16827-16828]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-06843]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission's staff may attend the following 
meetings related to the transmission planning activities of the New 
York Independent System Operator, Inc. (NYISO):

NYISO Electric System Planning Working Group Meeting

April 6, 2017, 1:00 p.m.-4:00 p.m. (EST).

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: http://www.nyiso.com/public/committees/documents.jsp?com=bic_espwg&directory=2017-04-03.

[[Page 16828]]

NYISO Business Issues Committee Meeting

April 12, 2017, 10:00 a.m.-1:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: http://www.nyiso.com/public/committees/documents.jsp?com=bic&directory=2017-04-12.

NYISO Operating Committee Meeting

April 12, 2017, 1:00 p.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: http://www.nyiso.com/public/committees/documents.jsp?com=oc&directory=2017-04-12.

NYISO Electric System Planning Working Group Meeting

April 19, 2017, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: http://www.nyiso.com/public/committees/documents.jsp?com=bic_espwg&directory=2017-04-19.

NYISO Management Committee Meeting

April 26, 2017, 10:00 a.m.-4:00 p.m. (EST)

    The above-referenced meeting will be via web conference and 
teleconference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: http://www.nyiso.com/public/committees/documents.jsp?com=mc&directory=2017-04-26.
    The discussions at the meetings described above may address matters 
at issue in the following proceedings:
    New York Independent System Operator, Inc., Docket No. ER13-102.
    New York Independent System Operator, Inc., Docket No. ER15-2059.
    New York Transco, LLC, Docket No. ER15-572.
    For more information, contact James Eason, Office of Energy Market 
Regulation, Federal Energy Regulatory Commission at (202) 502-8622 or 
[email protected].

    Dated: March 31, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-06843 Filed 4-5-17; 8:45 am]
 BILLING CODE 6717-01-P



                                                                                 Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices                                                 16827

