82_FR_17301 82 FR 17234 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

82 FR 17234 - Merchant Hydro Developers, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission

Federal Register Volume 82, Issue 67 (April 10, 2017)

Page Range17234-17234
FR Document2017-07089

Federal Register, Volume 82 Issue 67 (Monday, April 10, 2017)
[Federal Register Volume 82, Number 67 (Monday, April 10, 2017)]
[Notices]
[Page 17234]
From the Federal Register Online  [www.thefederalregister.org]
[FR Doc No: 2017-07089]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14823-000]


Merchant Hydro Developers, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On January 18, 2017, Merchant Hydro Developers, LLC, filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act (FPA), proposing to study the feasibility of the 
Bacon Ridge Pumped Storage Hydro Project to be located near Snyder 
Township in Blair County, Pennsylvania. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A new 
upper reservoir with a surface area of 110 acres and a storage capacity 
of 1,650 acre-feet at a surface elevation of approximately 2,480 feet 
above mean sea level (msl) created through construction of a new 
roller-compacted concrete or rock-fill dam; (2) a new lower reservoir 
with a surface area of 43 acres and a storage capacity of 1,980 acre-
feet at a surface elevation of 1,620 feet msl; (3) a new 4,840-foot-
long, 48-inch-diameter penstock connecting the upper and lower 
reservoirs; (4) a new 150-foot-long, 50-foot-wide, 25-foot-high 
powerhouse containing two turbine-generator units with a total rated 
capacity of 116 megawatts; (5) a new 4,824-foot-long transmission line 
connecting the powerhouse to the Sandy Ridge Wind Farm 115/34.5-
kilovolt circuit; and (6) appurtenant facilities. The proposed project 
would have an annual generation of 424,616 megawatt-hours.
    Applicant Contact: Adam Rousselle, Merchant Hydro Developers, LLC, 
5710 Oak Crest Drive, Doylestown, PA 18902; phone: 267-254-6107.
    FERC Contact: Woohee Choi; phone: (202) 502-6336.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-14823-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14823) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: April 4, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017-07089 Filed 4-7-17; 8:45 am]
BILLING CODE 6717-01-P