                                                     Filed Date: 3/31/17.                                    Comments Due: 5 p.m. ET 4/21/17.                      Docket Numbers: ES17–15–000.
                                                     Accession Number: 20170331–5185.                        Docket Numbers: ER17–1355–000.                        Applicants: ISO New England Inc.
                                                     Comments Due: 5 p.m. ET 4/21/17.                        Applicants: AEP Texas Inc.                            Description: ISO New England Inc.
                                                     Docket Numbers: ER16–2360–003.                          Description: § 205(d) Rate Filing: AEP             Application Under Section 204 of the
                                                     Applicants: Great Western Wind                       TX—Texas-New Mexico Power                             Federal Power Act for an Order
                                                  Energy, LLC.                                            Interconnection Agreement to be                       Authorizing Future Drawdowns Under
                                                     Description: Notice of Non-Material                  effective 3/15/2017.                                  Existing Authorized Securities.
                                                  Change in Status of Great Western Wind                     Filed Date: 3/31/17.                                  Filed Date: 3/31/17.
                                                  Energy, LLC.                                               Accession Number: 20170331–5105.                      Accession Number: 20170331–5166.
                                                     Filed Date: 3/30/17.                                    Comments Due: 5 p.m. ET 4/21/17.                      Comments Due: 5 p.m. ET 4/21/17.
                                                     Accession Number: 20170330–5363.                        Docket Numbers: ER17–1356–000.                        The filings are accessible in the
                                                     Comments Due: 5 p.m. ET 4/20/17.                        Applicants: AEP Texas Inc.                         Commission’s eLibrary system by
                                                     Docket Numbers: ER17–734–001.                           Description: § 205(d) Rate Filing: AEP             clicking on the links or querying the
                                                     Applicants: Entergy Louisiana Power,                 TX—RES Cactus Flats Wind                              docket number.
                                                  LLC.                                                    Interconnection Agreement to be                          Any person desiring to intervene or
                                                     Description: Tariff Amendment:                       effective 3/15/2017.                                  protest in any of the above proceedings
                                                  Cancellation of CID to be effective 12/                    Filed Date: 3/31/17.                               must file in accordance with Rules 211
                                                  31/9998.                                                   Accession Number: 20170331–5108.                   and 214 of the Commission’s
                                                     Filed Date: 3/30/17.                                    Comments Due: 5 p.m. ET 4/21/17.                   Regulations (18 CFR 385.211 and
                                                     Accession Number: 20170330–5305.                        Docket Numbers: ER17–1357–000.                     § 385.214) on or before 5:00 p.m. Eastern
                                                     Comments Due: 5 p.m. ET 4/20/17.                        Applicants: Duke Energy Progress,                  time on the specified comment date.
                                                     Docket Numbers: ER17–1350–000.                       LLC, Duke Energy Carolinas, LLC.                      Protests may be considered, but
                                                     Applicants: Entergy Louisiana, LLC.                     Description: § 205(d) Rate Filing: Joint           intervention is necessary to become a
                                                     Description: § 205(d) Rate Filing:                   OATT DEP and DEC Real Power Loss                      party to the proceeding.
                                                  ELL–SRMPA 13th Extension of Interim                     Factor Filing to be effective 6/1/2017.                  eFiling is encouraged. More detailed
                                                  Agreement to be effective 4/1/2017.                        Filed Date: 3/31/17.                               information relating to filing
                                                     Filed Date: 3/30/17.                                    Accession Number: 20170331–5127.                   requirements, interventions, protests,
                                                                                                             Comments Due: 5 p.m. ET 4/21/17.                   service, and qualifying facilities filings
                                                     Accession Number: 20170330–5304.
                                                     Comments Due: 5 p.m. ET 4/20/17.                        Docket Numbers: ER17–1358–000.                     can be found at: http://www.ferc.gov/
                                                                                                             Applicants: PJM Interconnection,                   docs-filing/efiling/filing-req.pdf. For
                                                     Docket Numbers: ER17–1351–000.
                                                                                                          L.L.C.                                                other information, call (866) 208–3676
                                                     Applicants: Scrubgrass Generating
                                                                                                             Description: § 205(d) Rate Filing:                 (toll free). For TTY, call (202) 502–8659.
                                                  Company, L.P.
                                                                                                          Amendment to Service Agreement No.                      Dated: March 31, 2017.
                                                     Description: § 205(d) Rate Filing: CIS
                                                                                                          4608; Queue No. AB1–027 to be                         Kimberly D. Bose,
                                                  re Q Power to be effective 3/31/2017.
                                                                                                          effective 1/4/2017.
                                                     Filed Date: 3/30/17.                                    Filed Date: 3/31/17.                               Secretary.
                                                     Accession Number: 20170330–5308.                        Accession Number: 20170331–5192.                   [FR Doc. 2017–06841 Filed 4–5–17; 8:45 am]
                                                     Comments Due: 5 p.m. ET 4/20/17.                        Comments Due: 5 p.m. ET 4/21/17.                   BILLING CODE 6717–01–P
                                                     Docket Numbers: ER17–1352–000.                          Docket Numbers: ER17–1359–000.
                                                     Applicants: Southwest Power Pool,                       Applicants: Avista Corporation.
                                                  Inc.                                                       Description: Notice of Termination of              DEPARTMENT OF ENERGY
                                                     Description: § 205(d) Rate Filing:                   Transmission Service Agreement No.
                                                  1276R13 Kansas City Power & Light                                                                             Federal Energy Regulatory
                                                                                                          T1082–5 of Avista Corporation.                        Commission
                                                  Company NITSA and NOA to be                                Filed Date: 3/31/17.
                                                  effective 3/1/2017.                                        Accession Number: 20170331–5207.                   Notice of Commission Staff
                                                     Filed Date: 3/30/17.                                    Comments Due: 5 p.m. ET 4/21/17.                   Attendance
                                                     Accession Number: 20170330–5322.                        Docket Numbers: ER17–1360–000.
                                                     Comments Due: 5 p.m. ET 4/20/17.                        Applicants: Midcontinent                              The Federal Energy Regulatory
                                                     Docket Numbers: ER17–1353–000.                       Independent System Operator, Inc.                     Commission (Commission) hereby gives
                                                     Applicants: PJM Interconnection,                        Description: § 205(d) Rate Filing:                 notice that members of the
                                                  L.L.C., Pennsylvania Electric Company,                  2017–03–31_SA 2931 ATC-Wisconsin                      Commission’s staff may attend the
                                                  Mid-Atlantic Interstate Transmission,                   Power & Light Amended E&P (J390) to                   following meetings related to the
                                                  LL.                                                     be effective 3/30/2017.                               transmission planning activities of the
                                                     Description: § 205(d) Rate Filing:                      Filed Date: 3/31/17.                               New York Independent System
                                                  MAIT and Penelec submit engineering                        Accession Number: 20170331–5241.                   Operator, Inc. (NYISO):
                                                  and construction services agreement No.                    Comments Due: 5 p.m. ET 4/21/17.                   NYISO Electric System Planning
                                                  4558 to be effective 4/1/2017.                             Docket Numbers: ER17–1361–000.                     Working Group Meeting
                                                     Filed Date: 3/30/17.                                    Applicants: Public Service Company
                                                     Accession Number: 20170330–5336.                     of New Mexico.                                        April 6, 2017, 1:00 p.m.–4:00 p.m.
                                                     Comments Due: 5 p.m. ET 4/20/17.                        Description: § 205(d) Rate Filing:                 (EST).
                                                     Docket Numbers: ER17–1354–000.                       Annual Real Power Loss Factor Filing                    The above-referenced meeting will be
mstockstill on DSK3G9T082PROD with NOTICES




                                                     Applicants: Consolidated Edison                      for 2017 to be effective 6/1/2017.                    via web conference and teleconference.
                                                  Company of New York, Inc.                                  Filed Date: 3/31/17.                                 The above-referenced meeting is open
                                                     Description: § 205(d) Rate Filing:                      Accession Number: 20170331–5261.                   to stakeholders.
                                                  Clean Energy Surcharge to be effective                     Comments Due: 5 p.m. ET 4/21/17.                     Further information may be found at:
                                                  4/1/2017.                                                  Take notice that the Commission                    http://www.nyiso.com/public/
                                                     Filed Date: 3/31/17.                                 received the following electric securities            committees/documents.jsp?com=bic_
                                                     Accession Number: 20170331–5001.                     filings:                                              espwg&directory=2017-04-03.


                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000   Frm 00049   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1


                                                  16828                          Federal Register / Vol. 82, No. 65 / Thursday, April 6, 2017 / Notices

                                                  NYISO Business Issues Committee                           Dated: March 31, 2017.                              Power Administration, Department of
                                                  Meeting                                                 Kimberly D. Bose,                                     Energy, 1166 Athens Tech Road,
                                                                                                          Secretary.                                            Elberton, Georgia 30635, (706) 213–
                                                  April 12, 2017, 10:00 a.m.–1:00 p.m.
                                                                                                          [FR Doc. 2017–06843 Filed 4–5–17; 8:45 am]            3838.
                                                  (EST)
                                                                                                          BILLING CODE 6717–01–P                                SUPPLEMENTARY INFORMATION:      The
                                                    The above-referenced meeting will be                                                                        Federal Energy Regulatory Commission
                                                  via web conference and teleconference.                                                                        (FERC) confirmed and approved on a
                                                    The above-referenced meeting is open                  DEPARTMENT OF ENERGY                                  final basis Wholesale Power Rate
                                                  to stakeholders.                                                                                              Schedules SOCO–1–E, SOCO–2–E,
                                                                                                          Southeastern Power Administration
                                                    Further information may be found at:                                                                        SOCO–3–E, SOCO–4–E, ALA–1–N,
                                                  http://www.nyiso.com/public/                            Proposed Rate Adjustment, Public                      MISS–1–N, Duke–1–E, Duke–2–E,
                                                  committees/documents.jsp?com=                           Forum, and Opportunities for Public                   Duke–3–E, Duke–4–E, Santee–1–E,
                                                  bic&directory=2017-04-12.                               Review and Comment for Georgia-                       Santee–2–E, Santee–3–E, Santee–4–E,
                                                  NYISO Operating Committee Meeting                       Alabama-South Carolina System of                      SCE&G–1–E, SCE&G–2–E, SCE&G–3–E,
                                                                                                          Projects                                              SCE&G–4–E, Pump–1–A, Pump–2,
                                                  April 12, 2017, 1:00 p.m.–4:00 p.m.                                                                           Regulation–1, and Replacement–1
                                                  (EST)                                                   AGENCY: Southeastern Power                            applicable to Georgia-Alabama-South
                                                                                                          Administration, DOE.                                  Carolina System of Projects’ power for a
                                                    The above-referenced meeting will be                  ACTION: Notice of proposed rate.
                                                  via web conference and teleconference.                                                                        period ending September 30, 2017. (143
                                                                                                          SUMMARY:    Southeastern Power                        FERC ¶ 62,002; Apr. 2, 2013).
                                                    The above-referenced meeting is open
                                                  to stakeholders.                                        Administration (Southeastern) proposes                   Discussion: The Georgia-Alabama-
                                                                                                          to revise existing schedules of rates and             South Carolina System (System)
                                                    Further information may be found at:                                                                        consists of ten projects in or on the
                                                  http://www.nyiso.com/public/                            charges applicable to the sale of power
                                                                                                          from the Georgia-Alabama-South                        border of the states of Georgia, Alabama,
                                                  committees/documents.jsp?com=                                                                                 and South Carolina. The power
                                                  oc&directory=2017-04-12.                                Carolina System of Projects effective for
                                                                                                          a 5-year period, October 1, 2017,                     generated at these projects is sold to 170
                                                  NYISO Electric System Planning                          through September 30, 2022.                           preference entities serving 203
                                                  Working Group Meeting                                   Additionally, opportunities will be                   preference customers in Alabama,
                                                                                                          available for interested persons to                   Florida, Georgia, Mississippi, South
                                                  April 19, 2017, 10:00 a.m.–4:00 p.m.                                                                          Carolina, and North Carolina. The
                                                  (EST)                                                   review the present rates and the
                                                                                                          proposed rates and supporting studies,                System provides 2,184,232 kilowatts of