                                                    17234                          Federal Register / Vol. 82, No. 67 / Monday, April 10, 2017 / Notices

                                                      Filed Date: 03/31/2017.                               feet above mean sea level (msl) created                 Dated: April 4, 2017.
                                                      Accession Number: 20170331–5461.                      through construction of a new roller-                 Kimberly D. Bose,
                                                      Comment Date: 5:00 p.m. Eastern                       compacted concrete or rock-fill dam; (2)              Secretary.
                                                    Time on Wednesday, April 12, 2017.                      a new lower reservoir with a surface                  [FR Doc. 2017–07089 Filed 4–7–17; 8:45 am]
                                                       The filings are accessible in the                    area of 43 acres and a storage capacity               BILLING CODE 6717–01–P
                                                    Commission’s eLibrary system by                         of 1,980 acre-feet at a surface elevation
                                                    clicking on the links or querying the                   of 1,620 feet msl; (3) a new 4,840-foot-
                                                    docket number.                                          long, 48-inch-diameter penstock                       DEPARTMENT OF ENERGY
                                                       Any person desiring to intervene or                  connecting the upper and lower
                                                    protest in any of the above proceedings                 reservoirs; (4) a new 150-foot-long, 50-              Federal Energy Regulatory
                                                    must file in accordance with Rules 211                  foot-wide, 25-foot-high powerhouse                    Commission
                                                    and 214 of the Commission’s                             containing two turbine-generator units                [Docket No. EL17–59–000]
                                                    Regulations (18 CFR 385.211 and                         with a total rated capacity of 116
                                                    § 385.214) on or before 5:00 p.m. Eastern               megawatts; (5) a new 4,824-foot-long                  Joint California Complainants v.
                                                    time on the specified comment date.                     transmission line connecting the                      Pacific Gas and Electric Company;
                                                    Protests may be considered, but                         powerhouse to the Sandy Ridge Wind                    Notice of Complaint
                                                    intervention is necessary to become a                   Farm 115/34.5-kilovolt circuit; and (6)                  Take notice that on March 31, 2017,
                                                    party to the proceeding.                                appurtenant facilities. The proposed                  pursuant to sections 206 and 212 of the
                                                       eFiling is encouraged. More detailed                 project would have an annual                          Federal Energy Regulatory
                                                    information relating to filing                          generation of 424,616 megawatt-hours.                 Commission’s (Commission) Rules of
                                                    requirements, interventions, protests,
                                                                                                               Applicant Contact: Adam Rousselle,                 Practice and Procedure, 18 CFR 385.206
                                                    service, and qualifying facilities filings
                                                                                                            Merchant Hydro Developers, LLC, 5710                  and 385.212 (2016) and section 206 of
                                                    can be found at: http://www.ferc.gov/
                                                                                                            Oak Crest Drive, Doylestown, PA 18902;                the Federal Power Act, 16 U.S.C. 824(e)
                                                    docs-filing/efiling/filing-req.pdf. For
                                                                                                            phone: 267–254–6107.                                  (2012), Joint California Complainants
                                                    other information, call (866) 208–3676
                                                                                                                                                                  (Complainant) 1 filed a formal complaint
                                                    (toll free). For TTY, call (202) 502–8659.                 FERC Contact: Woohee Choi; phone:
                                                                                                                                                                  against Pacific Gas and Electric
                                                      Dated: April 3, 2017.                                 (202) 502–6336.                                       Company (PG&E or Respondent)
                                                    Kimberly D. Bose,                                          Deadline for filing comments, motions              requesting that the Commission launch
                                                    Secretary.                                              to intervene, competing applications                  an investigation into PG&E’s
                                                    [FR Doc. 2017–07039 Filed 4–7–17; 8:45 am]              (without notices of intent), or notices of            Transmission Owner rates and establish
                                                    BILLING CODE 6717–01–P                                  intent to file competing applications: 60             the earliest possible refund effective
                                                                                                            days from the issuance of this notice.                date, all as more fully explained in the
                                                                                                            Competing applications and notices of                 complaint.
                                                    DEPARTMENT OF ENERGY                                    intent must meet the requirements of 18                  The Complainants states that a copy
                                                                                                            CFR 4.36.                                             of the complaint has been served on the
                                                    Federal Energy Regulatory                                                                                     Respondent.
                                                    Commission                                                 The Commission strongly encourages
                                                                                                                                                                     Any person desiring to intervene or to
                                                                                                            electronic filing. Please file comments,
                                                    [Project No. 14823–000]                                                                                       protest this filing must file in
                                                                                                            motions to intervene, notices of intent,
                                                                                                                                                                  accordance with Rules 211 and 214 of
                                                                                                            and competing applications using the                  the Commission’s Rules of Practice and
                                                    Merchant Hydro Developers, LLC;
                                                                                                            Commission’s eFiling system at http://                Procedure (18 CFR 385.211, 385.214).
                                                    Notice of Preliminary Permit
                                                    Application Accepted for Filing and                     www.ferc.gov/docs-filing/efiling.asp.                 Protests will be considered by the
                                                    Soliciting Comments, Motions To                         Commenters can submit brief comments                  Commission in determining the
                                                    Intervene, and Competing Applications                   up to 6,000 characters, without prior                 appropriate action to be taken, but will
                                                                                                            registration, using the eComment system               not serve to make protestants parties to
                                                       On January 18, 2017, Merchant Hydro                  at http://www.ferc.gov/docs-filing/                   the proceeding. Any person wishing to
                                                    Developers, LLC, filed an application for               ecomment.asp. You must include your                   become a party must file a notice of
                                                    a preliminary permit, pursuant to                       name and contact information at the end               intervention or motion to intervene, as
                                                    section 4(f) of the Federal Power Act                   of your comments. For assistance,                     appropriate. The Respondent’s answer
                                                    (FPA), proposing to study the feasibility               please contact FERC Online Support at                 and all interventions, or protests must
                                                    of the Bacon Ridge Pumped Storage                       FERCOnlineSupport@ferc.gov, (866)                     be filed on or before the comment date.
                                                    Hydro Project to be located near Snyder                 208–3676 (toll free), or (202) 502–8659               The Respondent’s answer, motions to
                                                    Township in Blair County,                               (TTY). In lieu of electronic filing, please           intervene, and protests must be served
                                                    Pennsylvania. The sole purpose of a                     send a paper copy to: Secretary, Federal              on the Complainants.
                                                    preliminary permit, if issued, is to grant              Energy Regulatory Commission, 888                        The Commission encourages
                                                    the permit holder priority to file a                    First Street NE., Washington, DC 20426.               electronic submission of protests and
                                                    license application during the permit                   The first page of any filing should                   interventions in lieu of paper using the
                                                    term. A preliminary permit does not                     include docket number P–14823–000.                    ‘‘eFiling’’ link at http://www.ferc.gov.
                                                    authorize the permit holder to perform                                                                        Persons unable to file electronically
                                                    any land-disturbing activities or                          More information about this project,
asabaliauskas on DSK3SPTVN1PROD with NOTICES




                                                                                                            including a copy of the application, can              should submit an original and 5 copies
                                                    otherwise enter upon lands or waters
                                                    owned by others without the owners’                     be viewed or printed on the ‘‘eLibrary’’                1 The Joint Californian Complainants include the
                                                    express permission.                                     link of Commission’s Web site at http://              following parties: The Transmission Agency of
                                                       The proposed project would consist of                www.ferc.gov/docs-filing/elibrary.asp.                Northern California; the City of Santa Clara,
                                                    the following: (1) A new upper reservoir                Enter the docket number (P–14823) in                  California; the M–S–R Public Power Agency; the
                                                                                                            the docket number field to access the                 State Water Contractors; the California Public
                                                    with a surface area of 110 acres and a                                                                        Utilities Commission; the Modesto Irrigation
                                                    storage capacity of 1,650 acre-feet at a                document. For assistance, contact FERC                District; and the Sacramento Municipal Utility
                                                    surface elevation of approximately 2,480                Online Support.                                       District.



                                               VerDate Sep<11>2014   20:02 Apr 07, 2017   Jkt 241001   PO 00000   Frm 00057   Fmt 4703   Sfmt 4703   E:\FR\FM\10APN1.SGM   10APN1



Document Created: 2017-04-08 03:31:15
Document Modified: 2017-04-08 03:31:15
CategoryRegulatory Information
CollectionFederal Register
sudoc ClassAE 2.7:
GS 4.107:
AE 2.106:
PublisherOffice of the Federal Register, National Archives and Records Administration
SectionNotices
FR Citation82 FR 17234 

2025 Federal Register | Disclaimer | Privacy Policy
USC | CFR | eCFR