                                                    The above-referenced meeting will be                  to participate in a public forum and to               capacity and about 3,381,000 MWh of
                                                  via web conference and teleconference.                  submit written comments. Southeastern                 average annual energy from stream-flow
                                                    The above-referenced meeting is open                  will evaluate all comments received in                based on modeling for the period of
                                                  to stakeholders.                                        this process.                                         record.
                                                    Further information may be found at:                  DATES: Written comments are due on or
                                                                                                                                                                   Existing rate schedules are predicated
                                                  http://www.nyiso.com/public/                            before July 5, 2017. A public                         upon a July 2012 repayment study and
                                                  committees/documents.jsp?com=bic_                       information and comment forum will be                 other supporting data. A repayment
                                                  espwg&directory=2017-04-19.                             held in Savannah, Georgia, at 2:30 p.m.               study prepared in February of 2017
                                                                                                          on May 9, 2017. Persons desiring to                   shows that existing rates meet
                                                  NYISO Management Committee                                                                                    repayment criteria and would generate a
                                                  Meeting                                                 attend the forum should notify
                                                                                                          Southeastern by May 2, 2017, so that a                large surplus.
                                                  April 26, 2017, 10:00 a.m.–4:00 p.m.                    list of forum participants can be                        The revised repayment study shows
                                                  (EST)                                                   prepared. Persons desiring to speak at                that a revenue reduction of $18,991,000
                                                                                                          the forum should specify this in their                in Fiscal Year 2018 and all future years
                                                     The above-referenced meeting will be                                                                       over the current repayment study will
                                                  via web conference and teleconference.                  notification to Southeastern; others may
                                                                                                          speak if time permits. If Southeastern                result in all costs being repaid within
                                                     The above-referenced meeting is open                                                                       the term of these rate schedules or their
                                                                                                          has not been notified by close of
                                                  to stakeholders.                                                                                              service life. The revenue requirement is
                                                                                                          business on May 2, 2017, that at least
                                                     Further information may be found at:                 one person intends to be present at the               $200,000,000 per year. Southeastern is
                                                  http://www.nyiso.com/public/                            forum, the forum may be canceled with                 proposing to revise the existing rate
                                                  committees/documents.jsp?com=                           no further notice.                                    schedules to generate this revenue. The
                                                  mc&directory=2017-04-26.                                                                                      rate adjustment reduces the Revenue
                                                                                                          ADDRESSES: Written comments should
                                                     The discussions at the meetings                      be submitted to: Administrator,                       Requirement by about nine percent
                                                  described above may address matters at                  Southeastern Power Administration,                    (9%). To collect this reduced revenue
                                                  issue in the following proceedings:                     Department of Energy, 1166 Athens                     requirement, rates for capacity have
                                                     New York Independent System                          Tech Road, Elberton, Georgia, 30635–                  been reduced by fifteen percent (15%).
                                                  Operator, Inc., Docket No. ER13–102.                    6711. The public information and                      The current energy rate will be
                                                     New York Independent System                          comment forum for the Georgia-                        extended.
                                                  Operator, Inc., Docket No. ER15–2059.                   Alabama-South Carolina System of                         This rate reduction is due to
mstockstill on DSK3G9T082PROD with NOTICES




                                                     New York Transco, LLC, Docket No.                    Projects will be at the DoubleTree Hotel              capitalized deficits that were unpaid in
                                                  ER15–572.                                               Savannah Historic District, 411 West                  2012 being recovered, and required
                                                                                                          Bay Street, Savannah, Georgia 31401,                  payments due in the last five years
                                                     For more information, contact James
                                                                                                          Phone: (912) 790–7000.                                being met.1 Southeastern is proposing
                                                  Eason, Office of Energy Market
                                                  Regulation, Federal Energy Regulatory                   FOR FURTHER INFORMATION CONTACT:                        1 In 2012, Southeastern had large repayment
                                                  Commission at (202) 502–8622 or                         Virgil Hobbs, Assistant Administrator,                obligations on two system projects as well as
                                                  James.Eason@ferc.gov.                                   Finance & Marketing, Southeastern                     outstanding capitalized deferred expenses. These



                                             VerDate Sep<11>2014   18:51 Apr 05, 2017   Jkt 241001   PO 00000   Frm 00050   Fmt 4703   Sfmt 4703   E:\FR\FM\06APN1.SGM   06APN1



Document Created: 2017-04-06 01:46:43
Document Modified: 2017-04-06 01:46:43
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 16827 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR